Codes adopted

2018 International Building Code (IBC) — with amendments; effective January 1, 20212018 International Residential Code (IRC, Parts I, II, III, IX) — with Idaho amendments (Idaho Residential Code 2020 Edition); effective January 1, 20212018 International Energy Conservation Code (IECC) — with amendments (Idaho Energy Conservation Code 2020 Edition); effective January 1, 20212018 International Existing Building Code (IEBC) — effective January 1, 20212023 National Electrical Code (NEC) — adopted statewide by the Idaho Electrical Board (IDAPA 24.39.10), effective July 1, 20242018 International Mechanical Code (IMC) — effective January 1, 20212018 International Fuel and Gas Code (IFGC) — effective January 1, 20212018 International Residential Code Parts V and VI (mechanical) — effective January 1, 20212017 Idaho State Plumbing Code (ISPC) — based on 2015 Uniform Plumbing Code; effective January 1, 20212018 International Fire Code (IFC) — administered by Idaho Fire Marshal; effective January 1, 2021

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for all new single-family residential construction in Star. Applications submitted and payments made online through the IWORQ Permit Portal. Plans must be 24" × 36", submitted in landscape orientation as PDF. Contractors must register before accessing the portal. Typical review: small residential projects 2–4 weeks; larger residential projects approximately 4–6 weeks. Revisions add 3–4 weeks per cycle.

Verified 2026-07-16 · Source

Requirements

  • All new construction requires a building permit
  • Contractors must complete the Contractor Registration Form before accessing the permit portal
  • All plans submitted online via IWORQ Portal (staridpermit.portal.iworq.net); no in-person paper submissions
  • Plan size must be 24" × 36" in landscape orientation with space reserved for City approval stamps
  • Sewer certificate required from Star Sewer & Water District for all new homes with sewer service
  • If structure is in flood plain, contact the City Zoning Administrator before submitting
  • Structures 4,000 sq. ft. or more require Fire review for hydrant flow adequacy
  • Soils/geotechnical report required if project includes a basement; must be stamped by Idaho licensed engineer
  • Structural drawings and calculations must be stamped, signed, and dated by Idaho licensed design professional if applicable
  • Fire sprinkler/alarm plans (3 sets, under separate cover) if required — may be deferred
  • Energy compliance required: Alternate Energy Path (signed, all pages) or Prescriptive Method
  • Plans must include a plan check report as the first pages of the submittal

Required documents

  • RequiredResidential Submittal Checklist & Standards (Form #312, Rev 02-2026)City of Star's required residential submittal checklist including site plan, foundation plan, floor plan, roof/floor framing, elevations, wall bracing, wall sections/details, connection details, energy compliance, structural drawings, and MEP floor plan requirements
  • RequiredSite PlanMust show location of new structure on site, all existing structures, dimensional setbacks from rear and side yards and from back of sidewalk, driveway width, proposed or existing fences, all property lines and easements, and a short narrative of scope of work with square footage
  • RequiredFoundation PlanMust include foundation system type, compliant crawlspace venting, anchor bolt locations, and footing detail. Basements require soils/geotechnical report stamped by Idaho licensed engineer.
  • RequiredConstruction Drawings (Floor Plan, Framing, Elevations, Wall Bracing, Sections and Details)Complete plan set showing code compliance per 2018 IRC; all rooms labeled with clear dimensions; all sides of structure shown in elevations
  • RequiredEnergy Compliance DocumentationAlternate Energy Path (signed, all pages) or Prescriptive Method demonstrating 2018 IECC compliance
  • RequiredContractor Registration FormRequired for all contractors before accessing the permit portal; available on the City of Star Building Department website

