You are viewing the permanent link for the record currently in effect, published 2026-07-07.
Lewistown building permits
VerifiedLewistown, Montana — as published 2026-07-07.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Additions)
VerifiedRequired for new single-family home construction and additions within Lewistown city limits. Issued by the City of Lewistown under its DLI-certified local Building (B) program. Reviewed against the City's 2021 IBC/IRC/IECC/IEBC adoption (effective September 1, 2022) by an internal multi-department review (Building, Planning/Zoning, Public Works, 911 Coordinator, Fire).
Verified 2026-07-03 · Source
Requirements
- Two complete building plans (drawn to scale) including: job name/complete legal address/legal description, floor plan, foundation plan with roof and floor framing plan, exterior elevations, cross sections footing to roof, details showing compliance with all codes, finish schedule and specifications, and mechanical/plumbing/electrical plans where applicable
- The building official may require professional preparation and a wet stamp of plans, drawings, specifications, or calculations for structures deviating from conventional light wood-frame construction, or where construction is determined hazardous to health, safety, or welfare
- Soils report required if the site requires special design requirements
- Two site plans showing current and/or proposed construction, building orientation, and all dimensions from property lines to structure along with setback requirements
- Water and sanitary sewer location and service line details required
- Applications are processed through internal review by the Building, Planning/Zoning, and Public Works Departments, the 911 Coordinator, and the Fire Department
- Applicant acknowledges responsibility for compliance with all City codes, rules, and regulations; omissions in required documentation may delay the review process
Required documents
- RequiredResidential Building Permit Application (New Structures and Additions)City of Lewistown form specifying property owner, legal description, work description, and required plan/site-plan submittals
- RequiredBuilding Plans (2 complete sets, drawn to scale)Floor plan, foundation/framing plan, exterior elevations, cross sections, code-compliance details, finish schedule, and mechanical/plumbing/electrical plans where applicable
- RequiredSite Plan (2 copies)Shows current/proposed construction, building orientation, and dimensions from property lines with setbacks
- OptionalSoils ReportRequired only if the site requires special design considerations
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee | No published fee schedule exists for Lewistown residential building permits. Checked: City of Lewistown Building Department page, Forms & Applications page, Plans & Documents page, and the Residential Building Permit Application Procedure PDF (images/pdf/Respremit012015.pdf) itself — none list a dollar amount or valuation-based table (unlike Billings, which publishes a standalone Fee Schedule PDF). Left null rather than estimated; applicants must contact the Building Department at (406) 535-1776 or building@ci.lewistown.mt.us for a current quote. |
Commercial Building Permit (New Structures, Additions, Structural Modifications)
VerifiedRequired for new commercial construction, additions, and structural modifications within Lewistown city limits. Reviewed against the City's 2021 IBC/IEBC/IECC adoption and the 2012 IFC (as amended by ARM 23.12.601), plus City Ordinances #1749 and #1750, via a combined internal/external multi-department review.
Verified 2026-07-03 · Source
Requirements
- Plans must be stamped by a Montana-licensed Architect or Engineer
- The Prime or General Contractor must be a Registered Contractor licensed with the State of Montana and hold a current City Business License
- Three paper copies (Architectural D: 24" x 36") and one electronic copy of the final plan set required
- If located within a FEMA-designated floodplain, a floodplain permit is required with documentation of approval
- Plans must include: job name/legal address/legal description, site plan with setbacks, foundation/roof/floor framing plan, floor plan, cross sections, exterior elevations, mechanical/plumbing/electrical where applicable, engineer-stamped fire protection plans with calculations and cut sheets, code-compliance details, finish schedule, interior/exterior finishes, utility connection details, storm-water drainage/retention ponds if required, curb & gutter/sidewalk plan, parking plan, and signage plan (separate sign permit required)
- Application undergoes internal review by Building, Planning/Zoning, Public Works, 911 Coordinator, and Fire Department; may also be sent for external review at the building official's discretion, with additional plan-review costs added to the permit fee
- Tenant improvements, change of use, or change of occupancy are reviewed on a case-by-case basis
Required documents
- RequiredCommercial Building Permit ChecklistCity of Lewistown form (Rev. 9/1/2022) listing required plan contents, contractor licensing, and floodplain determination
- RequiredStamped Plans (3 paper + 1 electronic copy)Montana-licensed architect/engineer-stamped plan set, Architectural D size (24" x 36")
- OptionalFloodplain Permit DocumentationRequired only if the property is within a FEMA-designated floodplain
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial building permit fee | No published fee schedule exists for Lewistown commercial building permits. The Commercial Building Permit Checklist (Rev. 9/1/2022) states that 'additional costs incurred for plan review will be added to the building permit fee' but lists no base fee table. Checked the Building Department page, Forms & Applications, and Plans & Documents pages — none publish a commercial fee schedule. Left null rather than estimated; contact the Building Department at (406) 535-1776 for a current quote. |
Deck / Accessory Structure Permit
VerifiedDecks, sheds, and other detached accessory structures (garages, barns, playhouses, greenhouses) within Lewistown city limits fall under the City's standard Building Permit process for additions/structural work, subject to the City's setback requirements for accessory structures.
