Jacksonville building permits
Department contacts, adopted codes, permit types, fees, and gotchas for Jacksonville, Florida.
Last verified 2026-09-25 · Source · Embed this page’s badge · Version history
Building department
- Address
- 2nd Floor of the Ed Ball Building, 214 North Hogan Street, Jacksonville, FL 32202
- Phone
- 904-255-8500
- BIDDocuments@coj.net
- Office hours
- Monday through Friday, 7:00 a.m. to 4:00 p.m. The division adds that it is "closed most federal holidays". These hours sit under the division's own "Office Hours, Location, and Contact" heading, so they are recorded as the division's and not the city's.
- Website
- Official site
Codes adopted
Florida adopts construction codes statewide under Chapter 553, Part IV, Florida Statutes (the Florida Building Codes Act), administered by the Florida Building Commission. Adoption is automatic rather than local: under s. 553.73(6), F.S., "The initial adoption of, and any subsequent update or amendment to, the Florida Building Code by the commission is deemed adopted for use statewide without adoptions by local government." The edition in force is the Florida Building Code, 8th Edition (2023); the Commission states that its effective date is December 31, 2023. The Code is derived from the International Building Code as a base code, with Florida-specific amendments and supplements, and the Commission is required to update it every three years on a triennial cycle — 2026 Update materials are already being published, so the edition should be confirmed as current. Local variation runs one way only: s. 553.73, F.S. provides that "Local amendments must be more stringent than the minimum standards described in this section and must be transmitted to the commission within 30 days after enactment." Note that DBPR's own guidance describes the filing requirement differently, as submitted via the Building Code Information System "at least 30 days prior to being enforced" — the two sources state different deadlines and neither is restated here as the other. Note also a statewide carve-out on residential fire sprinklers: IRC section R313 sprinkler mandates may not be incorporated into the Code or adopted as a local amendment, except for a local government whose sprinkler ordinance has been in effect since January 1, 2010. Always confirm the edition in force and any local amendment with the jurisdiction issuing the permit.
- Florida Building Code, 8th Edition (2023) — adopted statewide under s. 553.73(6), Florida Statutes, without any act by the city. The division describes its own role as "the enforcement of the Florida Building Code and the City of Jacksonville's building ordinances".
Permit types & fees
Jacksonville's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Jacksonville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Jacksonville lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-08)
- 1,112units
514 buildings · $193.6M valuation
- Trailing 12 months
- 6,319units
12 of 12 months reported · #1 in Florida coverage by units
- Year to date (2026 YTD through 2026-08)
- 4,543units
2,855 buildings · $1,009.6M valuation
8 month(s) reported to Census
- Full year 2025
- 5,890units
3,693 buildings · $1,060.5M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-08 vintage. Census survey data — separate from the permit-requirements verification above. All Florida building activity
Tips & gotchas
- THERE IS NO PAPER ROUTE: the division states that "Online (electronic) permit submission is now required for all permit types", and that "You must have a JaxEPICS account to submit for a permit" — so the account is a prerequisite to applying, not a convenience.
- ZONING IS A DIFFERENT DESK AND A DIFFERENT NUMBER. The division's line is 904-255-8500; the page states separately that "Zoning can be reached at 904-255-8300". A zoning question put to the building number is a transfer.
- NO SAME-DAY INSPECTION CUT-OFF IS PUBLISHED on the pages read — a second read confirmed the negative. That is worth knowing because it differs from other Florida cities in this corpus: Orlando publishes a 6 a.m. cut-off for same-day inspections and Jacksonville publishes none, so do not carry Orlando's habit here or assume the same deadline applies.