Skip to main content
PermitBase

Sign Permit in Laurel, Montana

Required before erecting, constructing, moving, or displaying most signs within Laurel city limits, per the City of Laurel Sign Code (Laurel City Code Chapter 17.42, which adopts the Uniform Sign Code, 1997 Edition, by reference). Plans, specifications, and the review fee are submitted to the City of Laurel Building Department, which must grant a construction permit before any sign construction activity begins. Portable and banner signs additionally require a separate Temporary Sign Permit with calendar-limited display periods.

Verified 2026-07-22 · Source

When you need this permit

  • Plans and specifications and the required review fee for all signs (including those in the Entryway Zoning District) must be submitted to the City of Laurel Building Department prior to the start of construction; the Building Department must grant a construction permit before any sign construction activity (LMC 17.42.170.A)
  • All signs must be installed in compliance with the International Building Code (IBC) and applicable electrical codes enforced by the State of Montana (LMC 17.42.170.B)
  • Any change in sign construction or face -- other than changeable copy as defined in the chapter -- requires a new construction permit and fee (LMC 17.42.170.E)
  • Portable and banner (temporary) signs require a separate Temporary Sign Permit from the sign administrator: limited to one time for up to sixty days for a new or relocating business, or up to thirty consecutive days per calendar year (splittable into two fifteen-day periods) for an existing business advertising (LMC 17.42.060)
  • Certain sign types are exempt from the permit requirement altogether but must still conform to all other Chapter 17.42 requirements: construction signs of 16 sq. ft. or less, holiday lights/decorations, nameplates of 2 sq. ft. or less, public/emergency notices, real estate signs, political signs, interior signs not visible from the exterior, and directional signs up to 12 sq. ft./6 ft. height (LMC 17.42.070)
  • Sign size, height, setback, and permitted-use standards vary by zoning district and sign type per the Table - Signs by Zoning District and Table - Sign Requirements in LMC 17.42.130-17.42.140 (e.g., freestanding signs oriented to interstate traffic may reach 40 ft. height/350 sq. ft.; total sign area on a property is generally capped at 2 sq. ft. per lineal foot of local street frontage)
  • The Entryway Zoning District, SE 4th Street Overlay District, and Downtown Overlay District each impose additional sign provisions on top of the base Chapter 17.42 requirements (LMC 17.42.080)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign PermitResolution No. R25-18, Building Permit Fees and Charges table, page 11
$1.00 per sq.ft.
Sign Plan Review FeesResolution No. R25-18, Building Permit Fees and Charges table, page 11
$2.00 per sq.ft.
Sign -- Face ChangeResolution No. R25-18, Building Permit Fees and Charges table, page 11 -- applies when only the sign face/copy changes (excludes routine changeable-copy content changes, which need no new permit per LMC 17.42.170.E)
$30.00 per face
Temporary Sign Permit (portable/banner signs)Resolution No. R25-18, Building Permit Fees and Charges table, page 11
$75.00

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Laurel?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Sign Final Inspection

    City of Laurel Building Department inspection for compliance with all applicable codes, including structure, wind load, and electrical hook-up (LMC 17.42.170.C)

See the full Laurel inspection guide — scheduling & re-inspection fees →

Tips

  • Total cost to install a new permitted sign is effectively $3.00 per square foot ($1.00/sq.ft. Sign Permit plus $2.00/sq.ft. Sign Plan Review Fees), per Resolution No. R25-18 -- budget both line items, not just the permit fee.
  • A sign-face-only change (new copy/graphics on an existing structure) is a flat $30.00 per face rather than the per-square-foot new-sign fees -- but routine changeable-copy content updates need no new permit at all.
  • Many small signs never need a permit: construction signs under 16 sq.ft., nameplates under 2 sq.ft., real estate and political signs (within their size/duration limits), and directional signs under 12 sq.ft. are all exempt under LMC 17.42.070.
  • Portable/banner signs are on the clock: a new or relocating business gets one 60-day temporary sign permit, while an existing business is capped at 30 days of banner/portable signage per calendar year (splittable into two 15-day windows).
  • No review timeline is published for this permit. The sign code does not reference the MCA 50-60-106(2)(c) single-family-dwelling checklist deadline (signs are not SFD construction) and Laurel handles sign permitting itself rather than routing it to the state, so the state Building Codes Bureau's ~3-week average does not apply either. Checked: LMC Chapter 17.42, the City of Laurel Building Department page (current and 2025 Wayback archive), and Resolution No. R25-18 -- none states a sign-permit turnaround. Contact the Building Department at (406) 628-4796 ext. 5304 for current review timelines.

