Henderson building permits
VerifiedHenderson, Nevada — as published 2026-06-30.
Verified 2026-06-30 · Source
Codes adopted
Permit types & fees
Residential Building Permit — New Construction (Custom Single-Family)
VerifiedRequired for all new custom single-family dwellings in the City of Henderson. Covers structural construction, framing, envelope, and all associated systems. Plan check and inspection fees follow Henderson's Table A (Building Plan Check and Inspection — New Construction Fees). All MPE (mechanical, plumbing, electrical) plan checks and inspections are included in the Table A fee.
Verified 2026-06-30 · Source
Requirements
- Nevada State Contractor's license and City of Henderson business license required for contractor-pulled permits
- Homeowners may pull their own permit for owner-occupied single-family dwellings
- Apply via DSC Online portal at cityofhenderson.com or in person at 240 S Water St
- Plans must comply with 2024 IRC with Southern Nevada amendments (effective January 2, 2026)
- Energy compliance per 2024 IECC Climate Zone 3B required
- Plans must meet Table R301.2 climatic and geographic design criteria for Henderson's elevation
Required documents
- RequiredBuilding Permit ApplicationAvailable through DSC Online portal or in person at Development Services Center, 240 S Water St
- RequiredConstruction DrawingsComplete plans including site plan, floor plans, elevations, sections, and structural details drawn to scale
- RequiredEnergy Code Compliance Documentation2024 IECC Climate Zone 3B compliance documents for building envelope and mechanical systems
- OptionalContractor License and Business LicenseNevada State Contractor's license and Henderson business license (for contractor-pulled permits)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single-Family Custom — Plan Check (400 sf) | $2,945 | Henderson DSC Fee Schedule Table A, Single-Family — Custom, effective 10/01/2025. All MPE plan checks included. |
| Single-Family Custom — Plan Check (1,200 sf) | $3,355 | Table A, Single-Family — Custom. Plan check cost per additional 100 sf: $51 (400–1,200 sf range). |
| Single-Family Custom — Plan Check (2,000 sf) | $4,040 | Table A, Single-Family — Custom. Per add'l 100 sf: $86 (1,200–2,000 sf range). |
| Single-Family Custom — Plan Check (4,000 sf) | $4,890 | Table A, Single-Family — Custom. Per add'l 100 sf: $43 (2,000–4,000 sf range). |
| Single-Family Custom — Plan Check (8,000 sf) | $6,502 | Table A, Single-Family — Custom. Per add'l 100 sf: $81 (4,000–8,000 sf range). |
| Single-Family Custom — Inspection (400 sf) | $796 | Table A inspection fee. All MPE inspections included. |
| Single-Family Custom — Inspection (1,200 sf) | $1,516 | Table A inspection fee. Per add'l 100 sf: $90 (400–1,200 sf range). |
| Single-Family Custom — Inspection (2,000 sf) | $2,877 | Table A inspection fee. Per add'l 100 sf: $170 (1,200–2,000 sf range). |
| Single-Family Custom — Inspection (4,000 sf) | $3,725 | Table A inspection fee. Per add'l 100 sf: $42 (2,000–4,000 sf range). |
| Single-Family Custom — Inspection (8,000 sf) | $5,882 | Table A inspection fee. Per add'l 100 sf: $54 (4,000–8,000 sf range). |
Residential Addition / Remodel Permit
VerifiedRequired for additions, structural alterations, and remodels of single-family and multi-family dwellings in Henderson. Fees are based on square footage of work area per Table A. Dwelling remodel projects (non-addition interior remodels) use the Miscellaneous Table B dwelling-remodel rate.
Verified 2026-06-30 · Source
Requirements
- Room additions, structural modifications, second-story additions
- Basement or garage conversions to living space
- Kitchen and bathroom remodels involving structural work
- Covered patio additions and deck enclosures
- Apply through DSC Online portal or in person at Development Services Center
- Plans must comply with 2024 IRC with Southern Nevada amendments
Required documents
- RequiredBuilding Permit ApplicationAvailable via DSC Online or in person at 240 S Water St
- RequiredConstruction DrawingsPlans showing scope of work, dimensions, structural details, and connection to existing structure drawn to scale
- OptionalEnergy Code Compliance (if conditioned space added)2024 IECC Climate Zone 3B compliance for additions increasing conditioned floor area
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single-Family Residential Addition — Plan Check (200 sf) | $1,398 | Henderson DSC Fee Schedule Table A, Single-Family Residential — Addition, effective 10/01/2025. Per add'l 100 sf: $19. |
| Single-Family Residential Addition — Plan Check (1,000 sf) | $1,601 | Table A. Per add'l 100 sf: $16 (600–1,000 sf range). |
| Single-Family Residential Addition — Plan Check (2,000 sf) | $1,761 | Table A. Per add'l 100 sf: $15 (1,000–2,000 sf range). |
| Single-Family Residential Addition — Plan Check (4,000 sf) | $2,061 | Table A. Per add'l 100 sf: $15 (2,000–4,000 sf range), then $52 per 100 sf over 4,000 sf. |
| Single-Family Residential Addition — Inspection (200 sf) | $389 | Table A inspection fee. |
| Single-Family Residential Addition — Inspection (1,000 sf) | $1,555 | Table A. Per add'l 100 sf: $97 (200–600 sf range), $39 (600–1,000 sf range). |
| Single-Family Residential Addition — Inspection (2,000 sf) | $1,943 | Table A. Per add'l 100 sf: $39 (1,000–2,000 sf range). |
| Dwelling Remodel — First 200 sf | $817 | Table B — Miscellaneous Building Items, Dwelling Remodel (Single or Multifamily). First 200 sf = $817, each additional 100 sf = $211. |
| Dwelling Remodel — Each Additional 100 sf (beyond first 200 sf) | $211 | Table B — Miscellaneous Building Items. |
Electrical Permit
VerifiedRequired for standalone electrical work in Henderson, including panel upgrades, new circuits, service changes, EV charger installations, and appliance hookups. Governed by the 2023 NEC with Southern Nevada local amendments (effective January 2, 2026). Fees per Table C — Building MPE Items.
