This is PermitBase’s published record for Forsyth as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Forsyth building permits
VerifiedForsyth, Montana — as published 2026-07-20.
Verified 2026-07-04 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Addition / Alteration)
VerifiedRequired for new single-family/two-family home construction, additions, and alterations on RESIDENTIAL property within Forsyth city limits. Issued by the City of Forsyth under its DLI certification for Building (B), RESIDENTIAL ONLY, reviewed against the locally-adopted 2012 IBC / 2018 Residential Building Code / 2018 IECC / 2012 IEBC (Forsyth Code of Ordinances 11-1-1). This certification does NOT extend to commercial building work — see the separate commercial-building-permit-state entry.
Verified 2026-07-04 · Source
Requirements
- Contact Forsyth City Hall, (406) 346-2521, 247 N 9th Ave, Forsyth, MT 59327, to initiate a residential building permit application — no downloadable application form or online portal was found published on the City's own website (forsythmt.info) as of this review
- Pole building construction is capped at 900 square feet, single-story, 25 feet in height, per Forsyth Code 11-1-4
- Garages in Residential Districts 1 and 2 are capped at 1,200 square feet, per Forsyth Code 11-1-4
- Living quarters in a garage may be allowed only if a lumber criterion is met and zoning code requirements are satisfied, per Forsyth Code 11-1-4
- Project must comply with the codes adopted at Forsyth Code 11-1-1 (2012 IBC, 2018 Residential Building Code, 2018 IECC, 2012 IEBC, 2017/ARM accessibility rules)
Required documents
- RequiredBuilding Permit ApplicationNo downloadable application form was found published on the City of Forsyth's own website (forsythmt.info) as of this review; the site's 'Permit Application' page is a generic Wix Bookings service-page template with no attached form or fee schedule. Contact City Hall, (406) 346-2521, to obtain the current application.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential building permit fee | No fixed valuation-based fee table was found published on forsythmt.info (a Wix-hosted site whose Permit Application page is a generic Bookings template with no attached fee schedule), in Forsyth… Show full citationHideNo fixed valuation-based fee table was found published on forsythmt.info (a Wix-hosted site whose Permit Application page is a generic Bookings template with no attached fee schedule), in Forsyth Code of Ordinances Title 11, or anywhere else searched (city council meeting minutes/agendas, Rosebud County Planner page) as of this review — an honest publication gap after exhausting the City's own website, the Wayback Machine's complete archive index for the domain, and the codified ordinances, not an inferred or invented figure. Applicants must contact Forsyth City Hall at (406) 346-2521 for a current fee quote. |
Commercial Building Permit (State-Issued)
VerifiedBecause Forsyth's DLI certification for Building covers RESIDENTIAL work only, any commercial building project within Forsyth city limits — new construction, addition, alteration — requires a Building Permit/Plan Review Application issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Forsyth.
Verified 2026-07-04 · Source
Requirements
- Submit a Building Permit/Plan Review Application together with complete construction plans to the Building Codes Bureau
- Plan review fee is generally 1%-2% of building valuation, calculated by the Bureau after initial screening
- A state building permit must be obtained before construction begins; starting construction beforehand may result in an investigation fee and required corrective construction
- Building permits must be issued before related Plumbing, Mechanical, or Electrical permits can be issued or that work can begin
- Apply in accordance with Title 50, Chapter 60, MCA and ARM Title 24, Chapter 301
Required documents
- RequiredBuilding Permit/Plan Review ApplicationMontana Building Codes Bureau statewide form; mailed with payment to Building and Commercial Measurements Bureau, PO Box 200517, Helena, MT 59602, or filed online at BuildingPermits.Mt.Gov / aca-prod.accela.com/bcb
- RequiredConstruction PlansComplete construction plans and details (site plan, floor plan, accessibility/restroom details, wall sections) are required and expedite plan review per the Bureau's own guidance
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit/Plan Review Fee | Generally 1%-2% of building valuation, calculated by the Building Codes Bureau after screening | Montana DLI Building Codes Bureau, 'Is a State Building Permit Needed?' guidance page — this is the Bureau's own stated fee-calculation method for state-issued building permits, which governs… Show full citationHideMontana DLI Building Codes Bureau, 'Is a State Building Permit Needed?' guidance page — this is the Bureau's own stated fee-calculation method for state-issued building permits, which governs Forsyth's commercial building projects since Forsyth's own certification does not cover commercial building work |
Electrical Permit (State-Issued)
VerifiedBecause Forsyth holds no DLI certification in Electrical (only a residential-only Building certification), electrical work anywhere within Forsyth city limits — residential or commercial — requires a Residential or Commercial Electrical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Forsyth, under the National Electrical Code as currently adopted statewide (2020 NEC per the Bureau's Current Codes page; Forsyth's own local ordinance text at 11-1-1 references the older 2014 NEC edition for its own — inapplicable to this state-enforced trade — reference).
