You are viewing the permanent link for the record currently in effect, published 2026-07-16.

Shelby building permits

Verified

Shelby, Montana — as published 2026-07-16.

Verified 2026-07-03 · Source

Codes adopted

Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs (bsd.dli.mt.gov/building-codes-permits).Shelby is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Ken Thaut, (406) 434-5222. Verified directly against the DLI Building Codes Bureau's 'Montana Certified Local Government Program' roster PDF (fetched and text-extracted directly from the primary-source PDF, updated 04/22/2026): 'Shelby | B | Ken Thaut | 434-5222 | City Limits'. Source: https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf. NOTE (2026-07-16 re-check): this DLI roster quote is preserved verbatim and re-confirmed current (re-fetched and re-extracted from the same PDF this session, still reading 'Ken Thaut'), but the City of Shelby's own live website (shelbymt.com/building, fetched the same day) spells the position 'Keith Thaut.' This is a genuine discrepancy between two current primary sources that could not be independently resolved — both spellings are recorded rather than one being silently chosen as correct.Shelby Municipal Code Title 10 (Building Regulations), Chapter 1 (Building Codes), Section 10-1-1 (Adoption Of Model Building And Technical Codes By Administrative Action), last amended by Ordinance 803 (9-20-2010): adopts by reference, through administrative action of the building inspector as authorized by Mont. Code Ann. Section 50-60-301(1)(b), 'the current editions of the building, mechanical and related codes and all accompanying appendices, amendments and modifications adopted by the bureau of building and measurement standards, Montana department of labor and industry (or its successor), as set out in the administrative rules of Montana.' Source: City of Shelby Code of Ordinances, https://codelibrary.amlegal.com/codes/shelbymt/latest/shelby_mt/0-0-0-2417 (section 10-1-1)Per the Montana DLI Building Codes Bureau's Current Codes page (statewide effective date June 11, 2022, applicable to all certified and state-enforced jurisdictions alike): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility. Shelby's own municipal code (Title 10, Chapter 1) adopts the state-published editions by administrative reference rather than authoring independently amended code text, consistent with a small B-only-certified jurisdiction enforcing the state-adopted editions. Source: bsd.dli.mt.gov/building-codes-permits/current-codes

Permit types & fees

Building Permit (New Construction / Addition / Structural Alteration)

Verified

Required for new single-family home construction, additions, and structural alterations within Shelby city limits. Issued by the City of Shelby under its DLI-certified local Building (B) program, reviewed by the City's Building Official (named 'Keith Thaut' on the City's live Building & Zoning page as of 2026-07-16; the Montana DLI certified-jurisdictions roster spells the same position 'Ken Thaut' — see department record for this unresolved discrepancy) against the state-adopted building and technical codes referenced in Shelby Municipal Code Title 10, Chapter 1.

Verified 2026-07-03 · Source

Requirements

  • Application for a building permit submitted to the City Building Official; plans reviewed for compliance with the applicable building/technical codes adopted by administrative reference under Shelby Municipal Code 10-1-1
  • Building plan review completed by the building official within 30 working days of submittal of a complete application (10-1-2.C); the building official may submit plans to other affected city departments for review before permit issuance (10-1-2.B)
  • Structural changes (any work increasing or decreasing the size of a structure) require a building permit and payment of the applicable fee per the valuation-based schedule in Shelby Municipal Code 1-12-13; whether contemplated work constitutes a 'structural change' is determined by the building inspector (10-1-9.B)
  • Non-structural 'remodeling' of a single-family dwelling (siding, reroofing, cupboard/counter/countertop replacement, interior wall repair/replacement, and window/door replacement using the original opening) requires NO permit and NO fee, provided it does not affect the structural integrity of the dwelling (10-1-9.A)
  • Factory-built buildings approved by the Montana Building Codes Bureau are subject to local inspection and fees for zoning, utility connections, and foundations only — not full plan review (10-1-5)

Required documents

  • RequiredBuilding Permit ApplicationSubmitted to Shelby City Hall / Building Official (Keith Thaut per the City's live site, Ken Thaut per the DLI roster — see department record); contact (406) 434-5222

