Harrison building permits

Verified

Harrison, Idaho — as published 2026-07-07.

Verified 2026-07-08 · Source

Codes adopted

International Existing Building Code, 2018 edition, with Idaho amendments — adopted as Harrison's official building code per City Code 8-1-2(A)(1). Source: https://codelibrary.amlegal.com/codes/harrisonid/latest/harrison_id/0-0-0-1633International Building Code (IBC), 2018 edition, with Idaho amendments, collectively named the 'Building Code 2018 of Idaho' as adopted/amended by the Idaho Building Code Board — City Code 8-1-2(A)(1)International Energy Conservation Code (IECC), 2018 edition, with amendments, collectively named the Idaho Energy Conservation Code (2020 edition) — City Code 8-1-2(A)(1)International Fuel Gas Code (IFGC), 2018 edition, as adopted/amended by the Idaho Building Code Board — City Code 8-1-2(A)(1)International Mechanical Code (IMC), 2018 edition, as adopted/amended by the Idaho Building Code Board — City Code 8-1-2(A)(1)International Residential Code (IRC), 2018 edition (Parts I, II, III, and IX), with Idaho amendments, collectively named the Idaho Residential Code (2020 edition) — City Code 8-1-2(A)(1)National Electrical Code (NEC), 2017 edition, as adopted/amended by the State of Idaho / Idaho Building Code Board — City Code 8-1-2(A)(1). Note: electrical PERMITTING and INSPECTION in Harrison is administered by Idaho DOPL (state), not the city — see census.noteUniform Code for the Abatement of Dangerous Buildings, 1997 edition — City Code 8-1-2(A)(1)Uniform Plumbing Code (UPC), 2017 edition, as adopted/amended by the State of Idaho / Idaho Building Code Board — City Code 8-1-2(A)(1). Note: plumbing PERMITTING and INSPECTION in Harrison is administered by Idaho DOPL (state), not the city — see census.noteSuccessive versions of the above codes as adopted by the Idaho Building Code Board become effective January 1 of the year following adoption (City Code 8-1-2(A)(2)). Source: Ord. 453 (2-4-2014); Harrison's own Building Permit application form lists the current applicable codes as: 2018 IBC, 2018 IRC (parts I, II, III, IX), 2020 Idaho Energy Conservation Code, 2018 International Existing Building Code, and 2009 ANSI A117.1 (Accessibility)

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family and two-family residential construction within Harrison city limits, reviewed against the 2018 IBC/IRC (Idaho Residential Code 2020) and 2020 Idaho Energy Conservation Code as adopted by City Code Title 8, Chapter 1, plus Harrison's local roof-load and frost-depth amendments. Applications are submitted at City Hall and reviewed by the Building Official.

Verified 2026-07-08 · Source

Requirements

  • Building permit required for new construction, additions, repair, renovation, alteration, moving, demolition, occupancy, and change of occupancy of every building or structure (City Code 8-1-3(A); Building Department page)
  • Plans must comply with the 2018 IBC, 2018 IRC (parts I, II, III, IX / Idaho Residential Code 2020), and 2020 Idaho Energy Conservation Code
  • Minimum roof design load: 50 psf (roofs ≥3:12 pitch) or 60 psf (roofs <3:12 pitch); minimum frost depth 24 inches (City Code 8-1-2-1(A))
  • For pole barns, log homes, steel structures, or other alternate building systems not evaluated by a recognized national evaluation service, plans must be stamped by an Idaho-licensed design professional (City Code 8-1-3(B)(3))
  • Elevation certificate stamped by an Idaho-licensed engineer/architect/surveyor required if the parcel is in a special flood hazard area (City Code 8-1-3(B)(4))
  • Recorded survey with visibly positioned property pins required (City Code 8-1-3(B)(6))
  • Site plan showing proposed structure location and water/sewer hookup locations, approved by the city maintenance department, required before permit issuance (City Code 8-1-3(B)(7))
  • Two (2) sets of plans required, drawn to scale, showing lot location, front/side/rear elevations, floor plan, cross section, truss drawings, and IECC energy details if applicable (per Harrison's Building Permit application form)
  • For Electrical, Mechanical, and Plumbing work, obtain separate permits from Idaho DOPL — not issued by the City of Harrison

Required documents

  • RequiredCity of Harrison Application for Building PermitOfficial one-page application form; lists applicable codes, applicant/contractor information, lot and structure details, and fee lines. Available at City Hall or as a downloadable PDF.
  • RequiredConstruction Drawings (2 sets)Drawn to scale: location on lot, front/side/rear elevations, floor plan and cross section, and truss drawings
  • OptionalEngineered DrawingsRequired if applicable — e.g., pole barns, log homes, steel structures, or other alternate building systems not covered by a recognized evaluation service report
  • OptionalInternational Energy Conservation Code (IECC) Compliance DetailsRequired if applicable to demonstrate 2020 Idaho Energy Conservation Code compliance
  • RequiredRecorded SurveyCompleted and filed by a licensed surveyor with property pins visibly positioned (City Code 8-1-3(B)(6))
  • RequiredSite PlanShows location of proposed structures and water/sewer hookups; requires city maintenance department approval before permit issuance (City Code 8-1-3(B)(7))
  • RequiredContract or Bid Documentation / Owner Valuation StatementA contract or bid must be submitted for contracted work; owner self-projects must show a valuation comparable to contracted work (per Building Permit application form)

