Post Falls building permits

Verified

Post Falls, Idaho — as published 2026-07-03.

Verified 2026-07-03 · Source

Codes adopted

Idaho has a mandatory statewide building code administered by the Idaho Division of Building Safety (DBS, now organizationally under the Division of Occupational and Professional Licenses / DOPL) under the Idaho Building Code Act, Idaho Code Title 39, Chapter 41, negotiated and adopted through the Idaho Building Code Board. Local jurisdictions that adopt and locally administer the code must enforce it at least as strictly as the state minimum; Post Falls administers its own Building Division for building, electrical, plumbing, and mechanical permitting within city limits. Source: City of Post Falls Current Adopted Codes and Design Criteria (Community Development Department, rev 02/16/25), https://www.postfalls.gov/DocumentCenter/View/750/Current-Codes-and-Design-Criteria-PDF2018 IBC (International Building Code), as adopted by the State of Idaho Building Code Board and locally administered by the City of Post Falls. Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)2018 IRC (International Residential Code), as adopted by the State of Idaho Building Code Board and locally administered by the City of Post Falls. Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)2018 IEBC (International Existing Building Code). Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)2018 IECC with 2012 Amendments for Residential (International Energy Conservation Code). Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)2018 IMC (International Mechanical Code). Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)2017 ISPC (Idaho State Plumbing Code) — Idaho's own state-amended plumbing code, not the Uniform or International Plumbing Code. Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)2018 IFGC (International Fuel Gas Code). Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)2023 NEC (National Electrical Code). Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)ICC A117.1-2009 (Accessibility). Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)2009 IPMC (International Property Maintenance Code), with amendments. Source: City of Post Falls Current Adopted Codes and Design Criteria (rev 02/16/25)The City of Post Falls Building Division directly issues and inspects electrical and plumbing permits within city limits (the Division's own permit-fee schedule lists dedicated Electrical Permits and Plumbing Permits fee tables administered by the City); this reflects local administration rather than direct-state DOPL/Division of Building Safety issuance for in-city work. Source: City of Post Falls Fee Schedule (Community Development Department, rev 10-1-2025), https://www.postfalls.gov/DocumentCenter/View/815/Fee-Schedule-PDF

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for construction of new single-family homes, duplexes, and townhouse units in Post Falls. Reviewed against the 2018 IRC and 2018 IECC (with 2012 Residential Amendments) as adopted by the City of Post Falls, plus the City's Design Criteria. Applications are submitted through the Community Development Portal (OpenGov/ViewPoint Cloud).

Verified 2026-07-03 · Source

Requirements

  • Building permit required for new single-family, duplex, and townhouse-unit construction
  • Plans must comply with the 2018 IRC and 2018 IECC (2012 Residential Amendments) as adopted by the City of Post Falls, and must note the City's Design Criteria (40 psf roof snow load, 56 psf ground snow load, 115 mph wind speed/Exposure B, 24-inch frost depth, Seismic Design Category C) directly on the plans
  • One set of building plans required (hand-drawn plans in black or blue pen only, no pencil; ¼" scale preferred, 1/8" minimum; full house plans on 11x17 minimum, 18x24 recommended)
  • One set of site plans showing property lines, lot dimensions, north arrow, lot square footage, building footprint square footage, driveway, percent lot coverage, setbacks, and utility easements
  • Energy calculations required: either the City's Prescriptive Package Form or a REScheck report (2018 IECC or 2018 IRC energy path)
  • Completed Mechanical, Electrical, and Plumbing Permit Applications (may be submitted after the initial Building Permit application)
  • Apply online at the Community Development Portal: https://postfallsid.portal.opengov.com/
  • Utility Registration Form required when submitting for a new single-family residence

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online through the Community Development Portal (postfallsid.portal.opengov.com)
  • RequiredResidential Building Plan Submittal RequirementsCity of Post Falls checklist covering building plans, site plans, energy calculations, foundation/floor/roof framing details, braced wall panels, egress, smoke/CO detectors, and mechanical/electrical/plumbing sub-applications
  • RequiredConstruction DrawingsFoundation plan, floor plans, floor framing details, roof framing plan/truss sheets, exterior elevations, and dimensioned section drawings consistent with the 2018 IRC and City Design Criteria
  • RequiredEnergy Compliance DocumentationResidential Prescriptive Energy Form or REScheck printout

Fee schedule

Fee typeAmountNotes
Residential Living Space valuation rate$96.83 per sq ft (used with the Valuation Chart to calculate the permit and plan-review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $1 to $500$23.50City of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $501 to $2,000$23.50 for the first $500 plus $3.05 for each additional $100, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $2,001 to $25,000$69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $25,001 to $50,000$391.25 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $50,001 to $100,000$643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $100,001 to $500,000$993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $500,001 to $1,000,000$3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation over $1,000,000$5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Residential Plan Review (Building Plan Check, paid at submittal)25% of the Building Permit feeCity of Post Falls Fee Schedule, rev 10-1-2025

Residential Addition / Remodel / Alteration Permit

Verified

Required for additions, interior finish/remodels, decks, patio covers, garages, and other alterations to existing residential structures in Post Falls, governed by the 2018 IRC as locally adopted, with dedicated per-square-foot valuation rates distinct from new-home construction.