Fee schedule

Fee typeAmountNotes
Residential Application Submittal Fee (non-refundable)$100.00City of Star Fee Information page (staridaho.org/1249/Fee-Information). Applied toward total building permit cost. Not refundable or transferable.
Building Permit Fee — Valuation $1 to $500$23.50Table 1-A, City of Star Building Permit Fees (staridaho.org/ImageRepository/Document?documentId=1637). All tiers re-verified line-by-line against the live fee table 2026-07-16; unchanged.
Building Permit Fee — Valuation $501 to $2,000$23.50 for first $500 plus $3.05 per each additional $100 or fraction thereof to $2,000Table 1-A, City of Star Building Permit Fees
Building Permit Fee — Valuation $2,001 to $25,000$69.25 for first $2,000 plus $14 per each additional $1,000 or fraction thereof to $25,000Table 1-A, City of Star Building Permit Fees
Building Permit Fee — Valuation $25,001 to $50,000$391.75 for first $25,000 plus $10.10 per each additional $1,000 or fraction thereof to $50,000Table 1-A, City of Star Building Permit Fees
Building Permit Fee — Valuation $50,001 to $100,000$643.75 for first $50,000 plus $7 per each additional $1,000 or fraction thereof to $100,000Table 1-A, City of Star Building Permit Fees
Building Permit Fee — Valuation $100,001 to $500,000$993.75 for first $100,000 plus $5.60 per each additional $1,000 or fraction thereof to $500,000Table 1-A, City of Star Building Permit Fees
Building Permit Fee — Valuation $500,001 to $1,000,000$3,233.75 for first $500,000 plus $4.75 per each additional $1,000 or fraction thereof to $1,000,000Table 1-A, City of Star Building Permit Fees
Building Permit Fee — Valuation $1,000,001 to $5,000,000$5,608.75 for first $1,000,000 plus $3.65 per each additional $1,000 or fraction thereof to $5,000,000Table 1-A, City of Star Building Permit Fees
Residential Mechanical Review Fee$35.00City of Star Fee Information page (staridaho.org/1249/Fee-Information)
Re-inspection Fee$65.00City of Star Fee Information page (staridaho.org/1249/Fee-Information)
Re-review Plans$50.00Must submit original AND updated plans. City of Star Fee Information page.
Ada County Highway District — Single Family Detached Impact Fee$5,803City of Star Fee Information page (staridaho.org/1249/Fee-Information). Impact fee paid to ACHD, not City of Star.
Star Fire Impact Fee$2,152City of Star Fee Information page (staridaho.org/1249/Fee-Information)
Star Parks Impact Fee$4,695.76City of Star Fee Information page (staridaho.org/1249/Fee-Information)
Star Police Impact Fee$680.88City of Star Fee Information page (staridaho.org/1249/Fee-Information)
Public Safety Mitigation Fee — Police$3,360City of Star Fee Information page (staridaho.org/1249/Fee-Information)
Public Safety Mitigation Fee — Fire$3,600City of Star Fee Information page (staridaho.org/1249/Fee-Information)
Ada County Single Family Residential Impact Fees (Jail, EMS, Coroner)$750City of Star Fee Information page (staridaho.org/1249/Fee-Information)

Commercial Building Permit (New Construction & TI)

Verified

Required for all new commercial construction and tenant improvements in Star. Plans must be stamped and signed by a licensed architect including a full code analysis. All applications submitted online through the IWORQ Permit Portal. Typical review: 4–6 weeks; revisions add 3–4 weeks per cycle.

Verified 2026-07-16 · Source

Requirements

  • Planning & Zoning approval required to verify proposed use is compatible with current zoning and that no other entitlements are needed
  • All commercial projects require a sewer/water certificate from Star Sewer & Water District
  • Architectural plans must be stamped and signed by a licensed architect with code analysis (code year, occupancy groups, construction types, floor areas, building height, fire suppression system)
  • Civil drawings required per Public Works Department specifications
  • Landscape drawings required including pressurized irrigation, street trees; if landscaping is used for stormwater mitigation, engineered design is required
  • Soils/geotechnical reports required for new buildings per IBC standards
  • Structural drawings and calculations must be stamped, signed, and dated by Idaho licensed design professional
  • MEP floor plan must be stamped, signed, and dated by Idaho licensed design professional
  • Plans submitted via IWORQ Portal (staridpermit.portal.iworq.net); plan size 24" × 36" in landscape orientation as PDF
  • If structure is in flood plain, contact City Zoning Administrator before submitting
  • Fire review required for Star Joint Fire Protection District (permits@starfirerescue.org); also contact ACHD Development Services and Central District Health / Southwest District Health as applicable

