Permit types & fees
New Residential Building Permit
VerifiedRequired for new one- and two-family dwelling construction in Middleton. Applied for through the CitizenServe online portal or in person at 1103 W Main St. A $250 building permit deposit is required at application (25% of building permit fee applies toward residential plan review, paid within 30 days or the deposit is forfeited).
Verified 2026-07-04 · Source
Requirements
- Submit 1 hard copy of plans and 1 digital copy of plans
- Site plan required
- Manual J load calculation required
- Res Check (IECC energy compliance) required
- Elevation Certificate required if property is in a floodplain
- Applicant responsible for identifying all property boundary lines and ensuring setbacks
- $250.00 New Residential Building Permit Deposit due at submittal (City Fee Schedule, Res. 526-25)
Required documents
- RequiredNew Residential Building Permit Application (Revised 4/23/2015)Official Middleton Building Department application for new one- and two-family dwellings; available at middleton.id.gov/Portals/0/InspectionForms/Residential Building Permit Application.pdf
- RequiredConstruction DrawingsComplete plan set: site plan, floor plans, elevations, structural details
- RequiredManual J Load CalculationHVAC heating/cooling load calculation
- RequiredRes Check Energy Compliance DocumentationDemonstrates compliance with the Idaho Energy Conservation Code (2018 IECC base)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Residential Building Permit Deposit | $250.00 | Due at application submittal; City Fee Schedule Res. 526-25 (effective 10/1/2025) |
| Building Permit Fee — valuation-based | Per ICC 2021 Building Valuation Data (BVD) table x City Permit Fee Multiplier; e.g. $0–3,000 valuation = $131.52; $6,000–7,000 = $220.00; $50,000–51,000 = $1,028.13; $99,000–100,000 = $1,570.04; values over $100,000 = $1,570.04 for first $100,000 plus $5.60 per each additional $1,000 or fraction thereof | City Fee Schedule Res. 526-25, Attachment A (Middleton 2021 Building Value Data table) |
| Residential Plan Review Fee | 25% of building permit fee | Must be paid within 30 days of assessment or the permit deposit is forfeited (City Fee Schedule Res. 526-25) |
| Public Works Residential/Commercial Building Inspection Fee | $25.00 | City Fee Schedule Res. 508-24 |
| Water Connection Fee (per Equivalent Dwelling Unit, 5/8" x 3/4" meter) | $4,476.53 | City Fee Schedule Res. 526-25 |
| Sewer Connection Fee (per Equivalent Dwelling Unit, 5/8" x 3/4" meter) | $15,000.00 | City Fee Schedule Res. 508-24 |
| City Parks Impact Fee — Single Family Residential (per EDU) | $2,313.00 | City Fee Schedule Res. 499-23 |
| Transportation Impact Fee — Single Family Housing (per dwelling unit) | $5,050.00 | City Fee Schedule Res. 526-25, Attachment E (New Transportation Impact Fees) |
| Reinspection — Building, second notice of correction for same item | $75.00 | City Fee Schedule Res. 508-24 |
Electrical Permit
VerifiedRequired for all electrical installations in Middleton, including new residential wiring, service changes, and remodel/repair circuits. Middleton self-administers electrical permitting and inspection through its own City Building Department (does not route to Idaho DOPL).
