This is PermitBase’s published record for Hailey as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Hailey building permits
VerifiedHailey, Idaho — as published 2026-07-07.
Verified 2026-07-07 · Source
Codes adopted
Permit types & fees
Building Permit (New Construction, Additions, Remodels)
VerifiedRequired for erecting, constructing, enlarging, altering, repairing, moving, improving, removing, converting, or demolishing any part of a building in Hailey, including new single-family and multi-family residential construction, commercial construction, and residential remodels. Painting, residing, and replacing floor coverings are exempt; window replacement requires a permit.
Verified 2026-07-07 · Source
Requirements
- New construction (commercial, single-family residential, or multi-family residential)
- Remodels (commercial or residential)
- Garages, basements, carports, foundations
- Accessory structures over 120 square feet (sheds, decks, pergolas, porches)
- Window replacement
- Construction documents must be submitted electronically for residential projects; two or more paper sets for commercial projects, prepared by an Idaho-licensed architect or structural engineer where required
Required documents
- RequiredApplication for Building PermitCity of Hailey Community Development Department application, revised 12/01/2025; includes owner, contractor (registration number mandatory), architect, class of work, zoning, and estimated cost of construction
- RequiredConstruction DrawingsSite plan, floor plans, elevations, sections, and structural details; electronic plan review submittal required for residential projects
- OptionalFloodplain Development Permit ApplicationRequired if the lot is in a designated flood plain
- RequiredZoning Review ChecklistConfirms zoning district, overlay designation, and proposed setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation $1 to $500 | $27.78 | Hailey Building Permit Fee Table 1-A, effective October 1, 2025 |
| Building Permit — valuation $501 to $2,000 | $27.78 for the first $500, plus $3.23 for each additional $100 or fraction thereof, to and including $2,000 | — |
| Building Permit — valuation $2,001 to $25,000 | $124.23 for the first $2,000, plus $19.65 for each additional $1,000 or fraction thereof, to and including $25,000 | — |
| Building Permit — valuation $25,001 to $50,000 | $556.84 for the first $25,000, plus $12.93 for each additional $1,000 or fraction thereof, to and including $50,000 | — |
| Building Permit — valuation $50,001 to $100,000 | $915.03 for the first $50,000, plus $5.74 for each additional $1,000 or fraction thereof, to and including $100,000 | — |
| Building Permit — valuation $100,001 to $500,000 | $1,412.52 for the first $100,000, plus $7.11 for each additional $1,000 or fraction thereof, to and including $500,000 | — |
| Building Permit — valuation $500,001 to $1,000,000 | $4,596.45 for the first $500,000, plus $6.14 for each additional $1,000 or fraction thereof, to and including $1,000,000 | — |
| Building Permit — valuation $1,000,001 and up | $7,971.90 for the first $1,000,000, plus $4.52 for each additional $1,000 or fraction thereof | — |
| Plan Check Fee | 67% of the base Building Permit Fee | Per Hailey Municipal Fee Schedule effective October 1, 2025 and confirmed on the Building Permit Application (rev. 12/01/2025) |
| Planning Review Fee | 34% of the Plan Check Fee | Per Building Permit Application (rev. 12/01/2025) |
| Hailey Fire Dept. Plan Review Fee | 44% of the Plan Check Fee, where applicable | Per Hailey Municipal Fee Schedule effective October 1, 2025 and the Building Permit Application (rev. 12/01/2025) |
| Development Impact Fee — new single-family dwelling, 600 sq ft or less net floor area | $3,464 per dwelling unit (Parks & Recreation $898 + Circulation $1,407 + Fire $1,018 + Police $141) | Development Impact Fee Schedule effective 12/01/2025; scales up to $12,465 per unit for 3,001+ sq ft |
| Hailey Clean Energy Deposit — new single-family, ADU associated with new construction, or townhome | $1,288.00 flat | Clean Energy Deposit Fee effective 05/18/2022, confirmed at $1,288 in the FY2026 Municipal Fee Schedule |
| Building Permit Extension (180-day extension) | $170 | FY2026 Hailey Municipal Fee Schedule; up to 4 extensions permitted |
Fence Permit
VerifiedRequired for all fences in Hailey, reviewed and approved through Community Development's planning and zoning staff. Height limited to 4 feet in the required front yard setback and 6 feet in required side/rear yard setbacks; corner lots have additional sight-triangle restrictions.
