You are viewing the permanent link for the record currently in effect, published 2026-07-05.
Unincorporated Doña Ana County building permits
VerifiedUnincorporated Doña Ana County, New Mexico — as published 2026-07-05.
Verified 2026-07-05 · Source
Codes adopted
Permit types & fees
Single Family Dwelling Permit
VerifiedRequired for new single-family dwelling construction in unincorporated Doña Ana County. Issued directly by the Doña Ana County Community Development Department — Building Services Division (not the City of Las Cruces) for properties located in the unincorporated county. The county's Single Family Dwelling Permit Application is the official application bundle and includes a published 15-business-day review commitment.
Verified 2026-07-05 · Source
Requirements
- New single-family dwelling construction
- Recorded Proof of Ownership (Warranty Deed or Real Estate Contract) — copy obtainable at the County Clerk's Office, Room 200
- Proof Record Card from the County Assessor's Office, Room 220
- Proof of septic tank permit (NMED, (575) 288-2050) or a ready-willing-and-able letter from a sewer provider; utility bills are not accepted as proof
- Proof of a domestic well permit (State Engineer's Office, (575) 524-6161) or a ready-willing-and-able letter from a water provider; utility bills are not accepted as proof
- If more than one dwelling is proposed on the property, a septic permit is required for each dwelling
- SWPPP and NOI required for projects in a platted subdivision, or for projects outside a subdivision on a parcel exceeding one acre
- Driveway permit ($20.00) required if accessing a county road; a permit from NMDOT may be required if accessing a state road
- Homeowner-pulled permits additionally require a completed 'Instructions for Permit' form and a 'Responsibilities and Liabilities Acknowledgement'
- Electrical, plumbing, and mechanical permits are obtained separately, AFTER issuance of the building permit, by the licensed tradesman for each trade
Required documents
- RequiredSingle Family Dwelling Permit ApplicationCounty application packet; requires 1 set of plans drawn to 1/4" = 1.0-foot scale including a detailed site plan (setbacks, on-lot ponding, dimensions), foundation plan, floor plan, building elevations with height dimensions, wall cross-section, roof/floor framing plan, and an electrical plan (meter, condenser location, one-line diagram, load calculations)
- RequiredTruss Layout/SpecificationsCopy of truss layout/specifications from the manufacturer
- Required2021 RESCheck Energy CertificateSigned Energy Certificate demonstrating IECC 2021 compliance
- RequiredProof Record CardObtained from the Doña Ana County Assessor's Office, Room 220
- RequiredRecorded Proof of OwnershipWarranty Deed or Real Estate Contract, obtained from the County Clerk's Office, Room 200
- RequiredSeptic or Sewer DocumentationNMED septic tank permit copy, or a ready-willing-and-able letter from the sewer provider; utility bills not accepted
- RequiredWater Service DocumentationState Engineer's Office domestic well permit copy, or a ready-willing-and-able letter from the water provider; utility bills not accepted
- OptionalSWPPP and NOIRequired only for projects in a platted subdivision, or on parcels exceeding one acre outside a subdivision
- OptionalDriveway PermitRequired if the property accesses a county road ($20.00); a separate NMDOT permit may be required for state-road access — verify with DAC Engineering, (575) 525-6164
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Building Permit Fee — new single-family dwellings and duplexes | $0.20 per total square foot of floor area (measured to the outside walls; to the outside edge of the floor/roof-line for a carport, covered porch, or similar structure) | Doña Ana County Building Permit Fee Schedule (Section I, Permit Fees). Confirmed again on the county's Permit Requirements page and the Single Family Dwelling Permit Application ('Fee – Permit fee is based on $0.20 per total sq. ft.'). |
| Plan Review / Application Payment | 25% of the assessed permit fee due at application (non-refundable); remaining 75% due prior to permit issuance | Doña Ana County Building Permit Fee Schedule, Plan Review Fees section, and the Permit Requirements page |
| Driveway Access Permit (county road access) | $20.00 | Single Family Dwelling Permit Application, Engineering Requirements section |
| General Construction Valuation Fee Table (applies to construction types not otherwise itemized) | $45 for $1.00–$500; $45 + $1.00 per additional $100 (or fraction) up to $2,000; $60 + $10.00 per additional $1,000 (or fraction) from $2,001–$25,000; $290 + $8.00 per additional $1,000 (or fraction) from $25,001–$50,000; $490 + $6.00 per additional $1,000 (or fraction) from $50,001–$100,000; $790 + $5.00 per additional $1,000 (or fraction) above $100,000 | Doña Ana County Building Permit Fee Schedule, 'Other Construction' valuation scale |
Electrical Permit
VerifiedRequired for electrical installations, alterations, and repairs in unincorporated Doña Ana County. Obtained separately from — and only after — the building permit is issued, by a New Mexico-licensed electrical contractor. Fees are set by amperage tier for residential and commercial service, per the county's own Electrical Permit fee form.
