This is PermitBase’s published record for Pocatello as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Pocatello building permits

Verified

Pocatello, Idaho — as published 2026-07-20.

Verified 2026-07-03 · Source

Codes adopted

Idaho has a mandatory statewide building code framework under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41), administered by the Division of Occupational and Professional Licenses' Building Safety Program, which sets the statewide-adopted editions of the IBC, IRC, IECC, and related codes; local jurisdictions administer and enforce permitting and inspections within their boundaries and may adopt local amendments. Source: City of Pocatello General Building Information page (pocatello.gov/164/General-Building-Information).The City of Pocatello operates its own Building Department and Development Services Center — it is not a DOPL-administered jurisdiction for permit issuance. The Building Department 'ensures the safety of all buildings and structures in the city of Pocatello through the administration and enforcement of codes and ordinances regarding new construction, remodeling, and the abatement of dangerous buildings,' and 'coordinates plan checks and issues building permits for all construction including electrical, plumbing, mechanical and gas installation; building demolitions; excavations; signs and sidewalks.' Source: City of Pocatello Building Department page (pocatello.gov/163/Building).2018 International Building Code (IBC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.2018 International Existing Building Code (IEBC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.2018 International Residential Code (IRC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.2017 Idaho State Plumbing Code (Idaho's state-amended plumbing code, administered locally) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.2018 International Mechanical Code (IMC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.2018 Idaho Fire Code — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.2023 National Electrical Code (NEC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.2018 International Energy Conservation Code (IECC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.2018 International Fuel Gas Code (IFGC) — adopted by City of Pocatello. Source: City of Pocatello General Building Information page.2018 International Wildland-Urban Interface Code (IWUIC) — referenced on the City's Residential Plan Checklist for fire access/turnaround review. Source: City of Pocatello Residential Development Application & Plan Checklist (PDF), pocatello.gov/DocumentCenter/View/81.All codes amended per the 2018 Idaho Administrative Code (IDAPA rules). Source: City of Pocatello General Building Information page.Idaho Division of Occupational and Professional Licenses (DOPL) administers statewide contractor/tradesperson licensing (electrical, plumbing, mechanical contractors and journeymen) — DOPL issues the underlying trade licenses, but the City of Pocatello Building Department issues the construction permits and performs inspections within city limits. Source: City of Pocatello Contractor Licenses page (pocatello.gov/166/Contractor-Licenses), which requires electrical/mechanical/plumbing contractors to hold and present 'a copy of State of Idaho license' (DOPL) rather than issuing a separate city trade license for those disciplines.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family and duplex residential construction in Pocatello, administered by the City of Pocatello Building Department against the 2018 IRC, 2018 IECC, and City of Pocatello General Design Specifications. Applications are submitted through the City's eTRAKiT portal or via the paper Residential Development Application.

Verified 2026-07-03 · Source

Requirements

  • Building permit required for new single-family, duplex, and other residential construction
  • Plans reviewed against the 2018 IRC and 2018 IECC as adopted by the City of Pocatello, plus the 2018 Idaho Administrative Code amendments
  • Completed Residential Development Application with legal description, parcel size, zoning district, and estimated construction cost
  • Completed MECcheck or REScheck energy compliance form must be completed prior to submitting the application
  • Manual D, J, and S (HVAC sizing) calculations must be submitted with the building plans prior to review (effective Oct. 1, 2021); every fifth home built by a builder must be blower-door tested to meet current thermal-envelope requirements
  • Individual site-specific Erosion and Sediment Control (ESC) plan required at time of application; City of Pocatello ESC Permit required alongside any EPA NOI/Construction General Permit obligations
  • Full plan set including plot plan (no smaller than 8.5x11 inches) with north arrow/scale, lot boundary dimensions, structure locations, setbacks from property lines, driveway with dimensions/grade, utility locations, floor plans, elevation views, and footing/foundation cross-sections
  • Retaining walls over 4 feet in height require engineered plans
  • Flood Plain Determination required if parcel is in the Flood Plain (pre-development Flood Plain Certificate)
  • Evidence of septic permit from the state Health Department required if sanitary sewer is not available
  • Apply online via the eTRAKiT portal (pocatello.gov/etrakit/) or submit the paper Residential Development Application

