You are viewing the permanent link for the record currently in effect, published 2026-07-06.

Milliken building permits

Verified

Milliken, Colorado — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

2024 International Building Code (IBC) — Town of Milliken Inspections & Building Codes page, https://millikenco.gov/163/Inspections-Building-Codes2024 International Residential Code (IRC)2024 International Existing Building Code (IEBC)2024 International Fuel Gas Code (IFGC)2024 International Property Maintenance Code (IPMC)2024 International Mechanical Code (IMC)2024 International Plumbing Code (IPC)2024 International Swimming Pool and Spa Code (ISPSC)2023 National Electrical Code (NEC)2024 International Energy Conservation Code (IECC)2024 International Fire Code (IFC)Code Amendments and Adopting — Ordinance No. 834 (adopted December 22, 2025), which brings the Town's codes into alignment with the respective 2024 ICC editions listed aboveMilliken Municipal Code, Chapter 18 (Building Regulations)

Permit types & fees

Residential Building Permit (New Construction / Any New Structure)

Verified

Required for new single-family, duplex, or multi-family residential construction in Milliken. Categorized as a 'Residential Permit' under the Town's three-tier review-timeline structure, reviewed under the 2024 IBC/IRC as adopted via Ordinance No. 834 by the Building Department, operated under contract by SAFEbuilt (formerly ProCode Inc.).

Verified 2026-07-06 · Source

Requirements

  • Permit required for new building, addition, remodel, repair, or basement finish, per the Town's Residential Building Permit application form
  • Plans must comply with the 2024 IBC/IRC as adopted via Ordinance No. 834
  • Categorized as a 'Residential Permit' (new construction, additions, remodels, basements, decks, patio covers, detached garages, sheds over 200 sq ft, solar systems) under the Town's Building Application Process page, carrying a 10-14 business day review window
  • Contractors must be registered/licensed with the Town of Milliken via CommunityCore before permit issuance, per Municipal Code Section 6-4-10
  • Application must be submitted through the CommunityCore online portal (or in person at Town Hall for homeowners without online access)

Required documents

  • RequiredResidential Building Permit ApplicationTown of Milliken Residential Building Permit form, submitted via CommunityCore
  • RequiredRecorded DeedProof of property ownership (a Deed of Trust is not accepted)
  • RequiredTwo Plot PlansSized 8.5x11 to 11x17, showing proposed building location, distances to lot lines and existing structures, street/road identification, driveway location with length/width, and a north arrow
  • RequiredTwo Sets of Building Plans
  • RequiredTwo Sets of Engineered Foundation PlansMust bear a registered Colorado engineer's stamp
  • RequiredTwo Sets of Soils Report or Open Hole Inspection Report
  • RequiredProof of Adequate WaterCopy of issued well permit, or copy of paid water tap agreement with the public water district

Fee schedule

Fee typeAmountNotes
Building Fee — Above Grade Floors (per sq ft, 1997 UBC-derived cost table)$160.00Town of Milliken Fee Schedule, effective May 1, 2026, Chapter 18 — Building Regulations, Section 18-1-10, p.7
Building Fee — Foundation/Crawlspace (per sq ft)$15.00
Building Fee — Foundation/Unfinished Basement (per sq ft)$25.00
Building Fee — Foundation/Finished Basement (per sq ft)$70.00
Building Fee — Garage (per sq ft)$55.00
Plan Review — Residential New Single Family/Duplex30% of Building Permit Fee; repeat submittal $50
Plan Review — Residential New Multi-Family (>3 units)65% of Building Permit Fee; repeat submittal $100
Building Permit Admin. Fee10% of combined Building, Electrical, Construction Meter, and Plan Review fees
Use Tax2.5% of materials cost, collected at permit issuance
Park Fee$600.00
Trails and Open Space Fee$350.00
Public Facilities Use Fee$325.00
Street Fee — Residential$2,000.00$1,525.00 for the Frank Farms Subdivision specifically
Drainage Fee$525.00
Police Admin. Infrastructure Fee$260.00
Admin. Fee Infrastructure Fee$210.00
School Fee (RE-5J Schools) — Single Family Detached$924.00
Deferred Payment Fee$125.00Optional, if payment of fees is deferred

Residential Addition / Remodel Permit (including Basement Finish, Deck, Detached Garage)

Verified

Required for additions, remodels, basement finishes, decks, patio covers, and detached garages in Milliken. Categorized as a 'Residential Permit' under the Town's three-tier review structure, carrying the same 10-14 business day window as new construction.