Frequently asked questions

Laurel requires a sign permit for: Plans and specifications and the required review fee for all signs (including those in the Entryway Zoning District) must be submitted to the City of Laurel Building Department prior to the start of construction; the Building Department must grant a construction permit before any sign construction activity (LMC 17.42.170.A); All signs must be installed in compliance with the International Building Code (IBC) and applicable electrical codes enforced by the State of Montana (LMC 17.42.170.B); Any change in sign construction or face -- other than changeable copy as defined in the chapter -- requires a new construction permit and fee (LMC 17.42.170.E); Portable and banner (temporary) signs require a separate Temporary Sign Permit from the sign administrator: limited to one time for up to sixty days for a new or relocating business, or up to thirty consecutive days per calendar year (splittable into two fifteen-day periods) for an existing business advertising (LMC 17.42.060); Certain sign types are exempt from the permit requirement altogether but must still conform to all other Chapter 17.42 requirements: construction signs of 16 sq. ft. or less, holiday lights/decorations, nameplates of 2 sq. ft. or less, public/emergency notices, real estate signs, political signs, interior signs not visible from the exterior, and directional signs up to 12 sq. ft./6 ft. height (LMC 17.42.070); Sign size, height, setback, and permitted-use standards vary by zoning district and sign type per the Table - Signs by Zoning District and Table - Sign Requirements in LMC 17.42.130-17.42.140 (e.g., freestanding signs oriented to interstate traffic may reach 40 ft. height/350 sq. ft.; total sign area on a property is generally capped at 2 sq. ft. per lineal foot of local street frontage); The Entryway Zoning District, SE 4th Street Overlay District, and Downtown Overlay District each impose additional sign provisions on top of the base Chapter 17.42 requirements (LMC 17.42.080). If your project isn't listed, confirm with City of Laurel Building Department — city-certified for Building (B) and Swimming Pool (SP) only; Electrical, Plumbing, Mechanical, and Fuel/Gas permits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau at (406) 628-4796 ext. 5304 before starting work.

A new permitted sign costs $1.00 per square foot for the Sign Permit plus $2.00 per square foot for Sign Plan Review Fees ($3.00/sq.ft. total), per Resolution No. R25-18. Changing only the face/copy on an existing sign structure is a flat $30.00 per face. A temporary (portable/banner) sign permit is $75.00.

Laurel does not publish a plan-review timeline for this permit. Contact City of Laurel Building Department — city-certified for Building (B) and Swimming Pool (SP) only; Electrical, Plumbing, Mechanical, and Fuel/Gas permits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau at (406) 628-4796 ext. 5304 for current turnaround.

You'll need: Sign Plans and Specifications. Depending on your project, Laurel may also ask for: Common Signage Plan (multi-tenant/multi-lot properties only). See the required-documents checklist on this page for details on each.

Laurel requires 1 inspection(s) for a sign permit, in order: Sign Final Inspection. Schedule each through City of Laurel Building Department — city-certified for Building (B) and Swimming Pool (SP) only; Electrical, Plumbing, Mechanical, and Fuel/Gas permits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau ((406) 628-4796 ext. 5304).

Apply through City of Laurel Building Department — city-certified for Building (B) and Swimming Pool (SP) only; Electrical, Plumbing, Mechanical, and Fuel/Gas permits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau at 115 W 1st St, Laurel, MT 59044. Phone: (406) 628-4796 ext. 5304, email: jgonzales@laurel.mt.gov. Office hours: Monday-Friday, 8:00 am to 5:00 pm (fax (406) 628-2241). Official information: https://cityoflaurelmontana.com/1295/City-Building-Code-Enforcement.