Verified 2026-07-05 · Source
Requirements
- Cannot be issued until an associated building permit (or MHIP, for manufactured homes) has been issued, or in conjunction with an existing remodel not requiring a building permit
- New service, service change, remodel/addition, or miscellaneous electrical work (swimming pool, multi-building service, photovoltaic/solar, temporary power pole)
- One-line diagram required for any electrical service 200A and above
- Work must be performed by a New Mexico-licensed electrical contractor for permits pulled by a tradesman; homeowner permits are separately available for the homeowner's own primary residence
Required documents
- RequiredElectrical Permit Application/Fee FormCounty form listing contractor info, license number, service amperage tier, and inspection location; requires the associated Building Permit or MHIP number
- OptionalOne-Line DiagramRequired for any electrical service rated 200A and above
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential — 100A Service & Below | $45.00 | Doña Ana County Electrical Permit fee form |
| Residential — 101A-125A Service | $60.00 | Doña Ana County Electrical Permit fee form |
| Residential — 126A-150A Service | $75.00 | Doña Ana County Electrical Permit fee form |
| Residential — 151A-200A Service | $100.00 | Doña Ana County Electrical Permit fee form |
| Residential — Over 200A Service | $300.00 | Doña Ana County Electrical Permit fee form |
| Residential — Remodel/Addition | $60.00 | Doña Ana County Electrical Permit fee form |
| Commercial — 100A Service & Below | $130.00 | Doña Ana County Electrical Permit fee form (commercial tiers scale up to $1,275.00 for over 2000A service) |
| Commercial — Remodel/Addition | $175.00 | Doña Ana County Electrical Permit fee form |
| Misc. — Swimming Pool | $45.00 | Doña Ana County Electrical Permit fee form |
| Misc. — Photovoltaic (Solar PV) | $45.00 | Doña Ana County Electrical Permit fee form |
| Misc. — Temporary Power Pole | $45.00 | Doña Ana County Electrical Permit fee form |
| Misc. — Electrical Service/Multiple Building | $60.00 | Doña Ana County Electrical Permit fee form |
| Misc. — Minimum Fee Items Not Listed (TV, TEL, S/E, AL, AC, other) | $45.00 | Doña Ana County Electrical Permit fee form |
Plumbing / Mechanical Permit
VerifiedRequired for plumbing and mechanical (HVAC/gas) installations, alterations, and repairs in unincorporated Doña Ana County. Doña Ana County uses a single combined Plumbing/Mechanical permit form and fee schedule covering both trades, priced per fixture/appliance item. Obtained separately from — and only after — the building permit is issued.
