Unincorporated Ada County building permits

Verified

Unincorporated Ada County, Idaho — as published 2026-06-29.

Verified 2026-06-29 · Source

Codes adopted

2018 International Building Code (IBC) — adopted via Ordinance #919, Ada County Code2018 International Residential Code (IRC) — adopted via Ordinance #9192018 International Existing Building Code (IEBC) — adopted via Ordinance #9192018 International Energy Conservation Code (IECC) — Commercial Provisions; Residential as modified by Idaho Statute Title 39 Chapter 41; adopted via Ordinance #9192018 International Mechanical Code (IMC) — adopted via Ordinance #9192018 International Fuel Gas Code (IFGC) — adopted via Ordinance #9192018 International Urban-Wildland Interface Code (IUWIC) — adopted via Ordinance #9192018 International Swimming Pool and Spa Code (ISPSC) — adopted via Ordinance #919

Permit types & fees

Residential Building Permit (New Construction / Addition)

Verified

Required for new single-family dwellings, additions, detached garages, shops, carports, patio covers, elevated decks, and accessory structures in unincorporated Ada County. Ada County Building Division has issued permits since 1975 under the Ada County Building Code. Plans Examiners review construction drawings and Building Inspectors perform on-site inspections. Applications are submitted digitally as PDF files by email to the Building Division.

Verified 2026-06-29 · Source

Requirements

  • Building permit required for all new residential construction, additions, and structural alterations in unincorporated Ada County
  • Submit complete digital PDF application package (application form + all plan sheets as individual files, not a single zip) by email
  • Site plan showing proposed and existing structures in relation to all property lines, easements, wells, and septic tanks/drainfields
  • Foundation plan with layout, venting, and section details showing sizes, depths, and grade
  • Floor framing plan with member specifications, sizes, spans, support, and subfloor details
  • Floor plan detailing conditioned, unconditioned, and covered areas with windows and door openings labeled
  • Braced wall line plan with methods noted and panel lengths dimensioned
  • Wall/building sections with insulation R-values, U-factors, and framing specifications
  • Roof framing plan with venting, spacing, framing, and connection details
  • HVAC design and layout required for new dwellings — Manual J, D, and S (or Wrightsoft) submittal required
  • Elevations for all sides of the structure
  • Electrical layout showing switches, receptacles, lights, vents, and smoke/CO detectors
  • Post-frame/pole buildings: stamped engineering required; steel buildings: stamped engineering including foundation design required
  • Central District Health approval required if property is on septic
  • ACHD impact fees for residential dwellings accepted at the Building Division (receipt copy required if paid directly to ACHD)

Required documents

  • RequiredBuilding Permit Application (Rev. 02.06.2026)Ada County building permit application form; available at adacounty.id.gov/developmentservices/permitting-division/applications-forms-templates/
  • RequiredBuilding Permit Application Checklist — Single Family DwellingsChecklist of all required plan elements for single-family residential permits; available on the Applications, Forms, and Templates page
  • RequiredFull Plan Set (Site Plan, Foundation, Floor Framing, Floor Plan, Braced Wall, Wall Sections, Roof Framing, Elevations, Electrical Layout, Details)Dimensioned and to-scale drawings per the Ada County Adopted Codes and Amendments for Construction checklist (proposed checklist PDF); each file submitted individually — not in a zip
  • RequiredManual J, D, and S (or Wrightsoft)HVAC design submittal required for new dwellings; submitted as an individual file alongside plans
  • OptionalSimple Dwelling Additions ChecklistApplication and plan requirements for simple additions, private garages, carports, patio covers, and elevated decks; available on the Applications, Forms, and Templates page
  • OptionalCentral District Health ApprovalRequired when property is served by septic and project involves any addition, expansion, or significant alteration; contact CDH at 208-327-7499

Fee schedule

Fee typeAmountNotes
Building permit feeValuation-based per Ada County 2025 Fee Schedule (Resolution 3149, effective November 2025); see Building-Fees.pdf at adacounty.id.gov/developmentservices/permitting-division/fees/Credit card payments assessed 2.4% convenience fee (minimum $2); e-checks flat $3.00. Fee schedule updated November 2025 in conjunction with new Ada County Zoning Code.

Commercial Building Permit (New Construction / Tenant Improvement)

Verified

Required for all new commercial, industrial, and multi-family buildings (three or more units), tenant improvements, remodels, and change-of-use projects in unincorporated Ada County. Governed by the 2018 International Building Code (IBC) as adopted by Ada County Ordinance #919. Applications submitted digitally by email.

