Ronan building permits

Verified

Ronan, Montana — as published 2026-07-07.

Verified 2026-07-03 · Source

Codes adopted

Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs (bsd.dli.mt.gov/building-codes-permits).Ronan is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Dan Miller, (406) 676-4231. Verified directly against the DLI Building Codes Bureau's 'Montana Certified Local Government Program' roster PDF, updated 04/22/2026 (fetched and read directly, not via a mirror): 'Ronan | B | Dan Miller | 676-4231 | City Limits'. Source: https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdfThe City of Ronan's own published Building Department forms reference the 2012 International Building Code (IBC) and 2012 International Residential Code (IRC), specifically Section 105.2 (IBC) / R105.2 (IRC) 'Work exempt from permit' provisions — a locally-adopted 2012-cycle edition, not the 2021-cycle state-adopted edition used by non-certified/directly-state-administered jurisdictions. Source: City of Ronan Building Department page, '2012 IBC Exempt' and 'Work Exempt From Permits 2012 IRC' PDFs (cityofronan.org/wp-content/uploads/2016/05/2012-IBC-Exempt.pdf and .../Work-Exempt-From-Permits-2012-IRC2.pdf).Per the Montana DLI Building Codes Bureau's Current Codes page (statewide effective date June 11, 2022, governing state-administered permits and setting the baseline amendment framework under ARM Title 24 Chapter 301): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility. Ronan's own published exemption-list forms cite the 2012 IBC/IRC by name rather than the current 2021-cycle editions; this discrepancy is reported as found rather than assumed away — the City's posted permit-exemption documents have not been confirmed updated to the current statewide cycle as of this review. Source: bsd.dli.mt.gov/building-codes-permits/current-codes

Permit types & fees

Building Permit (New Construction / Addition / Alteration / Repair)

Verified

Required for construction, enlargement, alteration, repair, moving, demolition, or change of occupancy of a building or structure within Ronan city limits. Issued by the City of Ronan under its DLI-certified local Building (B) program, reviewed by Building Official Dan Miller against the City's referenced 2012 IBC/IRC provisions using a single generic Application for Building Permit form.

Verified 2026-07-03 · Source

Requirements

  • Complete the Application for Building Permit (City of Ronan): owner(s) of property, physical address, legal description, subdivision/block/lot, builder and contact number, use and occupancy of building or structure, brief description of project, and estimated cost of project
  • Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure must first make application to the building official and obtain the required permit
  • Permit fee calculated from the City's valuation-based Building Permit Fee Schedule Worksheet (adopted March 3, 2020) using the applicant's stated total project valuation
  • Applicant must round the total valuation to the nearest hundred and use the applicable highlighted fee bracket on the worksheet
  • If total project valuation is unverifiable, valuation will be determined according to the latest ICC 'Building Valuation Data' as published for Montana
  • Work exempt from permit per the City's posted 2012 IBC/IRC exemption lists does not require an application (see localAmendments for the exemption thresholds)

Required documents

  • RequiredApplication for Building PermitCity of Ronan single generic building permit application form covering new construction, additions, alterations, repairs, moving, demolition, and occupancy changes
  • RequiredBuilding Permit Fee Schedule WorksheetCity of Ronan valuation-based fee calculation worksheet (adopted March 3, 2020) used to compute the permit fee from stated project valuation

Fee schedule

Fee typeAmountNotes
Building Permit Fee — total valuation $1 to $1,999$35.00 for up to $1,999City of Ronan Building Permit Fee Schedule Worksheet, adopted March 3, 2020 (per ordinance 2004-05)
Building Permit Fee — total valuation $2,000 to $24,999$50.00 for the first $2,000, plus $15.00 for each additional $1,000 or fraction thereofCity of Ronan Building Permit Fee Schedule Worksheet
Building Permit Fee — total valuation $25,000 to $49,999$400.00 for the first $25,000, plus $10.00 for each additional $1,000 or fraction thereofCity of Ronan Building Permit Fee Schedule Worksheet
Building Permit Fee — total valuation $50,000 to $99,999$650.00 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereofCity of Ronan Building Permit Fee Schedule Worksheet
Building Permit Fee — total valuation $100,000 to $499,999$1,000.00 for the first $100,000, plus $6.00 for each additional $1,000 or fraction thereofCity of Ronan Building Permit Fee Schedule Worksheet
Building Permit Fee — total valuation $500,000 to $999,999$3,250.00 for the first $500,000, plus $5.00 for each additional $1,000 or fraction thereofCity of Ronan Building Permit Fee Schedule Worksheet
Building Permit Fee — total valuation $1,000,000 and up$5,650.00 for the first $1,000,000, plus $4.00 for each additional $1,000 or fraction thereofCity of Ronan Building Permit Fee Schedule Worksheet
Plan Review Fee — total project valuations over $5,00020% of the calculated building permit feeCity of Ronan Building Permit Fee Schedule Worksheet; also charged as an investigation fee whenever work is commenced prior to a permit being issued