Verified 2026-06-30 · Source
Requirements
- Installation, replacement, or repair of any hard-wired electrical system
- Panel upgrades and service entrance changes
- New circuits or rewiring
- Electric vehicle charger (EV receptacle) installation
- Generator electrical connections
- Nevada State Contractor's license required for contractor work
- Note: For new construction, electrical is included in the Table A building permit fee — standalone Table C fees apply to alterations/replacements
Required documents
- RequiredBuilding / Electrical Permit ApplicationAvailable via DSC Online portal or in person at 240 S Water St
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Service regardless of amperage (including first meter socket) | $190 | Henderson DSC Fee Schedule Table C — Building MPE Items, effective 10/01/2025 |
| Each individual meter socket / sub-panel / distribution board | $175 | Table C |
| Each appliance (no limit to HP, KW, or KVA rating) | $155 | Table C — applies to HVAC appliances, water heaters, dryers, ranges, etc. |
| Each general lighting outlet, receptacle outlet, or switch (multi-outlet assembly per 5 ft or portion) | $152 | Table C |
| EV receptacle (not part of a PV system) | $223 | Table B — Miscellaneous Building Items; EV receptacle fee |
| Each temporary power pole or service | $206 | Table C |
| Signal, alarm, television outlet, control panel, antenna, or telephone switchboard (over 50 volts) | $178 | Table C |
| Underwater light (each) | $190 | Table C |
| Other electrical inspections (per hour) | $286 | Table C |
| Stand-alone electrical plan check (hourly) | $429 | Table C |
Plumbing Permit
VerifiedRequired for standalone plumbing installations, alterations, and repairs in Henderson, including water heater replacements, fixture additions, re-piping, gas piping, and sewer/water service line work. Governed by the 2024 Uniform Plumbing Code (UPC) with Southern Nevada amendments. Fees per Table C — Building MPE Items.
Verified 2026-06-30 · Source
Requirements
- Installation, repair, or replacement of any plumbing system component
- Water heater replacement (any fuel type)
- New fixture installations
- Gas piping installation (1–4 outlets or additional outlets)
- Sewer connection or building sewer repair
- Re-piping (interior water piping)
- Nevada State Contractor's license required
- Note: Henderson uses UPC (Uniform Plumbing Code), not IPC
Required documents
- RequiredBuilding / Plumbing Permit ApplicationAvailable via DSC Online or in person at 240 S Water St
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water heater replacement | $81 | Henderson DSC Fee Schedule Table C — Building MPE Items, effective 10/01/2025 |
| Plumbing fixtures including piping (each 10 fixtures) | $189 | Table C — applies per 10 fixtures in a new installation or addition |
| Gas piping — 1 to 4 outlets | $267 | Table C |
| Gas piping — each additional 4 outlets | $120 | Table C |
| Building sewer install / repair / replacement (per 100 lf) | $257 | Table C |
| Sewer connection fee | $136 | Table C |
| Water piping replacement (each 2,500 sf) | $240 | Table C — Kitec and repipes |
| Rainwater systems (per drain) | $240 | Table C |
| Miscellaneous repair including repair or alteration of drainage or vent piping (each fixture) | $211 | Table C |
| Industrial waste pretreatment interceptor (sand/oil) | $286 | Table C |
| Solar water heaters | $261 | Table C |
| Gas line repair or tag | $245 | Table C |
| Stand-alone plumbing plan check (hourly) | $429 | Table C |
| Other plumbing and gas inspections (per hour) | $299 | Table C |
Mechanical / HVAC Permit
VerifiedRequired for standalone heating, ventilation, and air conditioning work in Henderson, including furnace replacements, A/C and heat pump installations, ductwork alterations, and boiler work. Governed by the 2024 Uniform Mechanical Code (UMC) with Southern Nevada amendments. Fees per Table C — Building MPE Items.