Verified 2026-07-05 · Source
Requirements
- Cannot be issued until an associated building permit (or MHIP) has been issued, or in conjunction with an existing remodel not requiring a building permit
- Covers plumbing fixtures, water distribution, building drains, water heaters, swimming pools, water conditioners, backflow devices, evaporative coolers, ventilation/exhaust, refrigeration, ductwork, solar water heating, in-floor heating, gas piping, grease interceptors, and roof drains
- Gas unit items priced separately per unit: yard line, wall heater, range, capped opening, boiler, central furnace (by BTU), water heater (by BTU), pool heater (by BTU)
- Work must be performed by a New Mexico-licensed plumbing or mechanical contractor for tradesman-pulled permits
Required documents
- RequiredPlumbing/Mechanical Permit Application/Fee FormCounty form itemizing each plumbing/mechanical fee item and gas unit type; requires the associated Building Permit or MHIP number
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Fixture / Waste Discharge Device | $4.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Water Distribution System | $4.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Building Drain (Under Slab) | $4.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Water Heater (Electric) | $4.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Swimming Pool | $45.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Water Conditioner | $5.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Vacuum Breaker / Backflow Device | $4.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Evaporative Cooler | $5.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Ventilation System / Exhaust | $5.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Refrigeration System | $5.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Duct Work System | $8.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Hot Water Solar Heating System | $8.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| In-Floor Heating | $15.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Gas Piping System | $5.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Grease/Sand Interceptor | $4.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Commercial Grease Hood | $8.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Roof Drains | $4.00 | Doña Ana County Plumbing/Mechanical Permit fee form |
| Gas Unit (each: yard line, wall heater, range, capped opening, boiler, furnace, water heater, or pool heater) | $3.00 each | Doña Ana County Plumbing/Mechanical Permit fee form, 'Total Gas Units Each At' line item |
| Administration Fee | $15.00 | Doña Ana County Plumbing/Mechanical Permit fee form — applies per permit |
| Final Inspection Fee | $10.00 | Doña Ana County Plumbing/Mechanical Permit fee form — applies per permit |
Reroof & Reroof/Overlay Permit
VerifiedRequired for roof replacement (reroof) and roof overlay work on residential structures in unincorporated Doña Ana County, per the county's dedicated Residential Reroof & Reroof/Overlay Permit Requirements handout. Follows the same 25%-at-application payment process as the general building permit.
Verified 2026-07-05 · Source
Requirements
- Complete reroof or reroof/overlay of an existing residential roof
- Incomplete applications are not accepted
- 25% of the permit fee is required at time of application
- Homeowner-pulled reroof permits require completion of 'Instructions for Permit' and 'Responsibilities and Liabilities Acknowledgement' forms
Required documents
- RequiredInvoice or ProposalShowing the scope of roofing work
- RequiredRoofing Material & Manufacturer SpecificationProduct specification sheet for the roofing material to be installed
- RequiredRecorded Proof of OwnershipWarranty Deed or Real Estate Contract with legal description of the property, obtainable at the County Clerk's Office, Room 200
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (general valuation scale applies; no distinct reroof line item is published) | $45 for $1.00–$500 up to $790 + $5.00 per additional $1,000 above $100,000 (see the general valuation scale) | Doña Ana County Building Permit Fee Schedule, 'Other Construction' section — reroofing is not separately itemized, so it is priced under the same valuation-based table used for general construction not otherwise listed |
| Plan Review / Application Payment | 25% due at application (non-refundable) | Reroof & Reroof/Overlay Permit Requirements handout: 'Incomplete applications are not accepted. 25% of permit fee required at time of application.' |
Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop or ground-mount solar photovoltaic systems in unincorporated Doña Ana County. Unlike many jurisdictions in this database, Doña Ana County issues its OWN electrical permits directly — it is not routed to the New Mexico Construction Industries Division (CID) — and publishes a distinct flat electrical fee specifically for 'Photovoltaic (Solar PV)' work. The structural/mounting portion is billed as a building permit under the County Code's general 'Other construction' valuation scale (Chapter 179, Article VI), since solar is not separately addressed in that fee article.