Verified 2026-07-06 · Source

Requirements

  • Permit required for additions, remodels, and basement finishes, per the Town's Residential Building Permit application (purpose-of-permit checkboxes: New Building, Addition, Remodel, Repair, Basement Finish)
  • Decks, patio covers, and detached garages are explicitly listed as 'Residential Permits' on the Building Application Process page
  • Sheds larger than 200 sq ft require a permit (sheds 200 sq ft or less are grouped with the Residential Permit category per the Town's list, implying larger sheds follow the same track; sheds are exempt only via the size threshold, not the permit category)
  • All contractors must be registered with the Town via CommunityCore and be listed on the permit
  • Application requires two plot plans, two sets of building plans, and (for structural work) engineered foundation plans with a Colorado engineer's stamp

Required documents

  • RequiredResidential Building Permit ApplicationSame form used for new construction, additions, remodels, and basement finish, submitted via CommunityCore
  • RequiredTwo Plot PlansShowing the addition/deck/garage location and setbacks
  • RequiredTwo Sets of Building Plans

Fee schedule

Fee typeAmountNotes
Building Fee — Basement Finish (per sq ft)$45.00Town of Milliken Fee Schedule, effective May 1, 2026, Chapter 18, p.7
Building Fee — Covered Porch (per sq ft)$70.00
Building Fee — Covered Patio (per sq ft)$50.00
Building Fee — Deck (per sq ft)$35.00
Building Fee — Covered Deck (per sq ft)$65.00
Building Fee — Patio (per sq ft)$10.00
Building Fee — Garage (per sq ft)$55.00
Plan Review — Residential (repeat submittal)$50.00
Building Permit Admin. Fee10% of combined Building, Electrical, Construction Meter, and Plan Review fees

Electrical Permit (Electrical Service Change)

Verified

Required for electrical service changes and standalone electrical work in Milliken. Categorized as a 'Counter Permit' (24-72 hour approval) when it does not require plan review; governed by the 2023 NEC as adopted by the Town.

Verified 2026-07-06 · Source

Requirements

  • 'Electrical Service Change' is listed among the Town's Counter Permit categories (24-72 hour approval)
  • Electrical contractors must be registered with the Town of Milliken via CommunityCore, in addition to holding a current, active Colorado state electrical license
  • Homeowners may self-perform electrical work on their own residence via a notarized Homeowners Affidavit in lieu of hiring a licensed contractor

Required documents

  • RequiredElectrical Permit Application (CommunityCore)Submitted online via CommunityCore
  • OptionalHomeowners AffidavitRequired only if a homeowner is self-performing electrical work rather than hiring a licensed contractor

Fee schedule

Fee typeAmountNotes
Electrical Permit (fee per State Regulations schedule)According to State RegulationsTown of Milliken Fee Schedule, effective May 1, 2026, Chapter 18, p.7 — the Town references the state schedule directly rather than publishing its own flat electrical fee table
Electrical — Permits that do not require plan review but do require electrical work$50.00
Construction Meter$50.00
Building Permit Admin. Fee10% of combined Building, Electrical, Construction Meter, and Plan Review fees

Plumbing Permit (Water/Sewer Line Repair)

Verified

Required for water/sewer line repair in Milliken. Categorized as a 'Counter Permit' (24-72 hour approval). Governed by the 2024 IPC as adopted by the Town.