Verified 2026-07-03 · Source

Requirements

  • Building permit required for additions, interior finish, garages, decks, patio covers, breezeways, and basement finish work
  • If plans are for an addition, they must also show the adjoining existing areas and their use
  • Stairs, decks, and porches must show attachment/ledger details in the foundation plan; walls over 12 feet in height must be designed and stamped by an Idaho-licensed engineer
  • New structures/additions with a floor-area increase greater than 25% must meet Post Falls Municipal Code Section 18.24.020 (General Standards)
  • Site plan required showing setbacks, lot coverage percentage, and existing/proposed structure footprints
  • Apply through the Community Development Portal

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online through the Community Development Portal
  • OptionalResidential Deck GuideCity of Post Falls guide for residential deck construction and permitting
  • RequiredConstruction DrawingsSite plan and framing/structural details showing scope of work and connection to the existing structure, per Residential Building Plan Submittal Requirements

Fee schedule

Fee typeAmountNotes
Additions to Residential Homes$72.62 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Interior Finish Residential Homes$20.00 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Basement — Finished$96.83 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Basement — Unfinished$77.46 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Residential Garage$37.72 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Pole Building Residential$20.00 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Deck Only$15.00 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Deck with Cover$20.00 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Deck/Patio Cover and Enclosure$25.00 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Patio Cover Only$20.00 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Breezeway$20.00 per sq ft (use Valuation Chart to calculate permit and plan review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Residential Plan Review (Building Plan Check)25% of the Building Permit feeCity of Post Falls Fee Schedule, rev 10-1-2025
Changes to Approved Plans$100.00 per hour, one half-hour minimumCity of Post Falls Fee Schedule, rev 10-1-2025

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Post Falls, governed by the 2023 National Electrical Code (NEC) as adopted by the City. The City of Post Falls Building Division issues and inspects electrical permits directly within city limits.

Verified 2026-07-03 · Source

Requirements

  • Electrical permit required for installation, alteration, or repair of hard-wired electrical systems
  • Governed by the 2023 NEC as adopted by the City of Post Falls
  • Fee schedule differentiates new residential construction (by square footage), duplex, multi-family, existing residence/modular/manufactured/mobile home, spas/hot tubs, swimming pools, signs, and commercial work
  • Apply through the Community Development Portal; may be submitted alongside or after the Building Permit application

Required documents

  • RequiredElectrical Permit ApplicationSubmitted online through the Community Development Portal (postfallsid.portal.opengov.com)

Fee schedule

Fee typeAmountNotes
New Residential — up to 1,500 sq ft$130.00City of Post Falls Fee Schedule, rev 10-1-2025
New Residential — 1,501 to 2,500 sq ft$195.00City of Post Falls Fee Schedule, rev 10-1-2025
New Residential — 2,501 to 3,500 sq ft$260.00City of Post Falls Fee Schedule, rev 10-1-2025
New Residential — 3,501 to 4,500 sq ft$325.00City of Post Falls Fee Schedule, rev 10-1-2025
New Residential — over 4,500 sq ft$325.00 plus $65.00 for each additional 1,000 sq ftCity of Post Falls Fee Schedule, rev 10-1-2025
Duplex$260.00 per building plus $65.00 per unitCity of Post Falls Fee Schedule, rev 10-1-2025
Three or more multi-family units$130.00 per building plus $65.00 per unitCity of Post Falls Fee Schedule, rev 10-1-2025
Existing Residence/Modular, Manufactured, or Mobile Home/Detached Shop/Garage$65.00 fee (one circuit included) plus $10.00 per additional branch circuitCity of Post Falls Fee Schedule, rev 10-1-2025
Spas & Hot Tubs$65.00 for each inspectionCity of Post Falls Fee Schedule, rev 10-1-2025
Swimming Pools$130.00 (covers two mandatory inspections, excluding lighting)City of Post Falls Fee Schedule, rev 10-1-2025
Signs$65.00 per signCity of Post Falls Fee Schedule, rev 10-1-2025
Temporary Service$100.00City of Post Falls Fee Schedule, rev 10-1-2025
Commercial — total contracted amount up to $10,000(Total cost of system ÷ 10,000) × 0.01, plus $260.00City of Post Falls Fee Schedule, rev 10-1-2025
Commercial — $10,001 to $100,000(Total cost of system ÷ 100,000) × 0.005, plus $1,160.00City of Post Falls Fee Schedule, rev 10-1-2025
Commercial Plan Review Fee55% of the Electrical Permit fee (NEC, Building & Energy Code compliance)City of Post Falls Fee Schedule, rev 10-1-2025
ReinspectionFee equal to the permit feeCity of Post Falls Fee Schedule, rev 10-1-2025
Work without a permit(Total cost of system × 0.02) + $60.00City of Post Falls Fee Schedule, rev 10-1-2025

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Post Falls, governed by the 2017 Idaho State Plumbing Code (ISPC) as adopted by the City. The City of Post Falls Building Division issues and inspects plumbing permits directly within city limits.