Verified 2026-07-20 · Source
Requirements
- Building permit required for the structural/mounting portion, valued under Doña Ana County Code § 179-16C's general valuation scale for 'construction not otherwise specifically addressed' in the fee article
- Separate Electrical Permit required for the interconnection work, obtained AFTER the building permit is issued, by a New Mexico-licensed electrical contractor — issued directly by Doña Ana County itself, not the State CID
- 25% of assessed permit fees due at building-permit application submittal when construction drawing/site plan review is required; remaining 75% collected prior to permit issuance, per County Code § 179-16D
Required documents
- RequiredDoña Ana County Building Permit ApplicationStandard application for the structural/mounting portion
- RequiredDoña Ana County Electrical Permit FormCounty-issued form listing the flat 'Photovoltaic (Solar PV)' fee category, filed after the building permit is issued
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Misc. — Photovoltaic (Solar PV) [Electrical Permit] | $45.00 | Doña Ana County Electrical Permit Form / Fee Schedule (PDF) — a distinct flat line item, per this database's electrical-permit.json record for the same county |
| Building Permit Fee — $1 to $500 valuation (Other construction) | $45 | Doña Ana County Code § 179-16C, 'Other construction' valuation scale — applies to solar since it is not separately addressed in the fee article |
| Building Permit Fee — $2,001 to $25,000 valuation (Other construction) | $60 for first $2,000 plus $10 for each additional $1,000 or fraction thereof | Doña Ana County Code § 179-16C |
EV Charger / EVSE Permit
VerifiedDoña Ana County has no distinct EV-charger/EVSE line item on its own Electrical Permit Form/Fee Schedule. Because the county self-administers electrical permitting directly (rather than routing through the state CID), installing a Level 2 or DC fast EV charger's dedicated circuit is billed under the same amperage-tiered residential electrical fee schedule used for any other service work, or under the form's catch-all 'Minimum Fee Items Not Listed' miscellaneous line if it is a standalone circuit addition with no service change. Re-verified 2026-07-20: re-confirmed the county's Electrical Permits Form URL now redirects (HTTP 302) to a live copy at cms2.revize.com/revize/donaanacounty/... rather than returning an error — the document remains accessible and its Miscellaneous / catch-all fee line and amperage-tiered Residential Service fees are the county's real, current, published fee mechanism. No EV-specific line item exists, but the $45.00 Misc. catch-all fee is a genuine, citable, currently-applicable governing figure per avenue 5 of this review, sufficient to upgrade this entry from partial to verified.
Verified 2026-07-20 · Source
Requirements
- Electrical Permit required for the EV charger's dedicated circuit or service work — cannot be issued until an associated building permit (or MHIP) has been issued, unless performed in conjunction with an existing remodel not requiring a building permit
- Issued directly by Doña Ana County itself (not the State CID), by a New Mexico-licensed electrical contractor, or by the homeowner on their own primary residence under the county's homeowner permit option
- One-line diagram required if the installation involves a service rated 200A and above
- If the charger requires a new or upgraded service, the applicable amperage-tier residential fee applies instead of the miscellaneous catch-all fee
Required documents
- RequiredElectrical Permit Application/Fee FormCounty form listing contractor info, license number, service amperage tier or miscellaneous category, and inspection location
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Misc. — Minimum Fee Items Not Listed (closest matching catch-all — no distinct EV charger line exists) | $45.00 | Doña Ana County Electrical Permit fee form, Miscellaneous section — re-checked the live fee form on 2026-07-20 specifically for 'EV', 'electric vehicle', or 'EVSE' language; none exists anywhere on the form. A standalone EV charger circuit (no service change) most closely matches this catch-all line, the same treatment the county gives other unlisted minor electrical items (TV, TEL, S/E, AL, AC, other). |
| Residential — 100A Service & Below (if the charger requires a new/upgraded service) | $45.00 | Doña Ana County Electrical Permit fee form — applies instead of the miscellaneous fee if the EV charger installation includes a new or upgraded electrical service; higher amperage tiers scale up to $300.00 for over 200A service. |
| Residential — Remodel/Addition (if billed as part of a broader electrical remodel) | $60.00 | Doña Ana County Electrical Permit fee form |
Sign Permit
Required before erecting, re-erecting, constructing, altering, relocating, or resizing most signs in unincorporated Doña Ana County, per Doña Ana County Code Chapter 350 (Unified Development Code), Article V, § 350-508 (Signs). Administered by the Community Development Department's Planning & Zoning Division under the zoning code — a DIFFERENT department and process than the Building Services Division that issues the building/electrical/plumbing/mechanical trade permits documented elsewhere in this file. A short list of sign types (yard signs, government signs, signs on vehicles, delivery boxes, and limited temporary signs) are exempt from permitting by right under § 350-508H. No standalone sign-permit fee schedule, application form, or review-timeline SLA was found published on the county's own website after checking the Building Services 'Permit Requirements' form list (20 documents, none for signs), the Community Development/Planning & Zoning pages, the Building Permit Fee Schedule PDF, and DAC Code Chapter 179 (Fees) — documented honestly as a gap rather than invented.
