This is PermitBase’s published record for Priest River as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Priest River building permits
VerifiedPriest River, Idaho — as published 2026-07-07.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for all new single-family residential construction in the City of Priest River. Building plan review and inspections are performed by James A. Sewell & Associates, LLC under contract as the City's Building Official; the permit itself is issued by the City.
Verified 2026-07-08 · Source
Requirements
- Recorded copy of warranty deed or lease agreement showing name and legal description
- Compliance with zoning, subdivision, stormwater, and floodplain regulations
- Completed plot plan showing all setbacks from structure to property lines (survey may be required)
- Stormwater plan required if building site is within 300 feet of surface water or on a slope of 15% or greater
- Water and sewer approval signature from the City of Priest River obtained before application is accepted
- TWO (2) 11x17 complete sets of construction plans drawn to scale (full-size sets may be required if not legible)
- Plans for all pole buildings must be stamped by an Idaho Licensed Design Professional
- Commercial, industrial, and pole buildings must be wet-stamped by an Idaho-licensed architect or engineer per state law
- Separate state-issued Electrical, Mechanical, and Plumbing permits required via Idaho DOPL — not issued by the City
Required documents
- RequiredBuilding Permit and Sign ApplicationCity of Priest River / James A. Sewell & Associates combined building permit and plot plan application form
- RequiredRecorded Warranty Deed or Lease AgreementMust show applicant's name and legal description matching the site
- RequiredTwo Sets of Construction Drawings (11x17, scaled)Must include elevations of all sides, floor plans with smoke detector locations and window/door sizes, footing and foundation details with rebar schedules, complete framing details (header/beam sizes, window schedules, insulation R-values), typical cross-section, and roof/truss specifications with stamped engineered truss specs
- RequiredPlot PlanSite map showing boundary lines with dimensions, north arrow, roads, water bodies/drainage, proposed and existing structures, distances to property lines, parking, easements, stormwater drainage plan, and septic/well/water-sewer hookup locations
- RequiredWater and Sewer Connection ApplicationRequired approval/signature from the City before the building application is accepted
- OptionalStormwater Management PlanRequired if the site is within 300 feet of surface water or has a slope of 15% or greater
- OptionalDevelopment PermitRequired if the parcel is located in a Floodplain and/or Floodway; structures in a Floodway require an Idaho-licensed architect or engineer to design the foundation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Per Table 1-A of the 1997 Uniform Building Code (valuation-based) | City of Priest River Resolution No. 25-056 (effective 11/3/2025), Appendix A: 'Building Permit Fee — Table 1-A 1997 UBC.' Building valuation is determined using the 2010 Building Valuation Data Sheet referenced in the same resolution. |
| Plan Review Fee | 65% of the Building Permit Fee | Resolution No. 25-056, Appendix A |
| Additional Plan Review Fee | $50/hour | Resolution No. 25-056, Appendix A |
| Plan Addendum / Change Review | $47/hour | Resolution No. 25-056, Appendix A |
| Re-Inspection Fee | $47/hour | Resolution No. 25-056, Appendix A |
| New Construction Building Permit Deposit | $500 | Resolution No. 25-056, Appendix A |
| Violation for Failure to Obtain a Permit | Double the Building Permit Fee | Resolution No. 25-056, Appendix A |
| Water/Sewer Service Connection Fees | Varies by service line size — see Water and Sewer Connection Application | Required if the project site was not previously provided with sewer and water service; new residential/commercial builds are also subject to established impact fees per the applicable adopted fee schedule |
Sign Permit
VerifiedRequired for the construction or installation of signs within the City of Priest River, including free-standing signs. Building plan review is performed by James A. Sewell & Associates, LLC under contract with the City.
Verified 2026-07-08 · Source
Requirements
- Recorded copy of warranty deed or lease agreement showing name and legal description
- Compliance with zoning, subdivision, stormwater, and floodplain regulations
- Commercial and industrial projects must have site plan approval
- TWO (2) complete sets of construction plans drawn to scale
- All free-standing signs must be stamped by a licensed structural engineer
- State electrical permit required for illuminated signs via Idaho DOPL
Required documents
- RequiredSign Permit ApplicationCity of Priest River sign permit application procedures and combined building permit/plot plan form
- RequiredTwo Sets of Construction Drawings (scaled)Must show elevations of all sides, footing and foundation details with rebar schedules, and complete framing details
- RequiredStructural Engineer StampRequired for all free-standing signs
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Application Fee | $100 application fee, plus cost of building permit | City of Priest River Resolution No. 25-056 (effective 11/3/2025), Appendix A: 'Sign Permit — $100 application fee + cost of building permit' |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Priest River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.