Verified 2026-06-30 · Source
Requirements
- Furnace replacement or new installation
- Air conditioner or heat pump installation or replacement
- Boiler, compressor, or heat pump installation
- Ductwork installation or major modification
- Ventilation systems not part of HVAC (bath fans, range hoods, kitchen exhausts)
- Nevada State Contractor's license required
- Note: Henderson uses UMC (Uniform Mechanical Code), not IMC
Required documents
- RequiredBuilding / Mechanical Permit ApplicationAvailable via DSC Online or in person at 240 S Water St
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Each furnace installation/relocation up to 100,000 BTU/hr (including ducts) | $360 | Henderson DSC Fee Schedule Table C — Building MPE Items, effective 10/01/2025 |
| Each furnace installation/relocation — each additional 100,000 BTU/hr (including ducts) | $227 | Table C |
| Boiler, compressor, or heat pump (regardless of HP or BTU/H, including controls) | $374 | Table C — applies to A/C condensers, heat pumps, mini-splits, etc. |
| Repair/alter/add heating, cooling, or evaporative appliance including controls | $319 | Table C |
| Ductwork only on existing units (per register) | $319 | Table C |
| Ventilation systems not part of HVAC (bath or kitchen exhaust, mechanical exhaust hood and ducts, appliance vent) | $370 | Table C |
| Fire and smoke damper (not part of a system under permit) | $135 | Table C |
| Appliance or permit not listed above | $153 | Table C — catch-all for unlisted mechanical items |
| All other mechanical not listed elsewhere | $353 | Table C |
| Other mechanical inspections (per hour) | $206 | Table C |
| Stand-alone mechanical plan check (hourly) | $360 | Table C |
Residential Reroof Permit
VerifiedRequired for roof replacement and re-roofing on residential properties in Henderson. Henderson's hot-dry climate (Climate Zone 3B) requires appropriate roofing materials per 2024 IRC and 2024 IECC. Henderson is predominantly below 3,900 ft elevation so ice barrier underlayment is not required. Reroof permits are assessed under the 'Repair — Commercial/Multi-Family/Single-Family' category in Henderson DSC Fee Schedule Table A, effective 10/01/2025. Henderson uses a square-footage-based fee system for all permit types — there is no separate flat reroof fee and no valuation-based fee for reroofing.
Verified 2026-06-30 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Re-roofing overlay
- Nevada State Contractor's license required for contractor-pulled permits
- Materials must comply with 2024 IRC and wind speed 98 mph design criteria
Required documents
- RequiredBuilding Permit ApplicationAvailable via DSC Online or in person at 240 S Water St
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Reroof — Plan Check (100 sf) | $129 | Henderson DSC Fee Schedule Table A — Repair (Commercial/Multi-Family/Single-Family), effective 10/01/2025. Reroof/repair work uses the Table A 'Repair' category, which is square-footage-based. No flat reroof fee exists; no valuation-based assessment applies. Additional 100 sf increments: 400 sf = $514; 1,000 sf = $900; 2,000 sf = $1,350; 5,000 sf = $2,443. |
| Reroof — Inspection (100 sf) | $440 | Table A 'Repair' inspection fee, effective 10/01/2025. Additional 100 sf increments: 400 sf = $995; 1,000 sf = $1,627; 2,000 sf = $1,785; 5,000 sf = $3,570. |
Solar Photovoltaic (PV) Permit
VerifiedRequired for rooftop solar panel and ground-mount PV system installations on residential and commercial properties in Henderson. Henderson's solar fees are among the most detailed in Southern Nevada. Governed by the 2023 NEC with SNBO amendments. Fees per Table B — Miscellaneous Building Items.
Verified 2026-06-30 · Source
Requirements
- Rooftop or ground-mounted solar PV system installation
- PV battery storage system installation
- EV receptacle installation as part of a PV system
- Nevada State Contractor's license required
- Systems must comply with 2023 NEC Southern Nevada amendments (effective January 2, 2026)
Required documents
- RequiredBuilding / Solar Permit ApplicationAvailable via DSC Online portal
- RequiredSite Plan / Roof PlanLayout showing panel placement, roof access pathways, and setbacks
- RequiredSingle-Line Electrical DiagramSystem wiring from panels to inverter to main panel
- RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
- RequiredStructural AnalysisConfirming roof structure supports panel weight at 98 mph wind design speed
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential PV — up to 10 kW system | $700 | Henderson DSC Fee Schedule Table B — Miscellaneous Building Items, Photovoltaic (Residential), effective 10/01/2025 |
| Residential PV — each additional 10 kW in the same system | $176 | Table B |
| PV battery system — 1 to 3 batteries | $239 | Table B |
| PV battery system — each additional battery | $71 | Table B |
| EV receptacle (not part of a PV system) — each | $223 | Table B — separate fee when EV charger is not combined with solar |
| Generator (not part of a PV system) — each | $394 | Table B |
| PV panel changeout | $127 | Table B — for replacing existing panels without system expansion |
| Commercial PV rooftop — up to 10 kW | $827 | Table B |
| Commercial PV rooftop — each additional 10 kW | $281 | Table B |
Accessory Dwelling Unit (ADU) Permit
VerifiedRequired for construction of a new accessory dwelling unit on a residential property in Henderson, including detached casitas, attached additions, and garage conversions. Henderson's Development Code (Title 19) §19.9.4.B.6 sets the ADU standards: an ADU is a building/structure (including a tiny house) on the same lot as a principal dwelling — detached, attached, or built within the primary residence — intended for occupancy as separate living quarters. Maximum size is the greater of 25% of the principal dwelling's floor area or 1,000 sq ft (a tiny house is capped at 400 sq ft excluding lofts); only one ADU is allowed per lot. Nevada NRS 278.257 (effective July 1, 2026, applicable to cities with 60,000+ population including Henderson) additionally requires Henderson to authorize ADUs on single-family-zoned residential property and bars Henderson, as a condition of ADU approval, from prohibiting separate kitchen facilities, requiring more than one additional parking space where existing plus street parking is adequate, imposing side/rear setbacks stricter than the primary residence, or (with narrow exceptions) requiring public street improvements; it also bars Henderson from prohibiting long-term rental use of the ADU, though transient/short-term lodging may still be prohibited. NRS 278.257 contains no owner-occupancy provision, and Henderson's Title 19 ADU standards (§19.9.4.B.6) do not impose one either. Building permit fees follow Henderson DSC Fee Schedule Table A (new detached ADU or attached addition) or Table B Dwelling Remodel (garage conversions), effective 10/01/2025.