Verified 2026-07-07 · Source
Requirements
- All new fences require a permit reviewed by planning and zoning staff
- Maximum height 4 feet within the required front yard setback
- Maximum height 6 feet within required side and rear yard setbacks
- Fences on corner lots may not be located within 75 feet of the centerline intersection of the two streets
- Barbed wire, sharp-pointed metal, and electrically charged fences are prohibited unless approved by the Planning and Zoning Commission
- Governed by Hailey Municipal Code Title 17, Chapter 17.08A
Required documents
- RequiredFence Permit ApplicationAvailable from Hailey Community Development Department, Forms & Fees page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence Permit | $80 | FY2026 Hailey Municipal Fee Schedule, effective October 1, 2025 (up from $78 in FY2025) |
Re-Roof Permit
VerifiedRequired for roof replacement or re-roofing in Hailey, classified as a repair/remodel under the building code. Small patch jobs do not require a permit. Fee is valuation-based on the same Table 1-A schedule as new construction.
Verified 2026-07-07 · Source
Requirements
- Full roof tear-off and replacement, or re-roofing overlay
- Small patch/repair jobs are exempt
- New roof coverings must meet a minimum Class C roof assembly or be an approved noncombustible covering
- Cedar shake and other wood-based roof coverings are prohibited
- Alterations or repairs affecting 50% or more of an existing roof surface must bring the entire roof into compliance with Hailey's roof-covering amendment
Required documents
- RequiredBuilding Permit ApplicationSame City of Hailey application form used for all building permits; scope of work described as re-roof
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roof Permit — base fee based on estimated cost of construction | Calculated using Table 1-A valuation schedule (same as new construction Building Permit Fee) | FY2026 Hailey Municipal Fee Schedule: 'Re-Roof Permit — Base Permit Fee (based on estimated total valuation - Table 1A)' — no separate flat fee; valuation-based, no change proposed for FY2026 |
Demolition Permit
VerifiedRequired for moving a structure from one site to another, or destruction/demolition of a structure for disposal, in Hailey. Structures built wholly or in part before 1941 are treated as "historic structures" and trigger an additional 120-day review process before a demolition permit can be issued.
Verified 2026-07-07 · Source
Requirements
- Permit application must include owner, address, property description, phone number, description of scope, and time frame
- Acknowledgment of the demolition by utility companies, the Blaine County Assessor's office, and the building official (if other than City of Hailey) is required
- For historic structures (built wholly or in part before 1941): application is routed to Hailey Planning, Fire Department, and the Hailey Arts and Historic Preservation Commission for a 120-day review
- Applicant must demonstrate the building's age using reliable records (e.g., Blaine County Assessor records)
- Following demolition, the site must be revegetated with drought-resistant grasses/shrubs within one month, including noxious weed abatement
Required documents
- RequiredDemolition Permit ApplicationCity of Hailey application including owner, address, property description, and demolition scope/timeframe
- OptionalHistoric Structure DocumentationRequired only for structures built wholly or in part before 1941: color photographs (at least 4"x6") of at least two elevations, height/square footage/current use, and historical photographs if available
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | $160 | FY2026 Hailey Municipal Fee Schedule, effective October 1, 2025 (up from $155 in FY2025) |
| Historic Demolition Permit — base fee | $163, plus $57 publication cost and $38 onsite posting per notice | FY2026 Hailey Municipal Fee Schedule, effective October 1, 2025 |
Alternative Energy System Permit (Solar/Renewable)
VerifiedRequired for alternative energy system installations (e.g., rooftop solar) in Hailey. Uses a flat application fee model rather than valuation-based fees, established to base charges on actual staff time rather than system value.
Verified 2026-07-07 · Source
Requirements
- Alternative energy system installation (e.g., rooftop or ground-mounted solar photovoltaic)
- Structural/mounting review handled by the City of Hailey Building Division
- Electrical connection work falls under the State of Idaho DOPL electrical permitting program, not the City
Required documents
- RequiredAlternative Energy Permit ApplicationCity of Hailey application; flat fee plus percentage of plan review fee
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Alternative Energy Permit — application fee | $106, plus 67% of the fee for Plan Review | FY2026 Hailey Municipal Fee Schedule, effective October 1, 2025 (up from $103 + 65% in FY2025); established by Hailey Ordinance No. 1119 to move alternative energy permits from valuation-based to flat-fee pricing |
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hailey building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.