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$23.50Shelby Municipal Code 1-12-13, Plan Review And Building Permit Fees (Ord. 780, 5-21-2007)
Building Permit Fee — valuation $501.00 to $2,000.00$23.50 for the first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00Shelby Municipal Code 1-12-13
Building Permit Fee — valuation $2,001.00 to $25,000.00$69.25 for the first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00Shelby Municipal Code 1-12-13
Building Permit Fee — valuation $25,001.00 to $50,000.00$391.00 for the first $25,000.00, plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00Shelby Municipal Code 1-12-13
Building Permit Fee — valuation $50,001.00 to $100,000.00$643.75 for the first $50,000.00, plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00Shelby Municipal Code 1-12-13
Building Permit Fee — valuation $100,001.00 to $500,000.00$993.75 for the first $100,000.00, plus $5.60 for each additional $1,000.00 or fraction thereof, to and including $500,000.00Shelby Municipal Code 1-12-13
Building Permit Fee — valuation $500,001.00 to $1,000,000.00$3,233.75 for the first $500,000.00, plus $4.75 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00Shelby Municipal Code 1-12-13
Building Permit Fee — valuation $1,000,001.00 and up$5,608.75 for the first $1,000,000.00, plus $3.65 for each additional $1,000.00 or fraction thereofShelby Municipal Code 1-12-13
Other Inspections and Fees (after-hours inspections, reinspections, unlisted inspections, additional plan review)$47.00 per hour (2-hour minimum for after-hours inspections), or the City's total hourly cost, whichever is greaterShelby Municipal Code 1-12-13; outside-consultant use for plan checking/inspections billed at actual cost including administrative/overhead

Non-Structural Remodel (Permit-Exempt) / Structural Alteration Permit

Verified

Shelby Municipal Code 10-1-9 creates a specific no-fee/no-permit exception for defined non-structural 'remodeling' of single-family dwellings, while any structural change requires the standard Building Permit and fee.

Verified 2026-07-03 · Source

Requirements

  • 'Remodeling' is defined to specifically include siding, reroofing, replacing cupboards/counters/countertops, and repairing or replacing interior walls; windows and doors are included as remodeling so long as the original opening is used and not enlarged
  • No fee and no permit are required for remodeling of a single-family dwelling, provided the work does not in any way affect the structural integrity of the dwelling
  • Any structural change (work that increases or decreases the size of the structure) requires a building permit and payment of the applicable fee under the 1-12-13 valuation schedule
  • The building of any fence is explicitly classified as a structural change requiring a ZONING permit (not a building permit) and payment of the appropriate fee
  • Whether contemplated work constitutes a 'structural change' (vs. exempt remodeling) is determined by the building inspector on a case-by-case basis

Required documents

  • OptionalBuilding Permit Application (only if a structural change)Required only if the building inspector determines the work is a structural change rather than exempt remodeling

Fee schedule

Fee typeAmountNotes
Non-structural remodel (siding, reroof, cabinets/counters, interior walls, same-opening window/door replacement)$0 (no fee, no permit required)Shelby Municipal Code 10-1-9.A.2 — applies only if structural integrity of the single-family dwelling is unaffected
Structural change (size increase/decrease) — valuation-basedPer Shelby Municipal Code 1-12-13 valuation schedule, starting at $23.50 for $1-$500 valuationShelby Municipal Code 10-1-9.B and 1-12-13

Fence Zoning Permit

Verified

Construction of a fence within Shelby city limits is explicitly classified as a 'structural change' under Shelby Municipal Code 10-1-9.B and requires a zoning permit (administered under Title 13, Zoning Regulations) and payment of the appropriate fee.

Verified 2026-07-03 · Source

Requirements

  • Any fence construction is classified as a structural change under Shelby Municipal Code 10-1-9.B and requires a zoning permit
  • Zoning permit fee payment required; fee amount is referenced to the City's non-codified 'schedule of fees and permits' on file at City Hall or the Department of Public Works (Shelby Municipal Code 1-12-15) rather than published as a fixed dollar figure in the code itself
  • Zoning requirements generally governed by Shelby Municipal Code Title 13 (Zoning Regulations)

Required documents

  • RequiredZoning Permit ApplicationObtained from Shelby City Hall; contact (406) 434-5222

Fee schedule

Fee typeAmountNotes
Zoning Permit Fee (fence)Shelby Municipal Code 1-12-15 (Zoning) states only: 'Refer to the current "schedule of fees and permits" on file at the City Hall or Department of Public Works.' No fixed dollar figure is published in the codified ordinances themselves — confirmed via direct review of section 1-12-15 and its cross-reference to Title 13. This is an honest publication gap, not an inferred or invented number. Applicants must contact City Hall at (406) 434-5222 for the current fee.