Required documents

  • RequiredResidential Development ApplicationCity of Pocatello Development Services Center application form; requires owner/contractor info, legal description, ESC certification, project scope (new/addition/remodel/repair/foundation-only), square footages, and subcontractor info
  • RequiredResidential Plan ChecklistCity of Pocatello checklist covering application, MECcheck/REScheck, full plan set, plot plan, structure/setback locations, utilities, drainage/grading, fire access, flood plain, floor plans, elevations, and foundation details
  • RequiredMECcheck or REScheck Energy Compliance FormEnergy code compliance calculation, must be completed before the application is submitted
  • RequiredSite-Specific Erosion and Sediment Control (ESC) PlanIndividual plan showing drainage swales, sediment barriers, stabilized construction entrance, and other erosion controls per the City's example ESC plan
  • RequiredConstruction Drawings (plot plan, floor plans, elevations, foundation/footing details, roof plan)Full plan set per the Residential Plan Checklist, including sample plot plan and sample plans provided by the City

Fee schedule

Fee typeAmountNotes
Building Permit Fee — total valuation $1 to $500$23.50City of Pocatello Building Permit Fees schedule
Building Permit Fee — total valuation $501 to $2,000$23.50 for the first $500, plus $3.05 for each additional $100City of Pocatello Building Permit Fees schedule
Building Permit Fee — total valuation $2,001 to $25,000$69.25 for the first $2,000, plus $14.00 for each additional $1,000City of Pocatello Building Permit Fees schedule
Building Permit Fee — total valuation $25,001 to $50,000$391.75 for the first $25,000, plus $10.10 for each additional $1,000City of Pocatello Building Permit Fees schedule
Building Permit Fee — total valuation $50,001 to $100,000$643.75 for the first $50,000, plus $7.00 for each additional $1,000City of Pocatello Building Permit Fees schedule
Building Permit Fee — total valuation $100,001 to $500,000$993.75 for the first $100,000, plus $5.60 for each additional $1,000City of Pocatello Building Permit Fees schedule
Building Permit Fee — total valuation $500,001 to $1,000,000$3,233.75 for the first $500,000, plus $4.75 for each additional $1,000City of Pocatello Building Permit Fees schedule
Building Permit Fee — total valuation $1,000,001 and higher$5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000City of Pocatello Building Permit Fees schedule
Plan Review Fee — Residential35% of the building permit feeCity of Pocatello Building Permit Fees schedule

Residential Addition / Remodel / Repair Permit

Verified

Required for additions, remodels, repairs, and foundation-only work on existing one- and two-family dwellings in Pocatello, using the same Residential Development Application and valuation-based fee schedule as new construction.

Verified 2026-07-03 · Source

Requirements

  • Building permit required for additions, remodels, repairs, garages, and other alterations to existing residential structures
  • Same Residential Development Application used for new construction; select 'Addition,' 'Remodel,' 'Repair,' or 'Foundation Only' as the project type
  • Plans must show scope of work, connection to the existing structure, and compliance with the 2018 IRC as adopted by the City of Pocatello
  • Site/plot plan showing setbacks from property lines and location of existing and proposed structures
  • Retaining walls over 4 feet in height require engineered plans

Required documents

  • RequiredResidential Development ApplicationSame form used for new construction, with 'Addition,' 'Remodel,' 'Repair,' or 'Foundation Only' checked as project type
  • RequiredConstruction DrawingsPlans showing scope of work, existing conditions, and proposed alteration consistent with the 2018 IRC

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (same schedule as new construction)$23.50 minimum ($1-$500 valuation), scaling per the Building Permit Fees table (e.g., $69.25 for the first $2,000 plus $14.00 per additional $1,000 up to $25,000)City of Pocatello Building Permit Fees schedule
Plan Review Fee — Residential35% of the building permit feeCity of Pocatello Building Permit Fees schedule
Re-inspection$65 per hourCity of Pocatello Building Permit Fees schedule; must be paid prior to re-inspection
Additional plan review$65 per trade reviewCity of Pocatello Building Permit Fees schedule; must be paid prior to review

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Pocatello, governed by the 2023 National Electrical Code (NEC) as adopted by the City. Electrical contractors must hold a valid Idaho DOPL electrical contractor/journeyman license; the City issues the construction permit and performs inspections.

