Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Single- and Two-Family Dwellings)
VerifiedRequired for new construction of single-family homes, duplexes, townhouses, and manufactured/modular homes in Fernley. Combined building/electrical/plumbing/mechanical permit reviewed against the City of Fernley's adopted codes (2024 IBC/IRC/IMC/IFGC/IECC/UPC/UMC with 2023 NEC, plus 2024 NNICC amendments; 2018-code submittals still accepted until January 1, 2026). Applications are processed through the SmartGov Community Portal.
Verified 2026-07-03 · Source
Requirements
- Completed, signed residential building permit application with all contractor and sub-contractor information
- Two (2) sets of plans, all sheets stamped/dated/signed by design professional, contractor, or owner/builder (Owner/Builder Affidavit required if owner-builder permit)
- Site plan meeting the City of Fernley Building Site Plan Requirements Checklist (APN, north arrow, scale, 5-ft contour elevations, property lines/dimensions, easements/ROW, setbacks, utilities, stormwater drainage, flood hazard boundary if applicable)
- Architectural plan sheets: floor plan, roof plan, elevations, sectional building drawings, wall sections, exterior column sections, braced wall panels
- REScheck energy compliance report, signed/stamped by preparer
- Structural plan sheets: foundation design and details, brace/shear wall designs and anchorage to foundations, plus structural calculations
- Truss calculations and truss submittal verification letter
- Mechanical plans and system calculations per ACCA Manuals S, D, and J (engineered or stamped/signed by contractor)
- Electrical plans and electrical load calculations (engineered or stamped/signed)
- Plumbing plans (engineered or stamped/signed)
- Special inspections documentation if required (e.g., post-tension slabs require engineer's stamp/date/signature)
- Proof of water/sewer prepayment if applicable; Architectural Review Committee approval if in Desert Lakes or Miller Meadows subdivisions; proof of any approved zoning setback deviation
- Completed New Connection Form for water/sewer utilities; 'Request for Will Serve' application if new construction is not within an existing subdivision
- Design must meet City of Fernley/2024 NNICC climatic and geographic design criteria: Seismic Design Category D2, 120 mph basic wind speed (Special Wind Region), 18-inch minimum frost depth, 30 psf ground snow load per IBC Table 1608.2.1, Winter Design Temp 11 F
Required documents
- RequiredResidential Building Permit ApplicationCity of Fernley Building & Safety Division residential application (REV 05/2023), submitted via the SmartGov Community Portal
- RequiredResidential Submittal ChecklistChecklist of all required plan sheets, calculations, and supporting documents for new residential construction
- RequiredBuilding Site Plan Requirements ChecklistCity of Fernley checklist for site plan content (general info, project info, utilities, stormwater, critical areas) with a typical site plan example diagram
- RequiredNew Connection FormWater/sewer utility new-connection application, submitted with the building permit for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential/Commercial/Industrial/Miscellaneous construction not separately scheduled | Based on the current ICC Building Valuation Data (BVD) tables and/or written contract value (whichever is higher), applied to the City of Fernley Building Permit Fee Schedule (BPFS) | City of Fernley Resolution 20-009, Exhibit A; Building Official sets valuation if a project cannot be valued by the standard table |
| Plan Review Fee | Additional 65% of the determined Building Permit Fee | City of Fernley Resolution 20-009, Exhibit A; due at time of permit application |
| Manufactured/Modular Home Permit | $500 | City of Fernley Resolution 20-009, Exhibit A |
| Residential Foundation-Only Permit Application | $250 | City of Fernley Resolution 20-009, Exhibit A |
| Temporary Certificate of Occupancy | $200 | City of Fernley Resolution 20-009, Exhibit A |
| Third Plan Review (2nd revision resubmittal) | $98.00 per hour or quarter-hour fraction thereof | City of Fernley Resolution 20-009, Exhibit A, Note 2 |
| Permit Processing Fee (new construction, additions, repairs, TIs) | $25 | City of Fernley Resolution 20-009, Exhibit A |
Residential Addition / Remodel / Repair Permit
VerifiedRequired for additions, remodels, alterations, and repairs to existing one- and two-family dwellings in Fernley that are not exempt under adopted IRC Section R105.2 (e.g., exceed the exempt shed/deck/fence/retaining-wall thresholds). Reviewed against the City's adopted codes; combined building/electrical/plumbing/mechanical permit via the Residential Permit Application or the EZ Over-the-Counter application for smaller scope items.