Verified 2026-07-06 · Source

Requirements

  • 'Water/sewer line repair' is listed among the Town's Counter Permit categories
  • Plumbing contractors must be registered with the Town of Milliken via CommunityCore and hold a current active Colorado state plumbing license
  • Homeowners may self-perform plumbing work on their own residence via a notarized Homeowners Affidavit

Required documents

  • RequiredPlumbing Permit Application (CommunityCore)Submitted online via CommunityCore
  • OptionalHomeowners AffidavitRequired only if a homeowner is self-performing the work

Fee schedule

Fee typeAmountNotes
Building Permit Admin. Fee10% of combined Building, Electrical, Construction Meter, and Plan Review feesTown of Milliken Fee Schedule, effective May 1, 2026, Chapter 18, p.7 — no standalone flat plumbing-permit fee line item distinct from the Admin. Fee and general Building fee table was found published

Mechanical / HVAC Permit (Furnace, Air Conditioning, Gas Fireplace)

Verified

Required for furnace, air conditioning system, and gas fireplace installation or replacement in Milliken. Categorized as a 'Counter Permit' (24-72 hour approval). Governed by the 2024 IMC/IFGC as adopted.

Verified 2026-07-06 · Source

Requirements

  • 'Water heater, furnace, AC system,' and 'gas fireplace' are each listed among the Town's Counter Permit categories
  • Mechanical contractors must be registered with the Town of Milliken via CommunityCore and hold a current active Colorado state license
  • Homeowners may self-perform mechanical work on their own residence via a notarized Homeowners Affidavit

Required documents

  • RequiredMechanical Permit Application (CommunityCore)Submitted online via CommunityCore

Fee schedule

Fee typeAmountNotes
Building Permit Admin. Fee10% of combined Building, Electrical, Construction Meter, and Plan Review feesTown of Milliken Fee Schedule, effective May 1, 2026, Chapter 18, p.7 — no standalone flat mechanical-permit fee line item distinct from the Admin. Fee was found published

Roofing Permit (Re-roofing)

Verified

Required for re-roofing in Milliken. Categorized as a 'Counter Permit' (24-72 hour approval). As of 1/1/2026, the Town requires Class 4 impact-resistant shingles for reroofs.

Verified 2026-07-06 · Source

Requirements

  • 'Re-roofing' is listed among the Town's Counter Permit categories
  • As of January 1, 2026, Class 4 shingles are required for roofs, per the Town's Building Department page
  • Roofing contractors must be registered with the Town of Milliken via CommunityCore

Required documents

  • RequiredRoofing Permit Application (CommunityCore)Submitted online via CommunityCore

Fee schedule

Fee typeAmountNotes
Building Permit Admin. Fee10% of combined Building, Electrical, Construction Meter, and Plan Review feesTown of Milliken Fee Schedule, effective May 1, 2026, Chapter 18, p.7 — no standalone flat roofing-permit fee line item was found published

Residential Solar (PV) Permit

Verified

Required for residential photovoltaic solar installation in Milliken. Categorized as a 'Residential Permit' (10-14 business days), distinct from most other standalone trade permits which fall under the faster 'Counter Permit' track. Governed by the Town's own PV Solar Submittal Checklist, administered by ProCode/SAFEbuilt.

Verified 2026-07-06 · Source

Requirements

  • Solar systems are explicitly listed among the Town's 'Residential Permits' (10-14 business day review), per the Building Application Process page
  • Layout plan showing panel placement on any structure, including path-of-travel and minimum pathway width per IRC R324.6
  • Engineered structural plan or letter with a Colorado engineer's stamp, approving design, location, and installation, stating roof load and wind load
  • Framing details for any additional framing required by the engineer; a final engineer inspection letter may be required prior to final approval
  • Equipment details/spec sheets for all installed equipment, listed and labeled per UL 1703
  • Electrical one-line diagram showing disconnects, wiring, wire sizes, piping/conduit routes and sizes, grounding details, panel schedules, and connections per NFPA 70 (NEC) Chapter 690
  • Labeling examples and locations per NEC 690

Required documents

  • RequiredResidential Building Permit Application (Solar)Submitted via CommunityCore
  • RequiredPV Layout Plan
  • RequiredEngineered Structural Plan/LetterColorado-stamped, stating roof load and wind load
  • RequiredElectrical One-Line Diagram
  • RequiredEquipment Spec Sheets (UL 1703-listed)

