This is PermitBase’s published record for Stevensville as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Stevensville building permits

Verified

Stevensville, Montana — as published 2026-07-20.

Verified 2026-07-04 · Source

Codes adopted

Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; a certified local program's adopted code 'may include only codes adopted by the Building Codes Bureau' (ARM 24.301.202). Non-certified areas fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs (bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf, updated 04/22/2026).Stevensville is a Montana DLI-certified jurisdiction for Building (B), Plumbing (P), Electrical (E), Mechanical (M), and Swimming Pool (SP) — full-trade certification — within Stevensville city limits. Certified program contact on file with DLI: Tim Netzley, 880-5832. Source: Montana DLI Building Codes Bureau, 'Certified City, County and Town Programs' roster (bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf, updated 04/22/2026), row 'Stevensville — B,P,E,M,SP — Tim Netzley — 880-5832 — City Limits'. Directly verified by fetching and extracting the PDF text during this research pass (2026-07-04).Per the Town's own 'Adopted Building Codes' notice (currently_adopted_building_codes.docx): Montana adopted several updated building code editions with amendments under ARM 24.301.202(1) on December 7, 2019, giving municipalities 90 days to formally adopt. The Town of Stevensville complied with adoption and enforcement of new projects as of February 17, 2020. Codes in effect per that notice: 2018 Uniform Plumbing Code, 2018 International Mechanical Code, 2018 International Fuel Gas Code, 2018 NFPA 99C (Gas and Vacuum Systems), 2017 National Electrical Code, 2018 International Building Code, 2018 International Residential Code, 2012 International Energy Conservation Code (explicitly stated to remain in effect, not updated to a later edition), 2018 International Existing Building Code, 2018 International Swimming Pool and Spa Code. Signed by Tim Netzley, Building Official, Town of Stevensville. Source: Town of Stevensville, 'Currently Adopted Building Codes' (townofstevensville.com/forms, currently_adopted_building_codes.docx).This code-edition set (2018-vintage IBC/IRC/UPC/IMC/IFGC/IEBC/ISPSC, 2017 NEC, 2012 IECC) is older than the 2021-cycle codes now in effect statewide per the DLI's Current Codes page and is one edition cycle behind Hamilton's and Darby's currently-adopted 2021 codes; this is Stevensville's own most recently published adoption notice and is reported as-is rather than assumed to have been silently updated to the 2021 cycle without a superseding notice found on the Town's site.Montana uses the Uniform Plumbing Code (UPC), not the International Plumbing Code.

Permit types & fees

Building Permit (New Construction / Addition / Remodel)

Verified

Required for new construction, additions, remodels, expanded footprint, garages/sheds, decks/porches, re-roofing, fences, and other structural work in Stevensville. Reviewed against the Town's adopted 2018-cycle IBC/IRC/IEBC and related codes (see codesAdopted) by the Building Official, Public Works, and Zoning divisions. Applications are submitted to Town Hall, 206 Buck Street / PO Box 30.

Verified 2026-07-04 · Source

Requirements

  • Complete, signed Building Permit application including project address, project type, scope of work, square footage, and property owner/contractor/architect information
  • Site plan required for new construction, remodels, and expanded-footprint projects, per the Residential Site Plan Check List
  • Two (2) copies of complete project plans (one may be digital)
  • Two (2) copies of a signed ResCheck energy-compliance certification (energycodes.gov)
  • Two (2) copies of a signed affirmation of knowledge of the Stevensville Lighting District Resolution
  • Total project valuation (materials + labor) declared on the application; Building Official may require proof of valuation or will set the value using ICC tables if unverifiable
  • Reviewed by the Building Official, Public Works, and Zoning divisions
  • Permit becomes null and void if work is not commenced within 180 days of issuance or is suspended/abandoned for 180 days

Required documents

  • RequiredBuilding Permit ApplicationTown of Stevensville Building Permit application (August 2013 form)
  • RequiredResidential Site Plan Check ListTown of Stevensville Residential Site Plan Check List, required on all building/site plans for one-through-three-family dwellings for new construction, additions, or remodeling
  • OptionalCommercial Site Plan Check ListTown of Stevensville Site Plan Checklist for Commercial Projects

