Unincorporated Jefferson County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Jefferson County, Idaho.

Verified 2026-07-08 · Source

How to schedule

Inspections are requested through the building department below.

Address
210 Courthouse Way, Suite 170, Rigby, ID 83442
Phone
208-745-9220
Email
Office hours
Mon–Fri 9:00 AM – 5:00 PM

Published scheduling rules

  • Minimum 24 hours' notice is required to schedule any county inspection. (Residential Building Permit (Single-Family Dwelling / New Construction, Additions, ADUs))
  • Permits submitted before December 14, 2023 were not entered into the Cityworks system; call 208-745-9220 directly to schedule inspections on those legacy permits. (Residential Building Permit (Single-Family Dwelling / New Construction, Additions, ADUs))
  • Minimum 24 hours' notice is required for any inspection request. (General)

Inspection sequence

Applies to: Residential Building Permit (Single-Family Dwelling / New Construction, Additions, ADUs)

  1. 1

    Layout Inspection

    Verifies structure layout on the site matches the approved site plan

  2. 2

    Footing Inspection

    Must occur before concrete is poured

  3. 3

    Foundation Inspection

    Must occur before concrete is poured

  4. 4

    Sheathing Inspection

    Building cannot be wrapped/house-wrapped before this inspection

  5. 5

    State Rough-In Inspections (Electrical, Plumbing, HVAC)

    Performed by Idaho DOPL, not the county — required before framing/insulation cover

  6. 6

    Framing Inspection

    After structural framing complete

  7. 7

    Insulation Inspection

    Before drywall/wall cover

  8. 8

    Drywall Inspection

    Seams cannot be taped or mudded before this inspection

  9. 9

    State Final Inspections

    Final electrical/plumbing/HVAC sign-off performed by Idaho DOPL

  10. 10

    Health Department Final

    If applicable — e.g., septic system final from Eastern Idaho Public Health

  11. 11

    Final Inspection by Building Department

    Final county sign-off; Certificate of Occupancy or Certificate of Completion issued after this inspection. Minimum 24 hours' notice required to schedule any inspection.

Applies to: Solar Permit

  1. 1

    Layout / Footing (ground-mount only)

    For ground-mounted arrays requiring foundation work; roof-mounted systems typically proceed directly to framing/mounting inspection

  2. 2

    State Rough-In Electrical Inspection

    Performed by Idaho DOPL, not the county — verifies wiring, combiners, and disconnects before concealment

  3. 3

    State Final Electrical Inspection

    Final DOPL sign-off on the interconnection and point of connection

  4. 4

    Final Inspection by Building Department

    County sign-off on the mounting/structural work and overall permit closeout; minimum 24 hours' notice required to schedule

Applies to: EV Charger / EVSE Permit

  1. 1

    State Rough-In / Final Electrical Inspection (Idaho DOPL)

    Conductor sizing, breaker/panel work, grounding, and EVSE equipment connection verified under the separate state electrical permit — not performed by Jefferson County

  2. 2

    Final Inspection by Building Department (only if applicable)

    Required only if the EV charger installation is paired with new county-permitted structural construction

Re-inspection fees

Residential Building Permit (Single-Family Dwelling / New Construction, Additions, ADUs)Re-Inspection Fee · Jefferson County Fee Schedule 2026, Exhibit A
$90.00

Unincorporated Jefferson County building permits

Get alerts for Unincorporated Jefferson County

We'll email you when Unincorporated Jefferson County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.