Verified 2026-07-03 · Source
Requirements
- Building permit required for additions, remodels, and alterations affecting structural, fire, mechanical, electrical, or plumbing systems
- Work exempt from a building permit (IRC R105.2): one-story detached accessory structures (sheds) up to 200 sq ft; fences not over 7 ft; retaining walls not over 4 ft (unless supporting a surcharge); water tanks on grade up to 5,000 gallons; sidewalks/driveways; decks up to 200 sq ft that are not more than 30 in. above grade, unattached to the dwelling, and do not serve a required egress door
- Completed, signed residential building permit application with contractor/sub-contractor information, or the EZ Commercial/Residential application for smaller items (reroof, HVAC change-out, water heater, gas line, sewer/water line replacement, service change, stucco/siding, windows/doors)
- Site plan showing lot lines, setbacks, and existing/proposed structures for any addition that changes the building footprint
- Owner/Builder Affidavit required if filing as owner-builder (per NRS 624/NRS 278.573)
Required documents
- RequiredResidential Building Permit ApplicationFor additions/remodels affecting structure or major systems; submitted via SmartGov Community Portal
- OptionalBuilding Permit Application - EZ (Commercial and Residential)Over-the-counter application covering gas line, HVAC change-out, reroof, service change, sewer/water line replacement, stucco/siding, and window/door replacement for one- and two-family dwellings
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — based on ICC BVD valuation tables and/or contract value (whichever is higher), applied to the City's Building Permit Fee Schedule | Per City of Fernley Resolution 20-009, Exhibit A / current BPFS | City of Fernley Resolution 20-009, Exhibit A |
| Plan Review Fee | Additional 65% of the determined Building Permit Fee | City of Fernley Resolution 20-009, Exhibit A |
| Permit Processing Fee (additions, repairs, TIs) | $25 | City of Fernley Resolution 20-009, Exhibit A |
Electrical Permit (Tag / Service Change / New Installation)
VerifiedRequired for electrical installation, alteration, service change, or repair work in Fernley, governed by the 2023 National Electrical Code (NEC) as adopted by the City of Fernley. Small-scope electrical work (service change, tag inspection) uses the Gas or Electric Tag Application or the EZ application; new-construction electrical is included in the combined Residential/Commercial Building Permit Application.
Verified 2026-07-03 · Source
Requirements
- Electrical permit/tag required for installation, alteration, service change, or repair of hard-wired electrical systems
- Governed by the 2023 NEC as adopted by City of Fernley (Fernley Municipal Code Sec. 8.02.01) plus 2024 NNICC amendments
- Electrical work bundled into new construction is covered by the combined Residential/Commercial Building Permit Application; standalone tag work (utility service restoration, residential service under 400A) uses the Gas or Electric Tag Application
- Contractor must hold a current Nevada Contractor's License (NRS 624) and, where applicable, a City of Fernley business license
Required documents
- RequiredGas or Electric Tag ApplicationCity of Fernley Building Department handout/form for standalone electric tag, gas tag, or combined gas-and-electric tag inspections
- OptionalBuilding Permit Application - EZ (Commercial and Residential)Covers residential/commercial electrical service change (with existing/new amperage fields) as an over-the-counter permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit, Inspection & Tag — Residential Service under 400A, or Utility Service Restoration | $80 | City of Fernley Resolution 20-009, Exhibit A |
| New construction / larger electrical scope not separately scheduled | Based on ICC BVD valuation tables and/or contract value applied to the City's Building Permit Fee Schedule, plus 65% plan review fee | City of Fernley Resolution 20-009, Exhibit A |
| Hourly Inspection Rate (normal business hours), for work not otherwise scheduled | Actual cost | City of Fernley Resolution 20-009, Exhibit A |
| Hourly Inspection Rate (outside normal business hours, 2-hour minimum) | $103 | City of Fernley Resolution 20-009, Exhibit A |
| Re-Inspection Fee (third or subsequent inspection of same building element, each) | $207 | City of Fernley Resolution 20-009, Exhibit A |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Fernley, governed by the 2024 Uniform Plumbing Code (UPC) as adopted by the City of Fernley. New-construction plumbing is included in the combined Residential/Commercial Building Permit Application; standalone items (water heater, water/sewer line replacement) use the EZ Over-the-Counter application.
Verified 2026-07-03 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, gas piping, or water/sewer service lines
- Governed by the 2024 Uniform Plumbing Code (UPC) as adopted by City of Fernley (Fernley Municipal Code Sec. 8.02.01) — not the International Plumbing Code
- New-construction plumbing bundled into the Residential/Commercial Building Permit Application; standalone water heater, water line, or sewer line replacement uses the EZ Over-the-Counter application
- Manometer/gas-line pressure testing required per adopted code for gas piping work
Required documents
- RequiredBuilding Permit Application - EZ (Commercial and Residential)Covers standalone water heater/boiler replacement, water line replacement, and sewer line replacement (private property only) as an over-the-counter permit
- OptionalResidential Building Permit ApplicationFor new-construction plumbing systems bundled with the overall building permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water Heater, Wood Stove, or Gas Fireplace Insert Only | $80 | City of Fernley Resolution 20-009, Exhibit A |
| New construction / larger plumbing scope not separately scheduled | Based on ICC BVD valuation tables and/or contract value applied to the City's Building Permit Fee Schedule, plus 65% plan review fee | City of Fernley Resolution 20-009, Exhibit A |
| Hourly Inspection Rate (normal business hours), for work not otherwise scheduled | Actual cost | City of Fernley Resolution 20-009, Exhibit A |
| Re-Inspection Fee (third or subsequent inspection of same building element, each) | $207 | City of Fernley Resolution 20-009, Exhibit A |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installation, replacement, or alteration in Fernley, governed by the 2024 International Mechanical Code (IMC), 2024 Uniform Mechanical Code (UMC), and 2024 International Fuel Gas Code (IFGC) as adopted by the City of Fernley. Standalone HVAC change-outs use the EZ Over-the-Counter application; new-construction mechanical work is bundled into the Residential/Commercial Building Permit Application.