Verified 2026-06-29 · Source

Requirements

  • Required for new commercial/industrial buildings, multi-family structures (3+ units), tenant improvements, and change-of-occupancy projects
  • Submit complete digital PDF application package (application form + all plan sheets as individual files, not in a zip) by email to mechanical@adacounty.id.gov
  • Commercial Building Permit application form required
  • Full plan set drawn to scale and dimensioned; not all items apply to all structures
  • Post-frame and steel buildings require stamped engineering including foundation design
  • Structural calculations may be required by the plans examiner during review for non-standard materials or non-prescriptive construction

Required documents

  • RequiredCommercial Building Permit Application (.docx)Ada County commercial building permit application; available at adacounty.id.gov/developmentservices/permitting-division/applications-forms-templates/
  • RequiredFull Commercial Plan SetAll required drawings per plan examiner direction — site plan, floor plan, structural plans, architectural plans; each submitted as an individual PDF file

Fee schedule

Fee typeAmountNotes
Building permit feeValuation-based per Ada County 2025 Fee Schedule (Resolution 3149, effective November 2025); see Building-Fees.pdf at adacounty.id.gov/developmentservices/permitting-division/fees/Credit card payments: 2.4% convenience fee (minimum $2); e-checks: $3.00 flat rate.

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, air conditioning, fuel gas piping, and related mechanical installations in unincorporated Ada County. Residential and commercial mechanical permits are both issued by Ada County Development Services — Building Division. Governed by the 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) as adopted via Ordinance #919. Applications submitted digitally by email.

Verified 2026-06-29 · Source

Requirements

  • All installation, replacement, or repair of heating, cooling, ventilation, or fuel gas systems
  • Residential: submit Residential Mechanical Permit application by email to mechanical@adacounty.id.gov
  • Commercial: submit Commercial Mechanical Permit application by email to mechanical@adacounty.id.gov
  • Idaho contractor registration number required for commercial applicants

Required documents

  • RequiredResidential Mechanical Permit Application (2025)One-page application listing all mechanical work items; available at adacounty.id.gov/developmentservices/permitting-division/applications-forms-templates/
  • OptionalCommercial Mechanical Permit Application (2025)Commercial mechanical permit form with total bid amount; available on the Applications, Forms, and Templates page

Fee schedule

Fee typeAmountNotes
Residential Mechanical Permit — Base fee$35.00Ada County Residential Mechanical Permit Application (2025)
Residential — Furnace, air conditioner, heat pump, condenser, boiler (not supplying potable water), pool heater, or any other permanent space conditioning appliance$25.00 for eachAda County Residential Mechanical Permit Application (2025)
Residential — Exhaust duct or ventilation duct, head unit (mini-split), fireplace, hydronic system (closed loop only), residential energy storage system$15.00 for eachAda County Residential Mechanical Permit Application (2025)
Residential — Fuel gas piping$5.00 per outletAda County Residential Mechanical Permit Application (2025)
Commercial Mechanical Permit — Base fee plus percentage$35.00 base + 2% of total bid amountAda County Commercial Mechanical Permit Application (2025)

Grading & Drainage Permit

Verified

Required for grading and drainage work in unincorporated Ada County. Three tiers apply based on the area of disturbance and project type: Tier 1 for residential grading under one acre, Tier 2 for disturbance of one acre or more, and Tier 3 for commercial projects and new subdivisions. Governed by the 2018 International Building Code and Ada County Code (ACC 8-6). Applications submitted digitally by email.

Verified 2026-06-29 · Source

Requirements

  • Tier 1 (residential, area of disturbance less than 1 acre): site plan/drainage plan with property lines, easements, structures, well/septic locations, area of disturbance, stormwater flow arrows, and narrative
  • Tier 2 (disturbance 1 acre or greater): all Tier 1 items plus plan prepared by a design professional; soils report may be required
  • Tier 3 (commercial/drainage projects, new subdivisions): detailed drainage plan drawn to scale with all grading, drainage system essentials, stormwater routing, discharge flows, and evidence of consent from affected irrigation/drainage entities
  • Submit Grading & Drainage Application with all required documents to mechanical@adacounty.id.gov