Verified 2026-07-03 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of any plumbing system, fixture, water heater, gas piping, or sewer/water service line
  • Governed by the 2017 Idaho State Plumbing Code (ISPC) as adopted by the City of Post Falls
  • Processing fee of $35.00 on all permits plus per-fixture/item unit fees
  • Apply through the Community Development Portal; may be submitted alongside or after the Building Permit application

Required documents

  • RequiredPlumbing Permit ApplicationSubmitted online through the Community Development Portal (postfallsid.portal.opengov.com)

Fee schedule

Fee typeAmountNotes
Processing fee on all permits$35.00City of Post Falls Fee Schedule, rev 10-1-2025
Bar sink, bathtub including shower (each fixture)$8.00City of Post Falls Fee Schedule, rev 10-1-2025
Backflow assembly (building/landscape), backwater valve, clothes washer, drain waste/vent piping alteration/replacement (each fixture), floor drain/hub drain, gas piping (each outlet), kitchen sink and/or dishwasher, lavatory, lawn sprinklers (from water connection through backflow device), mobile home w/s hookup, radiant heat (per zone), sewer ejector/sump pump, sewer service, shower, utility sink, water closet, water heater, water piping alteration/replacement (each fixture), water service, water softener$65.00 up to 16 heads/fixtures; $4.00 per additional head/fixture (17 and up)City of Post Falls Fee Schedule, rev 10-1-2025 (combined per-fixture unit fee table)
Residential Fire Sprinkler Supply from Domestic Water System3% of the contract priceCity of Post Falls Fee Schedule, rev 10-1-2025
Commercial — up to the first $20,000.002% of the contract priceCity of Post Falls Fee Schedule, rev 10-1-2025
Commercial — $20,001.00 to $100,000.001% of the contract priceCity of Post Falls Fee Schedule, rev 10-1-2025
Commercial — $100,001.00 to $200,000.00 / over $200,0010.5% of the contract priceCity of Post Falls Fee Schedule, rev 10-1-2025

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, air conditioning, and related mechanical installations in Post Falls, governed by the 2018 International Mechanical Code (IMC) and International Fuel Gas Code (IFGC) as adopted by the City.

Verified 2026-07-03 · Source

Requirements

  • Mechanical permit required for installation or relocation of furnaces, heat pumps, air handlers, ventilation systems, gas piping, and appliance vents
  • Governed by the 2018 IMC and 2018 IFGC as adopted by the City of Post Falls
  • Processing fee of $18.00 on all permits (plus a stated $45.00 mechanical permit base fee heading) plus per-unit fees based on appliance type and capacity
  • Residential ducted systems require heat load calculations (ACCA Manuals J & D or approved software) submitted with the Mechanical Permit Application
  • Apply through the Community Development Portal

Required documents

  • RequiredMechanical Permit ApplicationSubmitted online through the Community Development Portal; may be submitted after the initial Building Permit application
  • RequiredResidential HVAC Review FormCity of Post Falls form for residential HVAC system review
  • OptionalResidential HVAC Air-Balancing FormCity of Post Falls form documenting air-balancing for ducted HVAC systems

Fee schedule

Fee typeAmountNotes
Processing fee on all permits$18.00City of Post Falls Fee Schedule, rev 10-1-2025
Furnace, all types under 100 KBTU$22.00City of Post Falls Fee Schedule, rev 10-1-2025
Furnace, all types over 100 KBTU$15.00City of Post Falls Fee Schedule, rev 10-1-2025
Misc. venting, C/A, duct modifications$25.00City of Post Falls Fee Schedule, rev 10-1-2025
Gas fireplace$16.00City of Post Falls Fee Schedule, rev 10-1-2025
Residential range hood$15.00City of Post Falls Fee Schedule, rev 10-1-2025
Gas water heater$10.00City of Post Falls Fee Schedule, rev 10-1-2025
Ventilating/exhaust fans$5.00City of Post Falls Fee Schedule, rev 10-1-2025
Gas piping, each outlet$16.00City of Post Falls Fee Schedule, rev 10-1-2025
Clothes dryers$16.00City of Post Falls Fee Schedule, rev 10-1-2025
Heat pump, A/C 0-3 tons$30.00City of Post Falls Fee Schedule, rev 10-1-2025
Heat pump, A/C 3+ to 15 tons$40.00City of Post Falls Fee Schedule, rev 10-1-2025
Heat pump, A/C 15+ to 30 tons$60.00City of Post Falls Fee Schedule, rev 10-1-2025
Heat pump, A/C 30+ to 50 tons$100.00City of Post Falls Fee Schedule, rev 10-1-2025
Air handlers/fan coil units under 10,000 CFM$20.00City of Post Falls Fee Schedule, rev 10-1-2025
Air handlers/fan coil units over 10,000 CFM$25.00City of Post Falls Fee Schedule, rev 10-1-2025
Evaporative coolers, all types$15.00City of Post Falls Fee Schedule, rev 10-1-2025
Commercial Mechanical Plan Review25% of the Mechanical Permit feeCity of Post Falls Fee Schedule, rev 10-1-2025

Re-Roofing Permit

Verified

Required for residential and commercial re-roofing in Post Falls, reviewed under the 2018 IBC/IRC roofing provisions and the City's Design Criteria (40 psf roof snow load; Ice Shield underlayment required per IRC R905.1.2 due to occasional severe weathering conditions). Billed as a flat fee rather than a valuation-based Building Permit fee.