Verified 2026-07-04 · Source
Requirements
- Application must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work
- Payment must be submitted with the application; incomplete applications are returned unprocessed
- Property address, GEOCODE/parcel/lot/block, owner information, and power company must be provided
- Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
Required documents
- RequiredApplication for Residential Electrical PermitMontana Building Codes Bureau statewide form (BCP-1); mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov / BuildingPermits.Mt.Gov / aca-prod.accela.com/bcb
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential — Up to 200-amp service (new single-family dwelling or cabin) | $200 | Montana Building Codes Bureau, Application for Residential Electrical Permit, BCP-1 — the same statewide fee schedule applied to all non-electrically-certified Montana jurisdictions; Show full citationHideMontana Building Codes Bureau, Application for Residential Electrical Permit, BCP-1 — the same statewide fee schedule applied to all non-electrically-certified Montana jurisdictions; cross-verified against the identical schedule already confirmed for Hardin, MT and Anaconda-Deer Lodge, MT in this same dataset |
| Residential — 201 to 400-amp service | $380 | Montana Building Codes Bureau, Application for Residential Electrical Permit |
| Residential Change of Service — exterior meter base & interior/exterior main disconnect only | $45 | Montana Building Codes Bureau, Application for Residential Electrical Permit |
Residential Solar Photovoltaic (PV) Permit — State-Issued Electrical Permit Add-On
VerifiedBecause Forsyth holds no DLI certification in Electrical (only a residential-only Building certification), rooftop or ground-mount residential solar PV installation within Forsyth city limits is not a separate stand-alone permit — it is billed and processed as an Alternative Energy Source add-on to the state-issued Residential Electrical Permit, issued directly by the Montana Department of Labor & Industry Building Codes Bureau (Helena), the same office that issues all electrical permits for Forsyth addresses. The Bureau's statewide Application for Residential Electrical Permit form (BCP-1) itemizes 'Alternative Energy Source (solar/wind/hydro)' as a fixed $65 fee added on top of whichever base electrical work-type fee applies, and requires the applicant to specify system type (Micro Inverter/AC Module System or PV String System). If the racking/mounting requires structural roof modification, that scope would separately require Forsyth's own residential-certified Building permit (or the state's commercial-building-permit-state entry, for non-residential property).
Verified 2026-07-20 · Source
Requirements
- Apply using the same statewide Application for Residential Electrical Permit (BCP-1) used for all Forsyth electrical work, since the state DLI Building Codes Bureau (not the city) issues electrical permits for Forsyth addresses
- Select the applicable base work-type fee (e.g., service, change of service) and add the Alternative Energy Source line item
- Specify system type: Micro Inverter/AC Module System or PV String System
- Application must be signed and dated by the licensed electrical contractor's person in charge; payment must be submitted with the application
- Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
- Governed by the 2020 NEC as currently adopted statewide (Forsyth's own local ordinance text at 11-1-1 references the older 2014 NEC for its own — inapplicable to this state-enforced trade — reference)
- If structural roof/mounting modification is needed, that scope separately requires a Forsyth residential Building permit (or the state commercial-building-permit-state track for non-residential property, since Forsyth's Building certification is residential-only)
Required documents
- RequiredApplication for Residential Electrical PermitMontana Building Codes Bureau statewide form (BCP-1), with the Alternative Energy Source (solar/wind/hydro) box checked; mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov / BuildingPermits.Mt.Gov / aca-prod.accela.com/bcb
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Alternative Energy Source add-on (solar, wind, or hydro) | $65 additional fee added to the selected base electrical work-type fee | Montana Building Codes Bureau, Application for Residential Electrical Permit (BCP-1) — the only PV-specific line item published on the statewide form used by all non-electrically-certified Montana… Show full citationHideMontana Building Codes Bureau, Application for Residential Electrical Permit (BCP-1) — the only PV-specific line item published on the statewide form used by all non-electrically-certified Montana jurisdictions, cross-verified against the identical fee already confirmed for East Helena, MT in this same dataset. Required in addition to whichever base fee option (e.g., $200 up-to-200-amp service, $45 change of service) applies to the underlying electrical work. |
Plumbing Permit (State-Issued, incl. Water Heater)
VerifiedBecause Forsyth holds no DLI certification in Plumbing (only a residential-only Building certification), plumbing work anywhere within Forsyth city limits — including water heater installation/replacement, residential or commercial — requires a Plumbing Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Forsyth, under the Uniform Plumbing Code as currently adopted statewide (2021 UPC per the Bureau's Current Codes page; Forsyth's own local ordinance text at 11-1-1 references the older 2012 UPC edition for its own — inapplicable to this state-enforced trade — reference).