Moving Building Permit

Verified

Required to move, remove, or relocate any building or structure within or into Shelby city limits, per Shelby Municipal Code Title 10, Chapter 4 (Moving Buildings).

Verified 2026-07-03 · Source

Requirements

  • No person shall move, remove, or relocate any building or structure within or into the city without first obtaining a moving permit (Shelby Municipal Code 10-4-1)
  • Application required per Shelby Municipal Code 10-4-2
  • Permit fee established by city council resolution per Shelby Municipal Code 10-4-3, cross-referenced to section 1-12-9
  • Restrictions on issuance apply per Shelby Municipal Code 10-4-4; permittee duties per 10-4-5; permit subject to revocation per 10-4-6

Required documents

  • RequiredMoving Permit ApplicationObtained from Shelby City Hall; contact (406) 434-5222

Fee schedule

Fee typeAmountNotes
Moving Permit FeeShelby Municipal Code 1-12-9 (Moving Buildings) states only: 'Refer to the current "schedule of fees and permits" on file at the City Hall or Department of Public Works.' No fixed dollar figure is published in the codified ordinances themselves — confirmed via direct review of both 10-4-3 and its cross-referenced fee section 1-12-9. This is an honest publication gap, not an inferred or invented number. Applicants must contact City Hall at (406) 434-5222 for the current fee.

Electrical Permit (State-Issued)

Verified

Because Shelby is DLI-certified for Building only, electrical work anywhere within Shelby city limits requires a Residential (or Commercial) Electrical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Shelby, under the 2020 NEC.

Verified 2026-07-03 · Source

Requirements

  • Application must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work
  • Payment must be submitted with the application; incomplete applications are returned unprocessed
  • Property address, GEOCODE/parcel/lot/block, owner information, and power company must be provided
  • Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431

Required documents

  • RequiredApplication for Residential Electrical PermitMontana Building Codes Bureau statewide form; mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov

Fee schedule

Fee typeAmountNotes
Single Family Dwelling or Cabin — up to 200-amp service (includes meter base and attached garages if wired at the same time)$200Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22) — same statewide fee schedule applied to all non-electrically-certified Montana jurisdictions, including Shelby; cross-verified against the identical schedule already confirmed for Choteau and Conrad, MT in this same research effort
Single Family Dwelling or Cabin — 201 to 400-amp service$380Application for Residential Electrical Permit (Rev. 12/22)
Residential Change of Service — exterior meter base & interior/exterior main disconnect only$45Application for Residential Electrical Permit (Rev. 12/22)

Plumbing Permit (State-Issued, incl. Water Heater)

Verified

Because Shelby is DLI-certified for Building only, plumbing work anywhere within Shelby city limits — including water heater installation/replacement — requires a Plumbing Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Shelby, under the 2021 Uniform Plumbing Code.

Verified 2026-07-03 · Source

Requirements

  • Application must be signed by the Master Plumber and include the Master Plumber License Number, or filed as a homeowner permit for owner-performed work where allowed
  • Property address, county, and whether the job is inside city limits must be indicated
  • Type of Building and Type of Work must be indicated; sewer service type (public/septic) and potable water source must be indicated
  • Apply in accordance with Title 50, Chapter 60, Section 505, MCA and ARM 24.301.301 / 24.301.361

Required documents

  • RequiredApplication for Plumbing PermitMontana Building Codes Bureau statewide form (BCP-1); mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov

Fee schedule

Fee typeAmountNotes
Each NEW water heater (or replacement)$25Montana Building Codes Bureau, Application for Plumbing Permit (BCP-1) statewide Fee Schedule — same schedule applied to all non-plumbing-certified jurisdictions, including Shelby; cross-verified against the identical schedule already confirmed for Choteau and Conrad, MT in this same research effort
Each plumbing fixture or trap$10 per fixture/trapApplication for Plumbing Permit (BCP-1) statewide Fee Schedule

Mechanical / HVAC Permit (State-Issued)

Verified

Because Shelby is DLI-certified for Building only, mechanical/HVAC work anywhere within Shelby city limits requires a Mechanical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Shelby, under the 2021 International Mechanical Code and International Fuel Gas Code.