Verified 2026-06-30 · Source
Requirements
- ADU maximum size: no more than 25% of the principal dwelling's floor area OR 1,000 sq ft, whichever is greater; a tiny house may be no larger than 400 sq ft (excluding lofts); an attached garage is not counted toward ADU size (Henderson Development Code §19.9.4.B.6.b.ii)
- No more than one ADU per lot (§19.9.4.B.6.b.iii); ADUs do not count toward maximum residential density (§19.9.4.B.6.b.iv)
- Setbacks: front and corner-side setbacks must match the principal dwelling; for a detached ADU 14 ft or less in height the side/rear setback is 5 ft; an ADU taller than 14 ft must meet the principal dwelling's setbacks; a detached ADU must be at least 6 ft from other buildings or be connected to the principal structure by a roof at least 10 ft wide (§19.9.4.B.6.b.i)
- Design: the ADU must be aesthetically compatible with the principal structure (materials, colors, building mass); if in a front or corner-side yard the design must match the principal structure; a rear-yard tiny house is exempt and must sit on a permanent foundation (§19.9.4.B.6.b.v)
- An ADU may not be sold apart from the principal dwelling on the same lot (§19.9.4.B.6.b.vi)
- ADU must meet all applicable building codes including 2024 IRC with Southern Nevada amendments; a manufactured ADU built to ANSI 119.5 must also comply with the adopted IRC (§19.9.4.B.6.b.vii)
- Per NRS 278.257 (eff. July 1, 2026): Henderson may not, as a condition of ADU approval, prohibit separate kitchen facilities, require more than one additional parking space where existing + street parking satisfies anticipated need, impose setbacks more restrictive than the primary residence, or (absent narrow exceptions) require public street improvements, and may not prohibit long-term rental use of the ADU (though transient/short-term lodging may still be prohibited) — these supersede any more-restrictive Title 19 condition as of that date. The statute contains no owner-occupancy provision
- Apply via DSC Online or in person at 240 S Water St
Required documents
- RequiredBuilding Permit ApplicationAvailable via DSC Online or in person at Development Services Center
- RequiredConstruction DrawingsFull construction drawings for ADU including site plan, floor plan, elevations, and utility connections
- RequiredEnergy Code Compliance2024 IECC Climate Zone 3B compliance documentation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| ADU — New Detached (Custom Single-Family schedule, Table A) | Varies by sq ft — plan check $2,945–$4,040; inspection $796–$2,877 | Henderson DSC Fee Schedule Table A, Single-Family — Custom rates; ADU typical sizes 400–1,200 sf. Effective 10/01/2025. Exact fee depends on square footage of ADU. Plan check from $2,945 (400 sf) to $4,040 (2,000 sf); inspection from $796 (400 sf) to $2,877 (2,000 sf). |
| ADU — Attached Addition (Single-Family Residential — Addition, Table A) | Varies by sq ft — plan check $1,398–$1,761; inspection $389–$1,943 | Table A Addition rates apply for attached ADU constructed as an addition to the primary dwelling. Effective 10/01/2025. Plan check from $1,398 (200 sf) to $1,761 (2,000 sf); inspection from $389 (200 sf) to $1,943 (2,000 sf). |
| ADU — Garage Conversion (Dwelling Remodel, Table B) | $817 first 200 sf, plus $211 per additional 100 sf | Table B Dwelling Remodel rate; most garage conversions are 400–600 sf. Effective 10/01/2025. |
Demolition Permit
VerifiedRequired for demolition of any structure in Henderson, including full building demolition, partial demolition, and accessory structure removal. Flat fee per Table B — Miscellaneous Building Items.
Verified 2026-06-30 · Source
Requirements
- Nevada State Contractor's license required for contractor-pulled demolition permits
- Utility disconnect verifications typically required before demolition
- Asbestos survey may be required for pre-1980 structures per Clark County health regulations
- Apply via DSC Online or in person at 240 S Water St
Required documents
- RequiredDemolition Permit ApplicationAvailable via DSC Online or in person at Development Services Center
- RequiredUtility Disconnection ConfirmationConfirmation that gas, electric, water, and sewer have been disconnected or capped
- OptionalAsbestos Survey (pre-1980 structures)Required for structures built before 1980 per Clark County health department regulations
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition permit (each structure) | $423 | Henderson DSC Fee Schedule Table B — Miscellaneous Building Items, effective 10/01/2025. Flat fee per demolition. |
Commercial Tenant Improvement Permit
VerifiedRequired for interior improvements to existing commercial spaces in Henderson, including remodels, buildouts, change of occupancy, and alterations. Fees are per Table A occupancy-based rates (TI/Remodel category). Henderson's commercial TI market is large given its position as Nevada's 2nd-largest city.