Required documents

  • RequiredCommercial Submittal Checklist & Standards (Form #307, Rev 02-2026)City of Star's required commercial submittal checklist; available at staridaho.org/DocumentCenter/View/1638/Commercial-Submittal-Checklist--2026-02
  • RequiredArchitectural Plans with Code AnalysisMust be stamped and signed by a licensed architect; code analysis must include code year, occupancy groups, construction types, all floor areas, building height, and fire suppression system specification
  • RequiredCivil and Landscape DrawingsPer Public Works Department specifications; landscape drawings must include pressurized irrigation and street trees
  • RequiredSoils / Geotechnical ReportRequired for new commercial buildings per IBC standards; must be stamped and signed by Idaho licensed engineer
  • RequiredStructural Drawings and CalculationsMust be stamped, signed, and dated by Idaho licensed design professional
  • RequiredMEP Floor PlanMechanical, Electrical, and Plumbing floor plan identifying all rooms by use with all associated MEP and legends; must be stamped, signed, and dated by Idaho licensed design professional
  • RequiredProject NarrativeDetailed narrative with full scope of work

Fee schedule

Fee typeAmountNotes
Commercial Application Submittal Fee (non-refundable)$200.00City of Star Fee Information page (staridaho.org/1249/Fee-Information). Applied toward total permit cost. Not refundable or transferable.
Building Permit Fee — valuation-based (Table 1-A)Valuation-based: e.g., $993.75 for first $100,000 plus $5.60 per $1,000 over $100,000 (to $500,000)Table 1-A City of Star Building Permit Fees (staridaho.org/ImageRepository/Document?documentId=1637). Same table as residential.
Ada County Highway District — Single Family Attached Impact Fee$3,182City of Star Fee Information page. For attached units. Contact ACHD for commercial-specific impact fees.
Re-inspection Fee$65.00City of Star Fee Information page (staridaho.org/1249/Fee-Information)

Mechanical Permit

Verified

Required for HVAC, gas lines, fireplaces, and other mechanical work on both new and existing residential and commercial properties in Star. Purchased separately from the building permit at City Hall / via the permit portal. Approved and issued same day if associated building permit is already approved.

Verified 2026-07-16 · Source

Requirements

  • Mechanical permit required in addition to and separate from any building permit
  • Apply via IWORQ Permit Portal (staridpermit.portal.iworq.net)
  • Work performed by Idaho state-licensed mechanical contractor for commercial; homeowners may perform their own work on their primary/secondary residence
  • Residential permit fee based on square footage of home (see fee schedule)

Required documents

  • RequiredPermit Application (online via IWORQ Portal)Submitted online; contractor must be registered in City system

Fee schedule

Fee typeAmountNotes
New Residential Mechanical — Single Family under 1,500 sq. ft.$130.00City of Star MEP Fee Schedule, Resolution 2025-03, approved 6/17/2025 (staridaho.org/DocumentCenter/View/1603/Mechanical-Electrical--Plumbing-Fee-Schedule). Confirmed still the current schedule 2026-07-16; no superseding resolution found.
New Residential Mechanical — Single Family 1,501–2,500 sq. ft.$195.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential Mechanical — Single Family 2,501–3,500 sq. ft.$260.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential Mechanical — Single Family 3,501–4,500 sq. ft.$325.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential Mechanical — Modular/Manufactured/Mobile Home$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Existing Residential Mechanical$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Gas Line$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Fireplace (Gas, Electric) or Wood Stove/Fireplace — New Residential$75.00City of Star MEP Fee Schedule, Resolution 2025-03
Fireplace (Gas, Electric) or Wood Stove/Fireplace — Existing Residential$130.00City of Star MEP Fee Schedule, Resolution 2025-03
Commercial/Other — valuation-basedUp to $20,000: multiply by 3% add $60; $20,001–$100,000: subtract $20,000, multiply by 2%, add $660; over $100,001: subtract $100,000, multiply by 1%, add $2,260City of Star MEP Fee Schedule, Resolution 2025-03
Re-inspection Fee$65.00City of Star MEP Fee Schedule, Resolution 2025-03

Electrical Permit

Verified

Required for all electrical work on residential and commercial properties in Star. Purchased separately from the building permit. Approved and issued same day if associated building permit is already approved. Fee schedule based on Resolution 2025-03 (approved 6/17/2025).

