Skip to main content
PermitBase

Demolition Permit in Ronan, Montana

Required for demolishing a building or structure within Ronan city limits, using the same generic Application for Building Permit form used for all other building work, since the City does not publish a separate demolition-specific application.

Verified 2026-07-03 · Source

When you need this permit

  • Any owner or authorized agent who intends to demolish a building or structure must first make application to the building official and obtain the required permit, per the City's Application for Building Permit form language
  • Complete the standard Application for Building Permit: owner, physical address, legal description, brief description of the demolition scope of work, and estimated cost/value of the project
  • Permit fee calculated from the same valuation-based Building Permit Fee Schedule Worksheet used for new construction

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, same schedule as new construction)City of Ronan Building Permit Fee Schedule Worksheet, adopted March 3, 2020. No separate demolition-specific fee or bond amount (comparable to Billings' $10,000 demolition bond) was found published by the City of Ronan after reviewing the Building Department page, the Application for Building Permit, and the Fee Schedule Worksheet — this is reported as a genuine small-town publication gap, not an inferred or invented figure. Applicants should confirm bonding/insurance requirements directly with the Building Department at (406) 676-4231.
$35.00 minimum (valuation $1,999 or less), scaling per the City's Building Permit Fee Schedule Worksheet

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Ronan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Ronan inspection guide — scheduling & re-inspection fees →

    Tips

    • No dedicated demolition bond or insurance requirement was found published for Ronan — confirm directly with the Building Department at (406) 676-4231 before planning a demolition project, since this is a much smaller jurisdiction without Billings-scale published demolition procedures.
    • Contact the Montana Department of Environmental Quality regarding asbestos/NESHAP regulations before any demolition, consistent with statewide requirements applicable to all Montana demolition projects regardless of jurisdiction size.

    Frequently asked questions

    Yes. The City of Ronan's Application for Building Permit form explicitly covers demolition alongside new construction, alteration, and moving. There is no separate demolition-only application. Contact the Building Department at (406) 676-4231 for a fee quote and to confirm any bonding requirements, which are not published online.

    In Ronan, the published Building Permit Fee (valuation-based, same schedule as new construction) is: $35.00 minimum (valuation $1,999 or less), scaling per the City's Building Permit Fee Schedule Worksheet. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Ronan does not publish a plan-review timeline for this permit. Contact City of Ronan Building Department — Building Official Dan Miller; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical/HVAC permits within Ronan city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 676-4231 for current turnaround.

    You'll need: Application for Building Permit (Demolition). See the required-documents checklist on this page for details on each.

    Apply through City of Ronan Building Department — Building Official Dan Miller; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical/HVAC permits within Ronan city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at 207 Main St SW, Ste A, Ronan, MT 59864. Phone: (406) 676-4231, email: clerk@cityofronan.org. Office hours: City Hall business hours not separately published online; contact (406) 676-4231 or clerk@cityofronan.org. City ordinances may be obtained at 207 Main St SW during normal business hours per the City's own Ordinances page.. Official information: https://cityofronan.org/departments/planning-department/.

    Ronan, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs (bsd.dli.mt.gov/building-codes-permits).; Ronan is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Dan Miller, (406) 676-4231. Verified directly against the DLI Building Codes Bureau's 'Montana Certified Local Government Program' roster PDF, updated 04/22/2026 (fetched and read directly, not via a mirror): 'Ronan | B | Dan Miller | 676-4231 | City Limits'. Source: https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf; The City of Ronan's own published Building Department forms reference the 2012 International Building Code (IBC) and 2012 International Residential Code (IRC), specifically Section 105.2 (IBC) / R105.2 (IRC) 'Work exempt from permit' provisions — a locally-adopted 2012-cycle edition, not the 2021-cycle state-adopted edition used by non-certified/directly-state-administered jurisdictions. Source: City of Ronan Building Department page, '2012 IBC Exempt' and 'Work Exempt From Permits 2012 IRC' PDFs (cityofronan.org/wp-content/uploads/2016/05/2012-IBC-Exempt.pdf and .../Work-Exempt-From-Permits-2012-IRC2.pdf).; Per the Montana DLI Building Codes Bureau's Current Codes page (statewide effective date June 11, 2022, governing state-administered permits and setting the baseline amendment framework under ARM Title 24 Chapter 301): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility. Ronan's own published exemption-list forms cite the 2012 IBC/IRC by name rather than the current 2021-cycle editions; this discrepancy is reported as found rather than assumed away — the City's posted permit-exemption documents have not been confirmed updated to the current statewide cycle as of this review. Source: bsd.dli.mt.gov/building-codes-permits/current-codes. Local amendments apply — see the Ronan overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-03.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ronan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.