Verified 2026-07-03 · Source
Requirements
- Detached tool/storage sheds, playhouses, greenhouses, and other accessory buildings must be set back 3 feet from a side property line, 3 feet from a rear property line without street/alley frontage, 0 feet from an alley property line, and 10 feet from a side street property line
- Site plan showing dimensions from property lines to the proposed structure, consistent with the Residential Building Permit Application Procedure requirements for additions
- Decks and accessory structures involving new structural framing follow the same plan submittal requirements as additions (floor plan, foundation/framing plan, cross sections)
- Private Property Accessory Building electrical work (garage, barn, etc.) requires a separate STATE-issued electrical permit — see electrical-permit-state
Required documents
- RequiredResidential Building Permit Application (Additions)Same City of Lewistown form used for additions and new structures, applied to decks/accessory structures
- RequiredSite PlanShows setback dimensions from property lines to the proposed deck or accessory structure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee | No published fee schedule exists for Lewistown deck/accessory structure permits; the same general Residential Building Permit Application Procedure and Commercial/Residential checklists were checked with no fee table found. Left null rather than estimated. |
Fence Permit / Right-of-Way Encroachment Permit
VerifiedFences on private property in Lewistown are regulated by height, material, and visibility rules under City Code 11-4-3, but do not require a general building permit. A separate Temporary Fence Encroachment Permit from the Public Works Department is required only if the fence is proposed within the public right-of-way.
Verified 2026-07-03 · Source
Requirements
- No solid fence, wall, or hedge over 3 feet in height may be erected or maintained on any street frontage
- Fences not exceeding 4 feet may be erected along street frontage if constructed of chain-link or other material providing an unobstructed view, approved by the building official
- Fences, walls, or hedges along side or rear yards not fronting streets must not exceed 6 feet
- No barbed wire, other sharp fence materials, electrically charged fencing, or metal T-posts allowed in any district
- Fences must be constructed of approved materials; may not be constructed from railroad ties, rubble, or salvaged material (Ord. 1726, 7-6-2009)
- Corner lots may not have fences, walls, hedges, or other sight obstructions over 3 feet within the designated 'clear view triangle'
- No fence, wall, or hedge may be erected or maintained in any public right-of-way unless a Temporary Fence Encroachment Permit has been obtained from the Public Works Director
- Where no sidewalk exists, no fence may be installed closer than 1 foot to the back of any future sidewalk
- To obtain a Temporary Fence Encroachment Permit: obtain an application at the Public Works Office; include a scaled drawing showing property lines and proposed fence location; permit must be approved by the Public Works Director prior to construction; all projects require a City inspection after completion
Required documents
- OptionalTemporary Fence Encroachment Permit ApplicationObtained at the Public Works Office; required only for fences proposed within the public right-of-way
- RequiredScaled DrawingShows property lines and proposed fence location, submitted with the encroachment permit application
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Temporary Fence Encroachment Permit fee | No fee amount is published in the City's Fences brochure (Public Works, 2015) or elsewhere on the City's site. Left null rather than estimated; contact Public Works at (406) 535-1770 or publicworks@ci.lewistown.mt.us for current fee information. |
Demolition Permit
VerifiedDemolition of structures within Lewistown city limits falls under the City's Building Department review process. No standalone demolition-specific bond, checklist, or fee schedule (comparable to Billings' $10,000 demolition bond) was found published by the City as of this review.