Verified 2026-07-03 · Source

Requirements

  • Building permit required for re-roofing (Building Permit, billed at the dedicated Re-Roof flat fee rather than the general valuation schedule)
  • Ice Shield underlayment required per adopted 2018 IRC Section R905.1.2 due to the City's 'Severe' weathering designation
  • Roof assemblies must be designed for the City's Design Criteria: 40 psf roof snow load, 56 psf ground snow load
  • Apply through the Community Development Portal

Required documents

  • RequiredBuilding Permit Application (Re-Roof)Submitted online through the Community Development Portal

Fee schedule

Fee typeAmountNotes
Re-Roof, Residential$150.00 Flat FeeCity of Post Falls Fee Schedule, rev 10-1-2025
Re-Roof, CommercialBased upon the valuation of the work to be performed, minimum of $150.00 feeCity of Post Falls Fee Schedule, rev 10-1-2025

Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Post Falls. The City has no separate solar-specific application or fee category; solar PV installations are permitted through the standard Building Permit (structural/mounting, valuation-based) and Electrical Permit (system wiring/interconnection, governed by the 2023 NEC, including Article 690 PV-specific provisions) processes.

Verified 2026-07-03 · Source

Requirements

  • Building Permit required for roof-mounting structural attachment, reviewed against the City's Design Criteria (40 psf roof snow load, 115 mph wind speed/Exposure B) to confirm the roof structure supports the added PV system load
  • Electrical Permit required for system wiring and utility interconnection, governed by the 2023 NEC as adopted by the City of Post Falls (NEC Article 690 governs PV-specific installation requirements)
  • Building Permit valuation is based on the installed cost of the system, run through the City's general Valuation Chart in the Fee Schedule
  • Electrical Permit fee for solar is calculated under the Commercial (total contracted amount) formula in the Fee Schedule, since no dedicated residential-solar line item is published
  • Apply through the Community Development Portal for both the Building and Electrical Permit components

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online through the Community Development Portal; used for the structural/mounting review of the PV installation
  • RequiredElectrical Permit ApplicationSubmitted online through the Community Development Portal; used for PV system wiring and interconnection review under the 2023 NEC

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (system installed cost run through the general Valuation Chart)$23.50 minimum ($1-$500 valuation), scaling per the City's Valuation ChartCity of Post Falls Fee Schedule, rev 10-1-2025; no dedicated solar Building Permit line item is published separately from the general valuation schedule
Electrical Permit — Commercial (total contracted amount) up to $10,000(Total cost of system ÷ 10,000) × 0.01, plus $260.00City of Post Falls Fee Schedule, rev 10-1-2025; used for PV interconnection fee calculation absent a dedicated solar line item
Electrical Permit — Commercial $10,001 to $100,000(Total cost of system ÷ 100,000) × 0.005, plus $1,160.00City of Post Falls Fee Schedule, rev 10-1-2025

Demolition Permit

Verified

Required for demolition of any building within Post Falls city limits, billed as a flat per-lot fee plus a required Engineering Bond distinct from the general Building Permit valuation schedule.

Verified 2026-07-03 · Source

Requirements

  • Demolition permit required before demolishing a residential or commercial structure within city limits
  • A $1,500.00 Engineering Bond is required in addition to the flat Demolition Permit fee
  • Apply through the Community Development Portal

Required documents

  • RequiredDemolition Permit ApplicationSubmitted online through the Community Development Portal
  • RequiredEngineering Bond ($1,500.00)Required alongside the Demolition Permit fee to secure site cleanup/restoration

Fee schedule

Fee typeAmountNotes
Demolition — Residential, per Lot$200.00 Flat Fee, plus $1,500.00 Engineering BondCity of Post Falls Fee Schedule, rev 10-1-2025
Demolition — Commercial, per Lot$300.00 Flat Fee, plus $1,500.00 Engineering BondCity of Post Falls Fee Schedule, rev 10-1-2025

Fence and Retaining Wall Permit

Verified

Fences in Post Falls do NOT require a Building Division permit — only compliance with Post Falls Municipal Code Section 18.24.020(K) height/placement standards. Retaining walls, however, are a listed Building Permit fee item billed per linear foot.

Verified 2026-07-03 · Source

Requirements

  • Fences: NO building permit required. Must be placed on or within the property boundary line; maximum 3 feet in height within a required front yard setback; maximum 6 feet in height in rear/side yard setback areas (per Post Falls Municipal Code Section 18.24.020(K))
  • Corner lots: fences may be 6 feet tall along the street-side yard so long as the fence does not extend into the front yard setback; fences abutting an adjoining lot's side yard may not exceed 3 feet or block driveway visibility; a 10-foot-by-10-foot vision-clearance triangle applies at driveways where new fences affect visibility
  • Compliance with zoning setbacks and lot coverage is NOT required for fences, walls, signs, or accessory structures that do not require a building permit, per Table 18.20.040 Note 10 of the Official Bulk and Placement Regulations
  • Retaining Walls: a Building Permit IS required and is billed at $4.50 per linear foot per the City's Fee Schedule
  • Apply through the Community Development Portal for retaining wall permits

Required documents

  • OptionalFence Requirements FAQCity of Post Falls handout confirming no permit is required for fences meeting the height/placement standards of PFMC 18.24.020(K)
  • RequiredBuilding Permit Application (Retaining Wall)Submitted online through the Community Development Portal for retaining walls

Fee schedule

Fee typeAmountNotes
Fence (meeting height/placement standards)No fee — no Building Division permit requiredCity of Post Falls Fence Requirements FAQ; governed by Post Falls Municipal Code Section 18.24.020(K) zoning standards only
Retaining Walls$4.50 per Linear FootCity of Post Falls Fee Schedule, rev 10-1-2025

Accessory Dwelling Unit (ADU) Permit

Verified

Post Falls permits Accessory Dwelling Units (attached, detached, or basement conversions) as secondary dwellings on single-family lots under Post Falls Municipal Code Sections 18.24.020, 18.24.030, and 18.20.040. ADUs are processed through the standard Residential Building Permit, priced under the same per-square-foot valuation categories as other residential construction (new living space, addition, interior finish, or basement finish, depending on the ADU type).