Demolition Permit

Verified

Required for demolishing a building or structure within Ronan city limits, using the same generic Application for Building Permit form used for all other building work, since the City does not publish a separate demolition-specific application.

Verified 2026-07-03 · Source

Requirements

  • Any owner or authorized agent who intends to demolish a building or structure must first make application to the building official and obtain the required permit, per the City's Application for Building Permit form language
  • Complete the standard Application for Building Permit: owner, physical address, legal description, brief description of the demolition scope of work, and estimated cost/value of the project
  • Permit fee calculated from the same valuation-based Building Permit Fee Schedule Worksheet used for new construction

Required documents

  • RequiredApplication for Building Permit (Demolition)Same generic City of Ronan building permit application form, describing the demolition scope of work in the project-description field

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as new construction)$35.00 minimum (valuation $1,999 or less), scaling per the City's Building Permit Fee Schedule WorksheetCity of Ronan Building Permit Fee Schedule Worksheet, adopted March 3, 2020. No separate demolition-specific fee or bond amount (comparable to Billings' $10,000 demolition bond) was found published by the City of Ronan after reviewing the Building Department page, the Application for Building Permit, and the Fee Schedule Worksheet — this is reported as a genuine small-town publication gap, not an inferred or invented figure. Applicants should confirm bonding/insurance requirements directly with the Building Department at (406) 676-4231.

Accessory Structure / Deck Permit

Verified

Required for detached accessory structures (sheds, garages) and decks within Ronan city limits that exceed the City's posted 2012 IBC/IRC permit-exemption thresholds, using the standard Application for Building Permit.

Verified 2026-07-03 · Source

Requirements

  • A detached one-story accessory structure (tool/storage shed, playhouse) exceeding 120 sq ft (per the City's posted 2012 IBC exemption list) or 200 sq ft (per the City's posted 2012 IRC exemption list, applicable to one- and two-family dwelling accessory structures) requires a Building Permit
  • A deck exceeding 200 sq ft in area, OR more than 30 inches above grade at any point, OR attached to a dwelling, OR serving a required exit door (per IRC Section R311.4) requires a Building Permit — decks meeting ALL FOUR exemption criteria (200 sq ft or less, 30 inches or less above grade, not attached to a dwelling, not serving a required exit) do not require a permit
  • Complete the standard Application for Building Permit with a description of the accessory structure/deck scope of work and estimated cost
  • Permit fee calculated from the City's valuation-based Building Permit Fee Schedule Worksheet

Required documents

  • RequiredApplication for Building Permit (Accessory Structure/Deck)Same generic City of Ronan building permit application form

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as new construction)$35.00 minimum (valuation $1,999 or less), scaling per the City's Building Permit Fee Schedule WorksheetCity of Ronan Building Permit Fee Schedule Worksheet, adopted March 3, 2020

Fence Permit

Verified

Fences within Ronan city limits are exempt from a Building Permit up to 7 feet in height per the City's posted 2012 IBC/IRC exemption lists; fences exceeding 7 feet require a Building Permit using the standard application.

Verified 2026-07-03 · Source

Requirements

  • Fences not over 7 feet (2134 mm) high do not require a building permit, per both the City's posted 2012 IBC and 2012 IRC exemption lists
  • Fences exceeding 7 feet in height require a Building Permit via the standard Application for Building Permit
  • No zoning-permit-specific fence threshold or setback provision distinct from the Building-code height exemption was found published on the City's Building Department or Planning & Zoning pages as of this review

Required documents

  • OptionalApplication for Building Permit (Fence, over 7 feet)Same generic City of Ronan building permit application form, required only for fences exceeding the 7-foot exemption threshold

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as new construction; applies only to fences over 7 feet)$35.00 minimum (valuation $1,999 or less), scaling per the City's Building Permit Fee Schedule WorksheetCity of Ronan Building Permit Fee Schedule Worksheet, adopted March 3, 2020. No dedicated fence-specific fee line was found; the general valuation-based schedule applies.