Verified 2026-06-30 · Source
Requirements
- Nevada State Contractor's license and Henderson business license required
- Plans must comply with 2024 IBC with Southern Nevada amendments
- Change of occupancy requires additional occupancy analysis
- ADA/accessibility compliance required per federal ADA and California Access Code (inapplicable) — use ICC A117.1
- Fire sprinkler plan check coordinated with Fire Safety Engineering (702-267-3630)
Required documents
- RequiredBuilding Permit ApplicationAvailable via DSC Online or in person at 240 S Water St
- RequiredConstruction DrawingsFull architectural, structural, mechanical, plumbing, and electrical plans for the TI scope
- OptionalFire Plan Check (if fire system affected)Separate fire plan check submission to Fire Safety Engineering if sprinklers, alarms, or fire suppression are modified
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Business TI/Remodel — Plan Check (500 sf) | $1,190 | Henderson DSC Fee Schedule Table A, Business — TI/Remodel (any business not specifically listed), effective 10/01/2025. Per add'l 100 sf: $31. |
| Business TI/Remodel — Plan Check (2,000 sf) | $1,656 | Table A. Per add'l 100 sf: $13 (500–2,000 sf range). |
| Business TI/Remodel — Plan Check (5,000 sf) | $2,047 | Table A. Per add'l 100 sf: $25 (2,000–5,000 sf range). |
| Business TI/Remodel — Plan Check (10,000 sf) | $3,295 | Table A. Per add'l 100 sf: $5 (5,000–10,000 sf range). |
| Business TI/Remodel — Inspection (500 sf) | $1,285 | Table A inspection fee. Per add'l 100 sf: $87. |
| Business TI/Remodel — Inspection (2,000 sf) | $2,593 | Table A. Per add'l 100 sf: $50 (500–2,000 sf range). |
| Business TI/Remodel — Inspection (5,000 sf) | $4,089 | Table A. Per add'l 100 sf: $26 (2,000–5,000 sf range). |
Swimming Pool / Spa Permit
VerifiedRequired for installation of in-ground swimming pools, spas, hot tubs, and water features in Henderson. Henderson's hot desert climate drives high residential pool volume. Pool/spa permits are governed by the 2024 International Swimming Pool and Spa Code (ISPSC) with Southern Nevada amendments. Fees per Table B — Miscellaneous Building Items.
Verified 2026-06-30 · Source
Requirements
- Nevada State Contractor's license required
- Separate plumbing and electrical permits may be required for pool equipment (Table C fees apply)
- Gas line for pool heater requires a plumbing/gas permit
- Safety barrier (fence/gate) required per 2024 IRC Section R327 and 2024 ISPSC
- Apply via DSC Online or in person at 240 S Water St
- Standard Pool Plan (pre-approved design) available for faster processing
Required documents
- RequiredPool / Spa Permit ApplicationAvailable via DSC Online or in person at Development Services Center
- RequiredSite Plan showing pool location and setbacksPlot plan showing pool boundary, setbacks from property lines, structures, and utilities
- RequiredPool / Spa Construction DrawingsStructural drawings, equipment specifications, plumbing plan, and electrical plan
- RequiredBarrier / Safety Fence PlanPlan showing pool safety barrier per 2024 IRC R327 and ISPSC requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential pool/spa combination (in-ground) | $712 | Henderson DSC Fee Schedule Table B — Miscellaneous Building Items, Pools section, effective 10/01/2025 |
| Residential pool with septic system | $712 | Table B |
| Prefabricated pool / spa / hot tub (residential or commercial) | $294 | Table B — applies to above-ground or pre-fabricated units set in place |
| Commercial pool / spa combination | $1,098 | Table B |
| Standard Pool Plan (plan check only — for pre-approved designs) | $772 | Table B — plan check fee only for a standard pool plan package |
| Water feature | $607 | Table B — decorative water features, fountains |
| Fire feature, slide, bar-b-que (each) | $212 | Table B — add-on accessories to pool/spa permit |
Block / Screen Wall Permit
VerifiedRequired for construction of masonry block walls, screen walls, and non-masonry fences in Henderson. Common for property line walls, patio enclosures, and screen walls between residential lots. Henderson's arid climate and lot sizes make masonry block the dominant fence/wall material. Fees per Table B — Miscellaneous Building Items.
