You are viewing the permanent link for the record currently in effect, published 2026-07-07.
Red Lodge building permits
VerifiedRed Lodge, Montana — as published 2026-07-07.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Addition / Alteration)
VerifiedRequired for new single-family home construction, additions, and alterations within Red Lodge city limits. Issued by the City of Red Lodge under its DLI-certified local Building (B) program using the City's Building Permit Application form, reviewed by Building Inspector Brian Hanna against the 2021 IRC and City Design Criteria.
Verified 2026-07-03 · Source
Requirements
- Building Permit Application completed: job address, legal description, owner/contractor/architect-designer/engineer contact information, building dimensions and setbacks, class of work (New/Addition/Alteration/Repair), valuation of work (materials and labor), use of building, description of work
- Two sets of building plans, including a plot plan, submitted to the City Building Inspector; plans must clearly identify proposed setbacks and building height
- Plans must comply with the 2021 IRC (one- and two-family dwellings) or 2021 IBC (multifamily/commercial), plus City of Red Lodge Design Criteria: 70 psf minimum roof snow load, wind load per risk category (100-120 MPH, Exposure B; 115 MPH residential), 42-inch frost depth foundation, two rows of ice & water shield on all roofs
- Subject to Building Official's discretion, plans may be required to be stamped/certified by a licensed design professional
- A City Business Registration is required before the permit is issued
- Separate permits are required for electrical, plumbing, heating, ventilation, or air conditioning work (issued by the State DLI Building Codes Bureau, not the City, since Red Lodge is Building-only certified)
- Fire sprinklers required/not required must be indicated on the application; off-street parking spaces (required/furnished) must be indicated
Required documents
- RequiredBuilding Permit ApplicationCity of Red Lodge form covering job address, owner/contractor/architect/engineer information, class of work, valuation, building dimensions and setbacks, occupancy group, and required signatures
- RequiredConstruction Drawings / Plot PlanTwo sets of building plans including a plot plan showing setbacks and building height, per City requirement
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | No fixed, published valuation-based fee table was found on the City of Red Lodge website during this research pass. The Building Permit Application form has blank 'PLAN CHECK FEE' and 'PERMIT FEE' lines filled in by City staff after review rather than a downloadable fee schedule (the City's 'Applications, Forms & Fees' page returned a 404 at time of research). Secondary/third-party sources reference historical City Ordinance #892 tying fees to Appendix 'L' of the 2009 IRC, but this was NOT independently verified against a live City-published primary source during this session, so it is not cited as a governing fact. Left null per the zero-tolerance policy rather than estimated or sourced from an unverified secondary reference. Applicants should contact the Building Division at (406) 446-1606 for a current fee quote. |
Demolition Permit
VerifiedRequired for demolition of a structure within Red Lodge city limits, processed through the same Building Permit Application used for new construction, additions, and alterations. Demolition work must be completed within 30 days of permit issuance unless otherwise noted.
Verified 2026-07-03 · Source
Requirements
- Building Permit Application completed with the scope of work identified as demolition (the form's class-of-work checkboxes are New/Addition/Alteration/Repair; demolition scope is described in the 'DESCRIBE WORK' field and remarks section per the form's own demolition completion clause)
- Demolition work must be completed within 30 days of permit issuance, unless otherwise noted under remarks on the permit
- A City Business Registration is required for contractors before the permit is issued
- Owner/contractor contact information, valuation of work, and building dimensions/legal description required as with any other permit type on this form
Required documents
- RequiredBuilding Permit Application (Demolition)Same City of Red Lodge form used for all building work, with demolition scope described in the work-description field
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building/Demolition Permit Fee | No fixed, published fee table or standalone demolition bond requirement was found for Red Lodge — unlike Billings' distinct $10,000 demolition bond ordinance (City Code Chapter 6, Article 6-1000), Red Lodge's Municipal Code Title 9, Chapter 3 (which would parallel a demolition-specific chapter) is marked '(RESERVED)', meaning no separate demolition ordinance exists; demolition fees are filled in on the same Building Permit Application's blank fee lines. Confirmed via direct review of Title 9 chapter listing (eCode360) and the Building Permit Application form. Left null rather than estimated. |
Deck / Accessory Structure Permit
VerifiedRequired for construction of decks, garages, sheds, and other accessory structures within Red Lodge city limits, using the standard Building Permit Application. Accessory structures built before the principal use is established are permitted jointly with the principal structure.
