Hailey building permits

Verified

Hailey, Idaho — as published 2026-07-07.

Verified 2026-07-07 · Source

Codes adopted

2018 International Building Code (IBC), as amended by the Idaho Building Code Board, including new Appendix O (Radon Control Methods)2018 International Residential Code (IRC), Parts I–III and IX, as amended by the Idaho Building Code Board, including Appendix F (Radon Control Methods), Appendix Q (Tiny Houses), and Appendix T (Solar Ready Provisions — Detached One- and Two-Family Dwellings and Townhouses)2018 International Energy Conservation Code (IECC), as amended by the Idaho Building Code Board2018 International Swimming Pool and Spa Code (ISPSC)2018 International Existing Building Code (IEBC), as amended by the Idaho Building Code BoardIdaho State Plumbing Code (ISPC), as adopted and amended by the Idaho Plumbing Board — required plumbing fixture counts per IBC Table 2902.1National Electrical Code (NEC), latest edition approved by the Idaho Electrical Board — administered and inspected by the State of Idaho, not the City of Hailey

Permit types & fees

Building Permit (New Construction, Additions, Remodels)

Verified

Required for erecting, constructing, enlarging, altering, repairing, moving, improving, removing, converting, or demolishing any part of a building in Hailey, including new single-family and multi-family residential construction, commercial construction, and residential remodels. Painting, residing, and replacing floor coverings are exempt; window replacement requires a permit.

Verified 2026-07-07 · Source

Requirements

  • New construction (commercial, single-family residential, or multi-family residential)
  • Remodels (commercial or residential)
  • Garages, basements, carports, foundations
  • Accessory structures over 120 square feet (sheds, decks, pergolas, porches)
  • Window replacement
  • Construction documents must be submitted electronically for residential projects; two or more paper sets for commercial projects, prepared by an Idaho-licensed architect or structural engineer where required

Required documents

  • RequiredApplication for Building PermitCity of Hailey Community Development Department application, revised 12/01/2025; includes owner, contractor (registration number mandatory), architect, class of work, zoning, and estimated cost of construction
  • RequiredConstruction DrawingsSite plan, floor plans, elevations, sections, and structural details; electronic plan review submittal required for residential projects
  • OptionalFloodplain Development Permit ApplicationRequired if the lot is in a designated flood plain
  • RequiredZoning Review ChecklistConfirms zoning district, overlay designation, and proposed setbacks

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $500$27.78Hailey Building Permit Fee Table 1-A, effective October 1, 2025
Building Permit — valuation $501 to $2,000$27.78 for the first $500, plus $3.23 for each additional $100 or fraction thereof, to and including $2,000
Building Permit — valuation $2,001 to $25,000$124.23 for the first $2,000, plus $19.65 for each additional $1,000 or fraction thereof, to and including $25,000
Building Permit — valuation $25,001 to $50,000$556.84 for the first $25,000, plus $12.93 for each additional $1,000 or fraction thereof, to and including $50,000
Building Permit — valuation $50,001 to $100,000$915.03 for the first $50,000, plus $5.74 for each additional $1,000 or fraction thereof, to and including $100,000
Building Permit — valuation $100,001 to $500,000$1,412.52 for the first $100,000, plus $7.11 for each additional $1,000 or fraction thereof, to and including $500,000
Building Permit — valuation $500,001 to $1,000,000$4,596.45 for the first $500,000, plus $6.14 for each additional $1,000 or fraction thereof, to and including $1,000,000
Building Permit — valuation $1,000,001 and up$7,971.90 for the first $1,000,000, plus $4.52 for each additional $1,000 or fraction thereof
Plan Check Fee67% of the base Building Permit FeePer Hailey Municipal Fee Schedule effective October 1, 2025 and confirmed on the Building Permit Application (rev. 12/01/2025)
Planning Review Fee34% of the Plan Check FeePer Building Permit Application (rev. 12/01/2025)
Hailey Fire Dept. Plan Review Fee44% of the Plan Check Fee, where applicablePer Hailey Municipal Fee Schedule effective October 1, 2025 and the Building Permit Application (rev. 12/01/2025)
Development Impact Fee — new single-family dwelling, 600 sq ft or less net floor area$3,464 per dwelling unit (Parks & Recreation $898 + Circulation $1,407 + Fire $1,018 + Police $141)Development Impact Fee Schedule effective 12/01/2025; scales up to $12,465 per unit for 3,001+ sq ft
Hailey Clean Energy Deposit — new single-family, ADU associated with new construction, or townhome$1,288.00 flatClean Energy Deposit Fee effective 05/18/2022, confirmed at $1,288 in the FY2026 Municipal Fee Schedule
Building Permit Extension (180-day extension)$170FY2026 Hailey Municipal Fee Schedule; up to 4 extensions permitted

Fence Permit

Verified

Required for all fences in Hailey, reviewed and approved through Community Development's planning and zoning staff. Height limited to 4 feet in the required front yard setback and 6 feet in required side/rear yard setbacks; corner lots have additional sight-triangle restrictions.