Required documents

  • RequiredGrading & Drainage Application (2025)Ada County grading/drainage permit application listing all submittal requirements by tier; available at adacounty.id.gov/developmentservices/permitting-division/applications-forms-templates/
  • RequiredSite Plan / Drainage PlanRequired for all tiers — must show property lines, easements, existing structures, well/septic locations, area of disturbance, stormwater flow direction
  • OptionalDesign Professional Drainage Plan (Tier 2 and Tier 3)Tier 2: prepared by a design professional. Tier 3: full drainage plan drawn to scale with calculations; soils report may be required

Fee schedule

Fee typeAmountNotes
Tier 1 — Residential grading, area of disturbance less than 1 acre$100.00Ada County Grading & Drainage Application (2025)
Tier 2 — Area of disturbance 1 acre or greater$500.00Ada County Grading & Drainage Application (2025)
Tier 3 — Commercial grading/drainage projects, new subdivisions$1,500.00Ada County Grading & Drainage Application (2025)

Swimming Pool / Spa Permit

Verified

Required for in-ground swimming pools, above-ground pools, and spas in unincorporated Ada County. Governed by the 2018 International Swimming Pool and Spa Code (ISPSC) as adopted via Ordinance #919. A special barrier acknowledgment letter signed by the contractor and property owner is required BEFORE Ada County will issue the pool building permit. Unfinished pool permits (no final inspection within one year) trigger a property alert preventing new building permits.

Verified 2026-06-29 · Source

Requirements

  • Swimming Pool/Spa Permit Application plus full plans required
  • Barrier acknowledgment letter (Page 2 of the combined pool application) signed by both the contractor and the property owner must be submitted and received by Ada County BEFORE the building permit is issued
  • All pools/spas must comply with 2018 ISPSC barrier requirements
  • Final inspection must be requested within one year of permit issuance or an alert is placed on the property preventing further building permits

Required documents

  • RequiredSwimming Pool Permit Application (Combined 2026) — including Barrier Acknowledgment LetterTwo-page application: Page 1 is the permit application; Page 2 is the required barrier acknowledgment letter that must be signed by contractor and property owner before the permit is issued. Available at adacounty.id.gov/developmentservices/permitting-division/applications-forms-templates/
  • RequiredPool/Spa PlansPlans and specifications for pool/spa construction; submit as individual PDF files by email

Fee schedule

Fee typeAmountNotes
Swimming pool building permit feeValuation-based per Ada County 2025 Fee Schedule (Resolution 3149); see adacounty.id.gov/developmentservices/permitting-division/fees/Barrier acknowledgment letter must be on file before permit is issued.

Agricultural Structure Permit (Zoning Certificate)

Verified

An agricultural structure in unincorporated Ada County requires the issuance of a Zoning Certificate before construction begins. Qualifies only for structures on a 'farm' (5 acres or more in agricultural use with agricultural exemption) that are used exclusively for agricultural purposes — not for dwellings or personal item storage. Application fee is $100. Governed by Ada County Code ACC 8-2-23-2.

Verified 2026-06-29 · Source

Requirements

  • Property must be a 'farm' — 5 acres or larger in agricultural use with agricultural exemption
  • Structure must be for agricultural use only (not a dwelling; not personal item storage)
  • Accessory Use / Zoning Certificate approval required through Ada County Development Services before construction
  • Site plan (drawn to scale/dimensioned) including all existing and proposed easements, property lines, structures, setbacks, and well/septic locations
  • Detailed letter describing the proposed structure and its use
  • Property owner signature consenting to the application and site inspections

Required documents

  • RequiredAgricultural Structure Application (2025)Two-page application form for agricultural structures under ACC 8-2-23-2; available at adacounty.id.gov/developmentservices/permitting-division/applications-forms-templates/
  • RequiredSite Plan (drawn to scale/dimensioned)Showing all existing and proposed easements, property lines, structures, setbacks, and well/septic locations
  • RequiredDetailed LetterDescribing the proposed structure and its agricultural use

Fee schedule

Fee typeAmountNotes
Agricultural Structure Zoning Certificate — Application fee$100.00Ada County Agricultural Structure Application (2025), ACC 8-2-23-2

Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mount solar photovoltaic systems in unincorporated Ada County. The structural/mounting portion is a building permit issued by Ada County Development Services, using the same valuation-based fee table as other building work, with a solar-specific valuation rule: the taxable valuation for a solar PV permit includes the structural elements, racking, mounting elements, rails, and labor, but EXCLUDES the solar panels/equipment and inverters themselves. Electrical interconnection work is permitted separately by the State of Idaho (DOPL/Division of Building Safety), not the County, since no electrical-permit type is issued by Ada County Development Services.

