Skip to main content
PermitBase

Version history — Village of Los Ranchos de Albuquerque, New Mexico

This is PermitBase’s own verified record for Village of Los Ranchos de Albuquerque, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Village of Los Ranchos de Albuquerque’s actual law was at that time.

Permanent link to today’s record

/new-mexico/bernalillo-county/los-ranchos-de-albuquerque/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
  • 2026-08-25Superseded
  • 2026-08-21Superseded
  • 2026-08-17Superseded
  • 2026-08-01Superseded
    • Village of Los Ranchos de Albuquerque, New Mexico — Commercial Building Permit record added
  • 2026-07-23Superseded
    • Village of Los Ranchos de Albuquerque, New Mexico — Building Permit (New Construction, Addition, or Alteration) fee record added: Bernalillo County Building Permit Fee (Table 3-A, charged by the Village's designee for issuance) ($30.00 plus $4.00 per $1,000.00 of valuation)
    • Village of Los Ranchos de Albuquerque, New Mexico — Building Permit (New Construction, Addition, or Alteration) fee record added: Bernalillo County Building Plan Review Fee (Table 3-A) ($30.00 plus $2.00 per $1,000.00 of valuation)
    • Village of Los Ranchos de Albuquerque, New Mexico — EV Charger / Electric Vehicle Charging Station Permit fee record added: Electrical Permit Fee (EV charger circuit) ($23.50 administrative charge (all electrical permit applications) plus $4.00 for the applicable per-item line -- either 'Outlet: 30 amp or over including panels' or 'Residential Fixed Appliances (30 amps or over),' whichever the Building Official classifies a dedicated EV charger circuit under)
    • Village of Los Ranchos de Albuquerque, New Mexico — Change of Use / Certificate of Occupancy fee record updated: Valuation-based; no fixed dollar figure published for a standalone change-of-occupancy scope → $30.00 plus $4.00 per $1,000.00 of valuation (Building Permit Fee), plus $30.00 plus $2.00 per $1,000.00 of valuation (Building Plan Review Fee)
    • Village of Los Ranchos de Albuquerque, New Mexico — EV Charger / Electric Vehicle Charging Station Permit fee record removed: Electrical Permit Fee (EV charger circuit, valuation-based)
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Village of Los Ranchos de Albuquerque, New Mexico — Solar Panel Zone Review Permit record added
    • Village of Los Ranchos de Albuquerque, New Mexico — Solar Panel Zone Review Permit record removed
    • Village of Los Ranchos de Albuquerque, New Mexico — EV Charger / Electric Vehicle Charging Station Permit record added
  • 2026-07-18Initial record — coverage of Village of Los Ranchos de Albuquerque began