Verified 2026-07-03 · Source

Requirements

  • Electrical permit required for installation, alteration, or repair of electrical systems
  • Governed by the 2023 NEC as adopted by the City of Pocatello
  • Electrical contractors must present a copy of their State of Idaho (DOPL) electrical contractor license; the City does not issue a separate city electrical contractor license
  • Fee schedule scales by square footage for new residential electrical, or is itemized by service/permit type for other work
  • Apply through the eTRAKiT portal

Required documents

  • RequiredElectrical Permit ApplicationSubmitted online through the eTRAKiT portal (pocatello.gov/etrakit/)
  • RequiredCopy of State of Idaho DOPL Electrical Contractor LicenseRequired for the licensed electrical contractor performing the work

Fee schedule

Fee typeAmountNotes
New Residential Electrical — up to 1,500 sq ft$130City of Pocatello Building Permit Fees schedule
New Residential Electrical — 1,501 to 2,500 sq ft$195City of Pocatello Building Permit Fees schedule
New Residential Electrical — 2,501 to 3,500 sq ft$260City of Pocatello Building Permit Fees schedule
New Residential Electrical — 3,501 to 4,500 sq ft$325City of Pocatello Building Permit Fees schedule
New Residential Electrical — over 4,500 sq ft$325 plus $65 for each additional 1,000 sq ft or portion thereofCity of Pocatello Building Permit Fees schedule
Existing residence — service/circuit work$65 plus $10 per additional branch circuitCity of Pocatello Building Permit Fees schedule
Electric Space Heating & A/C$65City of Pocatello Building Permit Fees schedule
Service upgrade or service change$65City of Pocatello Building Permit Fees schedule
Temporary Service$65City of Pocatello Building Permit Fees schedule
Service Reconnect$65City of Pocatello Building Permit Fees schedule
Solar Photovoltaic Electrical Service — residential$65City of Pocatello Building Permit Fees schedule
Industrial/Commercial Services — up to $20,000 installation cost$65 permit fee plus 2% of costs up to $400City of Pocatello Building Permit Fees schedule
Industrial/Commercial Services — over $20,000 installation cost$65 permit fee plus $400 plus 0.5% of costs over $20,000City of Pocatello Building Permit Fees schedule

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Pocatello, governed by the 2017 Idaho State Plumbing Code as adopted by the City. Plumbing contractors must hold a valid Idaho DOPL plumbing license.

Verified 2026-07-03 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, water/sewer lines, and water heaters
  • Governed by the 2017 Idaho State Plumbing Code as adopted by the City of Pocatello
  • Plumbing contractors must present a copy of their State of Idaho (DOPL) plumbing contractor license; the City does not issue a separate city plumbing contractor license
  • New residential plumbing fee scales by square footage; other work (water/sewer lines, water heaters) is itemized
  • Apply through the eTRAKiT portal

Required documents

  • RequiredPlumbing Permit ApplicationSubmitted online through the eTRAKiT portal (pocatello.gov/etrakit/)
  • RequiredCopy of State of Idaho DOPL Plumbing Contractor LicenseRequired for the licensed plumbing contractor performing the work

Fee schedule

Fee typeAmountNotes
New Residential Plumbing — up to 1,500 sq ft$130City of Pocatello Building Permit Fees schedule
New Residential Plumbing — 1,501 to 2,500 sq ft$195City of Pocatello Building Permit Fees schedule
New Residential Plumbing — 2,501 to 3,500 sq ft$260City of Pocatello Building Permit Fees schedule
New Residential Plumbing — 3,501 to 4,500 sq ft$325City of Pocatello Building Permit Fees schedule
New Residential Plumbing — over 4,500 sq ft$325 plus $65 for each additional 1,000 sq ft or portion thereofCity of Pocatello Building Permit Fees schedule
Existing Residential Plumbing (per structure)$65 per structure plus $10 per fixtureCity of Pocatello Building Permit Fees schedule
Water line alone$65City of Pocatello Building Permit Fees schedule
Sewer line alone$65City of Pocatello Building Permit Fees schedule
Water and sewer installed together$65City of Pocatello Building Permit Fees schedule
Water Heater$65City of Pocatello Building Permit Fees schedule
Commercial/Industrial — up to $20,000 installation cost$65 minimum plus 2% of total costsCity of Pocatello Building Permit Fees schedule
Commercial/Industrial — over $20,000 installation cost$65 minimum plus 2% of total costs up to $20,000 plus 1.5% of total costs over $20,000City of Pocatello Building Permit Fees schedule
Irrigation System — Residential$65City of Pocatello Building Permit Fees schedule

