Version history — Colstrip, Montana
This is PermitBase’s own verified record for Colstrip, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Colstrip’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-20Current record
- 2026-07-22Superseded
- 2026-07-20Superseded
- Colstrip, Montana — Solar PV / Alternative Energy Permit (State-Issued) record added
- Colstrip, Montana — Electric Vehicle (EV) Charger / EVSE Permit record added
- Colstrip, Montana — Electric Vehicle (EV) Charger / EVSE Permit fee record added: Single Family Interior/Exterior Wire or Rewire -- item H: 1 additional circuit or piece of equipment ($45)
- 2026-07-07Superseded
- 2026-07-04Initial record — coverage of Colstrip began