Verified 2026-07-04 · Source
Requirements
- Permit required before starting electrical work; failure to obtain a permit prior to starting work results in double/triple fees
- All permits applied for and issued through the CitizenServe portal; allow 24 hours for permit processing
- Work must comply with the 2023 National Electrical Code (NEC) with Idaho amendments
- Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling
Required documents
- RequiredElectrical Permit Application (Attachment B, Revised 8/1/2024)City of Middleton Building Department electrical permit form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Residential — single family dwelling, up to 1,500 sq ft | $130.00 | City Fee Schedule Res. 526-25, Attachment B — Electrical Permit form (rev. 8/1/2024), item 2 New residential — single family dwelling, Up to 1500 SQFT tier. |
| New Residential — single family dwelling, 1,501 to 2,500 sq ft | $195.00 | City Fee Schedule Res. 526-25, Attachment B — Electrical Permit form (rev. 8/1/2024), item 2 New residential — single family dwelling, 1,501 to 2,500 SQFT tier. |
| New Residential — single family dwelling, 2,501 to 3,500 sq ft | $260.00 | City Fee Schedule Res. 526-25, Attachment B — Electrical Permit form (rev. 8/1/2024), item 2 New residential — single family dwelling, 2,501 to 3,500 SQFT tier. |
| New Residential — single family dwelling, 3,501 to 4,500 sq ft | $325.00 | City Fee Schedule Res. 526-25, Attachment B — Electrical Permit form (rev. 8/1/2024), item 2 New residential — single family dwelling, 3,501 to 4,500 SQFT tier. |
| Existing Residential | $65.00 basic fee, plus $10.00 each additional branch circuit up to the maximum for the corresponding residential square footage | City Fee Schedule Res. 526-25, Attachment B — Electrical Permit form (rev. 8/1/2024), item 4 Existing residential. |
| Electrical temporary construction service only (200 amp or less, one location) | $65.00 | City Fee Schedule Res. 526-25, Attachment B — Electrical Permit form (rev. 8/1/2024), item 1 Electrical temporary construction services only. |
| Modular, manufactured, or mobile homes — electrical | $65.00 basic fee plus $10.00 for each additional circuit | City Fee Schedule Res. 526-25, Attachment B — Electrical Permit form (rev. 8/1/2024), item 5 Modular, manufactured or mobile homes. |
| Request inspection / re-inspection / technical service | $65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel to and from job location | City Fee Schedule Res. 526-25, Attachment B — Electrical Permit form (rev. 8/1/2024), item 13 Request inspection — re-inspections — technical service. |
Plumbing Permit
VerifiedRequired for all plumbing installations in Middleton, including new residential piping, fixture additions, and sewer/water connections. Governed by the 2017 Idaho State Plumbing Code (based on the 2015 Uniform Plumbing Code). Self-administered by the City Building Department.
Verified 2026-07-04 · Source
Requirements
- Permit required before starting plumbing work; failure to obtain a permit prior to starting work results in double/triple fees
- All permits applied for and issued through the CitizenServe portal; allow 24 hours for permit processing
- Work must comply with the 2017 Idaho State Plumbing Code
Required documents
- RequiredPlumbing Permit Application (Attachment C, Revised 8/1/2024)City of Middleton Building Department plumbing permit form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Residential — single family dwelling, up to 1,500 sq ft | $130.00 | City Fee Schedule Res. 526-25, Attachment C — Plumbing Permit form (rev. 8/1/2024), item 1 New residential — single family dwelling, Up to 1500 SQFT tier. |
| New Residential — single family dwelling, 1,501 to 2,500 sq ft | $195.00 | City Fee Schedule Res. 526-25, Attachment C — Plumbing Permit form (rev. 8/1/2024), item 1 New residential — single family dwelling, 1,501 to 2,500 SQFT tier. |
| New Residential — single family dwelling, 2,501 to 3,500 sq ft | $260.00 | City Fee Schedule Res. 526-25, Attachment C — Plumbing Permit form (rev. 8/1/2024), item 1 New residential — single family dwelling, 2,501 to 3,500 SQFT tier. |
| New Residential — single family dwelling, 3,501 to 4,500 sq ft | $325.00 | City Fee Schedule Res. 526-25, Attachment C — Plumbing Permit form (rev. 8/1/2024), item 1 New residential — single family dwelling, 3,501 to 4,500 SQFT tier. |
| Existing Residential | $65.00 basic fee plus $10.00 per additional plumbing fixture up to the maximum for the corresponding square footage | City Fee Schedule Res. 526-25, Attachment C — Plumbing Permit form (rev. 8/1/2024), item 3 Existing Residential. |
| Plumbing Residential Sewer & Water | $50.00 each, or $65.00 for combination if inspected at the same time | City Fee Schedule Res. 526-25, Attachment C — Plumbing Permit form (rev. 8/1/2024), item 6 Plumbing Residential Sewer & Water. |
| Modular, manufactured, or mobile home — plumbing (sewer and water stub connection) | $65.00 basic fee | City Fee Schedule Res. 526-25, Attachment C — Plumbing Permit form (rev. 8/1/2024), item 4 Modular, manufactured or mobile home — Plumbing. |
| Lawn sprinklers / water heaters / water conditioners | $65.00 basic fee per item | City Fee Schedule Res. 526-25, Attachment C — Plumbing Permit form (rev. 8/1/2024), item 7 Plumbing Lawn Sprinklers — Water Heaters — Water Conditioners. |
| Request inspection / re-inspection / technical service | $65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel | City Fee Schedule Res. 526-25, Attachment C — Plumbing Permit form (rev. 8/1/2024), item 9 Request Inspections — re-inspections — technical service. |
Mechanical / HVAC Permit
VerifiedRequired for all mechanical equipment installations in Middleton, including furnaces, HVAC systems, gas lines, and fireplaces. Governed by the 2018 International Mechanical Code and 2018 International Fuel Gas Code. Self-administered by the City Building Department.
