Skip to main content
PermitBase

Version history — Idaho City, Idaho

This is PermitBase’s own verified record for Idaho City, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Idaho City’s actual law was at that time.

Permanent link to today’s record

/idaho/boise-county/idaho-city/as-of/2026-08-02/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-02Current record
    • Idaho City, Idaho — Commercial Building Permit (New Construction & Additions) record added
    • Idaho City, Idaho — Tenant Improvement / Commercial Remodel Permit record added
  • 2026-07-20Superseded
    • Idaho City, Idaho — Solar Photovoltaic (PV) Permit record added
    • Idaho City, Idaho — Electric Vehicle (EV) Charger / EVSE Permit record added
    • Idaho City, Idaho — Electric Vehicle (EV) Charger / EVSE Permit fee record added: Existing Residential Dwelling Unit Permit (DOPL) — applies to an EV charger circuit added to an existing home ($65 per inspection)
    • Idaho City, Idaho — Electric Vehicle (EV) Charger / EVSE Permit fee record added: Other Installation (Including Industrial and Commercial) Permit (DOPL) — applies to commercial/multi-family EV charging installations (Wiring cost not exceeding $10,000: $60 plus 2% of wiring cost. $10,001-$100,000: $260 plus 1% of the amount over $10,000. Over $100,000: $1,160 plus 0.5% of the amount over $100,000.)
    • Idaho City, Idaho — Electric Vehicle (EV) Charger / EVSE Permit fee record removed: Electrical Permit (DOPL, valuation-based)
  • 2026-07-07Initial record — coverage of Idaho City began