Verified 2026-06-30 · Source
Requirements
- Nevada State Contractor's license required for contractor-pulled permits; homeowner may self-permit in some cases
- Standard masonry wall design plans available from Henderson's Southern Nevada Approved Standard Designs
- Height and setback requirements per Henderson Development Code
- Masonry walls 0–6 ft high typically eligible for standard plan fees
Required documents
- RequiredWall / Fence Permit ApplicationAvailable via DSC Online or in person at Development Services Center
- RequiredSite Plan showing wall location and setbacksPlot plan with wall dimensions, setbacks from property lines, and grade information
- RequiredWall Design / Standard Plan PackageStandard design package (purchased from Henderson) or custom engineering drawings for non-standard walls
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Masonry fence/wall — Standard Plan design package (each design) | $878 | Henderson DSC Fee Schedule Table B — Miscellaneous Building Items, Walls and Fences section, effective 10/01/2025. One-time fee per standard plan design package. |
| Masonry fence/wall — Standard (0–6 ft high) — first 100 lf | $174 | Table B. Per 100 linear feet. |
| Masonry fence/wall — Standard (0–6 ft high) — each additional 100 lf | $87 | Table B |
| Masonry fence/wall — Special Design (engineer-stamped) — first 100 lf | $628 | Table B — for walls exceeding 6 ft or requiring engineered design |
| Masonry fence/wall — Special Design — each additional 100 lf | $135 | Table B |
| Non-masonry fence/wall — any height — first 100 lf | $294 | Table B — applies to wood, vinyl, chain-link, wrought iron, aluminum fences |
| Non-masonry fence/wall — each additional 100 lf | $18 | Table B |
| Retaining wall (concrete or masonry) — standard plan design package | $875 | Table B — one-time package fee |
| Retaining wall — standard — first 50 lf | $417 | Table B |
| Retaining wall — standard — each additional 50 lf | $18 | Table B |
| Retaining wall — special design — any height — first 50 lf | $632 | Table B |
| Retaining wall — special design — each additional 50 lf | $18 | Table B |
EV Charger / EVSE Permit
VerifiedHenderson has a dedicated, itemized 'EV receptacle' fee on its Development Services Center (DSC) Fee Schedule -- a standalone flat fee separate from the general electrical permit line items, distinct from (and lower than) a full solar PV permit. This entry covers a standalone EV charger/receptacle installation that is NOT part of a PV (solar) system; when an EV charger is installed together with rooftop solar, it is typically bundled into the solar-pv-permit instead (see the sibling solar-pv-permit entry in this dataset, which lists the same $223 EV receptacle line item for that combined scenario).
Verified 2026-07-20 · Source
Requirements
- Standalone electrical permit application via Henderson's DSC Online portal for EV charger/receptacle installation not combined with a PV system
- Nevada State Contractor's license required for the installing electrician/contractor
- Systems must comply with the 2023 NEC with Southern Nevada Building Officials (SNBO) amendments (effective January 2, 2026)
- If the EV charger is installed as part of a new or expanded solar PV system, it is billed under the solar-pv-permit's electrical scope instead of as a standalone EV receptacle
Required documents
- RequiredBuilding / Electrical Permit ApplicationAvailable via DSC Online portal
- RequiredSingle-Line Electrical DiagramCircuit wiring from panel/sub-panel to the EV charger/receptacle
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV receptacle (not part of a PV system) -- each | $223 | Henderson DSC Fee Schedule Table B -- Miscellaneous Building Items, effective 10/01/2025; also cross-listed on Table C -- Building MPE Items in the sibling electrical-permit entry of this dataset -- corroborated by an independent secondary source referencing the same $223 Henderson EV charger permit fee |
Sign Permit
VerifiedRequired for most permanent and many temporary signs installed on commercial, mixed-use, industrial, and residential/PS properties in Henderson, including wall, freestanding (monument/pylon), blade, projecting, awning/canopy, landscape wall, and window signs. Permanent sign types, area, height, and placement standards are governed by Henderson Development Code Chapter 19.13 (Signs); permitting itself is authorized under Henderson Municipal Code (HMC) Title 15 per Development Code Section 19.13.4.A.2. Applications are submitted to the Development Services Center (DSC), routed first to Community Development for sign-code review, then to the Building Department for building-code review. Fees are per DSC Fee Schedule Table B — Miscellaneous Building Items, Signs section.
Verified 2026-07-22 · Source
Requirements
- Sign must comply with Development Code Chapter 19.13 (Signs) and any applicable approved Master Sign Plan for the site
- Only complete Sign Permit Applications are accepted — submitted using the Sign Permit Submittal Checklist
- Applications are typically submitted to DSC by a Nevada Licensed Sign Contractor
- Paint-on window signs covering up to 25% of a window: no permit required
- Freestanding monument signs in commercial districts: max 80 sq ft area, max 8 ft height, 15 ft front setback, 1 per 250 ft of street frontage (Development Code Table 19.13.4-5)
- Pylon signs in multi-tenant commercial developments: max area/height vary by zoning district and tenant count (up to 300 sq ft / 30 ft in CC/CH/CT/CA districts with more than 5 tenants) per Table 19.13.4-6
- Wall sign area is governed by a sign-area ratio applied to tenant frontage (Table 19.13.4-9/19.13.4-10), not a flat square-footage cap
- Electronic Message Sign (EMS) component is prohibited within 250 ft of a building containing a residential use unless an intervening building fully blocks visibility, and prohibited within 250 ft of another EMS
- Each freestanding sign must display the property address on the sign face or supporting structure
Required documents
- RequiredSign Permit ApplicationDSC Online application; permit type code depends on sign type (BSI1 Sign, BSII Sign-Illuminated, BSIN Sign-Non-Illuminated, BSIP Sign-Political, BSIT Sign-Temporary, BSIV CD Temporary Sign & Banners, BSIY Sign Standard Plan)
- RequiredSign Permit Submittal ChecklistOnly complete applications matching this checklist are accepted for review
- OptionalMaster Sign Plan ReferenceIf the site has an approved Master Sign Plan (common for shopping centers and non-residential developments), the sign must conform to it
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Wall Mounted, Illuminated — any size (each) | $437 | Henderson DSC Fee Schedule Table B — Miscellaneous Building Items, Signs section, effective 10/01/2025 |
| Wall Mounted, Non-Illuminated — any size (each) | $437 | Table B |
| Freestanding, Illuminated — up to 400 sq ft of sign area | $1,135 | Table B. Each additional 400 sq ft of area: $981. |
| Freestanding, Non-Illuminated — up to 400 sq ft of sign area | $1,402 | Table B. Each additional 400 sq ft of area: $637. |
| Temporary Sign (each) | $366 | Table B |
Fire Sprinkler System Permit
VerifiedRequired for installation of new automatic fire sprinkler systems and for sprinkler modifications in existing systems in Henderson, including new commercial/multi-family construction, tenant improvement/remodel sprinkler work, and — per Henderson's local ordinance adopting the 2009 IRC residential sprinkler requirement — new single-family dwellings and townhouses. Plan review is performed by the Building and Fire Safety Department's Fire Safety Engineering Division. Henderson's fee schedule prices sprinkler permits by head count and lists numerous add-on review items (hydraulic calculations, standpipes, fire pumps, specialty suppression systems) separately. Fees per DSC Fee Schedule Table E — Fire Prevention Items (Fire Systems: Fire Sprinkler Systems section).