Verified 2026-07-04 · Source
Requirements
- Permit required before starting mechanical work; failure to obtain a permit prior to starting work results in double/triple fees
- All permits applied for and issued through the CitizenServe portal; allow 24 hours for permit processing
- Work must comply with the 2018 International Mechanical Code and 2018 International Fuel Gas Code
Required documents
- RequiredMechanical Permit Application (Attachment D, Revised 8/1/2024)City of Middleton Building Department mechanical permit form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Residential — single family dwelling, up to 1,500 sq ft | $130.00 | City Fee Schedule Res. 526-25, Attachment D — Mechanical Permit form (rev. 8/1/2024), item 1 New residential — single family dwelling, Up to 1500 SQFT tier. |
| New Residential — single family dwelling, 1,501 to 2,500 sq ft | $195.00 | City Fee Schedule Res. 526-25, Attachment D — Mechanical Permit form (rev. 8/1/2024), item 1 New residential — single family dwelling, 1,501 to 2,500 SQFT tier. |
| New Residential — single family dwelling, 2,501 to 3,500 sq ft | $260.00 | City Fee Schedule Res. 526-25, Attachment D — Mechanical Permit form (rev. 8/1/2024), item 1 New residential — single family dwelling, 2,501 to 3,500 SQFT tier. |
| New Residential — single family dwelling, 3,501 to 4,500 sq ft | $325.00 | City Fee Schedule Res. 526-25, Attachment D — Mechanical Permit form (rev. 8/1/2024), item 1 New residential — single family dwelling, 3,501 to 4,500 SQFT tier. |
| Existing Residential | $65.00 basic fee plus $10.00 for each additional HVAC equipment item up to the maximum for the corresponding square footage | City Fee Schedule Res. 526-25, Attachment D — Mechanical Permit form (rev. 8/1/2024), item 3 Existing Residential. |
| HVAC Only — fireplace installation | $130.00 (includes two inspections) | City Fee Schedule Res. 526-25, Attachment D — Mechanical Permit form (rev. 8/1/2024), item 3, HVAC Only — Fireplace installation. |
| HVAC Gas Line | $65.00 basic fee | City Fee Schedule Res. 526-25, Attachment D — Mechanical Permit form (rev. 8/1/2024), item 6 HVAC Gas Line. |
| Hydronic Flooring | $65.00 basic fee plus $10.00 for each additional manifold/zone | City Fee Schedule Res. 526-25, Attachment D — Mechanical Permit form (rev. 8/1/2024), item 3, Hydronic Flooring. |
| Request inspection / re-inspection / technical service | $65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel | City Fee Schedule Res. 526-25, Attachment D — Mechanical Permit form (rev. 8/1/2024), item 7 Request inspections — re-inspections — technical service. |
Accessory Structure Permit
VerifiedRequired for any structure or accessory structure exceeding 200 square feet constructed, remodeled, renovated, or added to within the City of Middleton, per City Code Title 4, Chapter 1, Section 4-1-1.
Verified 2026-07-04 · Source
Requirements
- No structure or accessory structure over 200 square feet may be constructed, remodeled, renovated, or added to without first obtaining a building permit and paying established fees (Middleton City Code 4-1-1)
- Structures 200 sq ft or under are not addressed by this section — confirm permit-exempt status and any zoning/setback requirements with the Building Department before proceeding
Required documents
- RequiredSmall Projects Building Permit applicationFor accessory structures and small projects; a $75 Small Projects Building Permit Deposit applies per the City Fee Schedule (Res. 526-25). Contact the Building Department for the specific form.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Small Projects Building Permit Deposit | $75.00 | City Fee Schedule Res. 526-25 |
| Building Permit Fee — valuation-based | Per ICC 2021 Building Valuation Data table x City Permit Fee Multiplier (see Attachment A of City Fee Schedule) | City Fee Schedule Res. 526-25, Attachment A |
Solar PV Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems in Middleton. The City's own Electrical Permit form (Attachment B) publishes a dedicated 'Other Installations commercial/industrial/solar' fee category (Category #6) with a cost-based formula, directly naming solar as a covered installation type; the structural/racking scope is permitted through the City's general valuation-based Building Permit. Middleton self-administers both scopes through its own Building Department — it does not route the electrical component to Idaho DOPL.