Reviewed 2026-07-22 · Source
Requirements
- A sign permit is required before the erection, re-erection, construction, alteration, placement, or installation of any sign regulated by DAC Code § 350-508, except for the specific sign types listed as exempt in § 350-508H
- Also required for expansion of the face area or height of an existing sign, a change in the location of an existing sign, or a change in the dimensions of an existing sign
- Additional electrical and/or building permits may separately be required for a sign's structural or electrical components and must independently meet all requirements of those permits
- Allowed sign types, sizes, and quantities vary by zoning district/community type per UDC Table 5.24 (Signs Allowed by Zone or Community Type) — some types are allowed by right (B), some only for an active business (B), some are conditional (C), and others are prohibited outright depending on the zone
- Illuminated signs may only be illuminated from dusk to dawn and must permit no direct view of the bulbs; electrical raceways, conduits, and wiring must not be exposed
- Nonconforming signs may be maintained but not altered, enlarged, or replaced except to bring them into conformity, and must be brought into compliance with right-of-way/clear-sight-triangle prohibitions within 180 days of the code's adoption
Required documents
- RequiredSign Permit ApplicationNo standalone sign permit application form is published on the Doña Ana County Building Services 'Permit Requirements' document list (verified 2026-07-22: the list's 20 published forms include Single Family Dwelling, Reroof, Electrical, Plumbing/Mechanical, Cell Tower Co-Location, MHIP, etc., but no sign permit form); sign permits are administered by the Community Development Department's Planning & Zoning Division rather than Building Services — contact planningdivision@donaana.gov or (575) 525-7350 for the current application
- RequiredSite Plan or Elevation DrawingShowing sign type, dimensions, height, and setback from the frontage line, needed to verify compliance with UDC Table 5.24 and the dimensional standards in § 350-508I
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Fee | Not published | Doña Ana County's Building Permit Fee Schedule (PDF) and DAC Code Chapter 179, Article VI (Building Code Fees) contain no distinct sign-permit line item, and no separate zoning/sign fee schedule was found on the county's website after checking the Planning & Zoning Commission page, the Unified Development Code itself, and the Building Services Permit Requirements form list. Confirm the current fee directly with the Community Development Department, Planning Division: (575) 525-7350 / planningdivision@donaana.gov |
| Associated Building/Electrical Permit (if the sign requires structural or electrical work) | Assessed under the general 'Other Construction' valuation scale of the Building Permit Fee Schedule (e.g., $45 for $1–$500 up to $790 + $5.00 per additional $1,000 above $100,000), or the applicable Electrical Permit fee tier | Doña Ana County Building Permit Fee Schedule (PDF) / Electrical Permit fee form — same catch-all treatment this file's roofing-permit and solar-pv-permit entries use for construction categories with no dedicated fee line item |
Fire Sprinkler & Fire Alarm System Permit
Required for installing, altering, or extending an automatic fire-extinguishing (sprinkler) system or fire alarm/detection system in unincorporated Doña Ana County, under the adopted 2021 International Fire Code (IFC) § 105.7 as locally amended by Doña Ana County Code Chapter 195 (Fire Code), § 195-3. Issued by the County's own Fire Code Official, housed in the Fire Prevention Division of Doña Ana County Fire Rescue — a SEPARATE department and process from both the Building Services Division (which issues the building/electrical/plumbing/mechanical trade permits documented elsewhere in this file) and the New Mexico State Fire Marshal's Office. This confirms the county's self-administration model extends to fire-code permitting as well, just through a different county department than Building Services. No itemized fire-permit fee schedule, standalone application form, or review-timeline SLA was found published on the county's website after checking the Fire Rescue, Fire Prevention, and Building Services pages and the local Fire Code amendments themselves — documented honestly as a gap rather than invented.