Verified 2026-07-03 · Source
Requirements
- Building Permit Application completed with building dimensions, setbacks, and class of work (New/Addition) indicated; garage attached/detached box checked if applicable
- Plans must clearly identify the proposed setback and building height for Building Official review
- If an accessory structure is constructed prior to establishing the principal use, the building permit for both the accessory structure and the principal use is issued together, and the accessory structure's final inspection is withheld until the principal use receives its rough framing inspection
- Plans must comply with the 2021 IRC and City of Red Lodge Design Criteria (70 psf roof snow load, wind load per risk category, 42-inch frost depth) where structurally applicable
Required documents
- RequiredBuilding Permit ApplicationSame City of Red Lodge form used for all building work; garage attached/detached checkbox and building dimensions/setback fields apply to accessory structures
- RequiredPlot PlanSite plan showing the accessory structure location, setbacks, and dimensions
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | No fixed, published fee table specific to decks/accessory structures was found; fees are filled in on the same Building Permit Application's blank fee lines, consistent with the City's general absence of a published valuation-based fee schedule. Left null rather than estimated. |
Solar PV / Alternative Energy Permit (State-Issued Electrical + City-Issued Structural)
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic (and wind/hydro) alternative-energy systems within Red Lodge city limits. Because Red Lodge is DLI-certified for Building ONLY (not Electrical), the electrical-connection scope of a solar install is permitted directly by the Montana DLI Building Codes Bureau via its statewide Alternative Energy Permit application; the structural/roof-mounting scope falls under the City's own certified Building Permit program (Building Inspector Brian Hanna).
Verified 2026-07-19 · Source
Requirements
- Application for Alternative Energy Permit filed with the Montana DLI Building Codes Bureau covers the electrical connection scope of a solar, wind, or hydro system, since Red Lodge holds no Electrical certification
- If the project produces 90 or more volts of electricity, a licensed electrical contractor must do the work, UNLESS the homeowner is doing the work on their own private house
- If the project involves a grid-tied alternative energy generator, a licensed electrical contractor must obtain an additional permit for the final interconnection, even where a homeowner performed the rest of the installation
- Applicant selects one of: PV String System, Generator, or Microinverter/AC Module System
- The structural/roof-mounting scope of the installation requires a City of Red Lodge Building Permit (same Building Permit Application used for other construction), reviewed by Building Inspector Brian Hanna against the 2021 IRC/IBC and City Design Criteria (70 psf minimum roof snow load, wind load by risk category)
- A City Business Registration is required for contractors before the City Building Permit is issued
Required documents
- RequiredApplication for Alternative Energy PermitMontana Building Codes Bureau statewide form; covers solar/wind/hydro electrical connection scope, including the commercial valuation-based fee chart for larger systems
- RequiredCity of Red Lodge Building Permit Application (structural/roof-mounting scope)Same City form used for other construction; covers the structural mounting of the array
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Change of Service (typical residential alternative-energy interconnection) | $45 | Montana Building Codes Bureau, Application for Alternative Energy Permit — same statewide fee schedule already verified for Anaconda-Deer Lodge and Pondera County in this dataset; applies identically to Red Lodge since it holds no Electrical certification |
| Commercial Alternative Energy — valuation $0 to $1,000 | $45 for the first $500 plus 6% of the balance of the project cost | Application for Alternative Energy Permit |
| Commercial Alternative Energy — valuation $1,001 to $10,000 | $75 for the first $1,000 plus 2% of the balance of the project cost | Application for Alternative Energy Permit |
| City Building Permit Fee (structural/roof-mounting scope) | No fixed, published valuation-based fee table was found on the City of Red Lodge website (same publication gap already documented for the residential-building-permit entry in this file) — the Building Permit Application's PLAN CHECK FEE / PERMIT FEE lines are filled in by staff after review. Contact the Building Division, (406) 446-1606, for a current quote. |
Electrical Permit (State-Issued)
VerifiedBecause Red Lodge is DLI-certified for Building only, electrical work anywhere within Red Lodge city limits requires a Residential (or Commercial) Electrical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Red Lodge, under the 2020 NEC.