Verified 2026-07-20 · Source
Requirements
- Electrical interconnection billed under the Electrical Permit form's Category #6, 'Other Installations commercial/industrial/solar — work not specifically covered by any of the fee schedules,' with a copy of the contractor's bid required
- Structural/racking mounting work requires a City of Middleton Building Permit, valuation-based per the ICC 2021 Building Valuation Data table x City Permit Fee Multiplier (Attachment A) — no dedicated solar-specific building-fee line is published separately from this general table
- All permits applied for and issued through the CitizenServe online portal; allow 24 hours for permit processing
- Electrical work must comply with the 2023 National Electrical Code (NEC) with Idaho amendments; structural work must comply with the 2018 IBC/IRC as adopted
- Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling
Required documents
- RequiredElectrical Permit Application (Attachment B, Revised 8/1/2024)City of Middleton Building Department electrical permit form; select Category #6 'Other Installations commercial/industrial/solar' and include a copy of the contractor's bid
- RequiredBuilding Permit Application (structural/racking scope)City of Middleton form for the racking/mounting structural work, valuation-based per Attachment A
- RequiredContractor's Bid (copy)Required for the Category #6 electrical fee calculation, per the form's own instruction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit — Other Installations commercial/industrial/solar (Category #6) — cost up to $10,000 | 2% of fair market value of labor, equipment and materials, plus $60.00 | City of Middleton Fee Schedule, Resolution 526-25, Attachment B (Electrical Permit form, revised 8/1/2024) — this category is explicitly named to include solar installations. |
| Electrical Permit — Category #6 — cost $10,001 to $100,000 | 1% of (cost minus $10,000), plus $260.00 | City of Middleton Fee Schedule, Resolution 526-25, Attachment B |
| Electrical Permit — Category #6 — cost over $100,001 | 0.5% of (cost minus $100,000), plus $1,160.00 | City of Middleton Fee Schedule, Resolution 526-25, Attachment B |
| Building Permit Fee (structural/racking scope) — valuation-based | Per ICC 2021 Building Valuation Data (BVD) table x City Permit Fee Multiplier | City Fee Schedule Res. 526-25, Attachment A — no dedicated solar-specific building-fee line is published; billed under the same general valuation table used for other construction. |
| Public Works Residential/Commercial Building Inspection Fee | $25.00 | City Fee Schedule Res. 508-24 |
EV Charger / EVSE Permit
VerifiedMiddleton has no separate permit type or fee line item for EV charging station (EVSE) installation. The City runs its own electrical permitting and inspection through the City Building Department rather than routing electrical work to Idaho DOPL, so a Level 1 or Level 2 charger circuit added to an existing home is billed under the same 'Existing Residential' branch-circuit fee category as any other electrical alteration.
Verified 2026-07-20 · Source
Requirements
- Electrical permit required before starting the EV charger circuit/panel work; failure to obtain a permit before starting work results in double/triple fees
- Work must comply with the 2023 National Electrical Code (NEC) with Idaho amendments
- All permits applied for and issued through the CitizenServe portal; allow 24 hours for permit processing
- Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling
Required documents
- RequiredElectrical Permit Application (Attachment B, Revised 8/1/2024)City of Middleton Building Department electrical permit form; no separate EV-charger-specific form exists
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Existing Residential — branch circuit addition (applies to a typical EV charger circuit) | $65.00 basic fee, plus $10.00 each additional branch circuit up to the maximum for the corresponding residential square footage | City of Middleton Fee Schedule — Resolution 526-25, Attachment B (Electrical Permit form, revised 8/1/2024) — the applicable category for an EV charger circuit/subpanel added to an existing home; Show full citationHideCity of Middleton Fee Schedule — Resolution 526-25, Attachment B (Electrical Permit form, revised 8/1/2024) — the applicable category for an EV charger circuit/subpanel added to an existing home; no distinct EV/EVSE fee line item was found. This is the same fee structure as the Idaho DOPL Homeowner Electrical Permit Worksheet used by nearby jurisdictions that route electrical work to the State, but here it is administered directly by the City. |
| Request inspection / re-inspection / technical service | $65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel to and from job location | City Fee Schedule Res. 526-25, Attachment B — Electrical Permit form (rev. 8/1/2024), item 13 Request inspection — re-inspections — technical service. |
New Commercial Building Permit
Required for new commercial construction, additions, and any change of occupancy in Middleton, per IBC Sections 105.1 and 111.1. Applied for through the CitizenServe online portal. A $1,000 New Commercial Building Permit Deposit is required at application (the Commercial Building Plan Review Fee, 65% of the building permit fee, applies toward the deposit and must be paid within 30 days or the deposit is forfeited).