Verified 2026-07-03 · Source
Requirements
- Contact the Building Department at (406) 535-1776 or building@ci.lewistown.mt.us prior to demolition to confirm current permit requirements, since no dedicated demolition checklist or ordinance excerpt is published on the City's site
- As with other building-related work, applications are understood to route through the City's standard multi-department internal review (Building, Planning/Zoning, Public Works, 911 Coordinator, Fire) based on the process described for residential and commercial permits generally
Required documents
- RequiredDemolition Permit ApplicationNo standalone demolition permit application form was found published on the City's Forms & Applications or Plans & Documents pages; applicants should request the current form directly from the Building Department
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition permit fee | No published fee schedule or bond requirement was found for demolition permits in Lewistown. Checked the City's Building Department page, Forms & Applications page, and Plans & Documents page — none list a dedicated demolition permit fee, bond amount, or checklist (unlike Billings, which publishes a $10,000 demolition bond requirement and dedicated checklist). This is reported as a genuine small-city publication gap, not an inferred or invented figure. Contact the Building Department at (406) 535-1776 for current requirements. |
Electrical Permit (State-Issued)
VerifiedBecause Lewistown is DLI-certified for Building only, electrical work anywhere within Lewistown city limits requires a Residential (or Commercial) Electrical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Lewistown, under the 2020 NEC.
Verified 2026-07-03 · Source
Requirements
- Application must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work
- Payment must be submitted with the application; incomplete applications are returned unprocessed
- Property address, county, whether the job is inside city limits, owner information, and power company must be provided
- Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
Required documents
- RequiredApplication for Residential Electrical PermitMontana Building Codes Bureau statewide form (Rev. 12/22); mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Family Dwelling or Cabin — up to 200-amp service (includes meter base and attached garages if wired at the same time) | $200 | Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22) — verified directly against the current fillable PDF form; same statewide fee schedule applies to all non-electrically-certified Montana jurisdictions, including Lewistown |
| Single Family Dwelling or Cabin — 201 to 400-amp service | $380 | Application for Residential Electrical Permit (Rev. 12/22) |
| Single Family Dwelling or Cabin — 401 to 600-amp service | $600 | Application for Residential Electrical Permit (Rev. 12/22) |
| Residential Change of Service — exterior meter base & interior/exterior main disconnect only | $45 | Application for Residential Electrical Permit (Rev. 12/22) |
| Private Property Accessory Building (garage, barn, etc.) — up to 200-amp panel | $80 | Application for Residential Electrical Permit (Rev. 12/22) |
Plumbing Permit (State-Issued, incl. Water Heater)
VerifiedBecause Lewistown is DLI-certified for Building only, plumbing work anywhere within Lewistown city limits — including water heater installation/replacement — requires a Plumbing Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Lewistown, under the 2021 Uniform Plumbing Code.
Verified 2026-07-03 · Source
Requirements
- Application must be signed by the Master Plumber and include the Master Plumber License Number
- Property address, county, and whether the job is inside city limits must be indicated
- Type of Building, Type of Work, Sewer Service Type (public/septic), and Potable Water Source must be indicated (all required fields)
- Apply in accordance with Title 50, Chapter 60, Section 505, MCA and ARM 24.301.301 / 24.301.361
Required documents
- RequiredApplication for Plumbing Permit (BCP-1)Montana Building Codes Bureau statewide form, Rev. 10/2019; mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Each NEW water heater (or replacement) | $25 | Montana Building Codes Bureau, Application for Plumbing Permit (BCP-1, Rev. 10/2019) — verified directly against the current fillable PDF form; same statewide schedule applies to all non-plumbing-certified jurisdictions, including Lewistown |
| Each plumbing fixture or trap | $10 | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
| Each connection of building water supply to water service/public utility or private well | $20 | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
| Each connection of building drain to sewer system (public or septic) | $20 | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
| Gray water system, commercial or residential | $60 | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
Mechanical / HVAC Permit (State-Issued)
VerifiedBecause Lewistown is DLI-certified for Building only, mechanical/HVAC work anywhere within Lewistown city limits requires a Mechanical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Lewistown, under the 2021 International Mechanical Code and International Fuel Gas Code.