Verified 2026-07-07 · Source

Requirements

  • All new fences require a permit reviewed by planning and zoning staff
  • Maximum height 4 feet within the required front yard setback
  • Maximum height 6 feet within required side and rear yard setbacks
  • Fences on corner lots may not be located within 75 feet of the centerline intersection of the two streets
  • Barbed wire, sharp-pointed metal, and electrically charged fences are prohibited unless approved by the Planning and Zoning Commission
  • Governed by Hailey Municipal Code Title 17, Chapter 17.08A

Required documents

  • RequiredFence Permit ApplicationAvailable from Hailey Community Development Department, Forms & Fees page

Fee schedule

Fee typeAmountNotes
Fence Permit$80FY2026 Hailey Municipal Fee Schedule, effective October 1, 2025 (up from $78 in FY2025)

Re-Roof Permit

Verified

Required for roof replacement or re-roofing in Hailey, classified as a repair/remodel under the building code. Small patch jobs do not require a permit. Fee is valuation-based on the same Table 1-A schedule as new construction.

Verified 2026-07-07 · Source

Requirements

  • Full roof tear-off and replacement, or re-roofing overlay
  • Small patch/repair jobs are exempt
  • New roof coverings must meet a minimum Class C roof assembly or be an approved noncombustible covering
  • Cedar shake and other wood-based roof coverings are prohibited
  • Alterations or repairs affecting 50% or more of an existing roof surface must bring the entire roof into compliance with Hailey's roof-covering amendment

Required documents

  • RequiredBuilding Permit ApplicationSame City of Hailey application form used for all building permits; scope of work described as re-roof

Fee schedule

Fee typeAmountNotes
Re-Roof Permit — base fee based on estimated cost of constructionCalculated using Table 1-A valuation schedule (same as new construction Building Permit Fee)FY2026 Hailey Municipal Fee Schedule: 'Re-Roof Permit — Base Permit Fee (based on estimated total valuation - Table 1A)' — no separate flat fee; valuation-based, no change proposed for FY2026

Demolition Permit

Verified

Required for moving a structure from one site to another, or destruction/demolition of a structure for disposal, in Hailey. Structures built wholly or in part before 1941 are treated as "historic structures" and trigger an additional 120-day review process before a demolition permit can be issued.

Verified 2026-07-07 · Source

Requirements

  • Permit application must include owner, address, property description, phone number, description of scope, and time frame
  • Acknowledgment of the demolition by utility companies, the Blaine County Assessor's office, and the building official (if other than City of Hailey) is required
  • For historic structures (built wholly or in part before 1941): application is routed to Hailey Planning, Fire Department, and the Hailey Arts and Historic Preservation Commission for a 120-day review
  • Applicant must demonstrate the building's age using reliable records (e.g., Blaine County Assessor records)
  • Following demolition, the site must be revegetated with drought-resistant grasses/shrubs within one month, including noxious weed abatement

Required documents

  • RequiredDemolition Permit ApplicationCity of Hailey application including owner, address, property description, and demolition scope/timeframe
  • OptionalHistoric Structure DocumentationRequired only for structures built wholly or in part before 1941: color photographs (at least 4"x6") of at least two elevations, height/square footage/current use, and historical photographs if available

Fee schedule

Fee typeAmountNotes
Demolition Permit$160FY2026 Hailey Municipal Fee Schedule, effective October 1, 2025 (up from $155 in FY2025)
Historic Demolition Permit — base fee$163, plus $57 publication cost and $38 onsite posting per noticeFY2026 Hailey Municipal Fee Schedule, effective October 1, 2025

Alternative Energy System Permit (Solar/Renewable)

Verified

Required for alternative energy system installations (e.g., rooftop solar) in Hailey. Uses a flat application fee model rather than valuation-based fees, established to base charges on actual staff time rather than system value.