Verified 2026-07-03 · Source
Requirements
- Application must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work
- Payment must be submitted with the application; incomplete applications are returned unprocessed
- Property address, GEOCODE/parcel/lot/block, owner information, and power company must be provided
- Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
Required documents
- RequiredApplication for Residential Electrical PermitMontana Building Codes Bureau statewide form; mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Family Dwelling or Cabin — up to 200-amp service (includes meter base and attached garages if wired at the same time) | $200 | Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22) — same statewide fee schedule that applies to all non-electrically-certified Montana jurisdictions, including Red Lodge |
| Single Family Dwelling or Cabin — 201 to 400-amp service | $380 | Application for Residential Electrical Permit (Rev. 12/22) |
| Residential Change of Service — exterior meter base & interior/exterior main disconnect only | $45 | Application for Residential Electrical Permit (Rev. 12/22) |
Plumbing Permit (State-Issued, incl. Water Heater)
VerifiedBecause Red Lodge is DLI-certified for Building only, plumbing work anywhere within Red Lodge city limits — including water heater installation/replacement — requires a Plumbing Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Red Lodge, under the 2021 Uniform Plumbing Code.
Verified 2026-07-03 · Source
Requirements
- Application must be signed by the Master Plumber and include the Master Plumber License Number, or filed as a homeowner permit for owner-performed work where allowed
- Property address, county, and whether the job is inside city limits must be indicated
- Type of Building and Type of Work must be indicated; sewer service type (public/septic) and potable water source must be indicated
- Apply in accordance with Title 50, Chapter 60, Section 505, MCA and ARM 24.301.301 / 24.301.361
Required documents
- RequiredApplication for Plumbing PermitMontana Building Codes Bureau statewide form (BCP-1); mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Each NEW water heater (or replacement) | $25 | Montana Building Codes Bureau, Application for Plumbing Permit (BCP-1) statewide Fee Schedule — same schedule applied to all non-plumbing-certified jurisdictions, including Red Lodge |
| Each plumbing fixture or trap | $10 per fixture/trap | Application for Plumbing Permit (BCP-1) statewide Fee Schedule |
Mechanical / HVAC Permit (State-Issued)
VerifiedBecause Red Lodge is DLI-certified for Building only, mechanical/HVAC work anywhere within Red Lodge city limits requires a Mechanical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Red Lodge, under the 2021 International Mechanical Code and International Fuel Gas Code.
Verified 2026-07-03 · Source
Requirements
- Project Value must be provided; permit fee is calculated from the state's valuation-based fee schedule
- Type of Building and Type of Work must be indicated
- Boiler work requires a separate Boiler Permit form, not the Mechanical Permit
- Apply in accordance with Title 50, Chapter 60, Section 104, MCA and ARM 24.301.172
Required documents
- RequiredApplication for Mechanical PermitMontana Building Codes Bureau statewide form (BCP-1); mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit — Project value $0-$10,000 | $48 for the first $1,000, plus $14 for each additional $1,000 or fraction thereof | Montana Building Codes Bureau, Application for Mechanical Permit (BCP-1) statewide Fee Schedule — same schedule applied to all non-mechanically-certified jurisdictions, including Red Lodge |
EV Charging Station Permit (State-Issued Electrical Permit)
VerifiedRequired for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within Red Lodge city limits. Because Red Lodge is DLI-certified for Building ONLY (not Electrical), the electrical-connection scope of an EV charger install is permitted directly by the Montana DLI Building Codes Bureau via its statewide Application for Residential Electrical Permit, the same mechanism this file's electrical-permit-state entry documents for other residential wiring work. No separate City building permit is required for a standalone EVSE circuit unless it also involves a new structure (e.g. carport) or triggers structural work, in which case the City's own certified Building Permit program applies to that scope.
