Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family residences, manufactured/modular homes, additions, alterations, and most other structures within the City of Donnelly. Applications are submitted to Donnelly City Hall; Valley County Building Department performs plan review support and all inspections under an interlocal service arrangement — Donnelly issues the permit and sets its own fee schedule.
Verified 2026-08-02 · Source
Requirements
- Completed building permit application, signed by owner (or contractor acting as agent with owner's letter of authorization)
- All permits are filed and issued under the property owner's name
- Plans and structural engineering calculations must be stamped by an Idaho-licensed engineer or architect
- Contractor registration number required before construction begins if a contractor is performing the work
- Structures must be certified compliant with 2018 IRC, 2018 IBC, 2018 IECC, and Valley County Ordinances
- As of July 15, 2019, all plans must include structural calculations
- Donnelly Rural Fire Protection District (DRFPD) impact fee collected at application for new construction (effective October 2, 2023)
- Donnelly has no separate commercial-building-permit or tenant-improvement-permit product — this same Building Permit Application, plan/document set, and valuation-based fee schedule apply to commercial and community-type structures and to remodels/tenant improvements ('Remodels/additions require the same information,' per the City's Building Permit Application Information and Instructions, 2021, p.4)
- Commercial or community-type structures may additionally require an approved Conditional Use Permit (CUP) from Donnelly Planning and Zoning, and plans must be stamped by a licensed architect or engineer certifying compliance with the 2018 International Codes and City of Donnelly Ordinances
- A separate Change of Use Permit (through Planning and Zoning, not the Building Department) is required when a project converts occupancy — e.g., a tenant improvement that converts residential space to commercial use
Required documents
- RequiredBuilding Permit Application (fillable PDF)Official City of Donnelly building permit application form, numbered fields 1–14
- RequiredSite Plan DrawingFully dimensioned site plan showing existing/proposed structures, well and septic locations, driveway alignment/grade/drainage, property lines, easements, and waterways; 2 copies required
- RequiredConstruction Plan DrawingsFully dimensioned foundation/basement plan, cross-section, floor plan, framing detail, roof plan, and elevation drawings, drawn to scale on 18x24" or 24x36" sheets; 2 copies required
- RequiredEngineering with Idaho StampStructural engineering calculations on 8.5x11" paper, stamped by an Idaho-licensed engineer; required on all plans since July 15, 2019; 2 copies required
- RequiredREScheck Energy Compliance ReportAutomated residential energy code (2018 IECC) trade-off compliance calculation
- OptionalHOA / Architectural Review Committee ApprovalOnly required when the property is within an active subdivision with a governing HOA or ARC
- RequiredOutdoor Lighting Site PlanSite plan showing outdoor lighting locations
- RequiredDriveway PlanCompleted driveway plan; culverts require 12-inch minimum diameter steel pipe extended 2 feet on either side of the approach width
- OptionalWood-Stove Insert ApplicationRequired only if installing a wood-stove insert; inspected/permitted by Valley County
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation $1 to $500 | $24.00 | City of Donnelly Building Permit Application Information and Instructions (2021), Fees and Valuations table, page 7 |
| Building Permit — valuation $501 to $2,000 | $24.00 for the first $500, plus $3.00 per each additional $100 or fraction thereof, to and including $2,000 | City of Donnelly Building Permit Application Information and Instructions (2021), FEES AND VALUATIONS table, page 7 |
| Building Permit — valuation $2,001 to $40,000 | $69.00 for the first $2,000, plus $11.00 per each additional $1,000 or fraction thereof, to and including $40,000 | City of Donnelly Building Permit Application Information and Instructions (2021), FEES AND VALUATIONS table, page 7 |
| Building Permit — valuation $40,001 to $100,000 | $487.00 for the first $40,000, plus $9.00 per each additional $1,000 or fraction thereof, to and including $100,000 | City of Donnelly Building Permit Application Information and Instructions (2021), FEES AND VALUATIONS table, page 7 |
| Building Permit — valuation $100,001 to $500,000 | $1,027.00 for the first $100,000, plus $7.00 per each additional $1,000 or fraction thereof, to and including $500,000 | City of Donnelly Building Permit Application Information and Instructions (2021), FEES AND VALUATIONS table, page 7 |
| Building Permit — valuation $500,001 to $1,000,000 | $3,827.00 for the first $500,000, plus $5.00 per each additional $1,000 or fraction thereof, to and including $1,000,000 | City of Donnelly Building Permit Application Information and Instructions (2021), FEES AND VALUATIONS table, page 7 |