Verified 2026-07-03 · Source

Requirements

  • ADU may be detached, attached, or a basement conversion; must have its own electricity, kitchen, and sanitary facilities
  • Size limited to 50% of the primary residence's living area or 1,000 sq ft, whichever is smaller
  • Only one ADU allowed per lot; one of the two dwelling units on the lot must be owner-occupied
  • Detached ADUs must be set back behind the front of the primary residence (corner lots may place the ADU on the street-side yard)
  • One additional paved off-street parking space required
  • No separate driveway approach permitted unless from a rear-loaded alley, or a side street on a corner lot
  • Building materials must be consistent with the primary residence; no more than one entrance visible from the street; primary residence entrance must remain clearly visible and street-facing
  • An existing accessory structure may be converted to an ADU if it is brought up to all currently adopted building code requirements
  • Detailed site plan required, drawn to scale, showing full property extents, setbacks, and all existing/proposed structures with square footage
  • ADU must comply with lot coverage, height limitations, and setback requirements for its underlying zoning district
  • Apply through the Community Development Portal using the standard Residential Building Permit application

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online through the Community Development Portal; ADUs use the standard Residential Building Permit application, not a separate ADU-specific form
  • RequiredPost Falls Accessory Dwelling Units General InformationCity handout summarizing ADU type diagrams (basement, attached, detached rear-yard, detached side-yard), placement/size/parking standards, and Municipal Code citations
  • RequiredSite PlanDetailed, to-scale site plan showing property extents, setbacks, and all existing/proposed structures with square footage of floor area and footprint

Fee schedule

Fee typeAmountNotes
New detached ADU (new living space)$96.83 per sq ft (use Valuation Chart to calculate Building Permit and plan-review fee)City of Post Falls Fee Schedule, rev 10-1-2025; no separate ADU fee category is published — new ADU square footage is billed under the same Residential Living Space rate as other new construction
Basement-conversion ADU (finished basement)$96.83 per sq ft (use Valuation Chart to calculate Building Permit and plan-review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Attached ADU built as an addition$72.62 per sq ft (use Valuation Chart to calculate Building Permit and plan-review fee)City of Post Falls Fee Schedule, rev 10-1-2025
Residential Plan Review (Building Plan Check)25% of the Building Permit feeCity of Post Falls Fee Schedule, rev 10-1-2025

EV Charger / EVSE Permit

Verified

The City of Post Falls has no EV-charger-specific permit type or fee line — confirmed by direct review of the City's Fee Schedule (rev 10-1-2025), which contains no EV charger, electric vehicle, or EVSE line item anywhere. An EV charger circuit is filed as ordinary residential electrical work, governed by the 2023 NEC as adopted by the City, and billed under the 'Existing Residence/Modular, Manufactured, or Mobile Home/Detached Shop/Garage' fee category — the same flat fee (one circuit included, plus per-additional-circuit charge) used for any other existing-home electrical addition.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the EV charger circuit installation, filed as ordinary residential electrical work
  • Governed by the 2023 NEC as adopted by the City of Post Falls
  • Apply through the Community Development Portal; may be submitted alongside or after a Building Permit application if applicable

Required documents

  • RequiredElectrical Permit ApplicationSubmitted online through the Community Development Portal (postfallsid.portal.opengov.com); there is no separate EV-charger-specific application form

Fee schedule

Fee typeAmountNotes
Existing Residence/Modular, Manufactured, or Mobile Home/Detached Shop/Garage (applies to a new dedicated EV charger circuit; no EV-specific line item found)$65.00 fee (one circuit included) plus $10.00 per additional branch circuitCity of Post Falls Fee Schedule, rev 10-1-2025. Confirmed by direct review of the published fee schedule PDF: no EV charger, electric vehicle, or EVSE line item exists — an EV charger circuit is billed under this general existing-home electrical category.
Temporary Service (if applicable during installation)$100.00City of Post Falls Fee Schedule, rev 10-1-2025

Commercial Building Permit (New Construction)

Verified

Required for new commercial construction, additions, and other structural work on non-residential buildings in Post Falls. Reviewed against the 2018 IBC as adopted, with valuation established per Occupancy Classification and Type of Construction (the City's Fee Schedule cites 'Building Safety Journal 7/2008' as its valuation-methodology source — i.e. the ICC's industry-standard building valuation data — rather than a flat city-published per-square-foot rate as used for residential). Commercial Plan Check/Review is billed at 65% of the Building Permit fee (vs. 25% for single-family/duplex/townhouse). Kootenai County Fire and Rescue (KCFR), a separate political subdivision independent of the City, bills separately for its own plan review and inspections on new commercial construction.