Verified 2026-07-03 · Source

Requirements

  • Project Value must be provided; permit fee is calculated from the state's valuation-based fee schedule
  • Type of Building and Type of Work must be indicated
  • Boiler work requires a separate Boiler Permit form, not the Mechanical Permit
  • Apply in accordance with Title 50, Chapter 60, Section 104, MCA and ARM 24.301.172

Required documents

  • RequiredApplication for Mechanical PermitMontana Building Codes Bureau statewide form (BCP-1); mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov

Fee schedule

Fee typeAmountNotes
Mechanical Permit — Project value $0-$10,000$48 for the first $1,000, plus $14 for each additional $1,000 or fraction thereofMontana Building Codes Bureau, Application for Mechanical Permit (BCP-1) statewide Fee Schedule — same schedule applied to all non-mechanically-certified jurisdictions, including Shelby; cross-verified against the identical schedule already confirmed for Choteau and Conrad, MT in this same research effort

Solar Photovoltaic (PV) Permit

Verified

Required for installing a rooftop or ground-mount photovoltaic system within Shelby city limits. Because Shelby is DLI-certified for Building only, TWO permits and TWO authorities apply: a City of Shelby Building Permit for the structural/roof-mount work (valuation-based, City Building Official) and a State of Montana Residential (or Commercial) Electrical Permit for the PV electrical installation, issued directly by the Montana DLI Building Codes Bureau in Helena, which adds a flat Alternative Energy Source fee on top of its standard electrical fee.

Verified 2026-07-20 · Source

Requirements

  • City of Shelby Building Permit required if the installation constitutes a structural change (racking/roof-mount work), per Shelby Municipal Code 10-1-9.B — whether a given installation qualifies is determined by the building inspector
  • State of Montana Residential (or Commercial) Electrical Permit required for the PV system's electrical installation — mailed to the Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online at ebiz.mt.gov; NOT issued by the City of Shelby
  • On the state Electrical Permit application, answer 'Yes' to 'Does this project consist of, or include an Alternative Energy Source?' and select 'Solar,' then select either 'Micro Inverter/AC Module System' or 'PV String System'
  • Licensed electrical contractors apply for the electrical permit and select solar on the application; non-electrician installers submit an alternate energy permit with solar specifications; homeowners may obtain a homeowner electrical permit for a single-family system
  • All commercial solar work requires a licensed electrical contractor to apply for the permit

Required documents

  • RequiredCity of Shelby Building Permit ApplicationSubmitted to Shelby City Hall / Building Official; required if the installation is a structural change
  • RequiredState of Montana Application for Residential (or Commercial) Electrical PermitIncludes an 'Alternative Energy Source' yes/no question and Solar/Wind/Hydro selection near the bottom of the form

Fee schedule

Fee typeAmountNotes
City Building Permit Fee — valuation $1.00 to $500.00$23.50Shelby Municipal Code 1-12-13, Plan Review And Building Permit Fees; no separate solar line item — same table used for all structural work
City Building Permit Fee — valuation $2,001.00 to $25,000.00$69.25 for the first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof
City Building Permit Fee — valuation $25,001.00 to $50,000.00$391.00 for the first $25,000.00, plus $10.10 for each additional $1,000.00 or fraction thereof
State Electrical Permit — Single Family Dwelling or Cabin, up to 200-amp service$200Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22); includes meter base and attached garages if wired at the same time
State Electrical Permit — Single Family Dwelling or Cabin, 201 to 400-amp service$380
State Electrical Permit — Alternative Energy Source add-on (Solar/Wind/Hydro)$65 flat, added on top of the applicable base electrical fee selected aboveApplication for Residential Electrical Permit (Rev. 12/22), 'Does this project consist of, or include an Alternative Energy Source?' section. Identical $65 add-on structure independently confirmed for Belgrade, MT elsewhere in this corpus, indicating a consistent statewide DLI fee schedule.

EV Charger / Electric Vehicle Charging Station Permit

Verified

Installing an EV charger in Shelby is electrical work, and because Shelby is DLI-certified for Building only (not Electrical), the permit for the charging circuit is issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Shelby -- the same state-issuance mechanism already documented in this file for the electrical-permit-state and solar-pv-permit entries. The state's Application for Residential Electrical Permit does not carry a dedicated 'EV charger' or 'EVSE' line item (unlike its explicit $65 Alternative Energy Source add-on for solar/wind/hydro); a new EV charger circuit at an existing single-family dwelling is billed under the form's general 'Single Family Interior/Exterior Wire or Rewire' fee categories for adding one or more circuits or pieces of equipment. A City of Shelby Building Permit is required in addition only if the installation includes new structural work (e.g., a carport built to house the charger), billed under the City's general valuation-based fee schedule at Shelby Municipal Code 1-12-13, the same mechanism documented for solar's structural/racking scope.

