This is PermitBase’s published record for Unincorporated Elmore County as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Elmore County building permits

Verified

Unincorporated Elmore County, Idaho — as published 2026-07-07.

Verified 2026-07-08 · Source

Codes adopted

2018 International Residential Code (IRC) — residential construction, as adopted statewide by the State of Idaho and enforced by Elmore County Land Use and Building Department (Resolution 790-21, approved January 15, 2021)2018 International Building Code (IBC) — commercial/industrial construction, as adopted statewide by the State of Idaho and enforced by Elmore County (Resolution 790-21)2018 International Energy Conservation Code (IECC) — Residential provisions, per Idaho statewide adoption2018 Idaho Manufactured Home Installation Standards — governs manufactured/mobile home placement and permanent foundation requirementsElmore County Zoning and Development Ordinance — local zoning, setback, and land-use overlay provisions administered alongside the building code

Permit types & fees

Residential Building Permit (New Construction / Addition)

Verified

Required for new single-family dwellings, additions, manufactured homes, accessory structures over 200 square feet, and other residential construction in unincorporated Elmore County. Governed by the 2018 International Residential Code (IRC) as adopted statewide and enforced by the Elmore County Land Use and Building Department. All building applications must be preceded by an approved Zoning Permit — no exceptions. Applications may be submitted by mail, in person, or by email to both department contacts.

Verified 2026-07-08 · Source

Requirements

  • A Zoning Permit must be approved BEFORE the Building Permit application will be accepted — no exceptions
  • Applicant must have a completed and inspected driveway before the building permit is issued
  • All structures over 200 square feet require an Elmore County Building Permit
  • Property lines must be staked by a licensed surveyor
  • Detailed site plan (need not be to scale) showing dimensions of the entire property, labeled existing and proposed structures, and approximate distances to property boundaries and between structures
  • Location of existing septic/well relative to structures; any easements shown
  • One printed complete set of building plans, 1/4" to 1" scale, full size 24"x36" for residential structures, including a floor plan with rooms labeled
  • RES Check (energy/R-values) per www.energycodes.gov or prescriptive requirements
  • Manuals J, S, and D heating/cooling calculations (typically from HVAC contractor) for new construction — not required for solar or fireplace-only permits
  • Central District Health Department signature (not required for solar or fireplace-only permits)
  • Highway District signature (not required for solar or fireplace-only permits)
  • Fire District signature confirming driveway meets fire-access specs, if property is in a fire district (required even for solar and fireplace permits)
  • Flood Development Permit with Elevation Certificate ($100 fee) required if the structure is located in a flood area
  • Contractors must provide current Idaho Contractor Registration number and expiration date
  • Plans for structures above ~5,000 ft elevation (above Tollgate) require an engineer/design-professional-stamped report or engineered truss diagrams for 120 lbs/sq ft snow load and 115 mph wind speed

Required documents

  • RequiredElmore County Zoning Permit ApplicationMust be approved before the building permit application will be accepted; $50 fee, valid 180 days from submittal, processing takes 2-4 weeks. Available at elmorecounty.org/land-use-and-building-department/applications-document-links/
  • RequiredElmore County Building Permit Application (revised 06-2026)Includes plan review fee schedule, submission requirements by structure type, and required agency sign-offs (Central District Health, Highway District, Fire District, E-911 addressing)
  • RequiredFull-Size Building Plan Set (24"x36")One printed set showing footing/foundation, framing, floor plan, electrical layout, windows/doors, and heights; site plan per the example in the application
  • RequiredRES Check / Energy ComplianceResidential energy code compliance documentation (energycodes.gov) or prescriptive compliance path
  • RequiredACCA Manuals J, D, and SHeating and cooling load calculations, typically supplied by the HVAC contractor; required on-site only (not submitted with application), required for new construction
  • RequiredCentral District Health Department SignatureSewer/septic permit sign-off; required for new residences and manufactured homes
  • RequiredHighway District SignatureRoad access sign-off from the applicable highway district (Mountain Home, Glenns Ferry, or Atlanta Highway District)
  • OptionalFlood Development Permit with FEMA Elevation CertificateRequired only if the site is within a mapped floodplain; $100 fee due at submission