Mechanical / HVAC Permit

Verified

Required for mechanical (HVAC), fuel gas, and ventilation installation, alteration, or repair work in Pocatello, governed by the 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) as adopted by the City.

Verified 2026-07-03 · Source

Requirements

  • Mechanical permit required for installation, alteration, or repair of HVAC systems, appliances, ductwork, fuel gas piping, and hydronic systems
  • Governed by the 2018 IMC and 2018 IFGC as adopted by the City of Pocatello
  • Mechanical contractors must present a copy of their State of Idaho (DOPL) mechanical contractor license; the City does not issue a separate city mechanical contractor license
  • Manual D, J, and S HVAC sizing calculations required with new residential building plans (effective Oct. 1, 2021); every fifth home built by a builder must be blower-door tested
  • New residential mechanical fee scales by square footage for new construction; itemized per-unit fees apply for appliances, ducts, fuel gas piping, and hydronic zones in other cases
  • Apply through the eTRAKiT portal

Required documents

  • RequiredMechanical Permit ApplicationSubmitted online through the eTRAKiT portal (pocatello.gov/etrakit/)
  • RequiredCopy of State of Idaho DOPL Mechanical Contractor LicenseRequired for the licensed mechanical contractor performing the work
  • OptionalManual D, J, and S CalculationsRequired with new residential building plans prior to plan review, effective October 1, 2021

Fee schedule

Fee typeAmountNotes
New Residential Mechanical — up to 1,500 sq ft$130City of Pocatello Building Permit Fees schedule
New Residential Mechanical — 1,501 to 2,500 sq ft$195City of Pocatello Building Permit Fees schedule
New Residential Mechanical — 2,501 to 3,500 sq ft$260City of Pocatello Building Permit Fees schedule
New Residential Mechanical — 3,501 to 4,500 sq ft$325City of Pocatello Building Permit Fees schedule
New Residential Mechanical — over 4,500 sq ft$325 plus $65 for each additional 1,000 sq ft or portion thereofCity of Pocatello Building Permit Fees schedule
Residential Base Permit (existing structure)$65City of Pocatello Building Permit Fees schedule
Appliances$20 per applianceCity of Pocatello Building Permit Fees schedule
Exhaust or ventilation ducts$15 for the first duct plus $5 per additional ductCity of Pocatello Building Permit Fees schedule
Fuel gas piping$5 per appliance outletCity of Pocatello Building Permit Fees schedule
Hydronic system$5 per zoneCity of Pocatello Building Permit Fees schedule
Commercial — up to $20,000 installation cost$65 minimum plus 2% of total costs up to $400City of Pocatello Building Permit Fees schedule
Commercial — over $20,000 installation cost$65 minimum plus $400 plus 1.5% of said costs over $20,000City of Pocatello Building Permit Fees schedule

Re-Roof / Roof Overlay Permit

Verified

Required for residential and commercial re-roofing or roof overlay work in Pocatello. Residential re-roofs carry a flat fee; commercial re-roofs are charged under the standard valuation-based Building Permit Fee schedule.

Verified 2026-07-03 · Source

Requirements

  • Permit required for re-roof or roof overlay work
  • Residential re-roof/overlay carries a flat permit fee
  • Commercial re-roof/overlay is charged per the Building Permit Fees valuation table
  • Governed by the 2018 IBC/IRC as adopted by the City of Pocatello

Required documents

  • RequiredBuilding Permit Application (Re-Roof)Submitted online through the eTRAKiT portal (pocatello.gov/etrakit/)

Fee schedule

Fee typeAmountNotes
Re-Roof or Roof Overlay — Residential$65City of Pocatello Building Permit Fees schedule
Re-Roof or Roof Overlay — CommercialPer Building Permit Fees valuation table (see Residential Building Permit entry)City of Pocatello Building Permit Fees schedule ('See Building Permit Fees above')

Solar Photovoltaic (PV) Permit

Verified

Required for residential and commercial solar photovoltaic system installation in Pocatello. Accessory-use solar PV is allowed by right in all zoning districts; the City created a dedicated Solar Permit Application through its SolSmart accreditation process.