Verified 2026-07-03 · Source
Requirements
- Project Value must be provided; permit fee is calculated from the state's valuation-based fee schedule
- Type of Building and Type of Work must be indicated
- Boiler work requires a separate Boiler Permit form, not the Mechanical Permit
- Apply in accordance with Title 50, Chapter 60, Section 104, MCA and ARM 24.301.172
Required documents
- RequiredApplication for Mechanical PermitMontana Building Codes Bureau statewide fillable form; mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit — Project value $0-$10,000 | $48 for the first $1,000, plus $14 for each additional $1,000 or fraction thereof | Montana Building Codes Bureau, Application for Mechanical Permit — statewide fee schedule verified via search of the current form's example calculation (e.g., $9,460 project value = $174 fee); same schedule applies to all non-mechanically-certified jurisdictions, including Lewistown |
Solar PV Permit (Alternative Energy)
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems within Lewistown city limits. Because Lewistown holds Montana DLI certification for Building (B) permits only, the electrical interconnection component is issued directly by the Montana DLI Building Codes Bureau in Helena as a Residential Electrical Permit with its 'Alternative Energy Source' add-on fee, not by the City of Lewistown. A structural/racking Building Permit is separately issued by the City for the mounting scope.
Verified 2026-07-20 · Source
Requirements
- Electrical interconnection requires a state-issued Residential (or Commercial) Electrical Permit from the Montana DLI Building Codes Bureau — Lewistown does not hold electrical certification, so the City cannot issue this permit itself
- The state Residential Electrical Permit application includes a distinct 'Alternative Energy Source' add-on fee (solar, wind, or hydro), charged in addition to the base electrical work fee selected on the same application (e.g., a service/panel or change-of-service fee)
- Structural/racking work (roof-mount or ground-mount) requires a City of Lewistown Building Permit, reviewed against the City's 2021 IBC/IRC adoption (effective September 1, 2022) via the standard multi-department internal review
- Apply for the electrical component in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
Required documents
- RequiredApplication for Residential Electrical Permit (state)Montana Building Codes Bureau statewide form (Rev. 12/22); mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov; select the Alternative Energy Source add-on box
- RequiredResidential or Commercial Building Permit Application (city, structural/racking scope)City of Lewistown form for the racking/mounting structural work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Alternative Energy Source add-on fee (solar, wind, or hydro) | $65, added to the base electrical work fee selected on the Residential Electrical Permit application (e.g., $45 for a Residential Change of Service, or the applicable service/panel fee) | Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22), Fee Schedule — the same statewide fee applied in other Montana DLI Building-only-certified jurisdictions in this corpus (Havre, Laurel, Livingston, Belgrade), and Lewistown, per the DLI's own certified-jurisdictions roster, shares that identical Building-only certification status. |
| City Building Permit Fee (structural/racking scope) | No published fee schedule exists for Lewistown Building permits generally (see residential-building-permit and commercial-building-permit entries in this file) — the City's Building Department page, Forms & Applications, Plans & Documents, and application PDFs do not publish a dollar table. Contact the Building Department at (406) 535-1776 for a current quote. |
EV Charger / Electric Vehicle Charging Station Permit
VerifiedMontana has no dedicated EV-charger permit type or fee line, and Lewistown is DLI-certified for Building only (not Electrical), so installing a Level 2 (240V) home EV charger or EVSE within Lewistown city limits requires a State of Montana Electrical Permit issued directly by the DLI Building Codes Bureau (Helena) -- not the City of Lewistown -- billed under the same general residential wiring/circuit line items used for any new dedicated circuit or service upgrade. A separate City of Lewistown Building Permit is only needed if the installation also involves new structural work (e.g., a new carport or accessory structure).