Verified 2026-07-16 · Source

Requirements

  • Electrical permit required in addition to and separate from any building permit
  • Apply via IWORQ Permit Portal (staridpermit.portal.iworq.net)
  • Work performed by Idaho state-licensed electrical contractor for commercial; homeowners may perform their own work on their primary/secondary residence

Required documents

  • RequiredPermit Application (online via IWORQ Portal)Submitted online; contractor must be registered in City system

Fee schedule

Fee typeAmountNotes
New Residential Electrical — Single Family under 1,500 sq. ft.$130.00City of Star MEP Fee Schedule, Resolution 2025-03 (staridaho.org/DocumentCenter/View/1603/Mechanical-Electrical--Plumbing-Fee-Schedule)
New Residential Electrical — Single Family 1,501–2,500 sq. ft.$195.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential Electrical — Single Family 2,501–3,500 sq. ft.$260.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential Electrical — Single Family 3,501–4,500 sq. ft.$325.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential Electrical — Modular/Manufactured/Mobile Home$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Existing Residential Electrical$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Additional Branch Circuits (existing residential)$10.00 per circuitCity of Star MEP Fee Schedule, Resolution 2025-03
Swimming Pool (residential)$195.00City of Star MEP Fee Schedule, Resolution 2025-03
Spas, Hot Tubs, and Hydro Massage Tubs$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Temporary Construction Services$65.00City of Star MEP Fee Schedule, Resolution 2025-03. Full credit/refund for temp pole permit if no inspection performed.
Commercial/Other — valuation-basedUp to $10,000: multiply by 2% add $60; $10,001–$100,000: subtract $10,000, multiply by 1%, add $260; over $100,001: subtract $100,001, multiply by 0.5%, add $1,160City of Star MEP Fee Schedule, Resolution 2025-03. Applies to commercial, industrial, solar, fire alarm, new SF residential over 4,500 sq. ft., multi-family.
Re-inspection Fee$65.00City of Star MEP Fee Schedule, Resolution 2025-03

Plumbing Permit

Verified

Required for all plumbing work on residential and commercial properties in Star. Purchased separately from the building permit. Approved and issued same day if associated building permit is already approved. Fee schedule based on Resolution 2025-03 (approved 6/17/2025).

Verified 2026-07-16 · Source

Requirements

  • Plumbing permit required in addition to and separate from any building permit
  • Apply via IWORQ Permit Portal (staridpermit.portal.iworq.net)
  • Work performed by Idaho state-licensed plumbing contractor for commercial; homeowners may perform their own plumbing work on their primary/secondary residence

Required documents

  • RequiredPermit Application (online via IWORQ Portal)Submitted online; contractor must be registered in City system

Fee schedule

Fee typeAmountNotes
New Residential Plumbing — Single Family under 1,500 sq. ft.$130.00City of Star MEP Fee Schedule, Resolution 2025-03 (staridaho.org/DocumentCenter/View/1603/Mechanical-Electrical--Plumbing-Fee-Schedule)
New Residential Plumbing — Single Family 1,501–2,500 sq. ft.$195.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential Plumbing — Single Family 2,501–3,500 sq. ft.$260.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential Plumbing — Single Family 3,501–4,500 sq. ft.$325.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential Plumbing — Modular/Manufactured/Mobile Home$65.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential — Sewer and Water$65.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential — Sewer Only$50.00City of Star MEP Fee Schedule, Resolution 2025-03
New Residential — Water Only$50.00City of Star MEP Fee Schedule, Resolution 2025-03
Existing Residential Plumbing$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Additional Fixtures (existing residential)$10.00 per fixtureCity of Star MEP Fee Schedule, Resolution 2025-03
Water Heater, Water Softener, Lawn Sprinkler$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Commercial/Other — valuation-basedUp to $20,000: multiply by 3% add $60; $20,001–$100,000: subtract $20,000, multiply by 2%, add $660; over $100,001: subtract $100,000, multiply by 1%, add $2,260City of Star MEP Fee Schedule, Resolution 2025-03
Re-inspection Fee$65.00City of Star MEP Fee Schedule, Resolution 2025-03