Verified 2026-07-03 · Source

Requirements

  • Solar PV permit required for grid-tied or standalone photovoltaic system installation
  • Accessory Use Solar Photovoltaics (PV) allowed by right in all zoning districts per City clarification (2022)
  • Dedicated Solar Permit Application with an inclusive checklist, created via the City's SolSmart silver-designation accreditation process
  • Electrical permit fee applies for the solar electrical service connection
  • Apply through the eTRAKiT portal

Required documents

  • RequiredSolar Permit ApplicationCity of Pocatello's dedicated solar permit application with installer checklist, accessed via the eTRAKiT portal (pocatello.gov/etrakit/)
  • OptionalAccessory Use Solar PV Zoning Clarification (2022) (PDF)City memo confirming solar PV is allowed by right in all zones

Fee schedule

Fee typeAmountNotes
Solar Photovoltaic Electrical Service — Residential$65City of Pocatello Building Permit Fees schedule (Electrical Permit Fees table)
Solar Photovoltaic Electrical Service — Commercial$65City of Pocatello Building Permit Fees schedule (Electrical Permit Fees table)

Demolition Permit

Verified

Required for building demolitions in Pocatello. The Building Department issues demolition permits at a flat fee alongside other construction permits, as part of its stated scope covering 'building demolitions; excavations; signs and sidewalks.' Demolition is governed generally by Pocatello Municipal Code Chapter 15.04 (Building Code) rather than a dedicated demolition chapter or bond ordinance.

Verified 2026-07-03 · Source

Requirements

  • Demolition permit required for building demolitions within city limits
  • Issued by the City of Pocatello Building Department as part of its general permitting scope
  • Governed by Pocatello Municipal Code 15.04.010, which subjects 'erection, construction, enlargement, alteration, repair, moving, removal, conversion, demolition, occupancy, equipment, use, height, area and maintenance of buildings and structures' to the adopted International Building Code / International Residential Code; no separate demolition-specific chapter, bond, or dedicated application form exists in the Municipal Code
  • Apply through the eTRAKiT portal

Required documents

  • RequiredDemolition Permit ApplicationSubmitted online through the eTRAKiT portal (pocatello.gov/etrakit/)

Fee schedule

Fee typeAmountNotes
Demolition$65City of Pocatello Building Permit Fees schedule (General Permit Fees table)

Fence Permit

Verified

Required for property-line fence construction in Pocatello. Height limits apply by location (front-yard setback vs. rear/side yard vs. sight triangle), per Pocatello City Code Chapter 15.28.

Verified 2026-07-03 · Source

Requirements

  • Fence permit required for property-line fence construction
  • Fence shall not exceed 7 feet in height
  • Fence within the front-yard setback may not exceed 4 feet in height
  • No fence, hedge, or walled enclosure may exceed 3 feet in height within the sight triangle (corner visibility area)
  • Site/plot plan required showing the proposed fence location on the property (or drawn on an aerial view map)
  • Inspection required upon completion; call the inspection hotline at (208) 234-6275 with permit number, address, and phone number — inspection completed within 24 hours
  • Complete fence guidelines are in Pocatello City Code Chapter 15.28

Required documents

  • RequiredProperty Line Fence Permit ApplicationCity of Pocatello Building Department fence permit form requiring owner/contractor info, site address, fence height by section, total linear feet, materials, and a site/plot plan

Fee schedule

Fee typeAmountNotes
Fence Permit$65City of Pocatello Building Permit Fees schedule (General Permit Fees table)

Accessory Dwelling Unit (ADU) Permit

Verified

ADUs are permitted in Pocatello but are processed as a Planning & Development Services land-use matter (not solely a Building Department permit); construction still requires a separate building permit and compliance with adopted codes. A recorded restrictive covenant is required.