| Building Permit — valuation $1,000,001 to $5,000,000 | $6,327.00 for the first $1,000,000, plus $3.00 per each additional $1,000 or fraction thereof, to and including $5,000,000 | City of Donnelly Building Permit Application Information and Instructions (2021), FEES AND VALUATIONS table, page 7 |
| Building Permit — valuation $5,000,001 and up | $18,327.00 for the first $5,000,000, plus $1.00 per each additional $1,000 or fraction thereof | City of Donnelly Building Permit Application Information and Instructions (2021), FEES AND VALUATIONS table, page 7 |
| Plan Review Fee | 65% of the building permit fee | Added to all permits per the Donnelly fee schedule worked example (e.g. $1,496.00 permit fee + 65% plan review = $972.40) |
| Donnelly Rural Fire Protection District (DRFPD) Impact Fee — Single Family Residence | $1,290.00 | Effective October 2, 2023; collected by the City during the building permit application process per Intergovernmental Agreement between City of Donnelly and DRFPD |
| Demolition / Removal Permit | $25.00 | City of Donnelly Fee Schedule adopted 18 August 2025, Development section — Demolition Permit, Structure, $25.00. Show full citationHideCity of Donnelly Fee Schedule adopted 18 August 2025, Development section — Demolition Permit, Structure, $25.00. The $16.50 previously recorded is the figure in the City's 2021 Permit Application Information and Instructions, page 4, which the City still publishes but which the adopted 2025 schedule supersedes on this line. |
| Manufactured Home — on blocks | $135.00 set fee | City of Donnelly Building Permit Application Information and Instructions (2021), OTHER PERMIT FEES box, page 7 |
| Manufactured Home — on full perimeter concrete or all-weather wood foundation | $150.00 set fee, plus foundation charge | City of Donnelly Building Permit Application Information and Instructions (2021), OTHER PERMIT FEES box, page 7 |
| Donnelly Rural Fire Protection District (DRFPD) Impact Fee — Commercial Buildings | $0.52 per square foot | Effective October 2, 2023, per the Intergovernmental Agreement between the City of Donnelly and DRFPD; Show full citationHideEffective October 2, 2023, per the Intergovernmental Agreement between the City of Donnelly and DRFPD; collected by the City during the building permit application process for new commercial construction. The city's own DRFPD-fee notice (cityofdonnelly.org/government/permits/) distinguishes '$1,290.00' for Single Family Residence from '$0.52 per square foot' for Commercial Buildings. |
| Conditional Use Permit (CUP) — required when a commercial or community-type structure needs Planning & Zoning approval | $330.00 + $11.00 per lot or unit | City of Donnelly Fee Schedule, adopted August 18, 2025 (cityofdonnelly.org/wp-content/uploads/2025/08/Fee-Schedule-_-August-18-2025.pdf), 'Development' fee table. Show full citationHideCity of Donnelly Fee Schedule, adopted August 18, 2025 (cityofdonnelly.org/wp-content/uploads/2025/08/Fee-Schedule-_-August-18-2025.pdf), 'Development' fee table. This is a Planning & Zoning fee, separate from and in addition to the Building Permit / plan-review fees above; not every commercial project requires a CUP — the Building Permit Instructions state a CUP 'may be required' for commercial or community-type structures. |
| Change of Use Permit — required when a project converts occupancy (e.g., residential to commercial), such as some tenant-improvement projects | $200.00 | City of Donnelly Fee Schedule, adopted August 18, 2025, 'Development' fee table. Filed through Planning & Zoning (Change of Use Application), separate from the Building Permit application. |
Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements)
VerifiedCovers new commercial construction, additions, and remodel or tenant-improvement work on commercial and community-type structures within Donnelly city limits. The City of Donnelly does not maintain a separate commercial application or fee schedule: the same Building Permit Application and the same valuation-based fee table used for the City's residential building permit apply to commercial work, per the City's own Building Permit Application Information and Instructions (2021). Commercial work is reviewed against the International Building Code rather than the International Residential Code that governs single-family homes on that same fee table; Donnelly City Code Section 15.05.050(A) adopts the International Building Code, current edition, and the City's Building Department currently identifies that edition as the 2018 IBC. Applications are submitted to Donnelly City Hall; Valley County Building Department provides plan review support and performs inspections under an interlocal service arrangement, but Valley County's own Building Department page states its office does not cover the City of Donnelly, and the County publishes its own separate building-fee structure for the area it does administer directly. The fees below are Donnelly's own.