Verified 2026-07-20 · Source
Requirements
- Electrical work must be performed and the permit pulled by a Montana-licensed electrical contractor (LCO/UCO), per the Application for Residential Contractor Electrical Permit (Rev 6/24)
- If the EV charger is added as a new dedicated circuit to an existing panel with no service/panel change, this is billed under the form's 'Single Family Interior/Exterior Wire or Rewire' section, line H ('1 additional circuit or piece of equipment') or line G ('2-3 additional circuits or pieces of equipment') depending on scope
- If the installation requires a panel upgrade or new/upsized electrical service to support the charger's amperage draw, it is billed instead under the amperage-based 'Single Family Dwelling or Cabin' service tiers (A-D)
- The state application form has no Alternative-Energy-style checkbox or dedicated question set for EV chargers (unlike its Solar/Wind/Hydro section) -- EVSE is treated as ordinary residential branch-circuit wiring
- A City of Lewistown Building Permit is required in addition only if the EVSE is mounted on, or paired with, new structural construction (e.g., a new carport or accessory structure); not required for a simple wall/pedestal-mounted charger on an existing structure
Required documents
- RequiredApplication for Residential (or Commercial) Contractor Electrical PermitMontana Building Codes Bureau statewide form (Rev 6/24); mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov/bcb
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| 1 additional circuit or piece of equipment (e.g., a single EV charger circuit added to an existing panel) | $45 | Montana Building Codes Bureau, Application for Residential Contractor Electrical Permit (Rev 6/24), line H -- no distinct 'EV charger'/'EVSE' line item exists on the state form; this is the general additional-circuit line an electrical contractor would use for a single new EV charger circuit, confirmed directly against the current fee schedule PDF |
| 2-3 additional circuits or pieces of equipment (e.g., EV charger plus other new circuits in the same job) | $70 | Application for Residential Contractor Electrical Permit (Rev 6/24), line G |
| Single Family Dwelling or Cabin -- up to 200-amp service (if the EV charger install requires a new/upgraded service) | $200 | Application for Residential Contractor Electrical Permit (Rev 6/24), line A -- applies if a panel/service upgrade is needed to support charger load rather than a simple additional circuit |
| Request Inspection, per hour | $60 (plus $30 per additional 30 minutes or fraction thereof, plus travel time) | Application for Residential Contractor Electrical Permit (Rev 6/24) |
Sign Permit
VerifiedRequired for erection, structural alteration, or relocation of most exterior signs and awnings within Lewistown city limits, under the LEWISTOWN SIGN ORDINANCE (City Code Title 5, Chapter 21). This is a DISTINCT permit administered by the Public Works Director (as chapter "administrator"), separate from the Building Department's Building Permit -- the City's own Commercial Building Permit Checklist (Rev. 9/1/2022) cross-references this requirement directly: "Signage plan (separate permit required for signs)."
Verified 2026-07-22 · Source
Requirements
- Application submitted to the administrator (public works director or designated representative) on a form provided by the administrator, per City Code 5-21-71
- Application must include: name and address of the sign owner; street address/location of the property with property owner name and address; the type of sign or sign structure and its weight; a site plan with measurements showing the proposed sign location and the locations of all existing signs on the same premises; and specifications/drawings showing materials, design, dimensions, structural supports, and electrical components
- Initial permit fee of $20.00 per sign due with the application (City Code 5-21-72)
- Signs exceeding thirty-two (32) square feet require additional review by the Design Review Board after administrator approval, before the permit is finalized (City Code 5-21-74)
- All signs must be installed in compliance with the City's building and electrical codes (City Code 5-21-60(A))
- No person may engage in erecting, altering, relocating, constructing, or maintaining signs for hire without a valid city sign contractor's/business license and all required state and federal licenses (City Code 5-21-37)
- If a sign is installed prior to permit issuance, the permit fee is doubled; this does not waive other penalties (City Code 5-21-75(C))
- The following sign types are EXEMPT from the permit requirement (but must still conform to all other chapter requirements): church/civic-organization signs, construction signs ≤16 sq ft, directional/information signs ≤6 sq ft, holiday/special-event decorations, nameplates ≤2 sq ft, political signs, public/emergency signs, real estate signs, window signs, incidental signs, garage sale signs, temporary special event signs, and snipe signs (City Code 5-21-33)