Verified 2026-07-03 · Source
Requirements
- Mechanical permit required for installation or replacement of furnaces, air conditioners, mini-split/heat pump systems, and gas lines/fireplaces
- Governed by the 2024 IMC, 2024 UMC, and 2024 IFGC as adopted by City of Fernley (Fernley Municipal Code Sec. 8.02.01), plus 2024 NNICC amendments
- EZ application requires: type of install (oil-to-gas, oil-to-oil, gas-to-gas), unit size (K BTUs, tons, or amps for heat pump), and gas line length if applicable
- New-construction mechanical plans and system calculations must follow ACCA Manuals S, D, and J (engineered or stamped/signed by contractor) per the Residential Submittal Checklist
Required documents
- RequiredBuilding Permit Application - EZ (Commercial and Residential)Covers HVAC furnace/AC/mini-split-heat-pump installation or replacement, gas fireplace insert, and gas line work as an over-the-counter permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water Heater, Wood Stove, or Gas Fireplace Insert Only | $80 | City of Fernley Resolution 20-009, Exhibit A (shared fee line covering gas fireplace inserts) |
| New construction / larger mechanical scope not separately scheduled | Based on ICC BVD valuation tables and/or contract value applied to the City's Building Permit Fee Schedule, plus 65% plan review fee | City of Fernley Resolution 20-009, Exhibit A |
| Hourly Inspection Rate (normal business hours), for work not otherwise scheduled | Actual cost | City of Fernley Resolution 20-009, Exhibit A |
| Hourly Inspection Rate (outside normal business hours, 2-hour minimum) | $103 | City of Fernley Resolution 20-009, Exhibit A |
Re-Roofing Permit
VerifiedRequired for residential and commercial re-roofing (tear-off or overlay) in Fernley. Submitted via the EZ Over-the-Counter application, reviewed against the City's adopted building code roofing provisions and 2024 NNICC design criteria for snow/wind loading.
Verified 2026-07-03 · Source
Requirements
- Building permit required for re-roofing; applicant specifies Tear Off or Overlay and roofing material (Asphalt, Metal, Tile, or Other) on the EZ application
- Roof assemblies must meet the City's adopted code (2024 IBC/IRC or 2018 IBC/IRC during the transition period) and 2024 NNICC design criteria: 30 lb/sq ft minimum ground snow load (per IBC Table 1608.2.1 for City of Fernley), 120 mph basic wind speed with Special Wind Region designation
- Ice barrier underlayment is NOT required by the City of Fernley design criteria (unlike several other Northern Nevada jurisdictions that require it above 5,300-5,500 ft elevation)
- Commercial re-roofing without alteration to openings may qualify for a valuation/permit-fee-only review (no plan review) per the City's fee schedule notes on similar OTC categories
Required documents
- RequiredBuilding Permit Application - EZ (Commercial and Residential)Over-the-counter reroof application specifying tear-off vs. overlay and roofing material type
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-roofing not separately scheduled | Based on ICC BVD valuation tables and/or contract value applied to the City's Building Permit Fee Schedule, plus 65% plan review fee | City of Fernley Resolution 20-009, Exhibit A (re-roofing falls under the general valuation-based fee provision; no dedicated flat re-roof fee line was found in the Resolution 20-009 fee schedule) |
| Hourly Inspection Rate (normal business hours), for work not otherwise scheduled | Actual cost | City of Fernley Resolution 20-009, Exhibit A |
| Re-Inspection Fee (third or subsequent inspection of same building element, each) | $207 | City of Fernley Resolution 20-009, Exhibit A |
Solar Photovoltaic (PV) / EV Charging Station Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems and electric vehicle charging stations on properties in Fernley. Dedicated Solar/EV Charging Station application distinct from the general building permit, covering both residential (one- and two-family) and commercial projects.
Verified 2026-07-03 · Source
Requirements
- Dedicated Solar/EV Charging Station Building Permit Application required, specifying system location (ground or roof mount), number of modules, existing electrical service panel size, whether an electrical service upgrade/derate is needed, whether existing roof retrofit is required, and battery storage system status (new/existing/none)
- For EV chargers: charger location (interior/exterior), size of existing service panel, and whether an electrical service upgrade is needed
- Project valuation (cost of labor and materials) must be stated
- Owner/Builder Affidavit required if filing as owner-builder
- Design professional (architect/engineer) information required if plans are engineered
- Systems reviewed against City of Fernley design criteria for roof structural loading (30 lb/sq ft ground snow load, 120 mph wind speed) and the adopted NEC for electrical interconnection
Required documents
- RequiredBuilding Permit Application - Solar / EV Charging StationCity of Fernley Building & Safety Division dedicated solar/EV application (REV 08/2024), covering both residential photovoltaic and commercial EV charging installations
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar PV / EV charger permit — valuation-based (project cost of labor and materials) | Based on ICC BVD valuation tables and/or written contract value applied to the City's Building Permit Fee Schedule, plus 65% plan review fee | City of Fernley Resolution 20-009, Exhibit A; no dedicated flat solar fee line was found — solar/EV falls under the general valuation-based provision |
| Hourly Inspection Rate (normal business hours), for work not otherwise scheduled | Actual cost | City of Fernley Resolution 20-009, Exhibit A |
EV Charger / Electric Vehicle Charging Station Permit
VerifiedRequired for installation of electric vehicle charging stations in Fernley. The City uses the same dedicated 'Building Permit Application - Solar / EV Charging Station' form (REV 08/2024) used for solar PV — see the solar-pv-permit entry — but this entry documents the EV-specific submittal fields and process distinctly, since EV charger installation is its own selectable section on that application.
