Skip to main content
PermitBase

This is PermitBase’s published record for Donnelly as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Donnelly building permits

Verified

Donnelly, Idaho — as published 2026-07-07.

Verified 2026-07-08 · Source

Codes adopted

2018 International Residential Code (IRC)2018 International Building Code (IBC)2018 International Energy Conservation Code (IECC)City of Donnelly Municipal Code Title 15 — Building Codes (Chapter 15.05)

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family residences, manufactured/modular homes, additions, alterations, and most other structures within the City of Donnelly. Applications are submitted to Donnelly City Hall; Valley County Building Department performs plan review support and all inspections under an interlocal service arrangement — Donnelly issues the permit and sets its own fee schedule.

Verified 2026-07-08 · Source

Requirements

  • Completed building permit application, signed by owner (or contractor acting as agent with owner's letter of authorization)
  • All permits are filed and issued under the property owner's name
  • Plans and structural engineering calculations must be stamped by an Idaho-licensed engineer or architect
  • Contractor registration number required before construction begins if a contractor is performing the work
  • Structures must be certified compliant with 2018 IRC, 2018 IBC, 2018 IECC, and Valley County Ordinances
  • As of July 15, 2019, all plans must include structural calculations
  • Donnelly Rural Fire Protection District (DRFPD) impact fee collected at application for new construction (effective October 2, 2023)

Required documents

  • RequiredBuilding Permit Application (fillable PDF)Official City of Donnelly building permit application form, numbered fields 1–14
  • RequiredSite Plan DrawingFully dimensioned site plan showing existing/proposed structures, well and septic locations, driveway alignment/grade/drainage, property lines, easements, and waterways; 2 copies required
  • RequiredConstruction Plan DrawingsFully dimensioned foundation/basement plan, cross-section, floor plan, framing detail, roof plan, and elevation drawings, drawn to scale on 18x24" or 24x36" sheets; 2 copies required
  • RequiredEngineering with Idaho StampStructural engineering calculations on 8.5x11" paper, stamped by an Idaho-licensed engineer; required on all plans since July 15, 2019; 2 copies required
  • RequiredREScheck Energy Compliance ReportAutomated residential energy code (2018 IECC) trade-off compliance calculation
  • OptionalHOA / Architectural Review Committee ApprovalOnly required when the property is within an active subdivision with a governing HOA or ARC
  • RequiredOutdoor Lighting Site PlanSite plan showing outdoor lighting locations
  • RequiredDriveway PlanCompleted driveway plan; culverts require 12-inch minimum diameter steel pipe extended 2 feet on either side of the approach width
  • OptionalWood-Stove Insert ApplicationRequired only if installing a wood-stove insert; inspected/permitted by Valley County

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $500$24.00City of Donnelly Building Permit Application Information and Instructions (2021), Other Permit Fees table
Building Permit — valuation $501 to $2,000$24.00 for the first $500, plus $3.00 per each additional $100 or fraction thereof, to and including $2,000
Building Permit — valuation $2,001 to $40,000$69.00 for the first $2,000, plus $11.00 per each additional $1,000 or fraction thereof, to and including $40,000
Building Permit — valuation $40,001 to $100,000$487.00 for the first $40,000, plus $9.00 per each additional $1,000 or fraction thereof, to and including $100,000
Building Permit — valuation $100,001 to $500,000$1,027.00 for the first $100,000, plus $7.00 per each additional $1,000 or fraction thereof, to and including $500,000
Building Permit — valuation $500,001 to $1,000,000$3,827.00 for the first $500,000, plus $5.00 per each additional $1,000 or fraction thereof, to and including $1,000,000
Building Permit — valuation $1,000,001 to $5,000,000$6,327.00 for the first $1,000,000, plus $3.00 per each additional $1,000 or fraction thereof, to and including $5,000,000
Building Permit — valuation $5,000,001 and up$18,327.00 for the first $5,000,000, plus $1.00 per each additional $1,000 or fraction thereof
Plan Review Fee65% of the building permit feeAdded to all permits per the Donnelly fee schedule worked example (e.g. $1,496.00 permit fee + 65% plan review = $972.40)
Donnelly Rural Fire Protection District (DRFPD) Impact Fee — Single Family Residence$1,290.00Effective October 2, 2023; collected by the City during the building permit application process per Intergovernmental Agreement between City of Donnelly and DRFPD
Demolition / Removal Permit$16.50
Manufactured Home — on blocks$135.00 set fee
Manufactured Home — on full perimeter concrete or all-weather wood foundation$150.00 set fee, plus foundation charge

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Donnelly building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-20) →View current record →All versions →

Permalink: /idaho/valley-county/donnelly/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 796430c

Reproducible from PermitBase’s version-controlled dataset, commit 796430c.