Required documents
- RequiredSign Permit ApplicationObtained directly from the administrator (Public Works Department); no downloadable version of this form was found published on the City's Forms & Applications or Plans & Documents pages as of this review
- RequiredSite Plan and Sign Specifications/DrawingsSite plan with measurements showing the proposed sign location and existing signs on the premises, plus specifications/drawings of materials, design, dimensions, structural supports, and electrical components, per City Code 5-21-71(D)-(E)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign permit fee (per sign) | $20.00 | City Code 5-21-72, verified directly against the codified ordinance text. Doubles to $40.00 if the sign is installed before the permit is issued (City Code 5-21-75(C)). Refunded in full if the permit is denied (5-21-75(A)), or refundable on request if no inspections/work have occurred and the permit and sticker/tag are returned within 45 days of issuance (5-21-75(B)). |
Fire Sprinkler / Fire Alarm System Permit (reviewed within the Commercial Building Permit -- no standalone product found)
Lewistown does NOT publish a standalone Fire Sprinkler or Fire Alarm permit application, fee, or timeline separate from its Building Permit process. The City's own Commercial Building Permit Checklist (Rev. 9/1/2022) requires "Engineer stamped fire protection plans including calculations and manufacture cut sheets" as line item 8 of the plan set submitted WITH the Commercial Building Permit application, and the Fire Department is one of five city departments (Building, Planning/Zoning, Public Works, 911 Coordinator, Fire) in that permit's internal review. Separately, City Code Title 7, Chapter 2 ("Fire Prevention Code," Ord. 1733/1734, 2011) locally adopts the fire code and amends specific sprinkler/alarm provisions, but creates no distinct permit-issuance or fee mechanism of its own for fire suppression/alarm systems -- City Code 7-2-10 instead establishes a standing committee (City Building Official, Fire Chief, and Fire Prevention Bureau chief/fire marshal) to designate any NEW materials, processes, or occupancies needing permits BEYOND what the already-adopted codes require; no evidence was found that this committee has created a separate fire-sprinkler/alarm permit product distinct from the Commercial Building Permit.
Reviewed 2026-07-22 · Source
Requirements
- Engineer-stamped fire protection plans, including hydraulic calculations and manufacturer cut sheets for sprinkler/suppression and alarm systems, submitted as item 8 of the plan set required for the City's Commercial Building Permit (Commercial Building Permit Checklist, Rev. 9/1/2022)
- Reviewed by the Lewistown Fire Department as one of five city departments in the Commercial Building Permit's internal review process; may also be sent for external review at the building official's discretion, with added costs added to the building permit fee
- Automatic sprinkler system hydraulic calculations must include a minimum safety factor of 10% but not less than 5 psi, per the City's local amendment to IFC section 903.3.5 (City Code 7-2-1(B), Ord. 1734, 5-16-2011)
- Fire alarm systems required by the fire code or building code must be monitored by an approved supervising station per NFPA 72, per the City's local amendment to IFC section 907.7.5 (City Code 7-2-1(B)); exceptions apply to single/multi-station smoke alarms, Group I-3 smoke detectors, and sprinkler systems in one- and two-family dwellings
- New commercial buildings, and existing commercial buildings undergoing remodeling exceeding $1,000, must install a fire department key box ("Knox-Box" style) at a bureau-approved exterior location, stocked with keys to areas containing fire protection system controls and alarm panels, installed on or before final inspection of the building (City Code 7-2-11)
- The City's codified Fire Prevention Code (Title 7, Chapter 2) locally adopts the 2009 International Fire Code by reference (Ord. 1733, 6-6-2011) -- a DIFFERENT, OLDER edition than the "International Fire Code 2012 IFC as amended by ARM 23.12.601" cited in the Commercial Building Permit Checklist (Rev. 9/1/2022); this is reported as a genuine unresolved discrepancy between the codified ordinance and the City's own current-practice checklist document, not an inferred figure
- If a fire alarm system requires new electrical wiring or circuits, that electrical work may separately require a State of Montana DLI Building Codes Bureau Electrical Permit, since Lewistown holds DLI certification for Building only, not Electrical (same split documented elsewhere in this file for electrical-permit-state, solar-pv-permit, and ev-charger-permit)
Required documents
- RequiredEngineer-Stamped Fire Protection Plans (sprinkler/alarm calculations and manufacturer cut sheets)Submitted as item 8 of the plan set required for the Commercial Building Permit; not a standalone fire-department-specific application form