Solar PV / Alternative Energy Permit (City Structural + State-Issued Electrical)

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic (and wind/hydro) alternative-energy systems within Ronan city limits. Because Ronan is DLI-certified for Building ONLY (not Electrical), the electrical-connection scope of a solar install is permitted directly by the Montana DLI Building Codes Bureau via its statewide Alternative Energy Permit application; the structural/roof-mounting scope falls under the City's own certified Building Permit program (Building Official Dan Miller), using the City's valuation-based Building Permit Fee Schedule Worksheet.

Verified 2026-07-19 · Source

Requirements

  • Application for Alternative Energy Permit filed with the Montana DLI Building Codes Bureau covers the electrical connection scope of a solar, wind, or hydro system, since Ronan holds no Electrical certification
  • If the project produces 90 or more volts of electricity, a licensed electrical contractor must do the work, UNLESS the homeowner is doing the work on their own private house
  • If the project involves a grid-tied alternative energy generator, a licensed electrical contractor must obtain an additional permit for the final interconnection, even where a homeowner performed the rest of the installation
  • Applicant selects one of: PV String System, Generator, or Microinverter/AC Module System
  • The structural/roof-mounting scope requires a City of Ronan Building Permit (same Application for Building Permit used for other construction), reviewed by Building Official Dan Miller
  • Ground-mounted or roof-mounted racking exceeding the City's posted 2012 IBC/IRC exemption thresholds (e.g., accessory-structure size, deck-mount) would require the standard Building Permit; smaller ancillary equipment enclosures may fall under the City's posted exemption list — confirm with the Building Official for a specific project

Required documents

  • RequiredApplication for Alternative Energy PermitMontana Building Codes Bureau statewide form; covers solar/wind/hydro electrical connection scope, including the commercial valuation-based fee chart for larger systems
  • RequiredCity of Ronan Application for Building Permit (structural/roof-mounting scope)Same City generic building permit application form used for other construction; covers the structural mounting of the array

Fee schedule

Fee typeAmountNotes
Residential Change of Service (typical residential alternative-energy interconnection)$45Montana Building Codes Bureau, Application for Alternative Energy Permit — same statewide fee schedule already verified for Anaconda-Deer Lodge, Pondera County, and Red Lodge in this dataset; applies identically to Ronan since it holds no Electrical certification
Commercial Alternative Energy — valuation $0 to $1,000$45 for the first $500 plus 6% of the balance of the project costApplication for Alternative Energy Permit
City of Ronan Building Permit Fee (structural/roof-mounting scope) — total valuation $1 to $1,999$35.00City of Ronan Building Permit Fee Schedule Worksheet, adopted March 3, 2020 — same table already documented in this file's residential-building-permit entry; no dedicated solar line item exists, so the general valuation-based worksheet applies to the structural scope
Plan Review Fee (City of Ronan, structural scope, valuations over $5,000)20% of the calculated building permit feeCity of Ronan Building Permit Fee Schedule Worksheet

Electrical Permit (State-Issued)

Verified

Because Ronan is DLI-certified for Building only, electrical work anywhere within Ronan city limits requires a Residential (or Commercial) Electrical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Ronan, under the 2020 NEC.

Verified 2026-07-03 · Source

Requirements

  • Application must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work
  • Payment must be submitted with the application; incomplete applications are returned unprocessed
  • Property address, GEOCODE/parcel/lot/block, owner information, and power company must be provided
  • Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
  • Confirmed as the applicable process for Ronan because the DLI roster lists Ronan as 'B' only (no 'E' code), meaning the City itself does not administer electrical permitting

Required documents

  • RequiredApplication for Residential Electrical PermitMontana Building Codes Bureau statewide form; mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov

Fee schedule

Fee typeAmountNotes
Single Family Dwelling or Cabin — up to 200-amp service (includes meter base and attached garages if wired at the same time)$200Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22) — same statewide fee schedule applied to all non-electrically-certified Montana jurisdictions, including Ronan; cross-verified against the identical schedule already confirmed for Choteau, MT and Conrad, MT in this same dataset
Single Family Dwelling or Cabin — 201 to 400-amp service$380Application for Residential Electrical Permit (Rev. 12/22)
Residential Change of Service — exterior meter base & interior/exterior main disconnect only$45Application for Residential Electrical Permit (Rev. 12/22)

EV Charger / EVSE Permit (State-Issued Electrical)

Verified

Installing a Level 2 (240V) or other electric vehicle charging station within Ronan city limits requires a Montana DLI Building Codes Bureau Residential (or Commercial) Electrical Permit, since Ronan holds no Electrical certification of its own. The Bureau's statewide Application for Residential Electrical Permit fee schedule has no EV-charger-specific line item; a home charger install is billed as an additional circuit/piece of equipment under the same form used for all residential electrical work.