Reviewed 2026-08-02 · Source
Requirements
- A Commercial Building Permit is required for any new construction, remodel, additions, alterations, and changes of occupancy per IBC 105.1 and 111.1 (City of Middleton Commercial Certificate of Occupancy Only Permit & New Tenant Verification form)
- $1,000.00 New Commercial Building Permit Deposit due at submittal (City Fee Schedule, Res. 526-25)
- Plan set must be prepared by an Idaho Registered Design Professional and include, per the City's 2018 IBC 'Commercial - NEW or Tenant Improvement' submittal requirements: Middleton Design Criteria, applicable code data, occupant load calculations and life-safety/means-of-egress analysis, drainage calcs and civil engineering, site plan, structural building sections and elevations, wall/roof assemblies, rated fire-wall and floor/ceiling assemblies, listed penetration firestopping, IECC energy COMMchecks (envelope, interior/exterior lighting, mechanical), structural engineering and special-inspections schedule, electrical/mechanical/plumbing design, plumbing fixture calculations (IBC Ch. 29), reflected ceiling plan, geotech/soils report, and accessible-elements design per ICC/ANSI A117.1-2009
- Preliminary approvals that may be required before permit issuance: Planning & Zoning pre-application meeting and Design Review Zoning Certificate, Industrial User Survey, Pre-Construction Elevation Certificate, Southwest District Health, Idaho Health & Welfare, HD4/ITD/Middleton Highway District, Civil Engineering, Public Works (Sewer and Water), and Middleton or Caldwell Fire Districts (City of Middleton Online Permitting and Registration Instructions)
- Fire protection systems plans must be submitted separately to the applicable fire district: Middleton Fire District for north-of-river development, or Caldwell Fire Dept. for south-of-river development
- Building permits will not be issued until confirmation is received that Sewer & Water Connection fees and all applicable Impact, Civil Engineering, and Fire Department fees have been paid
- General contractor/building permit holder is responsible for requesting all building-related inspections (foundation through completion), excluding electrical, mechanical, and plumbing, which are requested separately under the trade permits
Required documents
- RequiredCommercial Building Permit ApplicationSubmitted through the CitizenServe online portal; no separate standalone commercial application PDF distinct from the online application was located on the City's website
- RequiredComplete Commercial Plan Set (2018 IBC)Prepared by an Idaho Registered Design Professional; see requirements for full submittal content list
- RequiredCertificate of Value (or equivalent Building Valuation Data)Actual project value per Certificate of Value, or equivalent BVD based on Occupancy Classification and Type of Construction, used to calculate the valuation-based building permit fee
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Commercial Building Permit Deposit | $1,000.00 | Due at application submittal; City Fee Schedule Res. 526-25 (current schedule effective 7/15/2026 per Res. 544-26) |
| Building Permit Fee — valuation-based | Actual Project Value per Certificate of Value (or equivalent BVD per Occupancy Classification and Type of Construction) applied against the same ICC 2021 Building Valuation Data (BVD) table used for residential; e.g. $0-3,000 valuation = $131.52; $50,000-51,000 = $1,028.13; $99,000-100,000 = $1,570.04; values over $100,000 = $1,570.04 for the first $100,000 plus $5.60 per each additional $1,000 or fraction thereof | City Fee Schedule Res. 508-24/446-20, Attachment A |
| Commercial Building Plan Review Fee | 65% of building permit fee | Must be paid within 30 days of assessment or the permit deposit is forfeited (City Fee Schedule Res. 526-25) — compare to the 25% rate charged for residential plan review |