Verified 2026-07-20 · Source
Requirements
- Electrical permit is filed with the Montana DLI Building Codes Bureau (statewide Application for Residential Electrical Permit), not the City of Red Lodge, since Red Lodge holds no Electrical certification
- If the project produces 90 or more volts of electricity, a licensed electrical contractor must do the work, UNLESS the homeowner is doing the work on their own private house
- A dedicated branch circuit sized to the EVSE manufacturer's specifications is required, consistent with NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by Montana
- If the charger install requires a panel/service upgrade, that scope may fall under the service-size fee categories already documented in this file's electrical-permit-state entry rather than the addition/alteration category
Required documents
- RequiredApplication for Residential Electrical Permit (Montana DLI)Statewide Montana Building Codes Bureau form covering interior/exterior wiring additions such as an EV charger circuit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Family Interior/Exterior Wire or Rewire (Remodel/Addition) — 1 additional circuit or piece of equipment | $45 | Montana DLI Building Codes Bureau, Application for Residential Electrical Permit — this file's research could not directly machine-parse the fee-schedule PDF (it renders as encoded binary rather than extractable text), so this figure is drawn from an indexed search-result quotation of the official bsd.dli.mt.gov document rather than a direct read of the PDF text itself; treat as needing a direct confirmation call before relying on it for a specific project. An EV charger circuit is a natural fit for this 'additional circuit or piece of equipment' remodel/addition category, but DLI does not publish a dedicated EV/EVSE line item. |
Sign Permit (Outdoor Advertising)
VerifiedRequired to erect, construct, relocate, install, or alter a sign or other outdoor advertising device on a building or structure within Red Lodge city limits, unless the sign qualifies for an exemption under RLZR §4.6.30. Issued by the Planning & Zoning Division (Zoning Administrator) under Red Lodge Zoning Regulations §4.6.0, Outdoor Advertising.
Verified 2026-07-22 · Source
Requirements
- Sign Permit Application filed with the Community Development Department for any sign not exempted under RLZR §4.6.40 (exemptions include: official/warning/historical notices; indoor signs and window displays; minor residential building ID signs ≤4 sq ft, or wall signs ≤1 sq ft identifying residential occupants/owners; temporary/seasonal holiday lighting erected no more than 45 days before and removed within 15 days after the holiday, ≤70 lumens; one real estate 'for sale/for rent' sign per lot ≤6 sq ft; religious symbols, non-commercial and temporary political signs; wayfinding/traffic-control/entrance signs ≤6 sq ft; historical murals; time-and-temperature signs without blinking/rotating/moving lights; and a projecting sign not exceeding 2.5 sq ft of display surface)
- Application must include a site plan and elevation plan showing all existing and proposed signs, property lines, setbacks, and sign height, plus a drawing of the shape, size, colors, and lighting of each proposed sign
- Maximum sign area: 6 sq ft per lot/parcel/tract in Residential Districts (or 1 sq ft per linear foot of street frontage, up to 40 sq ft, for a sign announcing a development's name); 120 total sq ft per lot in Non-Residential Districts, with any single sign capped at 40 sq ft
- Maximum height of any freestanding sign, including embellishments, is 8 feet above natural grade (or 8 feet above the adjacent public road grade for a property below road grade)
- Signs must be located on the same property as the business, service, or product advertised (no off-site/off-premises signs)
- Neon and internally illuminated signs are only allowed via Design Review: neon only within the Downtown Historic Overlay District (max 22 sq ft, historically-appropriate materials/shapes, RLZR §4.6.80-82); internally illuminated signs are prohibited in the Downtown Historic Overlay District and Residential Districts, and require Design Review elsewhere in Commercial Districts
- Prohibited outright: flashing/blinking/rotating/moving signs (including inflatables, pennants, holograms), digital/electronic graphic display signs, strings/rows of upcast lights (except exempted holiday displays), and off-site signs
- Signs attached to a roof, wall, or projecting from a structure may also require a City Building Permit in addition to the Sign Permit
Required documents
- RequiredSign Permit Application (RLZR §4.6.0)City of Red Lodge Community Development Department form covering owner/agent contact information, legal description, zoning classification, sign type/count, illumination, and sign area/height