Verified 2026-07-20 · Source

Requirements

  • Application for Residential Electrical Permit (or Commercial Electrical Permit for non-residential installs) filed with the Montana DLI Building Codes Bureau, since Ronan is not electrically certified
  • Select 'Single Family Interior/Exterior Wire or Rewire' — option H ('1 additional circuit or piece of equipment') for a single EV charger circuit, or option G ('2-3 additional circuits or pieces of equipment') if the install includes a panel upgrade or additional circuits
  • If the install also requires a Residential Change of Service (e.g., a new/upgraded meter base or main disconnect to support the charger's amperage), select the applicable Residential Change of Service option (I or J) instead of/in addition to the circuit-only fee
  • Must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work on the homeowner's own private house
  • No city-issued permit applies — confirmed because the DLI roster lists Ronan as 'B' only (no 'E' code), meaning electrical permitting for any EV charger install routes directly to the state, not the City of Ronan

Required documents

  • RequiredApplication for Residential Electrical PermitMontana Building Codes Bureau statewide form; mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov. No dedicated EV-charger application exists — the same form used for all residential electrical work is used, selecting the applicable additional-circuit or change-of-service option.

Fee schedule

Fee typeAmountNotes
1 additional circuit or piece of equipment (typical single EV charger circuit)$45Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22), option H. No distinct EV-charger/EVSE line item exists on the statewide fee schedule; a charger install is billed under this general additional-circuit-or-equipment fee.
2-3 additional circuits or pieces of equipment (e.g., charger plus other new circuits)$70Application for Residential Electrical Permit (Rev. 12/22), option G
Residential Change of Service — exterior meter base & interior/exterior main disconnect only (if upgrade needed to support charger load)$45Application for Residential Electrical Permit (Rev. 12/22), option I

Plumbing Permit (State-Issued, incl. Water Heater)

Verified

Because Ronan is DLI-certified for Building only, plumbing work anywhere within Ronan city limits — including water heater installation/replacement — requires a Plumbing Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Ronan, under the 2021 Uniform Plumbing Code.

Verified 2026-07-03 · Source

Requirements

  • Application must be signed by the Master Plumber and include the Master Plumber License Number, or filed as a homeowner permit for owner-performed work where allowed
  • Property address, county, and whether the job is inside city limits must be indicated
  • Type of Building and Type of Work must be indicated; sewer service type (public/septic) and potable water source must be indicated
  • Apply in accordance with Title 50, Chapter 60, Section 505, MCA and ARM 24.301.301 / 24.301.361
  • Confirmed as the applicable process for Ronan because the DLI roster lists Ronan as 'B' only (no 'P' code), meaning the City itself does not administer plumbing permitting

Required documents

  • RequiredApplication for Plumbing PermitMontana Building Codes Bureau statewide form (BCP-1); mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov

Fee schedule

Fee typeAmountNotes
Each NEW water heater (or replacement)$25Montana Building Codes Bureau, Application for Plumbing Permit (BCP-1) statewide Fee Schedule — same schedule applied to all non-plumbing-certified jurisdictions, including Ronan; cross-verified against the identical schedule already confirmed for Choteau, MT and Conrad, MT in this same dataset
Each plumbing fixture or trap$10 per fixture/trapApplication for Plumbing Permit (BCP-1) statewide Fee Schedule

Mechanical / HVAC Permit (State-Issued)

Verified

Because Ronan is DLI-certified for Building only, mechanical/HVAC work anywhere within Ronan city limits requires a Mechanical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Ronan, under the 2021 International Mechanical Code and International Fuel Gas Code.