Verified 2026-07-03 · Source

Requirements

  • Accessory Dwelling Unit land-use application processed by Planning & Development Services (208-234-6184), separate from the Building Department's construction permit
  • Accessory Dwelling Unit Restrictive Covenant must be executed and recorded
  • Building permit still required for ADU construction, subject to all adopted building codes (2018 IBC/IRC as amended)
  • Apply for the land-use component through eTRAKiT's Land Use Permits category; apply for the construction permit through eTRAKiT's Building Permits category

Required documents

  • RequiredAccessory Dwelling Unit Restrictive Covenant (PDF)City of Pocatello legal document recorded against the property as a condition of ADU approval
  • RequiredLand Use Permit Application (ADU)Submitted through the eTRAKiT portal's Land Use Permits category to Planning & Development Services
  • RequiredBuilding Permit ApplicationStandard Residential Development Application / Building Permit application for the ADU structure itself

Fee schedule

Fee typeAmountNotes
ADU Construction — Building Permit Fee (valuation-based, same schedule as new residential construction)$23.50 minimum ($1-$500 valuation), scaling per the Building Permit Fees table (e.g., $69.25 for the first $2,000 plus $14.00 per additional $1,000 up to $25,000; see Residential Building Permit fee schedule for full table)An ADU is built under the standard Building Department building permit for the structure, valued and fee-scheduled identically to new residential construction; City of Pocatello Building Permit Fees schedule
Plan Review Fee — Residential35% of the building permit feeCity of Pocatello Building Permit Fees schedule; applies to the building-permit component of an ADU
Land-Use Application Fee — Administrative Review (staff level review), AAA/ADU$50
City of Pocatello FY2026 Fee Resolution No. Show full citation

City of Pocatello FY2026 Fee Resolution No. 2025-30, Exhibit O (Planning and Development Service Fees), effective Oct. 1, 2025–Sept. 30, 2026: 'Administrative Review (staff level review) AAA, ADU — $50.00.' An ADU is a permitted accessory use processed as a staff-level Administrative Review (Pocatello City Code 17.06.100), not a hearing-based Conditional Use Permit.

EV Charger / EVSE Permit

Verified

The City of Pocatello has no EV-charger-specific permit type or fee line. The City's Building Permit Fees schedule lists itemized electrical fee categories (New Residential Electrical by square footage, Existing Residence service/circuit work, Service Upgrade or Service Change, Temporary Service, Solar Photovoltaic Electrical Service, Industrial/Commercial Services, Electric Signs, Carnivals/Circuses) but no EV-charger, electric-vehicle, or EVSE line item — confirmed by direct review of the published fee schedule page. An EV charger circuit is filed as ordinary residential electrical work: a new dedicated circuit at an existing residence (the 'Existing residence — service/circuit work' fee), or a 'Service upgrade or service change' fee if a panel upgrade is needed to support the charger. Work is governed by the 2023 NEC as adopted by the City and applied for through the eTRAKiT portal.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the EV charger circuit installation, filed as ordinary residential electrical work
  • Governed by the 2023 NEC as adopted by the City of Pocatello
  • Electrical contractors must present a copy of their State of Idaho (DOPL) electrical contractor license; the City does not issue a separate city electrical contractor license
  • Apply through the eTRAKiT portal

Required documents

  • RequiredElectrical Permit ApplicationSubmitted online through the eTRAKiT portal (pocatello.gov/etrakit/); there is no separate EV-charger-specific application form
  • RequiredCopy of State of Idaho DOPL Electrical Contractor LicenseRequired for the licensed electrical contractor performing the work

Fee schedule

Fee typeAmountNotes
Existing residence — service/circuit work (applies to a new dedicated EV charger circuit; no EV-specific line item found)$65 plus $10 per additional branch circuitCity of Pocatello Building Permit Fees schedule. Confirmed by direct review of the published fee schedule: no EV charger, electric vehicle, or EVSE line item exists — an EV charger circuit is billed under this general existing-residence electrical service/circuit category.
Service upgrade or service change (if a panel upgrade is required to support the charger)$65City of Pocatello Building Permit Fees schedule

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pocatello building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-03)Later version (2026-08-02) →View current record →All versions →

Permalink: /idaho/bannock-county/pocatello/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: 66abe0e

Reproducible from PermitBase’s version-controlled dataset, commit 66abe0e.