- RequiredCommercial Building Permit ChecklistThe same City of Lewistown form (Rev. 9/1/2022) used for the underlying Commercial Building Permit -- fire protection plans are one required line item within it, not a separate filing
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Standalone Fire Sprinkler / Fire Alarm permit fee | No separate Fire Department or Fire Prevention Bureau fee for sprinkler or alarm system permitting is published by the City of Lewistown. Checked: City Code Title 7, Chapter 2 (Fire Prevention Code, Ord. 1733/1734) in full, the Building Department page, Forms & Applications page, Plans & Documents page, and the Commercial Building Permit Checklist (Rev. 9/1/2022) itself -- fire protection plans are folded into the Commercial Building Permit's own (also unpublished, see commercial-building-permit entry) fee, not billed separately. Left null rather than estimated. | |
| Fire Department Key Box ("Knox-Box") application fee | Up to $50.00 per structure | City Code 7-2-11(C)(2): "An application fee for each structure not to exceed fifty dollars ($50.00) may be established by the fire chief." This is a related, separately-documented real fee tied to fire-protection-system-equipped buildings, but it is a key-access fee, not a sprinkler/alarm system plan-review or permit fee. |
Change Of Use / Change Of Occupancy Review (case-by-case, via Commercial Building Permit -- no standalone product found)
Lewistown does not publish a standalone Change of Use, Change of Occupancy, or Certificate of Occupancy permit application, fee, or timeline. The City's Commercial Building Permit Checklist (Rev. 9/1/2022) states verbatim: "Requirements for Tenant Improvements, Change in Use or Change in Occupancy will be reviewed on a case by case basis," administered by the Building Department through the same review used for new commercial construction. Applicants should separately confirm zoning "permitted use" status using the City's Development Review Checklist before submittal, since a use not permitted outright in the existing zoning district requires a Board of Adjustment variance approved and submitted to the Building Department before any permit can issue.
Reviewed 2026-07-22 · Source
Requirements
- No dedicated Change of Use / Change of Occupancy / Certificate of Occupancy application form is published by the City; per the Commercial Building Permit Checklist (Rev. 9/1/2022), "Requirements for Tenant Improvements, Change in Use or Change in Occupancy will be reviewed on a case by case basis" -- applicants must contact the Building Department directly to determine what documentation is required for their specific scope
- The City's Development Review Checklist requires the applicant to confirm, prior to plan submittal, whether the "Proposed Use" is a Permitted Use under the property's Existing Zoning Classification
- If the proposed use is not a permitted use (or otherwise varies from City Code on setbacks, height, density, or lot coverage), a variance must be approved by the Board of Adjustment and a copy submitted to the Building Department prior to issuance of any building permit (Development Review Checklist)
- Where the change of use/occupancy involves construction or a life-safety reclassification, the applicant is directed through the applicable portions of the Commercial Building Permit process (stamped plans, contractor licensing, fire protection plans, etc.), scaled to the scope determined case-by-case by the Building Department
- Applications route through the City's standard multi-department internal review (Building, Planning/Zoning, Public Works, 911 Coordinator, Fire Department); commercial applications may also be sent for external review at the building official's discretion, with added review costs added to the permit fee
Required documents
- RequiredChange of Use / Change of Occupancy Documentation (determined case-by-case by the Building Department)No standalone form is published; contact the Building Department, (406) 535-1776 or building@ci.lewistown.mt.us, to determine the documentation required for the specific proposed change
- OptionalDevelopment Review ChecklistCity of Lewistown form used to confirm zoning-permitted-use status and identify whether a Board of Adjustment variance is needed before plan submittal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Change of Use / Change of Occupancy review fee | No published fee exists for a change-of-use or change-of-occupancy review. The Commercial Building Permit Checklist (Rev. 9/1/2022) states this is reviewed "on a case by case basis" but lists no dollar figure; the Building Department page, Forms & Applications, Plans & Documents, and Development Review Checklist were all checked and none publish a fee table for this specific review. Left null rather than estimated; contact the Building Department at (406) 535-1776 for a current quote scaled to your project. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lewistown building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.