Verified 2026-08-25 · Source
Requirements
- Building permit required for construction, alteration, addition, or demolition of any commercial or other structure within Donnelly city limits, per Donnelly City Code Section 15.05.120 (Permits Required)
- Commercial and community-type structures are reviewed against the International Building Code, current edition, adopted by Donnelly City Code Section 15.05.050(A); the City's Building Permit Application Information and Instructions (2021) and current Forms & Permits page identify the 2018 International Building Code, alongside the 2018 International Residential Code used for single-family residential work, as the edition currently in effect
- Plans must be stamped by a licensed architect or engineer certifying compliance with the 2018 International Codes and City of Donnelly Ordinances, per the City's Building Permit Application Information and Instructions (2021)
- An approved Conditional Use Permit from Donnelly Planning and Zoning may be required for a commercial or community-type structure, per the same Instructions document
- Donnelly City Code Section 15.05.090 designates property zoned Commercial ('C') or Industrial ('D') as Fire Zone 2, and all other areas of the city as Fire Zone 3, under the fire-zone provisions of the Uniform Building Code -- a reference standard that predates the City's currently-adopted International Building Code; no more recent fire-zone amendment to this section was found
- A Donnelly Rural Fire Protection District (DRFPD) impact fee is collected by the City at building permit application for new construction, calculated at $0.52 per square foot for commercial buildings rather than the flat $1,290.00 single-family-residence rate, effective October 2, 2023 under an Intergovernmental Agreement between the City and DRFPD
- A separate Change of Use Permit, filed through Planning and Zoning rather than the Building Department, is required when a project converts occupancy -- for example, a tenant-improvement project that converts residential space to commercial use
- Electrical, plumbing, and HVAC work require separate permits from the Idaho Division of Building Safety (dbs.idaho.gov); the City's Instructions state that all commercial installations of this kind must be performed by a licensed contractor
- Valley County Building Department provides plan review support and performs inspections for Donnelly commercial permits under the same interlocal service arrangement used for residential work; Valley County's own website states that its Building Department 'does not cover the City of McCall, the City of Cascade, or the City of Donnelly,' meaning the County does not independently administer or set fees for building permits inside Donnelly city limits
- No published fee for a Donnelly Rural Fire Protection District plan review of commercial construction was found beyond the per-square-foot impact fee above; the City's Instructions describe only a Donnelly Fire sign-off on propane tank installations prior to final inspection or certificate of occupancy
- No evidence was found that the Idaho State Fire Marshal reviews privately owned commercial construction in Donnelly -- the State Fire Marshal's own Plan Reviews page describes its scope as new construction, alterations, and renovations on state-owned and state-leased buildings
Required documents
- RequiredBuilding Permit Application (fillable PDF)The same City of Donnelly application used for residential permits, numbered fields 1-14; Number 12 (Change of Use) is left blank unless the project changes occupancy
- RequiredSite Plan DrawingFully dimensioned site plan showing existing/proposed structures, driveway alignment/grade/drainage, property lines, easements, and waterways; 2 copies required