Verified 2026-07-22 · Source
Requirements
- Nevada-licensed fire protection/fire sprinkler contractor required
- New-construction sprinkler system fees are tiered by head count (1-20 through 351+ heads) and each tier includes one hydraulic calculation
- Henderson Ordinance 2885 (adopted December 7, 2010; effective July 5, 2011) requires residential fire sprinklers per the 2009 International Residential Code (IRC) in covered new residential construction
- Tenant improvement/remodel sprinkler work (adding, relocating, or modifying heads in an existing system) is billed under a separate, lower TI/Remodel fee tier than new-construction systems
- Governed by the 2024 International Fire Code (IFC) — effective January 2, 2026 — and applicable NFPA standards (NFPA 13, 13R, 13D) as adopted by reference
- Submit via DSC Online using the Fire Safety Checklist for Fire Sprinkler Plans (or Fire Safety Checklist for Residential Fire Sprinkler Plans for 1- and 2-family dwellings) and the corresponding General Notes document
Required documents
- RequiredFire Sprinkler Permit ApplicationSubmitted via DSC Online to Fire Safety Engineering
- RequiredFire Safety Checklist for Fire Sprinkler Plans (or Residential Fire Sprinkler Plans checklist)Henderson-published submittal checklist; using the correct residential vs. commercial checklist reduces resubmittal cycles
- RequiredHydraulic CalculationsOne hydraulic calculation is included per new-construction fee tier; additional calculations are billed separately
- OptionalUnderground Fire Service PlansRequired when a new underground fire service line/lead-in is part of the scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Construction — 1-20 Heads (incl. 1 hydraulic calculation), single system | $647 | Henderson DSC Fee Schedule Table E — Fire Prevention Items, Fire Sprinkler Systems, effective 10/01/2025 |
| New Construction — 21-100 Heads (incl. 1 hydraulic calculation) | $1,433 | Table E |
| New Construction — 101-200 Heads (incl. 1 hydraulic calculation) | $1,861 | Table E |
| New Construction — 201-350 Heads (incl. 1 hydraulic calculation) | $2,335 | Table E |
| New Construction — 351 or greater Heads (incl. 1 hydraulic calculation) | $2,853 | Table E |
| Standard Plan IRC (each) — 1-20 Heads (incl. 1 calc) | $359 | Table E — residential standard-plan rate; each additional hydraulic calculation is $87 |
| Tenant Improvement/Remodel — 1-4 Heads, single system | $297 | Table E — lower TI/remodel tier, distinct from new-construction rates |
| Tenant Improvement/Remodel — 5-20 Heads, single system | $339 | Table E |
| Additional Hydraulic Calculation (NFPA 13, 13-M) — per calculation | $391 | Table E |
| Additional Hydraulic Calculation (NFPA 13-D, 13-DE, 13-R, 13-RE & 14) — per calculation | $156 | Table E |
| Fire Pump (each) | $2,473 | Table E |
| Fire Standpipe System — per outlet | $183 | Table E |
| Underground Fire Service Plan Check — Residential | $642 | Table E |
| Underground Fire Service Inspection — Residential | $615 | Table E |
Fire Alarm System Permit
VerifiedRequired for installation of new fire alarm systems (initiating and indicating appliances) and associated ancillary equipment in commercial buildings in Henderson, including voice evacuation, graphic annunciators, highrise/campus network systems, emergency responder radio systems, and two-way communication systems. Plan review is performed by the Building and Fire Safety Department's Fire Safety Engineering Division, documented separately from fire sprinkler plan review with its own submittal checklist. Fees per DSC Fee Schedule Table E — Fire Prevention Items (Fire Alarm System section).