Fee schedule

Fee typeAmountNotes
Building Permit Admin. Fee10% of combined Building, Electrical, Construction Meter, and Plan Review feesTown of Milliken Fee Schedule, effective May 1, 2026, Chapter 18, p.7 — no standalone flat solar-permit fee line item distinct from the general Building/Electrical fee tables was found published

Electric Vehicle (EV) Charger Permit

Verified

Milliken publishes no distinct EV-charger permit type, fee, or ordinance page. Colorado HB24-1173 (2024) requires counties with population 20,000+ and municipalities with population 10,000+ to adopt a streamlined EV-charging permit process by December 31, 2025; Milliken's population (approx. 8,400 at the 2020 Census, an estimated 9,400-9,700 in 2026) sits below the 10,000-population municipal threshold, so the Town is not confirmed to be legally required to have adopted a standalone EV-charging ordinance. A new circuit, outlet, or panel/service upgrade to serve an EV charger falls under the Town's standard 'Electrical Service Change' Counter Permit (24-72 hour approval) per the Building Application Process page.

Verified 2026-07-20 · Source

Requirements

  • A new circuit, outlet, or panel/service upgrade to serve an EV charger is permitted as an 'Electrical Service Change,' listed among the Town's Counter Permit categories (24-72 hour approval)
  • Electrical contractors must be registered with the Town of Milliken via CommunityCore and hold a current, active Colorado state electrical license
  • Homeowners may self-perform the work on their own residence via a notarized Homeowners Affidavit in lieu of hiring a licensed contractor
  • No EV-specific application form, checklist, or expedited process distinct from the standard Electrical Service Change permit was found published

Required documents

  • RequiredElectrical Permit Application (CommunityCore)Submitted online via CommunityCore; describe scope as new circuit/outlet or service upgrade for EV charging
  • OptionalHomeowners AffidavitRequired only if a homeowner is self-performing the electrical work

Fee schedule

Fee typeAmountNotes
Electrical — Permits that do not require plan review but do require electrical work (applies to EV charger circuit/outlet)$50.00Town of Milliken Fee Schedule, effective May 1, 2026, Chapter 18 — no distinct EV-charger fee line exists; this is the general Counter Permit fee for standalone electrical work
Building Permit Admin. Fee10% of combined Building, Electrical, Construction Meter, and Plan Review feesTown of Milliken Fee Schedule, effective May 1, 2026, Chapter 18

Demolition Permit

Verified

Required for demolition in Milliken. Categorized as a 'Counter Permit' (24-72 hour approval) and carries its own flat fee in the Town's Fee Schedule.

Verified 2026-07-06 · Source

Requirements

  • 'Demolition' is listed among the Town's Counter Permit categories
  • Contractors must be registered with the Town of Milliken via CommunityCore

Required documents

  • RequiredDemolition Permit Application (CommunityCore)Submitted online via CommunityCore

Fee schedule

Fee typeAmountNotes
Demolition Permit$50.00Town of Milliken Fee Schedule, effective May 1, 2026, Chapter 18 — Building Regulations, Section 18-1-10, p.7

Fence / Wall Permit

Verified

Required for all new fences, replacement fences, and new or replacement fence sections in Milliken. Categorized as a 'Counter Permit' (24-72 hour approval) and free of charge to Town residents.

Verified 2026-07-06 · Source

Requirements

  • 'Fences/walls' is listed among the Town's Counter Permit categories
  • Required for all new and replacement fences, and any new or replacement fence sections, per the Town's Building Department page
  • A plot plan showing the fence/wall location on the property must be uploaded with the application

Required documents

  • RequiredFence/Wall Permit Application (CommunityCore)Submitted online via CommunityCore
  • RequiredPlot PlanShowing fence/wall location on the property

Fee schedule

Fee typeAmountNotes
Fence/Wall Permit — ResidentsFreeTown of Milliken Building Department page: 'Fence permits are free to our residents.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Milliken building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /colorado/weld-county/milliken/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: bfcb452

Reproducible from PermitBase’s version-controlled dataset, commit bfcb452.