Verified 2026-07-20 · Source
Requirements
- Use the dedicated Solar/EV Charging Station Building Permit Application (REV 08/2024), selecting the EV Charger section
- Specify charger location (interior/exterior), size of existing electrical service panel, and whether an electrical service upgrade/derate is needed to support the charger
- Project valuation (cost of labor and materials) must be stated
- Owner/Builder Affidavit required if filing as owner-builder
- Reviewed against the adopted NEC for electrical interconnection; a main panel service upgrade/derate, if required, is evaluated as part of the same submittal
Required documents
- RequiredBuilding Permit Application - Solar / EV Charging StationCity of Fernley Building & Safety Division dedicated solar/EV application (REV 08/2024) — select the EV Charger section for a standalone charging-station project
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV charger permit — valuation-based (project cost of labor and materials) | Based on ICC BVD valuation tables and/or written contract value applied to the City's Building Permit Fee Schedule, plus 65% plan review fee | City of Fernley Resolution 20-009, Exhibit A; no dedicated flat EV-charger fee line was found — EV charger installation falls under the same general valuation-based provision documented on the solar-pv-permit entry |
| Hourly Inspection Rate (normal business hours), for work not otherwise scheduled | Actual cost | City of Fernley Resolution 20-009, Exhibit A |
Demolition Permit
VerifiedRequired for demolition of any building or structure within Fernley city limits, including detached one- or two-family dwellings, townhouses, and accessory structures. Governed by the City's Demo Application requirements, including utility disconnection, asbestos abatement documentation, and site restoration.
Verified 2026-07-03 · Source
Requirements
- Demo Application required, identifying project/unit type (detached one- or two-family dwelling, townhouse, or accessory structure), building height, floor areas (living space, decks, porches, basement/storage, garage), and total structure area
- Valuation amount or contract amount must be provided (copy of contract required)
- Service connections must be disconnected and capped: water service turned off and sewer capped, gas service turned off and capped, electrical service de-energized — with sign-off from Owner, Public Works, NV Energy, and Southwest Gas (SWG)
- Asbestos Abatement Report required prior to demolition
- Construction documents and demolition schedule required, specifying on a plot plan all buildings to be demolished and dimensions from property lines
- Vacant lot must be filled and maintained to existing grade after demolition/removal; provisions required to prevent water accumulation or foundation damage to adjoining property
- Fire extinguisher and water supply (dust control/fire protection) required on job site during demolition; sanitary facilities and pedestrian protection required
- For structures affected by fire damage: floor plan showing areas to be demolished/repaired, itemized material replacement list, asbestos abatement report, fire extinguisher on site, and owner signature required
- Lead-based paint (LBP) debris from residential structures may be disposed of at a municipal or construction & demolition waste landfill per USEPA's 2003 rule; non-residential/commercial LBP debris is subject to state/federal hazardous waste determination requirements
- Owner-Builder permits pursuant to NRS 278.573 require a signed Owner-Builder Received Acknowledgement Form
Required documents
- RequiredDemo ApplicationCity of Fernley Building Division demolition permit application, including utility disconnection sign-off section and fire-damage supplement
- RequiredAsbestos Abatement ReportRequired for all demolitions prior to work commencing
- RequiredPlot Plan / Construction Documents and Demolition ScheduleShows all buildings to be demolished, dimensions from property lines, and dimensions to remaining structures
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit; by valuation | Minimum fee $100 | City of Fernley Resolution 20-009, Exhibit A ('Demolitions Permit; by Valuation, minimum fee $100') |
| Mobile Home Conversion to Real Property Permit | $100 (minimum $200 per Exhibit A formatting) | City of Fernley Resolution 20-009, Exhibit A |
| Plan Review Fee (if applicable to demolition scope) | Additional 65% of the determined Permit Fee | City of Fernley Resolution 20-009, Exhibit A |
Fence and Retaining Wall Permit
VerifiedFences and retaining walls in Fernley are exempt from a building permit below specific height thresholds under the adopted IRC/IBC Section 105.2 (R105.2 residential); a building permit is required only above those thresholds.
Verified 2026-07-03 · Source
Requirements
- Fences not over 7 feet (2,134 mm) high: EXEMPT from a building permit, both residential and commercial (adopted IRC/IBC Section 105.2, item 2)
- Fences over 7 feet high: a building permit IS required (not separately exempted by the code section published by the City)
- Retaining walls not over 4 feet (1,219 mm) in height, measured from the bottom of the footing to the top of the wall, and NOT supporting a surcharge: EXEMPT from a building permit (residential and commercial)
- Commercial retaining walls not over 4 feet are also exempt unless supporting a surcharge OR impounding Class I, II, or IIIA liquids (per the commercial exemption list, a stricter standard than residential)
- Retaining walls over 4 feet, or any wall supporting a surcharge regardless of height, require a building permit
Required documents
- RequiredBuilding Permit Application - EZ (Commercial and Residential) or Residential Building Permit ApplicationUsed for fences/retaining walls exceeding the exempt thresholds; no fence- or wall-specific dedicated application form was found on the City's Applications page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence/retaining wall permit (above exempt threshold) — valuation-based | Based on ICC BVD valuation tables and/or contract value applied to the City's Building Permit Fee Schedule, plus 65% plan review fee | City of Fernley Resolution 20-009, Exhibit A; no dedicated flat fence/wall fee line was found — falls under the general valuation-based provision |
Sign Building Permit
VerifiedRequired for installation of most permanent or temporary signs (free-standing, wall, directional, or construction signs) in Fernley. Uses a dedicated Sign Building Permit Application, distinct from the Residential, Commercial, and EZ Over-the-Counter applications, reviewed against the City's adopted building code and Title 32, Chapter 32.10 (Signs) of the Fernley Municipal Code.