Laurel, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code (building, plumbing, electrical, mechanical, swimming pool, WUI, etc.); non-certified trades within a certified jurisdiction, and all trades in non-certified areas, fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs and Current Codes pages (bsd.dli.mt.gov/building-codes-permits).; Laurel is a Montana DLI-certified jurisdiction for Building (B) and Swimming Pool (SP) ONLY within Laurel city limits — Jason Gonzales is the certified building official of record, (406) 628-4796. Laurel is NOT certified for Electrical (E), Plumbing (P), or Mechanical (M); those permits are issued directly by the state DLI Building Codes Bureau for all addresses within Laurel city limits. Source: Montana DLI Building Codes Bureau, 'CITY CODES BUILDING OFFICIAL PHONE JURISDICTION' certified-jurisdictions PDF (bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf), updated 04/22/2026 — Laurel row reads 'B, SP / Jason Gonzales / 628-4796 / City Limits'. Legend on that PDF: B = Building, P = Plumbing, M/G = Medical Gas, E = Electrical, M = Mechanical, SP = Pool, W = WUI (Wildland-Urban Interface).; Unincorporated Yellowstone County (outside Laurel and Billings city limits) does not appear on the DLI certified-jurisdictions list at all — every permit type there (Building, Electrical, Plumbing, Mechanical) is issued directly by the state Building Codes Bureau, the same routing documented for unincorporated Yellowstone County in the Billings jurisdiction file. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs list.; The City of Laurel's own Building Department webpage confirms this split directly: 'Electrical, Fuel/Gas, Mechanical and Plumbing permits must be obtained through the State of Montana' at bsd.dli.mt.gov/Building-Codes-Permits/permit-applications. Source: City of Laurel Building/Building Code Enforcement page, cityoflaurelmontana.com/building.; 2021 International Building Code (IBC) — adopted by City of Laurel Ordinance No. O22-01 (Aug. 9, 2022), codified at Laurel City Code Chapter 14.12, adopted by reference pursuant to MCA 50-60-301(1)(a) as provided by ARM 24.301.131(1)-(3) with Appendix C (Group U — Agricultural Buildings) and modified through ARM 24.301.146(1)-(44); statewide effective June 11, 2022. Section 101.1 amended to read 'Building Code of City of Laurel'; Section 1612.3 amended to reference the Flood Insurance Study for Yellowstone County, Montana and Incorporated Area dated November 6, 2013 (Ord. No. O21-02, 4-13-2021). Source: Laurel, MT Code of Ordinances, Chapter 14.12 (International Building Code, 2021 Edition), library.municode.com/mt/laurel.; 2021 International Residential Code (IRC) — adopted by City of Laurel Ordinance No. O22-03 (Sept. 13, 2022), codified at Laurel City Code Chapter 14.16, adopted by reference pursuant to MCA 50-60-301(1)(a) as modified by ARM 24.301.154(1)-(24) with Appendix Q (Tiny Houses) as permitted by ARM 24.301.154(2)(a); statewide effective June 11, 2022. Section R101.1 amended to read 'Residential Code for One- and Two-family Dwellings of City of Laurel' (Ord. No. O21-02, 4-13-2021). Source: Laurel, MT Code of Ordinances, Chapter 14.16 (International Residential Building Code, 2021 Edition), library.municode.com/mt/laurel.; 2021 International Existing Building Code (IEBC) — adopted by City of Laurel, codified at Laurel City Code Chapter 14.18, adopted by reference pursuant to MCA 50-60-301(1)(a) as provided by ARM 24.301.171(1)-(4); statewide effective June 11, 2022. Section 101.1 amended to read 'Existing Building Code of the City of Laurel' (Ord. No. O21-02, 4-13-2021). Source: Laurel, MT Code of Ordinances, Chapter 14.18 (International Existing Building Code, 2021 Edition), library.municode.com/mt/laurel.; 2021 International Energy Conservation Code (IECC) — adopted by City of Laurel, codified at Laurel City Code Chapter 14.22, declared the energy conservation code of the city for design of new buildings/additions, exterior envelopes, and HVAC/service-water-heating/electrical-distribution/illuminating systems; statewide effective June 11, 2022. Sections C101.1 and R101.1 amended to read 'Energy Conservation Code of the City of Laurel' (Ord. No. O21-02, 4-13-2021). Source: Laurel, MT Code of Ordinances, Chapter 14.22 (International Energy Conservation Code, 2021 Edition), library.municode.com/mt/laurel.; 2021 International Swimming Pool and Spa Code (ISPSC) — adopted by City of Laurel Ordinance No. O22-01 (Aug. 9, 2022), codified at Laurel City Code Chapter 14.23, adopted by reference pursuant to MCA 50-60-301(1)(a) and ARM 24.301.175(2), as modified by ARM 24.301.175(1)-(6); statewide effective June 11, 2022. Section 101.1 amended to read 'Swimming Pool and Spa Code of the City of Laurel'; Section 105.6.2 amended so fees are set by the city council fee-schedule resolution rather than the model-code fee table (Ord. No. O21-02, 4-13-2021). Laurel is DLI-certified for Swimming Pool (SP) permitting. Source: Laurel, MT Code of Ordinances, Chapter 14.23 (International Swimming Pool and Spa Code, 2021 Edition), library.municode.com/mt/laurel.; Laurel's Code of Ordinances Title 14 (Buildings and Construction) contains adoption chapters ONLY for the codes Laurel is DLI-certified to enforce (IBC, IRC, IEBC, IECC, ISPSC) — there is no locally-adopted Electrical, Plumbing, Mechanical, or Fuel Gas chapter in Title 14, corroborating the DLI certified-jurisdictions list: those trades are enforced directly by the state, not the city. Source: Laurel, MT Code of Ordinances, Title 14, library.municode.com/mt/laurel/codes/code_of_ordinances?nodeId=TIT14BUCO.; 2021 International Mechanical Code (IMC), 2021 International Fuel Gas Code (IFGC), 2021 Uniform Plumbing Code (UPC), and 2020 National Electrical Code (NEC) all apply within Laurel city limits as the statewide-adopted editions (effective June 11, 2022) but are administered directly by the Montana DLI Building Codes Bureau (Helena), not the City of Laurel, because Laurel holds no local certification for those trades. Source: Montana DLI Building Codes Bureau, Current Codes page, bsd.dli.mt.gov/building-codes-permits/current-codes.. Local amendments apply — see the Laurel overview page for the full list.

No. LMC 17.42.070 exempts several sign types from the permit requirement, including small construction signs (16 sq.ft. or less), nameplates (2 sq.ft. or less), real estate signs, political signs, interior signs not visible from outside, and small directional signs (12 sq.ft./6 ft. height or less). All other signs need a City of Laurel Building Department construction permit before installation.

Sources & verification

Verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Laurel building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.