| Electrical Commercial Plan Review Fee | ≤10,000 SF: $200.00; >10,000 to 100,000 SF: $400.00; >100,000 SF: $600.00 | City Fee Schedule Res. 526-25 |
| Mechanical Commercial Plan Review Fee | ≤10,000 SF: $200.00; >10,000 to 100,000 SF: $400.00; >100,000 SF: $600.00 | City Fee Schedule Res. 526-25 |
| Plumbing Commercial Plan Review Fee | ≤10,000 SF: $200.00; >10,000 to 100,000 SF: $400.00; >100,000 SF: $600.00 | City Fee Schedule Res. 526-25 |
| Electrical Permit — Other Installations commercial/industrial/solar (Category #6), cost up to $10,000 | 2% of fair market value of labor, equipment and materials, plus $60.00 (1% from $10,001-$100,000 plus $260.00; 0.5% over $100,001 plus $1,160.00) | City Fee Schedule Res. 526-25, Attachment B — a copy of the contractor's bid is required |
| Plumbing Permit — Other Installations commercial/industrial (Category #5), cost up to $20,000 | 3% of cost of labor/materials/equipment plus $60.00 ($20,001-$100,000: minus $20,000, 2% plus $660.00; over $100,001: minus $100,000, 1% plus $2,260.00) | City Fee Schedule Res. 526-25, Attachment C |
| Mechanical Permit — Other Installations commercial/industrial (Category #5), cost up to $20,000 | 3% of cost of labor/materials/equipment plus $60.00 ($20,001-$100,000: minus $20,000, 2% plus $660.00; over $100,001: minus $100,000, 1% plus $2,260.00) | City Fee Schedule Res. 526-25, Attachment D |
| Public Works Residential/Commercial Building Inspection Fee | $25.00 | City Fee Schedule Res. 508-24 |
| City Engineer review of commercial/industrial/institutional/multi-family building permit applications | Time & Materials | City Fee Schedule Res. 525-25 |
| Temporary Certificate of Occupancy — Commercial Only | $75.00 | City Fee Schedule Res. 526-25 |
| Reinspection — Building, second notice of correction for same item | $75.00 | City Fee Schedule Res. 508-24 |
| Transportation Impact Fee — Commercial (per 1,000 sq ft), varies by land-use type | Examples: General Office $4,400; Shopping Center $6,414; Light Industrial $3,214; Warehousing $969; Restaurant-Fast Food (no drive-thru) $20,602 — full table of 40+ land-use types in Attachment E | City Fee Schedule Res. 526-25, Attachment E (New Transportation Impact Fees) — commercial rates vary far more widely than the flat per-dwelling-unit residential rate |
| Middleton Police Department Impact Fee — Nonresidential (per 1,000 sq ft) | Retail $422.00; Office $163.00; Industrial $73.00; Institutional $293.00 | City Fee Schedule Res. 499-23 |
| Fire District Impact Fee — Nonresidential (per 1,000 sq ft) | Middleton Rural Fire District: Retail $780.00, Office $300.00, Industrial $135.00, Institutional $541.00 | City Fee Schedule ORD 682 — a different fire district's fee schedule (e.g. Caldwell Fire Dept./Rural Fire District or Star Rural Fire District) applies depending on project location; confirm which district serves the parcel before budgeting |
Tenant Improvement (TI) Permit
Required for interior alterations to existing commercial space in Middleton — including work to finish and convert a building shell from Certificate of Completion to Certificate of Occupancy, and any project where the occupancy of record has not been previously established. Applied for through the CitizenServe online portal. A $500 Tenant Improvement Building Permit Deposit is required at application (the 65% Commercial Building Plan Review Fee applies toward the deposit, due within 30 days or the deposit is forfeited). Distinct from the City's separate $75 Commercial Occupancy Only Permit, which covers a tenant moving into an already-permitted space of the identical occupancy classification with zero proposed alterations.