Verified 2026-07-22 · Source
Requirements
- Dedicated Sign Building Permit Application required for permanent or temporary free-standing, wall, directional, or construction signs — not the Residential, Commercial, or EZ application
- Two sets of plans required (maximum size 42 in. x 30 in., minimum 8.5 in. x 11 in.) unless plans are already on file under a City of Fernley Standard Plan No.
- Plan submittal must include a Site Plan (proposed sign and project address, existing signs, property lines with dimensions, streets, easements, setbacks, north arrow, drawn to scale), a Footing Plan (footing size, location, materials, reinforcing, and all embedded anchoring such as anchor bolts, hold-downs, and post bases), and Elevations (all views with dimensions, vertical dimensions and heights, pole type/size/thickness/materials)
- Electrical plans required for illuminated signs: disconnect location, size and number of circuits, and lamp type (incandescent, fluorescent, or neon) specified
- Application must specify sign height above grade, sign type (free-standing/wall/directional/construction/other), and whether the sign is permanent or temporary
- Plans, specifications, and calculations prepared by a licensed professional must be wet-stamped, signed, and dated per NRS 625.140 and 625.565; plans must be prepared by a Nevada State licensed engineer, architect, or contractor
- Contractor must hold a current Nevada Contractor's License (NRS 624) and a City of Fernley business license; separate building/general contractor and electrical contractor information required on the application if the sign is illuminated
- Permit becomes invalid if work does not commence within 180 days of issuance, or is suspended/abandoned for 180 days after work commences; a minimum of one inspection approval is required as evidence work commenced; permits are not transferable — any change in occupancy, operation, tenancy, contractor of record, or ownership requires a new permit
Required documents
- RequiredSign Building Permit ApplicationCity of Fernley Department of Building and Safety dedicated sign application (revised 7/25/2011), covering applicant/owner/parcel info, sign type, valuation, and design professional/contractor information
- RequiredRecommendations/Guidelines for Sign Plan Submittal (Sign Plan Submittal Checklist)City of Fernley checklist specifying minimum required drawings (site plan, footing plan, elevations, electrical) and plan preparation/revision standards for sign permits
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit (Planning Fee) | $75 | City of Fernley Resolution 20-009, Exhibit B, Planning Fees — for a permanent sign |
| Temporary Sign Permit (Planning Fee) | $35 | City of Fernley Resolution 20-009, Exhibit B, Planning Fees — for a sign marked Temporary on the application |
| Building Permit Fee — based on ICC BVD valuation tables and/or contract value (whichever is higher), applied to the City's Building Permit Fee Schedule | Per City of Fernley Resolution 20-009, Exhibit A / current BPFS | City of Fernley Resolution 20-009, Exhibit A; no dedicated flat sign-structure fee line was found in Exhibit A — the sign structure/electrical falls under the general valuation-based provision |
| Plan Review Fee | Additional 65% of the determined Building Permit Fee | City of Fernley Resolution 20-009, Exhibit A |
| Re-Inspection Fee (third or subsequent inspection of same building element, each) | $207 | City of Fernley Resolution 20-009, Exhibit A |
| Hourly Inspection Rate (normal business hours), for work not otherwise scheduled | $69 | City of Fernley Resolution 20-009, Exhibit A |
Fire Sprinkler & Fire Alarm System Permit (North Lyon County Fire Protection District)
VerifiedRequired for installation of automatic fire sprinkler systems, fire alarm systems, and commercial hood/duct/automatic cooking extinguishing systems within Fernley city limits. Unlike other Fernley building permits, this permit is reviewed and issued by the North Lyon County Fire Protection District (NLCFPD) — an independent fire district, not a City of Fernley department — using NLCFPD's own Plan Review Application (Fire and Life Safety) and fee schedule. On the City's Building Permit Application-Commercial, both 'Proposed Fire Sprinkler System' and 'Proposed Fire Alarm System' are flagged '*separate permit required,' and the City will not approve a commercial building permit until NLCFPD returns a completed Building Permit Authorization Form.