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1 to $500$35 (minimum fee)Town of Stevensville Building Permit Fees schedule
Building Permit Fee — valuation $501 to $2,000$35 for the first $500 plus $6 for each additional $100 or fraction thereofTown of Stevensville Building Permit Fees schedule
Building Permit Fee — valuation $2,001 to $20,000$125 for the first $2,000 plus $16 for each additional $1,000 or fraction thereofTown of Stevensville Building Permit Fees schedule
Building Permit Fee — valuation $20,001 to $50,000$413 for the first $20,000 plus $12 for each additional $1,000 or fraction thereofTown of Stevensville Building Permit Fees schedule
Building Permit Fee — valuation $50,001 to $100,000$773 for the first $50,000 plus $8 for each additional $1,000 or fraction thereofTown of Stevensville Building Permit Fees schedule
Building Permit Fee — valuation $100,001 to $200,000$1,173 for the first $100,000 plus $7 for each additional $1,000 or fraction thereofTown of Stevensville Building Permit Fees schedule
Building Permit Fee — valuation $200,001 to $500,000$1,873 for the first $200,000 plus $6 for each additional $1,000 or fraction thereofTown of Stevensville Building Permit Fees schedule
Building Permit Fee — valuation $500,001 to $1,000,000$3,673 for the first $500,000 plus $5 for each additional $1,000 or fraction thereofTown of Stevensville Building Permit Fees schedule
Building Permit Fee — valuation $1,000,001 and up$6,173 for the first $1,000,000 plus $3.50 for each additional $1,000 or fraction thereofTown of Stevensville Building Permit Fees schedule
Plan Review Fee25% of the calculated building permit feeTown of Stevensville Building Permit Fees schedule; may be required to be paid prior to review and permit issuance. Also printed directly on the Building Permit application form as a line item.
After-hours inspection / re-inspection / additional plan review fee$50.00 per hour, $25.00 minimumTown of Stevensville Building Permit Fees schedule
Re-roof up to 3,000 square feet (flat fee)$50.00Town of Stevensville Building Permit Fees schedule, Miscellaneous Permit Fees table
Re-roof over 3,000 square feet (flat fee)$75.00Town of Stevensville Building Permit Fees schedule, Miscellaneous Permit Fees table
Fence (not if under 6 feet) (flat fee)$30.00Town of Stevensville Building Permit Fees schedule, Miscellaneous Permit Fees table
Siding (flat fee)$50.00Town of Stevensville Building Permit Fees schedule, Miscellaneous Permit Fees table
Demo (flat fee)$50.00Town of Stevensville Building Permit Fees schedule, Miscellaneous Permit Fees table
Sign (flat fee)$50.00Town of Stevensville Building Permit Fees schedule, Miscellaneous Permit Fees table
Change of use (flat fee)$75.00Town of Stevensville Building Permit Fees schedule, Miscellaneous Permit Fees table
Permit renewal10% of original permit feeTown of Stevensville Building Permit Fees schedule, Miscellaneous Permit Fees table
Footing or foundation only$1 per lineal foot, plus $5 per pier, or based on valuationTown of Stevensville Building Permit Fees schedule, Miscellaneous Permit Fees table
Water/Sewer/Water Meter/Street Cut/Curb Cut Infrastructure Fees
The Building Permit application itself includes blank line items for Water, Sewer, Water Meter, Street Cut, and Curb Cut infrastructure fees ('TOTAL INFRASTRUCTURE FEES'), but no dollar amounts or… Show full citation

The Building Permit application itself includes blank line items for Water, Sewer, Water Meter, Street Cut, and Curb Cut infrastructure fees ('TOTAL INFRASTRUCTURE FEES'), but no dollar amounts or separate published infrastructure fee schedule was found accompanying these line items on the Town's Forms page. Chase trail: reviewed the full Forms & Permits listing and Building Permit Fees PDF (rendered from scanned image via PyMuPDF and read visually) — no separate infrastructure/utility fee schedule document exists in the current listing. Left null rather than inventing a figure; contact Public Works via Town Hall (406) 777-5271 to confirm current infrastructure fee amounts.