Verified 2026-07-20 · Source

Requirements

  • Building permit required for the structural/mounting portion, issued by Ada County Development Services under the Ada County Building Code
  • Valuation for fee purposes includes the structural elements, racking, mounting elements, rails, and labor — but excludes the solar panels/equipment and inverters, per the County's own Building Permit Valuation Guidelines
  • The ELECTRICAL interconnection portion of a solar PV installation (inverter tie-in, NEC compliance) requires a SEPARATE permit issued by the State of Idaho DOPL/Division of Building Safety, not Ada County — Ada County Development Services issues no electrical-permit type
  • General inspection minimum fee of $100 applies per the County's Plan Review and Inspection Fees table

Required documents

  • RequiredBuilding Permit Application (Building Division)Standard Ada County building permit application for the structural/mounting portion; valuation excludes panels/inverters per the County's valuation guidelines
  • RequiredDOPL/Division of Building Safety Electrical PermitSeparate state-issued permit required for the electrical interconnection portion — obtained directly from the state, not through the County

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Valuation $1 to $2,000$65.00 for the first $2,000Ada County Development Services Fee Schedule, Building-Fees.pdf — Building Permit Valuation Guidelines table
Building Permit Fee — Valuation $2,000.01 to $25,000$65.00 for the first $2,000 + $11.00 for each additional $1,000 or fraction thereofAda County Development Services Fee Schedule, Building-Fees.pdf
General Inspection (minimum)$100Ada County Development Services Fee Schedule, Building-Fees.pdf — Plan Review and Inspection Fees table

EV Charger / EVSE Electrical Permit

Verified

Installation of an electric vehicle charging station (EVSE) in unincorporated Ada County is an electrical permit — and, as with all electrical work in the county, it is issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL, formerly Division of Building Safety), not by Ada County Development Services, which issues no electrical-permit type at all. There is no distinct EV-charger/EVSE line item in DOPL's fee rules (IDAPA 24.39.10.500); a residential EVSE circuit added to an existing home is billed under the 'Existing Dwelling Unit' per-inspection fee, and a commercial charging-station installation is billed under the wiring-cost-based commercial/industrial fee formula.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for EVSE circuit/branch-circuit and charger installation — issued by Idaho DOPL, not Ada County, since Ada County Development Services issues no electrical permits
  • Homeowners performing electrical work on their own primary/secondary residence may pull a Homeowner Electrical Permit directly from DOPL; otherwise a licensed Idaho electrical contractor must pull the permit
  • Residential EVSE added to an existing dwelling is billed under DOPL's 'Existing Dwelling Unit' fee (per inspection) — there is no separate EV-charger fee category in the DOPL fee rule
  • Commercial/multi-family EVSE installations are billed under DOPL's wiring-cost-based commercial/industrial fee formula (percentage of total wiring cost, tiered by valuation)
  • No county building permit is required for a standalone EVSE circuit unless it is paired with structural work (e.g., a new carport/canopy), in which case a separate Ada County building permit applies to that structural scope

Required documents

  • OptionalHomeowner Electrical Permit Application (DOPL)For homeowners wiring an EVSE circuit at their own primary/secondary residence; available at dopl.idaho.gov
  • OptionalContractor Electrical Permit Application (DOPL)For licensed Idaho electrical contractors installing EVSE circuits, whether residential or commercial; available at dopl.idaho.gov

Fee schedule

Fee typeAmountNotes
Existing Dwelling Unit (residential EVSE circuit added to an existing home)$65.00 per inspectionIDAPA 24.39.10.500 electrical permit fee schedule — no distinct EVSE/EV-charger line item exists; residential retrofit electrical work is billed at this flat per-inspection rate
Commercial/Industrial — wiring cost not exceeding $10,000$60.00 + 2% of total wiring costIDAPA 24.39.10.500 — applies to commercial/multi-family EVSE installations
Commercial/Industrial — wiring cost $10,001 to $100,000$260.00 + 1% of the amount exceeding $10,000IDAPA 24.39.10.500
Commercial/Industrial — wiring cost over $100,000$1,160.00 + 0.5% of the amount exceeding $100,000IDAPA 24.39.10.500

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Ada County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /idaho/ada-county/unincorporated-ada/as-of/2026-06-29/

Snapshot date: 2026-06-29

Commit: 9e5cbba

Reproducible from PermitBase’s version-controlled dataset, commit 9e5cbba.