Verified 2026-07-20 · Source

Requirements

  • The EV charger circuit itself must be permitted through the Montana DLI Building Codes Bureau (Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or apply online at ebiz.mt.gov) -- not through the City of Shelby, which holds Building-only DLI certification and has no electrical permitting function
  • On the state Application for Residential Electrical Permit, a new EV charger circuit at an existing single-family dwelling is selected under 'Single Family Interior/Exterior Wire or Rewire': category H ('1 additional circuit or piece of equipment') for a single dedicated EV circuit with no panel change, or category G ('2-3 additional circuits or pieces of equipment') if multiple circuits/equipment are added at once; category E or F applies if 4+ circuits and/or a panel/service change are involved
  • Applications must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work, with payment submitted with the application
  • A City of Shelby Building Permit is required only if new structural work (e.g., a carport or accessory structure) is built to house the charger, per the same 'structural change' standard (Shelby Municipal Code 10-1-9.B) documented for solar racking work

Required documents

  • RequiredApplication for Residential Electrical Permit (Montana DLI Building Codes Bureau)Statewide form; obtained directly from the State, not the City, for the EV charging circuit itself
  • OptionalCity of Shelby Building Permit Application (only if new structure is built)Required only if the EV charger installation includes new structural work

Fee schedule

Fee typeAmountNotes
State Electrical Permit — 1 additional circuit or piece of equipment (Category H)$45Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22) -- applies to a single new EV charger circuit added to an existing single-family dwelling with no panel/service change; this is the general-schedule line item under which EV charger circuits are billed, as the form carries no dedicated EV-charger or EVSE fee line (unlike its explicit $65 Alternative Energy Source add-on for solar/wind/hydro)
State Electrical Permit — 2-3 additional circuits or pieces of equipment (Category G)$70Application for Residential Electrical Permit (Rev. 12/22) -- applies if the EV charger installation is bundled with other new circuits/equipment
City Building Permit Fee — valuation $1.00 to $500.00 (only if new structure, e.g. carport, is built to house the charger)$23.50Shelby Municipal Code 1-12-13 -- applies only when new structural work is involved; a standalone wall/pedestal charger with no new structure does not require this

Sign Permit (Zoning Permit for Signs)

Verified

Shelby Municipal Code Title 13, Chapter 9 (Signs) sets substantive placement, lighting, and duration standards for on-site, off-site, and temporary signs, while Title 13, Chapter 12 (Administration and Enforcement) establishes the actual permit mechanism: Section 13-12-2.A requires a ZONING PERMIT from the City's Zoning Administrator prior to erecting 'any sign or group of signs having permanent geographical location.' The Zoning Administrator may also serve as the City Building Inspector (13-12-1.A), so the same city office typically handles both reviews.

Verified 2026-07-22 · Source

Requirements

  • A zoning permit must be secured from the Zoning Administrator prior to the construction, erection, enlargement, relocation, or structural alteration of any sign or group of signs having permanent geographical location (Shelby Municipal Code 13-12-2.A)
  • Permit application must be accompanied by plans in duplicate, drawn to scale, showing dimensions/shape of the lot, location of existing structures, and the location and dimensions of the proposed sign (13-12-2.B.1); the zoning permit application may be combined with the building permit application (13-12-2.B.4)
  • Substantive sign standards under Chapter 9 apply regardless of permit mechanics: on-site signs may not be set nearer to the street lot line than the district's minimum building setback, and wall signs mounted on a building may not project more than 8 feet from the building or within 2 feet of the curb, and must clear at least 10 feet from grade to the sign's lowest point (13-9-4)
  • Off-site signs are subject to the same setback standard and to state electrical code compliance for illuminated signs (13-9-5)
  • Temporary signs may be erected for a period of sixty (60) days plus the construction period (13-9-6); this is more specific than the general temporary-use zoning permit's 6-month maximum under 13-12-2.D.2
  • Certain sign types are listed as 'permitted in all districts' under 13-9-3 (real estate/lease signs, address/occupant-identification signs without commercial connotation, integral architectural features, private traffic-directional signs, and religious/school/educational bulletin boards set back at least 10 feet from the right-of-way) — whether these are also exempt from the 13-12-2 zoning-permit requirement is not explicitly stated in the code; confirm with the Zoning Administrator
  • If the work described in a zoning permit has not begun within 6 months of issuance, the permit expires; a single 6-month extension may be granted by the Zoning Administrator (13-12-2.D.1)
  • Electrically illuminated signs must comply with the state electrical code for all wiring, fittings, and materials (13-9-4.B, 13-9-5.B) — see this file's electrical-permit-state entry for the separate state DLI electrical permit that governs the wiring itself