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Stevensville, governed by the 2017 National Electrical Code (NEC) as adopted by the Town. Stevensville is a Montana DLI-certified jurisdiction for electrical permitting.

Verified 2026-07-04 · Source

Requirements

  • Electrical permit required for new construction, additions, remodels, service changes/upgrades, and other electrical work
  • Montana state license number required for licensed electrical contractors
  • Per Montana statute, a homeowner may secure the permit and perform electrical work only in a private structure occupied for their own personal use; all other work must be by (and permit issued to) a Montana-licensed electrician
  • Work must commence within 180 days of permit issuance; a written extension request may be granted for just cause
  • Installer must call for inspection prior to covering electrical work

Required documents

  • RequiredElectrical Permit ApplicationTown of Stevensville Electrical Permit application (February 2012 form)

Fee schedule

Fee typeAmountNotes
New single-family residence/dwelling/cabin, 100-200 amp service$200.00Town of Stevensville Electrical Permit Application, Residential fee table
New addition, remodel, interior rewire$100.00Town of Stevensville Electrical Permit Application
Service change-out or upgrade$75.00Town of Stevensville Electrical Permit Application
Accessory building (garage, barn, shed, greenhouse, etc.) — up to 200 amps$100.00Town of Stevensville Electrical Permit Application
Accessory building — 201-300 amps$200.00Town of Stevensville Electrical Permit Application
Accessory building — over 300 amps$300.00Town of Stevensville Electrical Permit Application
Misc. work not considered interior remodel/rewire$30.00Town of Stevensville Electrical Permit Application
Mobile home/RV/modular — on rental space with existing service$50.00Town of Stevensville Electrical Permit Application
Mobile home/RV/modular — private lot with existing service$75.00Town of Stevensville Electrical Permit Application
Mobile home/RV/modular — private lot, new service$100.00Town of Stevensville Electrical Permit Application
Multi-family (duplex through 12 units)$200 plus $75.00 per unitTown of Stevensville Electrical Permit Application
Commercial — valuation $1 to $1,000$60.00Town of Stevensville Electrical Permit Application, Commercial fee table
Commercial — valuation $1,001 to $10,000$60 for the first $1,000 plus 0.6% of the remainderTown of Stevensville Electrical Permit Application
Commercial — valuation $10,001 to $50,000$114 for the first $10,000 plus 1.5% of the remainderTown of Stevensville Electrical Permit Application
Commercial — valuation over $50,000$714 for the first $50,000 plus 2.5% of the remainderTown of Stevensville Electrical Permit Application

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Stevensville, governed by the 2018 Uniform Plumbing Code (UPC) as adopted by the Town. Stevensville is a Montana DLI-certified jurisdiction for plumbing permitting.

Verified 2026-07-04 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing fixtures and related systems
  • A homeowner may secure the permit for and plumb only their own residential building, occupied and used for their own personal use
  • A Montana-licensed plumber (with MT plumbing license number on file) is required on all rentals, commercial businesses, and other non-owner-occupied work
  • Fixture count and type itemized on the application (area drain, bidet, dishwasher, floor drain, kitchen sink, lavatory, shower, water closet, water heater, etc.)
  • Permit becomes null and void if work is not commenced within 180 days, or suspended/abandoned for 180 days after commencing

Required documents

  • RequiredPlumbing Permit ApplicationTown of Stevensville Plumbing Permit application (November 2011 form), including itemized fixture fee schedule