Residential/Commercial Solar Photovoltaic (PV) Permit

Verified

Required for installation of a rooftop or ground-mounted solar photovoltaic system in Star. The City's own Mechanical, Electrical & Plumbing Fee Schedule (Resolution 2025-03, approved 6/17/2025) explicitly lists 'solar' as one of the project types billed under the Electrical Permit's 'Commercial/Other — valuation-based' fee tier, rather than under the flat per-square-footage residential wiring tiers — a real, distinct, City-published fee mechanism for solar. A separate Building Permit (Table 1-A, valuation-based) applies to the mounting/racking structural scope.

Verified 2026-07-20 · Source

Requirements

  • Electrical interconnection/wiring for a solar PV system is billed under the Electrical Permit's 'Commercial/Other' valuation-based fee tier, per the City's MEP Fee Schedule, which explicitly states this tier 'applies to commercial, industrial, solar, fire alarm, new SF residential over 4,500 sq. ft., multi-family'
  • Mounting/racking structural work is permitted via the standard Residential or Commercial Building Permit (Table 1-A, valuation-based), using the same IWORQ Permit Portal process documented elsewhere in this file
  • Apply via IWORQ Permit Portal (staridpermit.portal.iworq.net); contractor must be registered in the City system before accessing the portal
  • Homeowners may perform their own electrical work on their primary/secondary residence; commercial-scope work requires an Idaho state-licensed electrical contractor
  • Governed by the 2023 National Electrical Code (NEC) — adopted statewide by the Idaho Electrical Board (IDAPA 24.39.10), effective July 1, 2024 — for the interconnection scope, and the 2018 IBC/IRC for the structural mounting scope

Required documents

  • RequiredPermit Application (online via IWORQ Portal)Submitted online for both the Building Permit (structural mounting) and Electrical Permit (interconnection) scopes; contractor must be registered in City system

Fee schedule

Fee typeAmountNotes
Solar Electrical Interconnection — Commercial/Other valuation-based tierUp to $10,000: multiply by 2% add $60; $10,001-$100,000: subtract $10,000, multiply by 1%, add $260; over $100,001: subtract $100,001, multiply by 0.5%, add $1,160City of Star MEP Fee Schedule, Resolution 2025-03, approved 6/17/2025 (staridaho.org/DocumentCenter/View/1603/Mechanical-Electrical--Plumbing-Fee-Schedule) — this Commercial/Other tier is explicitly stated to apply to 'commercial, industrial, solar, fire alarm, new SF residential over 4,500 sq. ft., multi-family,' rather than the flat per-square-footage residential wiring tiers used for ordinary new-home wiring.
Building Permit Fee (structural mounting/racking, Table 1-A)$23.50 minimum, scaling per the valuation tiers documented in the Residential Building Permit entry of this fileCity of Star Building Permit Fees (Table 1-A) — applies to the racking/mounting structural scope of a solar installation, same as any other structural work.
Re-inspection Fee$65.00City of Star Fee Information page (staridaho.org/1249/Fee-Information).

Demolition Permit

Verified

Required for demolition of structures in Star. Same-day approval when paperwork is complete.

Verified 2026-07-16 · Source

Requirements

  • Permit required for demolition of any structure
  • Apply via IWORQ Permit Portal (staridpermit.portal.iworq.net)

Required documents

  • RequiredPermit Application (online via IWORQ Portal)Submitted online; contractor or homeowner must be registered in City system

Fee schedule

Fee typeAmountNotes
Demolition Permit Fee$100.00City of Star Fee Information page (staridaho.org/1249/Fee-Information)

Residential Swimming Pool Permit

Verified

Required for residential swimming pool installation in Star. Separate application review fee applies in addition to the building permit fee.