Fee schedule

Fee typeAmountNotes
Plan Review Fee — Residential$100.00Elmore County Building Permit Application (revised 06-2026) and Fee Schedule (effective October 15, 2025); paid at time of application submission, separate from the building permit fee itself
Plan Review Fee — Solar, Fireplace, and Re-Roof$150.00Elmore County Building Permit Application (revised 06-2026)
Building Permit FeeValuation-based per IBC Section 109 and the International Code Council Building Valuation Data (updated every 6 months); calculated by the Elmore County Building Official based on square footage/project valueSeparate from the plan review fee; fee amounts rounded to the nearest dollar. Fee Schedule effective October 15, 2025.
Building Permit DepositTiered by building permit fee amount: <$500 fee = $100 deposit; $500-$1,000 = $250; $1,000-$2,000 = $500; $2,000-$3,000 = $750; $3,000-$4,000 = $1,000; >$4,000 = 25% of building permit feeRefundable after final inspection if no additional county time/resources used beyond the normal permit process. Fee Schedule effective October 15, 2025.
Zoning Permit Fee (prerequisite)$50.00Required before the building permit application is accepted; Fee Schedule effective October 15, 2025
Re-inspection Fee (beyond 2 failed inspections)$50.00 per inspectionFee Schedule effective October 15, 2025; also stated in Building Permit Application as $50 deducted from deposit after the second failed inspection of the same type

Commercial Building Permit (New Construction / Tenant Improvement)

Verified

Required for new commercial and industrial structures in unincorporated Elmore County. Governed by the 2018 International Building Code (IBC) as adopted statewide and enforced by the Elmore County Land Use and Building Department. Requires stamped plans by a design professional and a Com-Check energy compliance submittal. All building applications must be preceded by an approved Zoning Permit.

Verified 2026-07-08 · Source

Requirements

  • A Zoning Permit must be approved BEFORE the Building Permit application will be accepted — no exceptions
  • Detailed site plan showing dimensions of the entire property, labeled existing and proposed structures, and approximate distances to property boundaries and between structures
  • Location of existing septic/well relative to structures; any easements shown
  • One set of building plans, 1/4" scale, including a floor plan
  • Com-Check energy compliance submittal
  • Central District Health Department signature
  • Highway District signature
  • Fire District plan review and signature if in a fire district
  • Plans must be stamped by a design professional
  • Flood Development Permit with Elevation Certificate ($100 fee) required if the structure is located in a flood area
  • Contractors must provide current Idaho Contractor Registration number and expiration date

Required documents

  • RequiredElmore County Zoning Permit ApplicationMust be approved before the building permit application will be accepted
  • RequiredElmore County Building Permit Application (revised 06-2026)Commercial Structure submission checklist included in the application packet
  • RequiredStamped Commercial Plan Set1/4" scale plans including floor plan, stamped by a design professional
  • RequiredCom-CheckCommercial energy code compliance documentation

Fee schedule

Fee typeAmountNotes
Plan Review Fee — Commercial$200.00Elmore County Building Permit Application (revised 06-2026) and Fee Schedule (effective October 15, 2025)
Building Permit FeeValuation-based per IBC Section 109 and the International Code Council Building Valuation Data (updated every 6 months)Separate from the plan review fee. Fee Schedule effective October 15, 2025.
Building Permit DepositTiered by building permit fee amount: <$500 fee = $100 deposit; $500-$1,000 = $250; $1,000-$2,000 = $500; $2,000-$3,000 = $750; $3,000-$4,000 = $1,000; >$4,000 = 25% of building permit feeApplies to residential, industrial, and commercial permits. Fee Schedule effective October 15, 2025.

Manufactured Home Placement Permit

Verified

Required for placement of a manufactured or mobile home in unincorporated Elmore County, including new placement, permanent foundation review, and moving a manufactured home within or out of the county. Governed by the 2018 Idaho Manufactured Home Installation Standards. Requires County Assessor sign-off in addition to the standard agency approvals.