Verified 2026-07-22 · Source
Requirements
- NLCFPD Plan Review Application (Fire and Life Safety) required for new construction, remodel, addition, or tenant improvement involving a fire sprinkler system, fire alarm system, or commercial hood/duct/automatic cooking extinguishing system
- City of Fernley will not approve a commercial building permit until the North Lyon County Fire Protection District Building Permit Authorization Form is returned completed, indicating whether fire plan review and/or fire inspection are required
- Sprinkler system shop drawings must conform to NFPA 13 (installation) and NFPA 25 (inspection/testing/maintenance); FDC, wall indicator valve (WIV), and/or post indicator valve (PIV) locations must be in an approved location; sprinkler risers must be in an approved location, accessible from the exterior of the building
- Fire alarm system plans and specifications must conform to NFPA 72
- Site plan must show existing fire hydrants within 400 feet of the building if unsprinklered, or 600 feet if sprinklered, plus dimensioned fire department access roadways and driveways
- Exit analysis and designated occupant load per floor/room required for all occupancy groups except Groups R-2, R-3 (as applicable under Section 101.2) and I-1
- Reviewed against the 2024 International Fire Code (with Appendices A, B, C, D, H), 2024 International Building Code, 2024 International Wildland-Urban Interface Code, and Northern Nevada Amendments to the 2024 IFC, per NLCFPD Ordinance 2025-01
- Plans/specs by a Nevada-registered architect (NRS 623) or engineer (NRS 625) must be wet-stamped, signed, and dated; a Nevada-licensed contractor (NRS 624) may prepare plans within their license discipline and must hold both a City of Fernley and State of Nevada business license
- A separate Hazardous Materials Permit (with its own fee under Section C of the NLCFPD fee schedule) is required in addition to this plan review if the end-user will use, store, or process hazardous materials
- Plan review fees must be paid in full before the City of Fernley will issue the associated building permit
Required documents
- RequiredPlan Review Application - Fire and Life SafetyNorth Lyon County Fire Protection District application (revised 1/2026) covering project information, building use/materials description, contractor/parcel/owner/architect-engineer info, and the fee worksheet
- RequiredNorth Lyon County Fire Protection District Building Permit Authorization FormCity of Fernley form that must be returned completed by NLCFPD before the City will approve the related commercial building permit; indicates whether fire plan review and/or fire inspection are required
- OptionalHazardous Materials PermitSeparate NLCFPD permit required in addition to the Plan Review Application if the end-user will use, store, or process hazardous materials
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Project Application Fee (Section A, by total project valuation) | $25 ($1-$500) up to $30,000 (greater than $30,000,001); e.g. $300 for $2,001-$25,000, $3,750 for $100,001-$500,000 | North Lyon County Fire Protection District Plan Review/Permit Fee Schedule, Section A |
| Plan Review Fee (Section B, by construction type and size) | Residential single $15; Residential (2-4 units) $65; Residential multi-family $65 minimum + $6/unit; Commercial up to 5,000 sf $145; 5,001-10,000 sf $250; 10,000-100,000 sf $300; 100,001-500,000 sf $500; greater than 500,001 sf $700 | NLCFPD Plan Review/Permit Fee Schedule, Section B |
| Fire Sprinkler System (plan review add-on) | Add $200.00 | NLCFPD Plan Review/Permit Fee Schedule, Section B; no separate line-item fee for a fire-alarm-only system was found on the published schedule — a standalone fire alarm project appears to be billed under the base Section B plan review fee for its construction type/size |
| Inspection Fee (Section D, by size) | Residential single-family: no charge; residential multi-family $65 (+$10/unit over 10); commercial up to 5,000 sf $100 through $1,000 for 300,001 sf and greater; Commercial Hood System add $100; Medical Clinics with medical gasses add $120 | NLCFPD Plan Review/Permit Fee Schedule, Section D |
| Hazardous Materials Permit (additional annual fee, if applicable) | Category I $400; Category II $1,450; Category III $2,800 (per IFC 2018 Part V / HMIS determination); Hazardous Materials Disposal Site $5,800; Explosives/Blasting $1,000 | NLCFPD Plan Review/Permit Fee Schedule, Section C |
Change of Use / Change of Occupancy Permit
Fernley does not have a standalone 'change of use' application. A change of use or occupancy classification for an existing commercial building or tenant space is filed on the same Building Permit Application-Commercial used for new construction, remodels, and tenant improvements, by checking 'Change Of Use' as the project type and stating the Previous Occupancy and Proposed Occupancy classifications. It is reviewed against the City's adopted 2024 International Existing Building Code (IEBC) — whose Chapter 10 governs Change of Occupancy — alongside the standard IBC occupancy/construction-type requirements.