Verified 2026-07-16 · Source

Requirements

  • Building permit required for swimming pool installation
  • Apply via IWORQ Permit Portal (staridpermit.portal.iworq.net)
  • Separate electrical permit required for pool wiring (residential pool electrical fee: $195)
  • Submit site plan showing pool location with all setbacks

Required documents

  • RequiredPermit Application (online via IWORQ Portal)Submitted online; contractor or homeowner must be registered
  • RequiredSite PlanShowing pool location on property with all setback dimensions

Fee schedule

Fee typeAmountNotes
Residential Swimming Pool Application Review Fee$70.00City of Star Fee Information page (staridaho.org/1249/Fee-Information). In addition to building permit fee (Table 1-A) and separate electrical permit.
Swimming Pool Electrical Permit$195.00City of Star MEP Fee Schedule, Resolution 2025-03 (staridaho.org/DocumentCenter/View/1603/Mechanical-Electrical--Plumbing-Fee-Schedule)

Manufactured / Mobile Home Setup Permit

Verified

Required for setting manufactured, modular, or mobile homes in Star. Includes separate mobile home setup fee. Separate MEP permits required for mechanical, electrical, and plumbing.

Verified 2026-07-16 · Source

Requirements

  • Building permit required for setting a manufactured, modular, or mobile home
  • Apply via IWORQ Permit Portal (staridpermit.portal.iworq.net)
  • Separate electrical, mechanical, and plumbing permits required
  • Sewer certificate required from Star Sewer & Water District if connecting to public sewer

Required documents

  • RequiredPermit Application (online via IWORQ Portal)Submitted online; contractor must be registered in City system

Fee schedule

Fee typeAmountNotes
Mobile Home Set-up Fee$100.00City of Star Fee Information page (staridaho.org/1249/Fee-Information)
Modular/Manufactured/Mobile Home — Electrical Permit$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Modular/Manufactured/Mobile Home — Mechanical Permit$65.00City of Star MEP Fee Schedule, Resolution 2025-03
Modular/Manufactured/Mobile Home — Plumbing Permit$65.00City of Star MEP Fee Schedule, Resolution 2025-03

EV Charger / EVSE Permit

Verified

The City of Star has no dedicated electric-vehicle-charging-station permit or fee line. An EV charger circuit added to an existing home is electrical work covered by the general Electrical Permit process (Resolution 2025-03 MEP Fee Schedule): the 'Existing Residential Electrical' flat fee applies to the permit itself, with the 'Additional Branch Circuits' per-circuit fee layered on if more than one circuit is added. A charger installed as part of new residential construction would instead be folded into the applicable 'New Residential Electrical' square-footage tier. No EV/EVSE-specific dollar figure was found on the published fee schedule.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required, purchased separately from any building permit, per the same process documented in this file's Electrical Permit entry
  • Apply via the IWORQ Permit Portal (staridpermit.portal.iworq.net)
  • Homeowners may perform their own electrical work on their primary/secondary residence; commercial work requires an Idaho state-licensed electrical contractor
  • No dedicated EV/EVSE line-item, application, or checklist was found on the City's MEP Fee Schedule (Resolution 2025-03) or Building Department pages

Required documents

  • RequiredPermit Application (online via IWORQ Portal)Submitted online; no dedicated EV/EVSE checkbox exists

Fee schedule

Fee typeAmountNotes
Existing Residential Electrical (new circuit for EV charger added to an existing home)$65.00City of Star MEP Fee Schedule, Resolution 2025-03 — closest applicable line-item for adding an EV charger circuit to an existing residence; no dedicated EV/EVSE fee exists
Additional Branch Circuits (existing residential)$10.00 per circuitCity of Star MEP Fee Schedule, Resolution 2025-03 — applies if the charger install adds more than one circuit
New Residential Electrical (if charger is part of new-home construction, billed at the applicable square-footage tier)$130.00-$325.00 depending on home size (see Electrical Permit entry for full tier table)City of Star MEP Fee Schedule, Resolution 2025-03

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Star building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /idaho/ada-county/star/as-of/2026-06-29/

Snapshot date: 2026-06-29

Commit: 0fd24e8

Reproducible from PermitBase’s version-controlled dataset, commit 0fd24e8.