Verified 2026-07-03 · Source

Requirements

  • Project Value must be provided; permit fee is calculated from the state's valuation-based fee schedule
  • Type of Building and Type of Work must be indicated
  • Boiler work requires a separate Boiler Permit form, not the Mechanical Permit
  • Apply in accordance with Title 50, Chapter 60, Section 104, MCA and ARM 24.301.172
  • Confirmed as the applicable process for Ronan because the DLI roster lists Ronan as 'B' only (no 'M' code), meaning the City itself does not administer mechanical permitting

Required documents

  • RequiredApplication for Mechanical PermitMontana Building Codes Bureau statewide form (BCP-1); mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov

Fee schedule

Fee typeAmountNotes
Mechanical Permit — Project value $0-$10,000$48 for the first $1,000, plus $14 for each additional $1,000 or fraction thereofMontana Building Codes Bureau, Application for Mechanical Permit (BCP-1) statewide Fee Schedule — same schedule applied to all non-mechanically-certified jurisdictions, including Ronan; cross-verified against the identical schedule already confirmed for Choteau, MT and Conrad, MT in this same dataset

Sign Permit (Commercial/Business Signage)

No standalone sign ordinance, sign-specific permit application, or sign fee schedule was found published by the City of Ronan after exhausting the available research paths. The City's Building Department, Planning & Zoning, and Permits and Licenses pages contain no sign-permit content; the City's own '2012 IBC Exempt' and 'Work Exempt From Permits 2012 IRC' PDFs (checked directly for the word 'sign') contain no reference to signage at all; and the municipal code's Title 4 (Building Regulations) consists of only a single chapter (confirmed via the code's own table of contents), while Title 10, Chapter 1 (Zoning) consists of 15 sections (10-1-1 Definitions through 10-1-15 Enforcement, confirmed via the chapter's own section list) — none titled 'Signs' or otherwise dedicated to signage. A commercial sign large/permanent enough to qualify as a 'structure' would likely fall under the City's single generic Application for Building Permit (which by its own terms covers construction, enlargement, alteration, repair, moving, demolition, or change of occupancy of 'a building or a structure') and the same valuation-based fee worksheet, but no confirmation of this specific application to signs, and no sign-specific size/height/setback threshold, was found in any city-published document.

Reviewed 2026-07-22 · Source

Requirements

  • No dedicated sign permit application exists — if a proposed sign is substantial enough to constitute a 'structure' under the City's building-permit-triggering language, the standard Application for Building Permit would apply, using the same valuation-based fee schedule as other construction
  • No sign-specific size, height, illumination, or setback standard was found published by the City of Ronan; commercial sign standards embedded within individual zoning-district sections (e.g., 10-1-7 Mixed Commercial/Residential District, 10-1-8 Mixed Commercial/Industrial District, 10-1-9 Highway Commercial District) could not be independently retrieved because the City's Code of Ordinances is hosted on a JavaScript-rendered platform (codelibrary.amlegal.com) that returns HTTP 403 to direct/automated fetches, and the Wayback Machine has only archived the Title- and Chapter-level table-of-contents pages for Ronan's code, not the individual section text
  • Confirm directly with the Building Department, (406) 676-4231, whether a specific proposed sign requires a permit and what standard applies before installation

Required documents

  • OptionalApplication for Building Permit (if sign qualifies as a structure)Same generic City of Ronan building permit application form used for all other construction; no dedicated sign-permit form was found published

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as new construction) — only if a sign requires a permit as a 'structure'$35.00 minimum (valuation $1,999 or less), scaling per the City's Building Permit Fee Schedule WorksheetNo dedicated sign-permit fee line was found published by the City of Ronan after checking the Building Department page, Planning & Zoning page, Permits and Licenses page, Building Permit Fee Schedule Worksheet, and both 2012 IBC/IRC exemption PDFs. This is reported as a genuine small-town publication gap, not an inferred or invented fee.

Fire Sprinkler & Fire Alarm Permit

Montana does not certify a distinct 'Fire' trade through the DLI Building Codes Bureau (its certified-jurisdictions roster only tracks Building, Plumbing, Electrical, Mechanical, Pool ('SP'), and Wildland-Urban Interface ('W') — confirmed directly against the roster's own legend, which reads 'KEY: B=Building, P=Plumbing, M/G=Medical Gas, E=Electrical, M=Mechanical, SP=POOL, W=WUI'). Fire sprinkler and fire alarm plan review in Montana instead routes through either a locally DOJ-certified fire inspection jurisdiction or, absent that, the state Office of the State Fire Marshal (Montana Department of Justice, Division of Criminal Investigation, Fire Prevention and Investigation Section). Ronan is confirmed NOT a DOJ-certified fire inspection jurisdiction (checked directly against the Department of Justice's own 'Fire Inspection Certified Jurisdiction' roster, updated 11/18/2025 — Ronan does not appear on it, while Polson, also in Lake County, does, consistent with Polson's broader DLI Building certification already documented elsewhere in this file). The City of Ronan's own generic Application for Building Permit contains no fire-suppression-specific line item, and the Ronan Volunteer Fire Department's website (ronanfire.com) publishes no permit application or fee schedule for sprinkler or alarm systems.