Required documents

  • RequiredZoning Permit Application (for signs)Submitted to the Zoning Administrator at Shelby City Hall, (406) 434-5222; plans in duplicate required per Shelby Municipal Code 13-12-2.B; may be combined with the Building Permit Application

Fee schedule

Fee typeAmountNotes
Zoning Permit / Certificate of Zoning Compliance Fee (signs)Shelby Municipal Code 13-12-5.A states the city council sets fees 'by resolution' and cross-references Shelby Municipal Code 1-12-15 (Zoning), which itself states only 'Refer to the current "schedule of fees and permits" on file at the City Hall or Department of Public Works' — no fixed dollar figure is published in the codified ordinances themselves. This is the same honest publication gap already documented in this file's fence-zoning-permit entry, confirmed via direct review of 13-12-5 and its 1-12-15 cross-reference. Applicants must contact City Hall at (406) 434-5222 for the current fee.

Fire Sprinkler & Fire Alarm Permit

Shelby has NO distinct local permit product for fire sprinkler or fire alarm systems. The Montana DLI Building Codes Bureau's certified-jurisdictions roster (updated 04/22/2026, verified via direct PDF text extraction) confirms Shelby is certified for Building (B) ONLY; the roster's own code key (B, P, M/G, E, M, SP, W) contains no distinct 'Fire' trade designation for ANY Montana jurisdiction, consistent with the statewide pattern that DLI does not certify a separate Fire trade. Shelby Municipal Code Title 8 (Fire Regulations) covers only the Volunteer Fire Department's organizational structure (Chapter 1, sections 8-1-1 through 8-1-13: creation, officers, chief, membership, equipment, arson suppression, right of entry, fire-hazard abatement) and Fireworks (Chapter 3) — it contains no sprinkler/alarm permit process or fee schedule. Fire protection system review for new construction and alterations is instead folded into the standard City of Shelby Building Permit (Shelby Municipal Code 10-1-2), under the state-adopted 2021 IBC/2021 IFC (Chapter 9, Fire Protection and Life Safety Systems), reviewed by the same City Building Official who handles all of Shelby's city-certified Building permits.

Reviewed 2026-07-22 · Source

Requirements

  • No separate Shelby Municipal Code chapter, application, or fee schedule exists for fire sprinkler or fire alarm permits — confirmed by direct review of Title 8 (Fire Regulations), which contains only the Volunteer Fire Department chapter (8-1-1 to 8-1-13) and a Fireworks chapter, neither of which establishes a permit process
  • The Montana DLI Building Codes Bureau's certified-jurisdictions roster does not certify a distinct 'Fire' trade for any jurisdiction in Montana (key: B=Building, P=Plumbing, M/G=Medical Gas, E=Electrical, M=Mechanical, SP=Pool, W=Wildland-Urban Interface — no 'F' for Fire exists in the key at all), so fire-suppression-system review in a Building-only-certified city like Shelby routes through the standard Building Permit rather than a distinct fire-authority permit
  • Fire protection systems (sprinklers, alarms) installed as part of new construction or alteration work are reviewed for code compliance as part of the standard City of Shelby Building Permit application under the state-adopted 2021 IBC/2021 IFC Chapter 9 (Fire Protection and Life Safety Systems), following the same 30-working-day plan review clock documented in this file's residential-building-permit entry (Shelby Municipal Code 10-1-2.C)
  • The Shelby Volunteer Fire Department (non-emergency (406) 450-8924, Chief Ron Buck, per the City's own website) is the local fire-service provider, but the City's live 'Fire Protection' webpage publishes only department contact information — no permit application, inspection process, or fee schedule of its own