Reviewed 2026-08-02 · Source
Requirements
- A Tenant Improvement Permit is required for existing buildings not previously occupied and for work to finish and convert a building shell from Certificate of Completion to Certificate of Occupancy (City of Middleton Commercial Certificate of Occupancy Only Permit & New Tenant Verification form)
- Also required when occupancy of record has not been previously established, for approval of the proposed Use and Occupancy classification and issuance of a new Certificate of Occupancy
- $500.00 Tenant Improvement Building Permit Deposit due at submittal (City Fee Schedule, Res. 526-25)
- Plan set prepared by an Idaho Registered Design Professional per the City's 2018 IBC 'Commercial - NEW or Tenant Improvement' submittal requirements (occupant load calculations, life-safety/means-of-egress analysis, structural engineering, IECC energy COMMchecks, plumbing fixture calculations, accessible-elements design per ICC/ANSI A117.1-2009, etc.) — the same plan-set requirements apply to new commercial construction and TI projects
- If the scope is limited to a tenant moving into an existing, already-occupied space of the same occupancy group/classification with NO proposed alterations, remodel, or improvements, a $75 Commercial Occupancy Only Permit may apply instead of a full TI Permit — the Building Department determines this during application review
- Fire protection systems plans submitted separately to the applicable fire district: Middleton Fire District (north-of-river) or Caldwell Fire Dept. (south-of-river)
- Building permit will not be issued until confirmation is received that Sewer & Water Connection and all applicable Impact, Civil Engineering, and Fire Department fees have been paid
Required documents
- RequiredTenant Improvement Permit ApplicationSubmitted through the CitizenServe online portal; no separate standalone TI application PDF distinct from the online application was located on the City's website
- RequiredFloor Plan / Lease PlanMinimum 8.5x11 floor plan and/or lease plan in PDF form showing tenant space location, exits/egress, accessible routes, restroom locations, fixtures, and fire sprinkler/alarm installations — required at minimum for the related Commercial Occupancy review; a full TI plan set is required when alterations are proposed
- RequiredComplete Commercial Plan Set (2018 IBC)Required when the TI scope involves alterations, remodel, or a change of occupancy classification; prepared by an Idaho Registered Design Professional
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Tenant Improvement Building Permit Deposit | $500.00 | Due at application submittal; City Fee Schedule Res. 526-25 (current schedule effective 7/15/2026 per Res. 544-26) |
| Building Permit Fee — valuation-based | Actual Project Value per Certificate of Value (or equivalent BVD per Occupancy Classification and Type of Construction), applied against the same ICC 2021 Building Valuation Data (BVD) table used for new commercial and residential permits | City Fee Schedule Res. 508-24/446-20, Attachment A |
| Commercial Building Plan Review Fee | 65% of building permit fee | Must be paid within 30 days of assessment or the permit deposit is forfeited (City Fee Schedule Res. 526-25) |
| Electrical/Mechanical/Plumbing Commercial Plan Review Fee (each trade, if applicable) | ≤10,000 SF: $200.00; >10,000 to 100,000 SF: $400.00; >100,000 SF: $600.00 | City Fee Schedule Res. 526-25 |
| Electrical Permit — Other Installations commercial/industrial (Category #6), cost up to $10,000 | 2% of fair market value of labor, equipment and materials, plus $60.00 (1% from $10,001-$100,000 plus $260.00; 0.5% over $100,001 plus $1,160.00) | City Fee Schedule Res. 526-25, Attachment B — a copy of the contractor's bid is required |
| Plumbing/Mechanical Permit — Other Installations commercial/industrial (Category #5), cost up to $20,000 | 3% of cost of labor/materials/equipment plus $60.00 ($20,001-$100,000: minus $20,000, 2% plus $660.00; over $100,001: minus $100,000, 1% plus $2,260.00) | City Fee Schedule Res. 526-25, Attachments C & D |
| Commercial Occupancy Only Permit (related, alternate product — no alterations) | $75.00 | City of Middleton Commercial Certificate of Occupancy Only Permit form — applies instead of a TI Permit only when moving into an existing, previously-occupied space of the same occupancy classification with zero proposed alterations |
| Temporary Certificate of Occupancy — Commercial Only | $75.00 | City Fee Schedule Res. 526-25 |
| Public Works Residential/Commercial Building Inspection Fee | $25.00 | City Fee Schedule Res. 508-24 |
| Reinspection — Building, second notice of correction for same item | $75.00 | City Fee Schedule Res. 508-24 |
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fee schedules
Applications & forms
Checklists & handouts
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Middleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.