Verified 2026-07-07 · Source

Requirements

  • Alternative energy system installation (e.g., rooftop or ground-mounted solar photovoltaic)
  • Structural/mounting review handled by the City of Hailey Building Division
  • Electrical connection work falls under the State of Idaho DOPL electrical permitting program, not the City

Required documents

  • RequiredAlternative Energy Permit ApplicationCity of Hailey application; flat fee plus percentage of plan review fee

Fee schedule

Fee typeAmountNotes
Alternative Energy Permit — application fee$106, plus 67% of the fee for Plan ReviewFY2026 Hailey Municipal Fee Schedule, effective October 1, 2025 (up from $103 + 65% in FY2025); established by Hailey Ordinance No. 1119 to move alternative energy permits from valuation-based to flat-fee pricing

Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mount solar photovoltaic systems within Hailey city limits. The City's own permit is officially named the 'Alternative Energy Permit' (see the sibling alternative-energy-permit entry in this dataset for the full record) and covers the structural/mounting review; it uses a flat application-fee model rather than valuation-based fees, established by Hailey Ordinance No. 1119 specifically to base charges on actual staff time rather than system value. A separate State of Idaho DOPL electrical permit is required for the wiring/interconnection scope.

Verified 2026-07-20 · Source

Requirements

  • Alternative Energy Permit application (the City's official name for its solar/renewable-energy permit) submitted to the City of Hailey Building Division for the structural/mounting scope
  • Electrical connection work falls under the State of Idaho DOPL electrical permitting program, not the City -- on the DOPL Contractor Electrical Permit Worksheet, check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box under 'Other Installations including Commercial/Industrial/Solar/Renewable Energy'
  • Hailey deliberately moved this permit from valuation-based to flat-fee pricing via Ordinance No. 1119, reasoning that structural review effort does not scale with system cost
  • Renewable energy installations require a plan check prior to final inspection on the state electrical side, per the DOPL Electrical Permit Worksheet

Required documents

  • RequiredAlternative Energy Permit ApplicationCity of Hailey application for the structural/mounting scope; flat fee plus percentage of plan review fee
  • RequiredIdaho DOPL Contractor (or Homeowner) Electrical Permit ApplicationState application with an Electrical Permit Worksheet (Fee Schedule) that includes a dedicated Solar/Renewable Energy checkbox and valuation-based fee formula, for the wiring/interconnection scope

Fee schedule

Fee typeAmountNotes
Alternative Energy Permit -- application fee$106, plus 67% of the fee for Plan ReviewFY2026 Hailey Municipal Fee Schedule, effective October 1, 2025 (up from $103 + 65% in FY2025); established by Hailey Ordinance No. 1119 to move alternative energy permits from valuation-based to flat-fee pricing
State DOPL Electrical Permit -- Solar/Renewable Energy, up to $10,000 system cost(total system cost x 0.02) + $60Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022
State DOPL Electrical Permit -- Solar/Renewable Energy, $10,001-$100,000 system cost((system cost - $10,000) x 0.01) + $260Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022

EV Charger / EVSE Permit

Verified

Hailey has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. Unlike solar/renewable-energy installations (which trigger the City's flat-fee 'Alternative Energy Permit'), an EV charger is not a power-generation or energy-storage system, so it does not require a City structural/mounting permit. The wiring/circuit work is billed as a standard electrical installation under the State of Idaho DOPL Contractor (or Homeowner) Electrical Permit, using the general 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' valuation-based fee formula (the same formula used for solar, just without the Solar/Renewable Energy checkbox).

Verified 2026-07-20 · Source

Requirements

  • No City of Hailey building or structural permit is required for a standard wall-mounted or pedestal EV charger installation -- only electrical work is involved
  • Electrical permit issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City, per the DOPL Contractor Electrical Permit Worksheet
  • On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- the worksheet states this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all
  • Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- that box is for generation/storage systems, not vehicle-charging loads; the fee formula is identical either way

Required documents

  • RequiredIdaho DOPL Contractor (or Homeowner) Electrical Permit ApplicationState application with the Electrical Permit Worksheet (Fee Schedule); EV charger circuit work is priced under the 'Other Installations' valuation-based formula

Fee schedule

Fee typeAmountNotes
State DOPL Electrical Permit -- Other Installations, up to $10,000 system cost(total cost of system x 0.02) + $60Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022 -- same formula tier used for solar/renewable energy; no dedicated EV/EVSE line item exists on the state form
State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system cost((total cost of system - $10,000) x 0.01) + $260Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hailey building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /idaho/blaine-county/hailey/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: af1def2

Reproducible from PermitBase’s version-controlled dataset, commit af1def2.