- RequiredSite Plan and Elevation PlanShows all existing and proposed signs, property lines, setbacks, and sign height
- RequiredSign DrawingShows the shape, size, colors, and lighting of each proposed sign
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Temporary Sign | $10 | City of Red Lodge Sign Permit Application (RLZR §4.6.0), Instruction 5 |
| Permanent Sign | $40 | City of Red Lodge Sign Permit Application (RLZR §4.6.0), Instruction 5 |
| Neon or Internally Illuminated Sign | $300 | City of Red Lodge Sign Permit Application (RLZR §4.6.0), Instruction 5; these signs are additionally reviewed through the Design Review Process (neon per RLZR §4.6.80, internally illuminated per RLZR §4.6.90) rather than by the Zoning Administrator alone |
Fire Protection Systems Permit (Sprinkler / Alarm) — Commercial Building Construction Permit
VerifiedRequired from Red Lodge Fire Rescue for a commercial building's automatic fire-extinguishing (sprinkler) system and/or fire alarm and detection system, among other enumerated fire-protection categories, as part of the department's 'Commercial Building Construction Permit.' Red Lodge Fire Rescue issues and reviews this permit under an agreement with the City of Red Lodge and under Municipal Code Title 7, Chapter 1 (2021 International Fire Code as locally adopted and amended, Ord. 970, 4/8/2025). It is required IN ADDITION to, not instead of, the City of Red Lodge Building Division's own Building Permit and the Planning Department's review.
Verified 2026-07-22 · Source
Requirements
- Commercial Building Construction Permit Application filed with Red Lodge Fire Rescue, checking each fire-protection category that applies: Automatic Fire Extinguishing Systems and/or Fire Alarm and Detection Systems (the two categories relevant here), plus Compressed Gasses, Fire Pumps and Related Equipment, Flammable and Combustible Liquids, Hazardous Materials, LP-Gas Systems, Private Fire Hydrants, Spraying or Dipping Operations, and Standpipe Systems where applicable
- A written description of the building's fire protection features (proposed alarm systems, suppression systems, kitchen hood systems, hazardous materials storage areas) and the building's occupancy classification
- For buildings with automatic sprinklers only: the location of the proposed or closest existing fire hydrant and fire department connection; Red Lodge Fire Rescue conducts a flow test after the permit is received, for fire suppression system design purposes
- A complete scale site plan showing total building square footage, intended use, and all access to the building from public streets and private driveways
- Two complete sets of plans (one printed, one electronic)
- If the project site has no City of Red Lodge-issued physical address, a City of Red Lodge Addressing Application must be submitted alongside the fire permit application
- Each checked permit category is billed as a separate $75.00 Construction Permit — a project needing both a sprinkler permit and a fire alarm permit pays for two permits
- This Fire Department permit must be completed in addition to any application process required by the City of Red Lodge Planning and Building Departments
Required documents
- RequiredCommercial Building Construction Permit ApplicationRed Lodge Fire Rescue form; check all fire-protection permit categories that apply (Automatic Fire Extinguishing Systems, Fire Alarm and Detection Systems, etc.), each billed at $75.00
- RequiredWritten Description of Fire Protection FeaturesDescribes proposed alarm systems, suppression systems, kitchen hood systems, hazardous materials storage, and the building's occupancy classification
- OptionalFire Hydrant / Fire Department Connection MapRequired only for buildings with automatic sprinklers; shows nearest existing or proposed fire hydrants
- RequiredConstruction Plans (printed + electronic)Two complete sets, including total building square footage and all access to the building
- OptionalCity of Red Lodge Addressing ApplicationRequired only if the project site has not yet been issued a physical address by the City
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Construction Permit Fee (per fire-protection category, e.g. Automatic Fire Extinguishing Systems or Fire Alarm and Detection Systems) | $75.00 | Red Lodge Fire Rescue, Fire Prevention and Safety Fee Schedule — 'All Construction Permits $75.00'; billed once per checked permit category on the Commercial Building Construction Permit Application, so a building needing both a sprinkler and an alarm permit is billed $150.00 total |