Verified 2026-07-04 · Source
Requirements
- Application must be signed by the Master Plumber and include the Master Plumber License Number, or filed as a homeowner permit for owner-performed work where allowed
- Property address, county, and whether the job is inside city limits must be indicated
- Type of Building and Type of Work must be indicated; sewer service type (public/septic) and potable water source must be indicated
- Apply in accordance with Title 50, Chapter 60, Section 505, MCA and ARM 24.301.301 / 24.301.361
Required documents
- RequiredApplication for Plumbing PermitMontana Building Codes Bureau statewide form (BCP-1); mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov / BuildingPermits.Mt.Gov / aca-prod.accela.com/bcb
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Each NEW water heater (or replacement) | $25 | Montana Building Codes Bureau, Application for Plumbing Permit (BCP-1) statewide Fee Schedule — the same schedule applied to all non-plumbing-certified jurisdictions; Show full citationHideMontana Building Codes Bureau, Application for Plumbing Permit (BCP-1) statewide Fee Schedule — the same schedule applied to all non-plumbing-certified jurisdictions; cross-verified against the identical schedule already confirmed for Hardin, MT and Anaconda-Deer Lodge, MT in this same dataset |
| Each plumbing fixture or trap | $10 per fixture/trap | Montana Building Codes Bureau, Application for Plumbing Permit (BCP-1) statewide Fee Schedule |
Mechanical / HVAC Permit (State-Issued)
VerifiedBecause Forsyth holds no DLI certification in Mechanical (only a residential-only Building certification), mechanical/HVAC work anywhere within Forsyth city limits — residential or commercial — requires a Mechanical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Forsyth, under the International Mechanical Code and International Fuel Gas Code as currently adopted statewide (2021 IMC/IFGC per the Bureau's Current Codes page; Forsyth's own local ordinance text at 11-1-1 references the older 2012 editions for its own — inapplicable to this state-enforced trade — reference).
Verified 2026-07-04 · Source
Requirements
- Project Value must be provided; permit fee is calculated from the state's valuation-based fee schedule
- Type of Building and Type of Work must be indicated
- Boiler work requires a separate Boiler Permit form, not the Mechanical Permit
- Apply in accordance with Title 50, Chapter 60, Section 104, MCA and ARM 24.301.172
Required documents
- RequiredApplication for Mechanical PermitMontana Building Codes Bureau statewide form (BCP-1); mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov / BuildingPermits.Mt.Gov / aca-prod.accela.com/bcb
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit — Project value $0-$10,000 | $48 for the first $1,000, plus $14 for each additional $1,000 or fraction thereof | Montana Building Codes Bureau, Application for Mechanical Permit (BCP-1) statewide Fee Schedule — the same schedule applied to all non-mechanically-certified jurisdictions; Show full citationHideMontana Building Codes Bureau, Application for Mechanical Permit (BCP-1) statewide Fee Schedule — the same schedule applied to all non-mechanically-certified jurisdictions; cross-verified against the identical schedule already confirmed for Hardin, MT and Anaconda-Deer Lodge, MT in this same dataset |
EV Charger / Electric Vehicle Charging Circuit Permit (State-Issued)
VerifiedBecause Forsyth holds no DLI certification in Electrical (only a residential-only Building certification), an EV charger/EVSE circuit anywhere within Forsyth city limits requires the same state-issued Residential or Commercial Electrical Permit documented in the electrical-permit-state entry, issued directly by the Montana DLI Building Codes Bureau in Helena — not the City of Forsyth. The Bureau's statewide Application for Residential Electrical Permit form (BCP-1, Rev. 11/25) has no line item specifically labeled 'EV charger' or 'electric vehicle'; a retrofit EV charging circuit is billed under the 'Single Family Interior/Exterior Wire or Rewire' category as an additional circuit or piece of equipment, and a charger wired into a new single-family service is folded into the base new-service fee (per the amperage tier).
Verified 2026-07-20 · Source
Requirements
- Application must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work
- For a retrofit EV charger circuit in an existing single-family home, select 'Single Family Interior/Exterior Wire or Rewire' and check the applicable box: '1 additional circuit or piece of equipment' or '2-3 additional circuits or pieces of equipment'
- For a new single-family home wired with an EV charger circuit at the same time as the main service, no separate line item applies — it is included in the base new-service fee (per the amperage tier, A-D)
- Payment must be submitted with the application; incomplete applications are returned unprocessed
- Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
Required documents
- RequiredApplication for Residential Electrical PermitMontana Building Codes Bureau statewide form (BCP-1, Rev. 11/25) — no EV-specific version exists; use the standard rewire/additional-circuit category. Mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov / BuildingPermits.Mt.Gov / aca-prod.accela.com/bcb
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| 1 additional circuit or piece of equipment (retrofit EV charger circuit) | $45 | Montana Building Codes Bureau, Application for Residential Electrical Permit (BCP-1, Rev. Show full citationHideMontana Building Codes Bureau, Application for Residential Electrical Permit (BCP-1, Rev. 11/25) — 'Single Family Interior/Exterior Wire or Rewire' category, item H; no distinct EV-charger line item exists on the form, so a single dedicated EVSE circuit is billed at this generic per-item rate |
| 2-3 additional circuits or pieces of equipment | $70 | Montana Building Codes Bureau, Application for Residential Electrical Permit — item G; applies if the EV charger installation is bundled with other new circuits/equipment |
| 4+ circuits & change of service and/or interior panel (if a panel upgrade is needed to support the charger) | $120 | Montana Building Codes Bureau, Application for Residential Electrical Permit — item E |
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Forsyth building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.