Verified 2026-07-22 · Source
Requirements
- Nevada-licensed fire alarm contractor required
- Base fee tiered by total device count in a single system: 1-250, 251-500, 500-1,000, then a per-200-device increment above 1,000
- Governed by the 2024 International Fire Code (IFC) — effective January 2, 2026 — and NFPA 72 as adopted by reference
- Ancillary equipment (fan coils/dampers, magnetic hold-opens, hi/lo alarms, voice evacuation, graphic annunciators, network systems, emergency responder radio systems, two-way communication) is priced and reviewed separately from the base device-count fee
- Submit via DSC Online using the Fire Safety Checklist for Fire Alarm Plans; projects with a graphic annunciator also require the Fire Safety Checklist for Fire Alarm Annunciator Plans
- LVMPD and SNACC radio communications passthrough fees apply, in addition to City radio fees, for emergency responder radio system components
Required documents
- RequiredFire Alarm Permit ApplicationSubmitted via DSC Online to Fire Safety Engineering
- RequiredFire Safety Checklist for Fire Alarm PlansHenderson-published submittal checklist for fire alarm system plans
- OptionalFire Safety Checklist for Fire Alarm Annunciator PlansRequired in addition to the base Fire Alarm Plans checklist when the system includes a graphic annunciator panel
- RequiredGeneral Notes - Fire AlarmHenderson-published standard general notes sheet referenced on submitted fire alarm plans
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Alarm System (all initiating and indicating appliances) — 1-250 Devices, single system | $1,216 | Henderson DSC Fee Schedule Table E — Fire Prevention Items, Fire Alarm System section, effective 10/01/2025 |
| 251-500 Devices, single system | $1,993 | Table E |
| 500-1,000 Devices, single system | $2,666 | Table E |
| Each Additional 200 Devices above 1,000 (same system) | $875 | Table E |
| Fan Coils — per device | $134 | Table E — Additional Fire Alarm Items, Ancillary Equipment |
| Dampers — per device | $134 | Table E |
| Magnetic Hold-opens — per device | $140 | Table E |
| Hi/Lo Alarms (each) | $160 | Table E |
| Voice Evacuation — per system | $760 | Table E |
| Graphic Annunciator Review (each) | $1,922 | Table E |
| Highrise Building Network System — each system | $1,309 | Table E |
| Campus Building Network System — up to 5 monitored panels or nodes | $689 | Table E. Each additional 5 monitored panels or nodes: $254. |
| Emergency Responder Radio System — base and up to 5 antennas | $1,130 | Table E. Each additional 5 antennas: $384. LVMPD/SNACC radio communications passthrough fees apply in addition to City radio fees. |
| 2-Way Communication System — base and up to 5 call boxes | $825 | Table E. Each additional 5 call boxes: $324. |
Change of Occupancy / Certificate of Occupancy Permit
VerifiedCovers a change of occupancy classification for an existing building or tenant space where no building modifications are required or completed, plus issuance of a Temporary Certificate of Occupancy and its extension. Henderson prices these as a distinct 'Occupancy Certificates' line item on DSC Fee Schedule Table B — Miscellaneous Building Items. Where the new occupancy DOES require construction or system modifications, the project is instead processed (and fee'd) under the commercial-tenant-improvement-permit entry in this dataset, whose inspections list already includes a 'Final / Certificate of Occupancy' step for that scenario. Henderson's Fire Prevention fee schedule (Table E) separately lists a lower-dollar 'Fire Prevention Contributions' figure for the same three occupancy-certificate items; it is not publicly documented whether that fire-side figure is included within the Table B total shown here or billed as an additional line, so treat the Table B figures below as the confirmed baseline and verify the full total with DSC before budgeting.
Verified 2026-07-22 · Source
Requirements
- Applies when no building modifications are required or completed to support the new use/occupancy classification — this is the Table B 'no building modifications' rate
- If modifications are required to support the new occupancy, the project is processed under the commercial-tenant-improvement-permit (Table A rates) instead of this standalone product
- A Temporary Certificate of Occupancy may be issued ahead of final Certificate of Occupancy, with a separate extension fee if more time is needed
- Apply via DSC Online or in person at 240 S Water St
- Fire Safety Engineering sign-off is part of occupancy certificate issuance — Table E lists a parallel 'Fire Prevention Contributions' fee for the same three items, indicating fire review is a required component of the process even when no fire-system construction is involved
Required documents
- RequiredChange of Occupancy / Certificate of Occupancy ApplicationAvailable via DSC Online or in person at Development Services Center, 240 S Water St
- OptionalLife Safety Narrative or PlanDescription of the new use and life-safety provisions, as requested by DSC or Fire Safety Engineering to confirm the space is adequate for the new occupancy classification without modification
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Temporary Certificate of Occupancy (each) | $862 | Henderson DSC Fee Schedule Table B — Miscellaneous Building Items, Occupancy Certificates section, effective 10/01/2025 |
| Temporary Certificate of Occupancy Extension (each) | $227 | Table B |
| Change of occupancy — no building modifications required or completed | $681 | Table B. Note: Henderson's Table E (Fire Prevention, Activity, Renewable & Other Fees) separately lists a 'Fire Prevention Contributions' figure of $359 (Temporary CO), $202 (extension), and $379 (change of occupancy) for the same three items — it is not documented whether these fire-side figures are included in the Table B totals above or billed additionally. Confirm the full cost with DSC (702-267-3650) before budgeting. |
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Henderson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.