Reviewed 2026-07-22 · Source
Requirements
- Building Permit Application-Commercial (REV 05/2023 or later) used for a change of use, with the 'Change Of Use' box checked among the project-type options (alongside New Construction, Site Improvements, Remodel/Addition, Demolition, HVAC-Rooftop, New Tenant)
- Application requires stating the Building Code Year and Edition, Previous Occupancy, and Proposed Occupancy classification, plus Occupancy Classification and Use, Type of Construction, and square footage for each use/occupancy on the project
- Governed by the City's adopted 2024 International Existing Building Code (IEBC), Fernley Municipal Code Sec. 8.02.01, which contains the Change of Occupancy provisions (IEBC Chapter 10) applicable when a building's occupancy classification changes
- Commercial Plan Submittal Checklist requirements apply if the change of use is accompanied by any construction, alteration, electrical, plumbing, or mechanical work (e.g., a detailed code analysis, floor plan showing occupancy loads/egress, and a Fire Authorization Form)
- Existing/Proposed Fire Sprinkler System and Existing/Proposed Fire Alarm System fields on the Commercial application must be answered; adding or altering fire protection systems as part of the occupancy change requires a separate permit from the North Lyon County Fire Protection District (see the fire-sprinkler-alarm-permit entry)
- A change in occupancy, operation, tenancy, contractor of record, or ownership under an existing permit requires that a new permit be issued — an existing permit is not transferable to a new use
Required documents
- RequiredBuilding Permit Application - CommercialCity of Fernley Building & Safety Division commercial application (REV 05/2023), used for a change of use by checking the 'Change Of Use' project-type box and completing the Previous Occupancy/Proposed Occupancy fields
- OptionalCommercial Plan Submittal ChecklistRequired only if the change of use is accompanied by construction/alteration work; covers site plan, floor plan, code analysis, and MEP plan requirements
- OptionalFire Authorization FormRequired if fire sprinkler/alarm systems are affected by the occupancy change or if North Lyon County Fire Protection District plan review is otherwise triggered
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — based on ICC BVD valuation tables and/or contract value (whichever is higher), applied to the City's Building Permit Fee Schedule | Per City of Fernley Resolution 20-009, Exhibit A / current BPFS | City of Fernley Resolution 20-009, Exhibit A; applies only if the change of use is accompanied by construction/tenant-improvement work |
| Plan Review Fee | Additional 65% of the determined Building Permit Fee | City of Fernley Resolution 20-009, Exhibit A |
| Building Permit Plan Check - Planning | 40% of Permit Fee | City of Fernley Resolution 20-009, Exhibit B, Planning Fees |
| Temporary Certificate of Occupancy | $200 | City of Fernley Resolution 20-009, Exhibit A |
| Zoning Verification Letter (optional) | $150 | City of Fernley Resolution 20-009, Exhibit B, Planning Fees; confirms a proposed use is allowed in the zoning district independent of a full permit application |
| Permit Processing Fee (applies to new construction, additions, repairs & TI's) | $25 | City of Fernley Resolution 20-009, Exhibit A; applies if the change of use is accompanied by construction/TI work |
Commercial Building Permit (New Construction / Additions / Tenant Improvements)
VerifiedRequired for commercial, industrial, and multi-family building work in Fernley: new construction, site improvements, remodels/additions, rooftop HVAC replacement, change of use, and tenant improvements ('New Tenant'). One combined permit covering structural, electrical, plumbing, and mechanical scopes, filed on the Building Permit Application-Commercial (REV 05/2023) with the signed Commercial Plan Submittal Checklist, and reviewed against the City's adopted codes (2024 IBC/IMC/IFC/IFGC/IECC/IEBC, 2024 UPC/UMC, 2023 NEC, plus 2024 NNICC amendments — mandatory for all new submittals since January 1, 2026). Fernley publishes NO separate tenant-improvement permit: a TI is the same commercial building permit with the 'New Tenant' project-type box checked, billed on the same valuation-based fee schedule (the only TI-specific published fee line is a $300 Engineering Tenant Improvement Plan Review in Resolution 20-009, Exhibit B).
Verified 2026-08-01 · Source
Requirements
- Only a properly licensed State of Nevada General Contractor or Nevada Registered Design Professional may apply for a commercial construction permit under Nevada law (NRS 624); owners, tenants, or employees of commercial buildings may NOT apply for permits nor perform construction on the building unless properly licensed, or the work is exempt under NRS 624.031 and IBC 105.2
- Any project involving more than 3 trades (e.g., structural, plumbing, electrical) must have a General Contractor in charge; a GC may not self-perform plumbing, electrical, refrigeration, HVAC, or fire protection without the specific NRS 624 license — properly licensed subcontractors are required for those trades
- Building Permit Application-Commercial (REV 05/2023) completed with: project type (New Construction / Site Improvements / Remodel-Addition / Demolition / HVAC-Rooftop / Change Of Use / New Tenant), trades in scope (structural/electrical/plumbing/mechanical), APN and address, tenant/business information and hours of operation, property owner, GC's Nevada Contractor's License and City business license, building code year and edition, previous and proposed occupancy, area of work and total building square footage, IBC construction type and occupancy classification per area, and project valuation (cost of construction labor and materials, with cost of site improvements stated separately)
- Additional Contractor Information page (REV 08/2024) listing architect, engineer, and electrical/mechanical/plumbing/stucco subcontractors with state license and City business license numbers
- Two (2) site plans, two (2) complete building sets, and a flash drive with PDF files; plans to scale in blue or black ink on clear unlined paper, minimum sheet size 18 x 24 inches; plans prepared and stamped/signed by a Nevada Licensed Design Professional or Nevada State Contractor
- Title sheet with code analysis, IBC occupancy type(s) and construction type, square footage of each occupancy group, plumbing fixture schedule, sheet index, vicinity map, APN, and preparer information