Verified 2026-07-08 · Source

Requirements

  • A Zoning Permit must be approved BEFORE the Building Permit application will be accepted — no exceptions
  • Detailed site plan showing dimensions of the entire property, labeled existing and proposed structures, and distances to property boundaries and between structures
  • Location of existing septic/well relative to structures; any easements shown
  • Signature from the Elmore County Assessor
  • Central District Health Department signature
  • Highway District signature
  • Fire District signature confirming driveway meets fire-access specs, if in a fire district
  • State Rehabilitation Compliance Checklist required for manufactured homes constructed prior to June 1976
  • Flood Development Permit with Elevation Certificate ($100 fee) required if the site is located in a flood area
  • Compliance with the 2018 Idaho Manufactured Home Installation Standards

Required documents

  • RequiredElmore County Zoning Permit ApplicationMust be approved before the building permit application will be accepted
  • RequiredElmore County Building Permit Application (revised 06-2026)Manufactured Home submission checklist included in the application packet
  • OptionalState Rehabilitation Compliance Checklist for Manufactured HomesRequired only for homes constructed before June 1976
  • Optional2018 Idaho Manufactured Home Installation StandardsReference standard for permanent foundation and installation requirements

Fee schedule

Fee typeAmountNotes
Manufactured Homes/Trailers Placement$150.00 per section + $100.00 depositFee Schedule effective October 15, 2025
Permanent Foundation Plan Review$100.00Fee Schedule effective October 15, 2025
Moving Only (out of county/within county)$100.00 per sectionFee Schedule effective October 15, 2025
Manufactured Home Court Construction Permit$500.00 + $10.00 per spaceFee Schedule effective October 15, 2025; applies to manufactured home court/park development, not a single-home placement

Agricultural Building Exemption (Notice of Proposed New Agricultural Building)

A separate, lower-cost exemption path for structures meeting the International Building Code definition of an agricultural building — a structure used exclusively to store farm implements, hay, grain, poultry, livestock, or other horticultural products, not used for human habitation, employment, or public access. Exempt from full IBC/IRC inspection, but subject to site inspection for road, county-ordinance, and utility setback conformity, and a possible random compliance inspection within 12 months of final approval. Must be recorded with the County Recorder's Office as a notarized exemption statement.

Reviewed 2026-07-08 · Source

Requirements

  • Structure must meet the IBC definition of an agricultural building: storage of farm implements, hay, grain, poultry, livestock, or horticultural products; not a place of human habitation, employment, or public use
  • Site plan required
  • Setback compliance per Elmore County requirements (street front, street side, interior side, rear)
  • If hillside involved (15% or greater grade to building envelope), an Elmore County Grading Permit must be submitted
  • Electrical and/or plumbing permits (issued by Idaho DOPL, not the county) may be required depending on the structure's features
  • Access permission required from the applicable authority (Highway District, State Transportation Department, Forest Service, or BLM) if relevant
  • Central District Health, Highway District, and Fire District signatures required
  • Notarized Agricultural Building Exemption Statement must be recorded with the Elmore County Recorder's Office before the exemption permit is issued
  • Owner affirms the property may be subject to a random code-compliance inspection within 12 months of final approval to confirm continued agricultural use

Required documents

  • RequiredNotice of Proposed New Agricultural Building (REV 2024-04-11)Four-page application including site/use details, agency sign-offs, and the notarized Agricultural Building Exemption Statement; available at elmorecounty.org/land-use-and-building-department/applications-document-links/
  • RequiredSite PlanShowing proposed structure location and setbacks

Fee schedule

Fee typeAmountNotes
Agricultural Building/Structure Fee$150.00 + $100.00 plan review fee + $100.00 deposit
Notice of Proposed New Agricultural Building (REV 2024-04-11) states '$150.00 plus $100.00 plan review fee'; Show full citation

Notice of Proposed New Agricultural Building (REV 2024-04-11) states '$150.00 plus $100.00 plan review fee'; Fee Schedule (effective October 15, 2025) lists 'Agricultural Structure or Building: $150 + $100 (Deposit)' — the $100 plan review fee and $100 deposit are documented as distinct line items across the two official sources

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Elmore County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-20) →View current record →All versions →

Permalink: /idaho/elmore-county/unincorporated-elmore/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: b3888c6

Reproducible from PermitBase’s version-controlled dataset, commit b3888c6.