Ammon building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Ammon, Idaho.
Verified 2026-07-04 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 2135 South Ammon Road, Ammon, ID 83406
- Phone
- 208-612-4000
- Office hours
- Monday-Friday 7:30 AM-12:00 PM & 1:00 PM-4:30 PM (permits not accepted after 4:00 PM); Inspection hours Mon-Thu 9:00 AM-3:00 PM, Fri 9:00 AM-12:00 PM
- Website
- Official site
Published scheduling rules
- Ammon uses BluePrince (not eTrakit or Cityworks) for all building permit applications, inspection scheduling, and permit status tracking — create a free account to apply, upload documents, pay fees, and check status 24/7. (Residential Building Permit (New Construction))
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Footing
Before concrete pour
- 2
Foundation
Foundation wall and rebar verification
- 3
Underground Plumbing
Underground/under-slab plumbing before backfill or slab pour
- 4
Framing
Structural framing complete before insulation/drywall
- 5
Insulation
Insulation installed per energy code before drywall
- 6
Final
Final combined Building, Mechanical, Electrical, and Plumbing inspection
Applies to: Accessory Structure Permit (Sheds, Detached Garages, ADUs)
- 1
Footing/Foundation
Required before concrete pour where a foundation is used
- 2
Framing
Structural framing and connections
- 3
Final
Final inspection of completed structure
Applies to: Plumbing Permit
- 1
Underground Plumbing
Before backfill or slab pour
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
All fixtures connected, no leaks
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and service connections before walls are closed
- 2
Final
Devices installed, panel labeled, protections verified per adopted NEC
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
Wiring and box placement before walls are closed
- 2
Final
Charger installed, circuit verified, unit energized
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork, venting, and gas piping before enclosure
- 2
Final
Equipment operational and verified
Final inspection only: Re-Roofing Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ammon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Ammon building permits
Get alerts for Ammon
We'll email you when Ammon's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.