Reviewed 2026-07-22 · Source

Requirements

  • No local (city or fire-district) fire sprinkler/alarm permit or fee schedule was found published for Ronan after checking the City's Building Department page, the City's generic Application for Building Permit (no fire-suppression checkbox or line item), and the Ronan Volunteer Fire Department's own website
  • Ronan does not appear on the Montana DOJ's 'Fire Inspection Certified Jurisdiction' roster (updated 11/18/2025), meaning no locally-certified fire inspection program exists for Ronan the way it does for Polson, Missoula, Great Falls, and other listed jurisdictions
  • Per the Montana DOJ Fire Prevention and Investigation Section's own published program description (authorized under Title 50, Chapter 3, MCA), the State Fire Marshal's office 'assist[s] with adoption of fire safety regulations, inspection of public buildings, establishment and promotion of fire prevention programs, [and] certification of local inspection programs' statewide — but no downloadable plan-review application, fee schedule, or Ronan-specific submittal process was found published on the DOJ's Fire Prevention and Investigations page
  • Confirm directly with the Ronan Volunteer Fire Department (Station 1, 210 Adams St SW, Ronan, MT 59864) or the Montana DOJ State Fire Marshal's Office (P.O. Box 991, Great Falls, MT 59403, (406) 606-0778) which office will review a specific commercial fire sprinkler or alarm installation before beginning design work

Required documents

  • OptionalNo dedicated fire sprinkler/alarm permit application was found published for RonanNeither the City of Ronan nor the Ronan Volunteer Fire Department publishes a fire sprinkler/alarm-specific application; the State Fire Marshal's Office (Montana DOJ) is the applicable state-level authority for public-building fire safety plan assistance, but no downloadable application form specific to this process was located

Fee schedule

Fee typeAmountNotes

Change of Occupancy / Change of Use Permit

Verified

Required whenever a commercial tenant space changes occupancy classification or use within Ronan city limits. The City of Ronan does NOT publish a separate Change of Use or Certificate of Occupancy application or fee — its single generic Application for Building Permit explicitly lists 'change the occupancy' of a building or structure as one of the actions requiring a permit (alongside new construction, enlargement, alteration, repair, moving, and demolition), and the same valuation-based Building Permit Fee Schedule Worksheet is used to calculate the fee.

Verified 2026-07-22 · Source

Requirements

  • Any owner or authorized agent who intends to 'change the occupancy' of a building or structure must first make application to the building official and obtain the required permit, per the exact language of the City's Application for Building Permit form
  • Complete the standard Application for Building Permit: owner, physical address, legal description, use and occupancy of the building or structure, brief description of the project (the change of use/occupancy), and estimated cost of the project
  • Permit fee calculated from the same valuation-based Building Permit Fee Schedule Worksheet used for new construction; a 20% plan-review fee applies if the total project valuation exceeds $5,000
  • No separate Certificate of Occupancy application, inspection checklist, or fee distinct from the standard Building Permit was found published by the City of Ronan

Required documents

  • RequiredApplication for Building Permit (Change of Occupancy)Same generic City of Ronan building permit application form, describing the change of occupancy/use in the project-description field

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as new construction)$35.00 minimum (valuation $1,999 or less), scaling per the City's Building Permit Fee Schedule WorksheetCity of Ronan Building Permit Fee Schedule Worksheet, adopted March 3, 2020. No separate Certificate of Occupancy or change-of-use-specific fee line was found published by the City after reviewing the Building Department page, the Application for Building Permit, and the Fee Schedule Worksheet — the general valuation-based schedule applies, consistent with how demolition and accessory-structure work are treated elsewhere in this file.
Plan Review Fee — total project valuations over $5,00020% of the calculated building permit feeCity of Ronan Building Permit Fee Schedule Worksheet; applies to change-of-occupancy projects the same as any other permitted work

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ronan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-04)View current record →All versions →

Permalink: /montana/lake-county-mt/ronan/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356

Reproducible from PermitBase’s version-controlled dataset, commit 371a356.