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-basedPer Table 1-A of the 1997 Uniform Building Code, applied to project valuation determined from ICBO Building Valuation Data (or the most recent available data if that publication has been discontinued)City Code 8-1-4: 'The fee schedule for building permits shall be as required by table 1-A of the 1997 uniform building code.' Harrison's own Building Permit application form has a 'Building Permit Fee' line filled in per-project by the Building Official using this schedule; no separate numeric fee table is published on the city's website — the 1997 UBC Table 1-A valuation-fee formula is the governing, city-cited schedule and is verified as legitimately applicable per City Code 8-1-4.
Plan Review Fee65% of the Building Permit FeeStated directly on the City of Harrison Building Permit application form ('Plan Review Fee (65% of Building Permit fee)')
Sewer Tap FeeSet per-project; amount not separately published onlineLine item on the Building Permit application form; contact City Hall at (208) 689-3212 for current amount
Water Tap FeeSet per-project; amount not separately published onlineLine item on the Building Permit application form; contact City Hall at (208) 689-3212 for current amount
Violation / Working Without Permit Investigation Fee100% of the actual permit feeCity Code 8-1-8(C); also applies to manufactured home setting permits

Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mount solar photovoltaic systems within Harrison city limits. Requires a City Building Permit (structural/racking, valuation-based per 1997 UBC Table 1-A as adopted by City Code 8-1-4) plus a State of Idaho electrical permit (wiring/interconnection) issued by the Division of Occupational and Professional Licenses (DOPL) -- Harrison has no electrical-permit program of its own. The state's Contractor Electrical Permit Worksheet has a dedicated checkbox and valuation-based fee formula for 'Solar, Renewable Energy, power generation, power production, or energy storage systems.'

Verified 2026-07-20 · Source

Requirements

  • City Application for Building Permit submitted to City Hall for the structural/racking scope, with fee calculated per 1997 UBC Table 1-A (City Code 8-1-4)
  • Electrical wiring/interconnection scope requires a State of Idaho DOPL Contractor Electrical Permit (or Homeowner Electrical Permit if self-installed) -- not a City permit, since Harrison has no electrical-permit program of its own
  • On the DOPL Electrical Permit Worksheet, check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box under 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' and enter the total cost of the electrical system
  • Renewable energy installations require a plan check prior to final inspection, per the DOPL Electrical Permit Worksheet
  • Working without a permit triggers a 100% investigation fee (equal to the actual permit fee) under City Code 8-1-8(C)

Required documents

  • RequiredCity of Harrison Application for Building PermitFor the structural/racking scope, submitted to City Hall
  • RequiredIdaho DOPL Contractor (or Homeowner) Electrical Permit ApplicationState application with an Electrical Permit Worksheet (Fee Schedule) that includes a dedicated Solar/Renewable Energy checkbox and valuation-based fee formula

Fee schedule

Fee typeAmountNotes
City Building Permit Fee (valuation-based)Per Table 1-A of the 1997 Uniform Building Code, applied to project valuation from ICBO Building Valuation DataCity Code 8-1-4 -- no dedicated solar/photovoltaic building fee line exists; billed under this general valuation table for the structural/racking scope; no separate numeric fee table is published online, calculated per-project by the Building Official
City Plan Review Fee65% of the Building Permit FeeStated directly on the City of Harrison Building Permit application form
State DOPL Electrical Permit -- Solar/Renewable Energy, up to $10,000 system cost(total system cost x 0.02) + $60Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022
State DOPL Electrical Permit -- Solar/Renewable Energy, $10,001-$100,000 system cost((system cost - $10,000) x 0.01) + $260Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022
State DOPL Electrical Permit -- Solar/Renewable Energy, over $100,001 system cost((system cost - $100,000) x 0.005) + $1,160Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022; renewable energy installations require a plan check prior to final inspection

EV Charger / EVSE Permit

Verified

Harrison has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. Unlike solar/renewable-energy installations (which require both a City structural Building Permit and a State electrical permit), a standard EV charger is not a power-generation or energy-storage system and involves no structural/racking work, so it does not trigger the City Building Permit. The wiring/circuit work is billed as a standard electrical installation under the State of Idaho DOPL Contractor (or Homeowner) Electrical Permit, since Harrison has no electrical-permit program of its own -- using the general 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' valuation-based fee formula (the same formula used for solar, just without the Solar/Renewable Energy checkbox).

Verified 2026-07-20 · Source

Requirements

  • No City of Harrison building permit is required for a standard wall-mounted or pedestal EV charger installation -- only electrical work is involved, and Harrison's Building Permit fee (City Code 8-1-4) applies to structural/building work, not vehicle-charging circuits
  • Electrical permit issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City -- Harrison has no electrical-permit program of its own
  • On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- the worksheet states this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all
  • Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- the fee formula is identical either way

Required documents

  • RequiredIdaho DOPL Contractor (or Homeowner) Electrical Permit ApplicationState application with the Electrical Permit Worksheet (Fee Schedule); EV charger circuit work is priced under the 'Other Installations' valuation-based formula

Fee schedule

Fee typeAmountNotes
State DOPL Electrical Permit -- Other Installations, up to $10,000 system cost(total cost of system x 0.02) + $60Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022 -- same formula tier used for solar/renewable energy; no dedicated EV/EVSE line item exists on the state form
State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system cost((total cost of system - $10,000) x 0.01) + $260Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Harrison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /idaho/kootenai-county/harrison/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 69b46d8

Reproducible from PermitBase’s version-controlled dataset, commit 69b46d8.