Required documents

  • RequiredCity of Shelby Building Permit ApplicationThe same application used for this file's residential-building-permit entry; used to capture fire-suppression/fire-alarm scope of work since no separate fire-permit application exists

Fee schedule

Fee typeAmountNotes
Fire sprinkler / fire alarm scope of work (no distinct fee line item)No dedicated fire-sprinkler or fire-alarm fee exists in Shelby Municipal Code or in any Shelby Fire Department fee schedule — confirmed by direct review of Title 8 (Fire Regulations) and the City's Fire Protection webpage, neither of which publishes a fee. Where fire-protection-system work is bundled into a City Building Permit, it is billed under the same valuation-based schedule at Shelby Municipal Code 1-12-13 already documented in this file's residential-building-permit entry — this is an honest 'no distinct product' finding, not an invented fee.

Change Of Use / Certificate Of Occupancy Permit

Verified

Two governing layers apply to a commercial change of use or occupancy change in Shelby. First, Shelby Municipal Code 13-12-2.A requires a ZONING PERMIT from the Zoning Administrator prior to 'any change of use of any building or land,' and 13-12-2.C requires a CERTIFICATE OF COMPLIANCE before any nonconforming structure or use is changed or extended. Second, the state-adopted 2021 IBC (Montana Building Code, administratively adopted by Shelby Municipal Code 10-1-1) Section 111 (Certificate of Occupancy) independently requires the City Building Official to issue a certificate of occupancy before a 'change of occupancy' of a building or structure is made. Because Shelby's Zoning Administrator 'may also serve as the building inspector for the city' (13-12-1.A), both reviews are typically conducted by the same city office.

Verified 2026-07-22 · Source

Requirements

  • A zoning permit must be secured from the Zoning Administrator prior to any change of use of any building or land (Shelby Municipal Code 13-12-2.A); the zoning permit application may be combined with the building permit application (13-12-2.B.4)
  • A Certificate of Compliance is required before any nonconforming structure or use is changed or extended: at the time a building permit is requested, the Zoning Administrator surveys the structure and its use for conformity with applicable zoning ordinances, and the certificate must state specifically wherein the nonconforming use differs from Title 13's provisions (Shelby Municipal Code 13-12-2.C)
  • Under the state-adopted 2021 IBC (Montana Building Code) Section 111.1 (Change Of Occupancy): 'A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor' (Section 111.2 governs issuance; Montana's amendment ties issuance to Mont. Code Ann. § 50-60-107)
  • Zoning permits expire if the described work has not begun within 6 months of issuance; a single 6-month extension may be granted by the Zoning Administrator (13-12-2.D.1)
  • Applications for a zoning permit (other than temporary-use permits) must be accompanied by plans in duplicate showing lot dimensions, existing structures, and the proposed change (13-12-2.B.1-2)

Required documents

  • RequiredZoning Permit Application (change of use)Submitted to the Zoning Administrator at Shelby City Hall, (406) 434-5222; may be combined with the Building Permit Application per Shelby Municipal Code 13-12-2.B.4
  • OptionalCity of Shelby Building Permit ApplicationTriggers the Building Official's Certificate of Occupancy determination under the state-adopted 2021 IBC Section 111 when the change of use also involves a change of occupancy classification

Fee schedule

Fee typeAmountNotes
Zoning Permit / Certificate of Zoning Compliance Fee (change of use)Shelby Municipal Code 13-12-5.A sets fees 'by resolution,' cross-referenced to Shelby Municipal Code 1-12-15, which itself states only 'Refer to the current "schedule of fees and permits" on file at the City Hall or Department of Public Works' — no fixed dollar figure is published in the codified ordinances themselves. Confirmed via direct review of 13-12-5 and 1-12-15; this is an honest publication gap, not an invented number. Contact (406) 434-5222 for the current fee.
Building Permit / Certificate of Occupancy fee (if a Building Permit is also triggered)Per the valuation-based schedule at Shelby Municipal Code 1-12-13, starting at $23.50 for $1-$500 valuationSame fee schedule already documented in this file's residential-building-permit entry; no distinct Certificate-of-Occupancy line item exists separate from the general Building Permit fee table

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Shelby building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)View current record →All versions →

Permalink: /montana/toole-county/shelby/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: b5eab4a

Reproducible from PermitBase’s version-controlled dataset, commit b5eab4a.