- RequiredConstruction Plan DrawingsFully dimensioned foundation/basement plan, cross-section, floor plan, framing detail, roof plan, and elevation drawings, drawn to scale on 18x24" or 24x36" sheets; 2 copies required
- RequiredEngineering with Idaho StampStructural engineering calculations stamped by an Idaho-licensed engineer, certifying compliance with the 2018 International Codes and City of Donnelly Ordinances; 2 copies required
- OptionalConditional Use Permit ApplicationFiled with Donnelly Planning and Zoning; required only when a commercial or community-type structure is determined to need a Conditional Use Permit
- OptionalChange of Use ApplicationFiled with Donnelly Planning and Zoning; required only when a project converts the property's occupancy (e.g., residential to commercial)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit -- valuation $1 to $500 | $24.00 | Same citywide valuation-based fee table used for the City's residential building permit -- see that permit type for the full valuation-tier breakdown. City of Donnelly Building Permit Application Information and Instructions (2021), FEES AND VALUATIONS table. |
| Plan Review Fee | 65% of the building permit fee | Described as added to all permits in the City's Building Permit Application Information and Instructions (2021); no separate, commercial-specific plan-review percentage was found published. |
| Donnelly Rural Fire Protection District (DRFPD) Impact Fee -- Commercial Buildings | $0.52 per square foot | Effective October 2, 2023, per the Intergovernmental Agreement between the City of Donnelly and DRFPD; Show full citationHideEffective October 2, 2023, per the Intergovernmental Agreement between the City of Donnelly and DRFPD; collected by the City during the building permit application process for new commercial construction, per the City's Forms & Permits page (cityofdonnelly.org/government/permits/). |
| Conditional Use Permit (CUP) | $330.00 + $11.00 per lot or unit | City of Donnelly Fee Schedule, adopted August 18, 2025, Development fee table. Required only when Planning & Zoning determines a CUP applies to the commercial or community-type structure; separate from and in addition to the Building Permit / plan-review fees above. |
| Change of Use Permit | $200.00 | City of Donnelly Fee Schedule, adopted August 18, 2025, Development fee table. Filed through Planning & Zoning, separate from the Building Permit application; applies when a project converts occupancy. |
| Engineering Plan Review for Building Permit | $500.00 | City of Donnelly Fee Schedule, adopted August 18, 2025, Development fee table, listed alongside the Conditional Use Permit and Change of Use Permit fees. Show full citationHideCity of Donnelly Fee Schedule, adopted August 18, 2025, Development fee table, listed alongside the Conditional Use Permit and Change of Use Permit fees. The schedule does not state which permit applications trigger this fee, so confirm with City Hall before assuming it applies to a specific project. |
Solar Panel Permit (via Valley County Building Department)
VerifiedRequired for installation of solar photovoltaic panels on an existing building in Donnelly. The City of Donnelly's own Building Department relies on the Valley County Building Department for plan review and inspections (Donnelly does not maintain its own in-house plan review/inspection staff). Valley County's own published fee schedule lists a distinct 'Solar Panel on Existing Building' fee that includes both plan review and inspection. The electrical/interconnection wiring itself requires a licensed electrical contractor holding an Idaho DOPL electrical license; Idaho's Solar Photovoltaic electrical license category specifically requires NABCEP (or equivalent) photovoltaic installer certification.