- Site plan showing all existing/proposed structures and ground-mounted equipment, utilities (with plan-and-profile sheets for water and wastewater), backflow devices, sewer laterals, domestic water meters and a separate irrigation meter, utility abandonments, easements, setbacks, ADA accessibility (parking, routes of travel, signage, ramps, detectable warnings, slopes), temporary and permanent erosion control, stand-alone retaining walls, and impervious-surface coverage percentage
- Grading and drainage plans (existing contours extending 100 feet beyond the property boundary; drainage must not directly impact neighboring sites) plus a Drainage Report prepared and stamped by a Nevada Licensed Professional Engineer per the Public Works Design Standards and Development Code
- Fully dimensioned floor plan with detailed code analysis and egress plan; architectural plans; elevations of all four sides; cross sections; electrical plans (one-line diagram, panel schedules, load calculations, emergency lighting photometrics, grounding/bonding); mechanical plans (equipment schedules, duct layout and sizing, kitchen hood details, makeup air and combustion air calculations, Manuals S/D/J); plumbing plans (minimum fixture calculations, fixture schedule with flow rates, waste/vent and water/sewer/gas sizing calculations, grease trap/interceptor plans)
- Energy conservation compliance per the adopted IECC: a passing DOE COMcheck report signed by the design professional
- Structural package: fully dimensioned foundation plan, floor and roof framing plans, structural details/notes, two (2) digitally stamped/signed sets of structural engineering calculations, two (2) wet-stamped truss calculation sets with an Engineer of Record letter of compliance, and two (2) stamped geotechnical report sets where required
- Fire Authorization Form; new or modified fire sprinkler and fire alarm systems require separate permits (disclosed as existing/proposed on the application)
- Special Inspection Agreement form completed and submitted for any special inspections required per IBC 1704
- Planning conditions of approval; ERC Application with existing and proposed water and sewer demand calculations; parking calculation (required vs. proposed spaces); landscaping plans; New Connection Forms (one for the building, one for irrigation); and the Engineering Department Review Criteria Form — grading over 50 cubic yards, service connections to City water/sewer infrastructure, or work in City right-of-way each trigger a separate engineering permit
- State Health Permit required for food-handling occupancies (Nevada EHS, (775) 684-5280); grease or sand/oil interceptor status and gallons declared on the application
- Design must meet the City of Fernley/2024 NNICC climatic and geographic criteria: Seismic Design Category D2, 120 mph basic wind speed (Special Wind Region), 18-inch minimum frost depth, ground snow load per IBC Table 1608.2.1
Required documents
- RequiredBuilding Permit Application-CommercialCity of Fernley Building & Safety Division commercial application (REV 05/2023) with project-type checkboxes including New Tenant (tenant improvement), Remodel/Addition, HVAC-Rooftop, Site Improvements, Demolition, and Change Of Use, plus the Additional Contractor Information page (REV 08/2024)
- RequiredCommercial Plan Submittal ChecklistCompleted and signed checklist that MUST accompany the building permit application; incomplete submittals are not accepted
- RequiredEngineering Department Review Criteria FormYes/no form identifying drainage, grading, driveway, water/sewer facility, and right-of-way work; asterisked items (grading over 50 cu yd, connections to City mains, ROW work) require a separate engineering permit
- RequiredFire Authorization FormFire review authorization listed on the Commercial Plan Submittal Checklist; new or altered fire sprinkler/alarm systems additionally require their own separate permits
- OptionalSpecial Inspection AgreementRequired whenever the project involves special inspections per IBC 1704
- OptionalERC Application and New Connection FormsERC Application with existing/proposed water and sewer demand calculations; New Connection Forms (one building, one irrigation) where new utility connections are proposed
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — commercial/industrial construction | Based on the current ICC Building Valuation Data (BVD) tables and/or the written contract value (highest value applies), applied to the City of Fernley Building Permit Fee Schedule (BPFS) | City of Fernley Resolution 20-009, Exhibit A; the Building Official sets the valuation whenever a project cannot be valued by the table |
| Plan Review Fee | Additional 65% of the determined Building Permit Fee | City of Fernley Resolution 20-009, Exhibit A; payment required at time of permit application |
| Permit Processing Fee (applies to new construction, additions, repairs & TI's) | $25 | City of Fernley Resolution 20-009, Exhibit A |
| Building Permit Plan Check - Planning | 40% of Permit Fee | City of Fernley Resolution 20-009, Exhibit B, Planning Fees |
| Commercial Foundation Only Permit Application | $2,500 | City of Fernley Resolution 20-009, Exhibit A (residential equivalent is $250 — the commercial foundation-only fee is 10x higher) |
| Tenant Improvement Plan Review (Engineering) | $300 | City of Fernley Resolution 20-009, Exhibit B, Engineering/Miscellaneous — the only TI-specific fee line the City publishes |
| ERC Calculation Sheet Review and Processing Fee | $300 | City of Fernley Resolution 20-009, Exhibit B |
| Temporary Certificate of Occupancy | $200 | City of Fernley Resolution 20-009, Exhibit A |
| Third Plan Review (2nd revision resubmittal) | $98 per hour or quarter-hour fraction thereof | City of Fernley Resolution 20-009, Exhibit A, Note 2; outside professional consultants billed at actual cost plus 15% administrative processing (Note 4) |
| Hourly Inspection Rate (normal business hours) | $69 | City of Fernley Resolution 20-009, Exhibit A |
| Hourly Inspection Rate (outside normal business hours, 2-hour minimum) | $103 | City of Fernley Resolution 20-009, Exhibit A |
| Re-Inspection Fee (third or more inspection of same building element, each) | $207 | City of Fernley Resolution 20-009, Exhibit A |
| Work Without Permit / Stop Work Order | $300, plus triple the original permit and inspection fees for a first offense (quadruple for a second offense) | City of Fernley Resolution 20-009, Exhibit A ($300 line) and Exhibit B ('Working Without a Permit' penalty multiplier) |
| Hazardous Materials Permit, Storage or Waste Disposal Permit | $1,000 | City of Fernley Resolution 20-009, Exhibit A; relevant to industrial occupancies storing regulated materials |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fernley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.