Fee schedule

Fee typeAmountNotes
Each permit (base fee)$25.00Town of Stevensville Plumbing Permit Application fee table
Per-fixture fee (area drain, backflow preventer, bar sink, bidet, car wash sump, clothes washer, coffee maker, dishwasher, drinking fountain, dental chair, floor drain, floor sink, grease trap, ice maker, indirect waste, kitchen sink (domestic/commercial), lavatory, lawn/fire sprinkler, roof drains, service/utility sink, shower, sump drain, traps, urinal, water closet, water heater, wash tray)$9.00 per fixture (total number of fixtures x $9)Town of Stevensville Plumbing Permit Application, itemized fixture list
Water piping repair, replace, or alter$10.00Town of Stevensville Plumbing Permit Application
Drain repair, replace, or alteration$10.00Town of Stevensville Plumbing Permit Application
Vent piping repair, replace, or alteration$10.00Town of Stevensville Plumbing Permit Application
Fixture or trap repair, replace, or alter$10.00Town of Stevensville Plumbing Permit Application
Fuel gas piping, 1-4 outlets$10.00Town of Stevensville Plumbing Permit Application
Fuel gas piping, 5 or more outletsadd $6.00Town of Stevensville Plumbing Permit Application
Water heater replace/repair$10.00 eachTown of Stevensville Plumbing Permit Application
Medical gas/vacuum piping, 1-5 outlets$110.00Town of Stevensville Plumbing Permit Application
Medical gas/vacuum piping, each additional outlet$10.00Town of Stevensville Plumbing Permit Application
Water service$10.00Town of Stevensville Plumbing Permit Application

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, air conditioning, and related mechanical installations in Stevensville, governed by the 2018 International Mechanical Code (IMC) and International Fuel Gas Code (IFGC) as adopted by the Town. Stevensville is a Montana DLI-certified jurisdiction for mechanical permitting.

Verified 2026-07-04 · Source

Requirements

  • Mechanical permit required for furnaces, boilers, compressors, HVAC equipment, gas piping, fireplaces, wood/gas/pellet stoves, and related mechanical systems
  • Total cost of project (labor + materials + equipment) determines permit fee; applicant may be required to show verification/documentation of costs
  • Permit becomes null and void if work is not commenced within 180 days, or suspended/abandoned for 180 days after commencing

Required documents

  • RequiredMechanical Permit ApplicationTown of Stevensville Mechanical Permit application (November 2011 form)

Fee schedule

Fee typeAmountNotes
Mechanical system valuation — $1 to $10,000$50.00 for the first $1,000 plus $15.00 for each additional $1,000 or fraction thereof above $1,000Town of Stevensville Mechanical Permit Application fee table
Mechanical system valuation — $10,000 to $50,000$185.00 for the first $10,000 plus $10.00 for each additional $1,000 or fraction thereof above $10,000Town of Stevensville Mechanical Permit Application fee table
Mechanical system valuation — $50,000 and up$585.00 for the first $50,000 plus $5.00 for each additional $1,000 or fraction thereof above $50,000Town of Stevensville Mechanical Permit Application fee table
Plan Review Fee25% of the calculated mechanical permit feeTown of Stevensville Mechanical Permit Application; printed directly on the application form as an add-on to the calculated permit fee

Residential/Commercial Solar Photovoltaic (PV) Permit

Verified

Required for installation of a rooftop or ground-mounted solar photovoltaic system in Stevensville. Because Stevensville is a Montana DLI-certified jurisdiction for the Electrical (E) trade (in addition to Building, Plumbing, Mechanical, and Swimming Pool), solar PV is permitted locally by the Town rather than routed to the state — per the Montana DLI Building Codes Bureau's own published Alternative Energy Information guidance, a licensed electrical contractor applies for a standard Electrical Permit and selects 'solar' on the application, a non-electrician installer submits an Alternate Energy Permit with solar information, and a homeowner may use the homeowner electrical permit option with solar information provided. The fee is based on the total value of the electrical work, including the solar equipment, using the same Commercial valuation-based tier documented in this file's Electrical Permit entry.