Verified 2026-07-20 · Source
Requirements
- Submit a building permit application for the solar panel installation to the City of Donnelly, which routes plan review and inspection to the Valley County Building Department
- Installation must comply with the 2018 IRC/IBC as adopted by Donnelly Municipal Code Title 15, Chapter 15.05
- Electrical/interconnection work must be performed by a contractor holding an Idaho DOPL (Division of Occupational and Professional Licenses) electrical license; the Solar Photovoltaic license category specifically requires proof of NABCEP (North American Board of Certified Energy Practitioners) photovoltaic installer certification or equivalent
- Confirm with the City of Donnelly, (208) 325-8859, and Valley County Building Department, (208) 382-7115, whether a separate state electrical permit through Idaho DOPL is required for the interconnection, since Valley County's own published fee schedule lists no separate electrical permit fee line
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the City of Donnelly; plan review and inspection performed by the Valley County Building Department
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Panel on Existing Building (includes plan review and inspection) | $200.00 | Valley County Building Department Fees page (co.valley.id.us/departments/Building/BuildingFees) — a distinct, named solar-specific fee line item, directly fetched from the County's own published fee schedule; Show full citationHideValley County Building Department Fees page (co.valley.id.us/departments/Building/BuildingFees) — a distinct, named solar-specific fee line item, directly fetched from the County's own published fee schedule; This is Valley County's fee, not the City's. Valley County performs inspections for Donnelly, but Donnelly City Code 15.05.120 has City building permit fees set by City resolution and 15.05.160 has the City's building inspector collect them, and the City publishes its own valuation-based table. The City adopts a County fee in exactly one place — “Occupancy Permit: Valley County Fee + $11.00” on its 2025 fee schedule — and no adoption of the County's solar fee was found. Confirm with the City which applies inside city limits. |
EV Charger / EVSE Permit (State of Idaho Electrical Permit)
VerifiedInstallation of an electric vehicle charging station in Donnelly is electrical work and is NOT permitted by the City of Donnelly or Valley County at all — like all electrical work in Donnelly (see the residential-building-permit entry), it requires a separate State of Idaho electrical permit issued by the Division of Occupational and Professional Licenses (DOPL) / Division of Building Safety (dbs.idaho.gov). DOPL's own Contractor Electrical Permit Worksheet (Fee Schedule) has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item — a dedicated Level 2 charger circuit added to an existing residence is billed under the worksheet's 'Existing Residence / Modular, Manufactured or Mobile Homes / Detached Shop' bucket: $65 base fee plus $10 per additional branch circuit beyond the one circuit included in the base fee.
Verified 2026-07-20 · Source
Requirements
- Electrical permit issued by the State of Idaho DOPL/Division of Building Safety, not the City of Donnelly or Valley County Building Department — purchased online at dbs.idaho.gov (required for all permits as of January 1, 2023)
- DOPL's own Contractor Electrical Permit Worksheet (Fee Schedule, Rev. 8/17/2022) has no distinct EV-charger/EVSE fee line; a new circuit added at an existing residence for a charger falls under the 'Existing Residence... Detached Shop' bucket ($65 + $10 per additional branch circuit)
- Work must be performed by, or under, an electrical contractor holding a current Idaho DOPL electrical license, or by the homeowner personally under Idaho's homeowner electrical permit provision for their own primary/secondary residence
- If the charger circuit is bundled into a solar/renewable-energy or larger commercial/industrial electrical scope, it may instead fall under the worksheet's 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' valuation-based tier rather than the flat existing-residence fee
Required documents
- RequiredContractor Electrical Permit Application (State of Idaho DOPL)Purchased online at dbs.idaho.gov as of January 1, 2023; includes the Electrical Permit Worksheet (Fee Schedule) used to calculate the fee
- OptionalHomeowner Electrical Permit Application (State of Idaho DOPL)Alternative to the contractor application if the homeowner is personally performing the EV charger circuit installation on their own primary/secondary residence
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Existing Residence / Modular, Manufactured or Mobile Homes / Detached Shop (typical dedicated EV charger circuit added to an existing home) | $65 base fee, plus $10 per additional branch circuit beyond the one circuit included in the base fee | Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022 — no distinct EV-charger/EVSE line item exists on the statewide fee worksheet |
| Temporary Construction Services (200 amp or less, one location) — if applicable during installation | $65 | Idaho DOPL Contractor Electrical Permit Worksheet |
| Requested Inspection (findings or inspector consultation) | $65.00 per hour | Idaho DOPL Contractor Electrical Permit Worksheet |
Sources & verification
Verified against official sources. Last reviewed 2026-08-02.
Fee schedules
Applications & forms
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Donnelly building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.