Verified 2026-08-02 · Source

Requirements

  • Building permit required for new commercial construction and additions; plans reviewed under the 2018 IBC as adopted by the City of Post Falls
  • Commercial valuation is established per Occupancy Classification and Type of Construction (per the Fee Schedule's 'Building Safety Journal 7/2008' methodology reference), not a flat city per-sq-ft rate; the resulting valuation is run through the same general Valuation Chart used citywide to calculate the Building Permit fee
  • One (1) set of all plans required: architectural, structural, mechanical, electrical, and plumbing; multi-family plans require a separate application and plan set for each building. Architectural and structural plans must be sealed by an Idaho-licensed professional
  • If not designed to the prescriptive provisions of the IBC, complete structural calculations addressing both vertical and lateral forces, stamped and signed by an Idaho-licensed engineer or architect, are required
  • One (1) set of specifications, sealed engineering calculations, COMcheck(s) (IECC commercial energy compliance), and truss sheets as required for the project
  • Kootenai County Fire and Rescue (KCFR) Fee Acknowledgement form required (digital fill-in available during online submittal; separate paper form for paper submittals only) — acknowledges that KCFR, a separate agency, bills the applicant directly and separately from the City
  • A Building Code Analysis must appear on the plan cover sheet (or be readily found elsewhere in the plans): codes designed under, project location/description, separated or nonseparated uses, occupancy classification (whole building or per area), number of stories, total building height, type of construction per the IBC, square footage per floor, maximum floor area permitted and basis for any area increase, occupant load per area, exits required per occupant load, fire/occupancy separations, plumbing fixtures required, list of required special inspections, and any deferred submittals
  • Architectural site plan (based on City-approved site plans, if applicable); exterior elevations showing finished grade lines, stairs, ramps, handrails, and building height
  • Foundation plan with cross sections of footings, pads, walls, reinforcement, anchor bolts, and sill plates (size, location, embedment depth, including hold-down devices/straps); concrete reinforcement grade, size, spacing, location, and bar count
  • Floor plans showing dimensions, room use/occupancy classification labels, bearing walls, fire walls, area/occupancy separation walls, and window/door dimensions, locations, and types
  • Floor framing details, roof framing plan (prefabricated truss plans, or ridge/rafter/ceiling-joist/purlin sizing for hand-framed roofs, with lumber type/grade/species), cross sections, braced wall/shear wall plans (panel type, location, fastener size/spacing, anchorage), and header/beam/column/post locations and sizes
  • Equipment Screening plans required per Post Falls Municipal Code 18.24.040 (Commercial and Industrial Performance Standards): roof- or wall-mounted mechanical equipment (A/C, elevator overruns, heating/ventilating units and ducting) must be screened from a horizontal line of sight, architecturally consistent with the building; ground-mounted equipment visible from a public right-of-way must be inset into building facades and/or screened with landscaping or low walls
  • New commercial buildings must have a Knox lock box installed per International Fire Code Section 506.1 (per KCFR); an electric gate additionally requires a Knox override switch — all KCFR requirements, including outstanding invoices, must be satisfied at least 30 days before KCFR will sign the Certificate of Occupancy
  • Site Plan Review (a separate Planning/Zoning fee, $2,000.00 per site) commonly applies alongside a Commercial Building Permit for new sites or major commercial projects
  • Apply online (preferred) through the Community Development Portal (postfallsid.portal.opengov.com); paper submittals require complete address (including suite number if applicable), parcel information, accurate description and valuation of work, and owner/contractor/architect/engineer information

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online (preferred) through the Community Development Portal; paper submittals require address/suite/parcel info, valuation, and owner/contractor/architect/engineer information
  • RequiredCommercial Building Permit Submittal RequirementsCity of Post Falls checklist (rev 8/26/25) covering plans, documents, Building Code Analysis, site plan, elevations, foundation/floor/roof framing, braced wall/shear plans, and equipment screening
  • RequiredConstruction DrawingsArchitectural, structural, mechanical, electrical, and plumbing plans; foundation plan, floor plans, framing details, exterior elevations, and cross sections, sealed by an Idaho-licensed professional
  • RequiredCOMcheck(s)IECC commercial energy-code compliance documentation
  • RequiredKootenai County Fire and Rescue (KCFR) Fee Acknowledgement FormAcknowledges that KCFR, a separate political subdivision, bills separately from the City for its own plan review (30% of the building permit fee or $150.00, whichever is higher) and inspections ($108.00/hour, one-hour minimum)