Verified 2026-07-20 · Source

Requirements

  • Licensed electrical contractors apply for a standard Town of Stevensville Electrical Permit and select 'solar' on the application, per Montana DLI Building Codes Bureau Alternative Energy Information guidance
  • A homeowner performing their own PV installation on their own owner-occupied residence may use the homeowner electrical permit option (per Montana statute, as documented in this file's Electrical Permit entry) and must provide solar-specific system information on the application
  • A non-electrician solar installer (i.e., a solar-specific contractor who is not itself a licensed Montana electrical contractor) submits an Alternate Energy Permit with solar information rather than a standard Electrical Permit, per the same DLI guidance
  • All grid-tied systems require a Montana-licensed electrical contractor for the interconnection wiring itself, even if a non-electrician installer handles the mounting/racking
  • Fee is based on the total value of the electrical work, including the solar equipment — billed under the same Commercial valuation-based fee tiers already documented in this file's Electrical Permit entry, since Stevensville's own fee schedule does not carry a separate flat residential-solar line
  • Structural/racking work is permitted via the standard Town of Stevensville Building Permit (Table of valuation-based fees documented elsewhere in this file), governed by the 2018 IBC/IRC as locally adopted

Required documents

  • RequiredElectrical Permit Application (or Alternate Energy Permit, as applicable)Town of Stevensville Electrical Permit application, with 'solar' selected as the work type; a non-electrician-installed system instead uses an Alternate Energy Permit with solar information, per Montana DLI guidance
  • RequiredBuilding Permit ApplicationTown of Stevensville Building Permit application, for the racking/mounting structural scope

Fee schedule

Fee typeAmountNotes
Solar Electrical Interconnection — Commercial valuation-based tier$60 for the first $1,000 plus 0.6% of the remainder ($1,001-$10,000); $114 for the first $10,000 plus 1.5% of the remainder ($10,001-$50,000); $714 for the first $50,000 plus 2.5% of the remainder (over $50,000)
Town of Stevensville Electrical Permit Application, Commercial fee table — the same table already documented in this file's Electrical Permit entry; Show full citation

Town of Stevensville Electrical Permit Application, Commercial fee table — the same table already documented in this file's Electrical Permit entry; the Town's own MEP fee documents do not carry a distinct flat residential-solar line, so solar is billed on total electrical-work value using this valuation tier, consistent with the Montana DLI Building Codes Bureau's own statement that 'the fee is based on the total value of the electrical work, including solar.'

Building Permit Fee (structural mounting/racking)$35 minimum, scaling per the valuation tiers documented in the Residential Building Permit entry of this fileTown of Stevensville Building Permit Fees schedule — applies to the racking/mounting structural scope if it requires its own permit beyond the electrical interconnection.

EV Charger / EVSE Permit

Verified

The Town of Stevensville has no dedicated electric-vehicle-charging-station permit or fee line. As a Montana DLI-certified jurisdiction for electrical (E) permitting, the Town issues and inspects an EV charger circuit through its standard Electrical Permit (2017 NEC as adopted), with the fee computed from the same itemized Electrical Permit Application fee table used for any other residential electrical work — most closely the 'New addition, remodel, interior rewire' line ($100.00) for a new dedicated circuit, or 'Misc. work not considered interior remodel/rewire' ($30.00) for simpler scope. No EV/EVSE-specific dollar figure was found published.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the EV charger circuit, governed by the 2017 NEC as adopted by the Town — same requirement and application track as this file's Electrical Permit entry
  • Montana state license number required for licensed electrical contractors; a homeowner may secure the permit and perform the work only in a private structure occupied for their own personal use
  • Work must commence within 180 days of permit issuance
  • Installer must call for inspection prior to covering the electrical work
  • No dedicated EV/EVSE line-item was found on the Town's Electrical Permit Application fee table

Required documents

  • RequiredElectrical Permit ApplicationTown of Stevensville Electrical Permit application (February 2012 form); no dedicated EV/EVSE checkbox exists

Fee schedule

Fee typeAmountNotes
New addition, remodel, interior rewire (closest applicable line for a new EV charger circuit)$100.00Town of Stevensville Electrical Permit Application; no dedicated EV/EVSE fee line exists
Misc. work not considered interior remodel/rewire (alternate applicable line for simpler scope)$30.00Town of Stevensville Electrical Permit Application
Service change-out or upgrade (if a panel upgrade is required to support the charger)$75.00Town of Stevensville Electrical Permit Application

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Stevensville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-04)Later version (2026-07-22) →View current record →All versions →