- 2026-08-02Current record
- Plummer, Idaho — Commercial Building Permit record added
- Plummer, Idaho — Commercial Tenant Improvement / Change of Use Permit record added
- 2026-07-20Superseded
- Plummer, Idaho — EV Charger / EVSE Permit record added
- Plummer, Idaho — EV Charger / EVSE Permit fee record added: Electrical Permit — Existing Residence / Detached Shop (State of Idaho DOPL) ($65 flat fee, includes one branch circuit; plus $10 for each additional branch circuit)
- Plummer, Idaho — EV Charger / EVSE Permit fee record added: Building Permit — valuation-based (1997 UBC table, plus City's 25% surcharge) ($69.25 for the first $2,000 of valuation, plus $14 for each additional $1,000 or fraction thereof, plus the City's 25% surcharge)
- Plummer, Idaho — EV Charger / EVSE Permit fee record removed: Building Permit — valuation-based (1997 UBC table, plus City's 25% surcharge) — no EV-specific or general electrical fee line found
- Plummer, Idaho — Solar Photovoltaic (PV) Permit record added
- Plummer, Idaho — Solar Photovoltaic (PV) Permit fee record added: Idaho DOPL Electrical Permit — Other Installation (Including Industrial and Commercial) fee schedule (electrical interconnection scope, since Plummer has no local electrical-permitting program) (Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,000–$100,000: $260 plus 1% of the amount over $10,000; over $100,000: $1,160 plus 0.5% of the amount over $100,000)
- 2026-07-07Initial record — coverage of Plummer began