Fee schedule

Fee typeAmountNotes
General Building Permit Valuation per Occupancy and Type of Construction (Commercial)Established per Occupancy Classification and Type of Construction using the 'Building Safety Journal 7/2008' methodology referenced in the Fee Schedule (the ICC's historic building-valuation-data publication); no flat city per-sq-ft commercial rate is publishedCity of Post Falls Fee Schedule, rev 10-1-2025. Resulting valuation is run through the general Valuation Chart below to calculate the Building Permit fee.
Building Permit Fee — valuation $1 to $500$23.50City of Post Falls Fee Schedule, rev 10-1-2025 (same citywide Valuation Chart used for residential and commercial)
Building Permit Fee — valuation $501 to $2,000$23.50 for the first $500 plus $3.05 for each additional $100, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $2,001 to $25,000$69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $25,001 to $50,000$391.25 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $50,001 to $100,000$643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $100,001 to $500,000$993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation $500,001 to $1,000,000$3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Building Permit Fee — valuation over $1,000,000$5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000, or fraction thereofCity of Post Falls Fee Schedule, rev 10-1-2025
Commercial Building Plan Check / Commercial Plan Review65% of the Building Permit feeCity of Post Falls Fee Schedule, rev 10-1-2025. Listed under both the 'Building Plan Check (Paid at Plan Submittal)' table and the 'Building Permits' table; appears to be the same fee.
Site Plan Review (Commercial and 3-plex+)$2,000.00 per site (covers two reviews); $250.00 for additional reviews or meetingsCity of Post Falls Fee Schedule, rev 10-1-2025 (Zoning fee, separate from the Building Permit fee)
Re-Roof, CommercialBased upon the valuation of the work to be performed, minimum $150.00 feeCity of Post Falls Fee Schedule, rev 10-1-2025
Residing a Structure, CommercialBased upon the valuation of the work to be performed, minimum $100.00 Flat FeeCity of Post Falls Fee Schedule, rev 10-1-2025
Foundation Only10% of the Building Permit fee, in addition to the full Building Permit feeCity of Post Falls Fee Schedule, rev 10-1-2025
Work Performed with no valid permitPermit fee × 2 (double permit fee)City of Post Falls Fee Schedule, rev 10-1-2025
Non-Residential Impact Fees (per sq ft of floor area) — Commercial/Shopping Center$1.30 Public Safety + $6.62 Streets + $1.43 Multimodal + $0.65 Fire + $0.10 EMS = $10.10 total per sq ftCity of Post Falls Fee Schedule, rev 10-1-2025
Non-Residential Impact Fees (per sq ft of floor area) — Office$4.42 total per sq ftCity of Post Falls Fee Schedule, rev 10-1-2025
Non-Residential Impact Fees (per sq ft of floor area) — Light Industrial / Manufacturing / Warehousing / Mini-Warehouse$2.64 / $2.26 / $1.45 / $1.37 total per sq ft, respectivelyCity of Post Falls Fee Schedule, rev 10-1-2025
Non-Residential Impact Fees — Hotel$3,129.04 per room (Public Safety + Streets + Multimodal) plus $0.75 per sq ft (Fire + EMS)City of Post Falls Fee Schedule, rev 10-1-2025
Water Capitalization Fee (Commercial, based on service line size from meter)1" Commercial $5,463.00; 1½" $10,925.00; 2" $17,479.00; 3" $34,958.00; 4" $54,621.00; 6" $109,242.00; 8" $158,291.00City of Post Falls Fee Schedule, rev 10-1-2025
Sewer Capitalization Fee (Commercial/Industrial)Minimum $7,621.00, plus an additional $7,621.00 for each 5,000 gallons of reclaimed water flow (based on water consumption) above the first 5,000 gallons per monthCity of Post Falls Fee Schedule, rev 10-1-2025
Commercial R-O-W Inspection (Base fee)$350.00City of Post Falls Fee Schedule, rev 10-1-2025
Kootenai County Fire and Rescue (KCFR) Building Plan Review — SEPARATE AGENCY, not a City fee30% of the building permit fee, or $150.00, whichever is higherKCFR Fee Acknowledgement letter (Jeryl Archer, Fire Marshal). KCFR is a separate political subdivision of Idaho government, independent of the City of Post Falls; it bills the applicant directly. Fees collected by the City building department do NOT include KCFR's fees.
Kootenai County Fire and Rescue (KCFR) Inspections — SEPARATE AGENCY, not a City fee$108.00 per hour (subject to change annually), one-hour minimumKCFR Fee Acknowledgement letter. Covers automatic sprinkler installation inspections/testing, underground fuel tank pressure testing/delivery line tests, commercial kitchen hood tests, fire alarm tests/plan reviews, medical gas line testing, final inspection for occupancy, and any other on-site inspections required for new commercial construction.

Commercial Tenant Improvement / Change of Use or Occupancy Permit

Verified

Required whenever an existing commercial space is remodeled/altered (including removing or installing non-bearing walls or doors) or undergoes a change of use or occupancy classification (e.g., retail to restaurant, office to retail, office to daycare). Governed by Chapter 9 of the 2018 IEBC as adopted. This is a genuinely distinct product from new commercial construction: the permit fee is based on a licensed contractor's bid for the proposed work, rather than the Occupancy-Classification/Type-of-Construction valuation-table methodology used for ground-up commercial buildings, and the process can start with a no-construction path (a licensed Architect/Engineer letter) rather than full plan submittal.