| Addressing (if no City-issued address yet exists) | $100.00 / lot | Red Lodge Fire Rescue, Fire Prevention and Safety Fee Schedule and Address Request Form |
| Standard Hourly Fee (resubmittals / third-party plan review) | $100.00 / hour | Red Lodge Fire Rescue, Fire Prevention and Safety Fee Schedule; charged if deficiencies require a new plan review, or if Red Lodge Fire Rescue cannot review a complex system in-house and a third-party reviewer is required |
| Final / Compliance Inspection | $35.00 to $75.00 | Red Lodge Fire Rescue Fire Prevention and Safety Fee Schedule sets three inspection tiers: Minimum $35.00, General $50.00, Assembly/Hazard $75.00; the Commercial Construction Permit Instructions describe this same $35.00-$75.00 range as the fee due at the final occupancy inspection, when all alarm and suppression systems are tested for compliance |
Change of Use / Certificate of Occupancy
VerifiedRed Lodge has no standalone 'Change of Use Permit' or separate Certificate of Occupancy application or fee schedule. A certificate-of-occupancy/final inspection is issued as part of the same City of Red Lodge Building Permit Application used for new construction, additions, and alterations (see this file's residential-building-permit entry), once the structure and the property it sits on comply with the City-adopted International Building Codes and the terms, procedures, and standards of the Zoning Regulations (Red Lodge Zoning Regulations §12.4.1.64, 'Building Permit and Certification of Occupancy,' Ord. 957, 5-10-2022). Where an existing building's use or occupancy classification is changing, the project is reviewed under the 2021 International Existing Building Code (IEBC), which the City adopts by resolution under Municipal Code §9-1-1(B) alongside the 2021 IBC/IRC, using the same Building Permit Application and the same DLI Building (B)-only certification scope documented throughout this file.
Verified 2026-07-22 · Source
Requirements
- No separate/standalone Change of Use application exists — the City's own 'Applications and Petitions' page (Planning & Zoning Division) lists only Use of City-Owned Land, Temporary Use Permit, and Sign Permits as standalone applications; a change of use or occupancy classification is processed as a Building Permit Application
- Per Zoning Regulations §12.4.1.64: 'No building permit shall be issued except in compliance with the terms, procedures and standards of these Zoning Regulations. A certificate-of-occupancy/final inspection shall not be issued for any structure except when said structure is compliant with the applicable section of the City-adopted International Building Codes; and both said structure or development and property it is on is in compliance with the terms, procedures and standards of these Zoning Regulations'
- Where an existing building's use or occupancy classification is changing, review is conducted against the 2021 International Existing Building Code (IEBC) as adopted by Municipal Code §9-1-1(B), applied by City Building Inspector Brian Hanna under Red Lodge's DLI Building-only certification
- The Building Permit Application's class-of-work and use-of-building fields must reflect the new use; subject to the Building Official's discretion, plans may need to be stamped/certified by a licensed design professional
- A City Business Registration is required before a permit is issued, consistent with all other Building Permit Application-based permit types in this file
- If the change of use also alters a building's fire-protection design requirements (e.g., a new occupancy classification needing different sprinkler or alarm coverage), a separate Red Lodge Fire Rescue Commercial Building Construction Permit may additionally be required — see this file's fire-sprinkler-alarm-permit entry
Required documents
- RequiredBuilding Permit ApplicationSame City of Red Lodge form documented in this file's residential-building-permit entry; the new use/occupancy is described in the class-of-work and use-of-building fields
- OptionalConstruction Drawings / PlansRequired where structural or life-safety systems are affected, sufficient to demonstrate compliance with the 2021 IEBC/IBC for the new use
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Same publication gap already documented in this file's residential-building-permit entry: no fixed, published valuation-based fee table was found on the City of Red Lodge website; the Building Permit Application's PLAN CHECK FEE / PERMIT FEE lines are filled in by City staff after review. Left null per the zero-tolerance policy. Applicants should contact the Building Division at (406) 446-1606 for a current quote. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Red Lodge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.