Verified 2026-08-02 · Source

Requirements

  • Building permit required whenever a Change of Use or Change in Occupancy occurs (examples given by the City: retail space to restaurant, office to retail, office to daycare) OR for remodeling/alteration of space within an existing building, including removing and/or installing non-bearing walls, doors, etc.
  • Governed by Chapter 9 of the 2018 International Existing Building Code (IEBC) as adopted
  • Use and application of IEBC Chapter 9 (and any other applicable chapters) must be addressed by an Idaho State-licensed Architect or Engineer, unless the project meets exceptions (c) and (d) of Idaho Code Title 54, §54-309
  • If the licensed Architect/Engineer determines the existing structure requires NO modification for the new use/occupancy, this may be satisfied by a stamped and sealed letter on their letterhead; in that case a minimum permit fee may be assessed along with issuance of a new Certificate of Occupancy (the specific minimum-fee dollar amount is not published in the source document)
  • If the Architect/Engineer determines structural or nonstructural changes ARE needed, full plans must be submitted and routed through Planning Division review, Engineering Division review, and Building Division plan review before a construction permit is issued
  • The Building Division offers one courtesy site visit to help establish whether a change of use is triggered, what changes (if any) are required, and whether a licensed architect/engineer must be engaged
  • Applicant must separately contact the City of Post Falls Planning Division, Engineering Division, Kootenai County Fire and Rescue (KCFR), and Panhandle Health District — the Building Division's own review does not clear zoning/land-use, onsite parking, impact/wastewater fees, street-frontage improvements, drainage, fire-district, or health-department requirements
  • If plans are required (addition or tenant improvement), they must also show the adjoining existing areas and their use, per the Commercial Building Permit Submittal Requirements
  • Kootenai County Fire and Rescue (KCFR) Fee Acknowledgement form applies to Commercial Building Permit submittals generally (per the Commercial Building Permit Submittal Requirements checklist); KCFR bills separately from the City
  • Apply through the Community Development Portal (preferred) or in person; contact the Building Division at (208) 773-8708 or permits@postfalls.gov with questions

Required documents

  • RequiredChange of Use/Occupancy Permit Submittal RequirementsCity of Post Falls Building Division handout describing the permit-required triggers, applicable codes, the Architect/Engineer review requirement, and the process flowchart (courtesy site visit → minimal-change letter path OR full-plans path → Planning/Engineering/Building review → Certificate of Occupancy)
  • OptionalArchitect/Engineer Letter (no-modification path)Stamped and sealed letter on an Idaho-licensed Architect's or Engineer's letterhead attesting the existing structure requires no modification for the new use/occupancy, if applicable
  • OptionalConstruction Plans (modification path)Full architectural/structural/MEP plans per the Commercial Building Permit Submittal Requirements, if the Architect/Engineer determines changes are needed; must show adjoining existing areas and uses
  • RequiredBuilding Permit ApplicationSubmitted online (preferred) through the Community Development Portal, or in person
  • OptionalKootenai County Fire and Rescue (KCFR) Fee Acknowledgement FormAcknowledges KCFR bills separately from the City for plan review and inspections

Fee schedule

Fee typeAmountNotes
Tenant Improvement / Remodeling Building Permit FeeBased on a licensed contractor's bid for the proposed workCity of Post Falls Change of Use/Occupancy Permit Submittal Requirements. This valuation basis differs from the Occupancy-Classification/Type-of-Construction ('Building Safety Journal') methodology used for new commercial construction; the City's Fee Schedule does not separately confirm whether the resulting contractor-bid valuation is then run through the general Valuation Chart, though that chart is the only published valuation-to-fee mechanism in the Fee Schedule.
Commercial Plan Review65% of the Building Permit feeCity of Post Falls Fee Schedule, rev 10-1-2025 (same commercial rate applied to new construction)
Minimum Building Permit Fee (no-modification / change-of-occupancy-only path)A minimum permit fee applies, per the Change of Use/Occupancy Permit Submittal Requirements; exact dollar figure not published in the source documentCity of Post Falls Change of Use/Occupancy Permit Submittal Requirements. Issued alongside a new Certificate of Occupancy when a licensed Architect/Engineer confirms no structural or nonstructural modification is needed.
Mechanical Permit (if required)Based on the number of new or altered mechanical fixtures or systemsCity of Post Falls Change of Use/Occupancy Permit Submittal Requirements; see the Mechanical/HVAC Permit entry for the City's per-fixture commercial fee table
Plumbing Permit (if required)Based on the valuation of work for that tradeCity of Post Falls Change of Use/Occupancy Permit Submittal Requirements; see the Plumbing Permit entry for the City's Commercial contract-price-bracket fee table (3% up to $20,000; 2% $20,001-$100,000; 1% $100,001-$200,000; 0.5% over $200,001)
Electrical Permit (if required)Based on the valuation of work for that tradeCity of Post Falls Change of Use/Occupancy Permit Submittal Requirements; see the Electrical Permit entry for the City's Commercial total-contracted-amount fee formula
Kootenai County Fire and Rescue (KCFR) Building Plan Review — SEPARATE AGENCY, not a City fee30% of the building permit fee, or $150.00, whichever is higherKCFR Fee Acknowledgement letter (Jeryl Archer, Fire Marshal). KCFR is a separate political subdivision of Idaho government, independent of the City of Post Falls.
Kootenai County Fire and Rescue (KCFR) Inspections — SEPARATE AGENCY, not a City fee$108.00 per hour (subject to change annually), one-hour minimumKCFR Fee Acknowledgement letter. May apply to fire-alarm, sprinkler, and other inspections triggered by a tenant improvement or change of occupancy, at KCFR's determination.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Post Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /idaho/kootenai-county/post-falls/as-of/2026-07-03/

Snapshot date: 2026-07-03

Commit: ad178cf

Reproducible from PermitBase’s version-controlled dataset, commit ad178cf.