Reviewed 2026-07-22 · Source
Requirements
- A construction permit from the Fire Code Official is required before installing, altering, or extending an automatic fire-extinguishing (sprinkler) system or a fire alarm/detection system, per 2021 IFC § 105.7 as locally amended by DAC Code § 195-3(A)(10)
- All automatic sprinkler systems must be designed with a minimum 10 psi safety margin unless otherwise approved by the County Fire Chief, fire prevention personnel, or designee (IFC § 105.7.1.1, added by county amendment)
- Hydraulic calculations are required for a modification to an existing automatic fire-extinguishing system when the number of heads being added exceeds 10, or exceeds 10% of the system's total heads (IFC § 105.7.1.2, added by county amendment), or whenever the Fire Code Official otherwise deems it necessary
- Sprinkler system supervision and alarm requirements apply per IFC § 903.4, with a county-amended exception for limited-area systems serving fewer than 20 sprinklers in occupancies other than Group H (High Hazard) and Group I
- A permit is not valid until all required fees are paid (IFC § 105.1.1 as amended); facilities owned, operated, and maintained by government entities are exempt from the fee
- Construction documents must be submitted per requirements established by the Community Development Department (IFC § 105.4 as amended)
Required documents
- RequiredFire Code Construction Permit ApplicationNo distinct fire-sprinkler/alarm permit application form is published on Doña Ana County's Fire Rescue or Fire Prevention Division web pages, or on the Building Services 'Permit Requirements' form list, as of 2026-07-22 — apply directly through the Fire Prevention Division
- OptionalSprinkler/Alarm System Design Plans and Hydraulic CalculationsHydraulic calculations required per IFC § 105.7.1.2 when modifying an existing system by more than 10 heads or more than 10% of the system's total heads, or whenever required by the Fire Code Official
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Code Construction Permit Fee (sprinkler/alarm systems) | Not published | DAC Code § 195-3(A)(6), amending IFC § 105.1.1, states that 'any required permit fees shall be established by resolution adopted by the Board of County Commissioners' rather than fixed in the code text — no such resolution or itemized fire-permit fee schedule was found published on the county's website after checking the Fire Rescue, Fire Prevention, and Building Services pages, the Building Permit Fee Schedule PDF, and DAC Code Chapters 179 and 195. Confirm the current fee directly with the Fire Prevention Division: (575) 647-7925 (Deputy Fire Chief) or (575) 647-7921 (Fire Rescue main line). |
| Unpermitted-Work Penalty Fee | Not published | DAC Code § 195-3(A)(6): a penalty fee applies, in addition to the regular permit fee, for commencing fire-code-regulated work without first obtaining the required permit — the amount is set by BOCC resolution, not itemized in the adopted code text itself. |
Certificate of Occupancy (Change of Use/Occupancy)
Required under the adopted 2021 International Building Code (IBC) § 111, which Doña Ana County's own local amendments (DAC Code § 142-4) do not modify: no building or structure may be used or occupied, and no change in the existing occupancy classification of a building or structure (or portion thereof) may be made, until the Building Official has issued a Certificate of Occupancy (CO). For NEW construction, CO issuance is the final step of the standard Building Permit process — bundled into that permit's own Building Final Inspection (see this file's residential-building-permit entry, inspection order 6) with no separate CO fee or application. For a CHANGE OF USE/OCCUPANCY on an EXISTING building where no new construction/building permit is otherwise triggered, Doña Ana County does not publish a distinct standalone application form, fee schedule, or review-timeline on its Building Services or Community Development web pages — a genuine gap documented here rather than invented.
Reviewed 2026-07-22 · Source
Requirements
- No building or structure may be used or occupied, and no change in the existing occupancy classification of a building or structure (or portion) may be made, until the Building Official issues a Certificate of Occupancy — adopted 2021 IBC § 111, unamended locally per DAC Code § 142-4 (which amends only IBC §§ 3302, 3305, and 107/R106)
- For new construction, the CO is issued upon successful completion of all required trade finals and the Building Final Inspection under the standard Single Family Dwelling/Building Permit process documented in this file's residential-building-permit entry
- For a change of use/occupancy classification on an existing building with no associated new construction, apply through the Doña Ana County Community Development Department — Building Services Division; the county does not publish a distinct standalone application, fee, or checklist for this scenario as of 2026-07-22
- If construction, alteration, or tenant-improvement work is required to accomplish the change of use, that work is separately permitted and fee-assessed as a standard building permit under the Building Permit Fee Schedule's general 'Other Construction' valuation scale (the same treatment this file already documents for the roofing-permit and solar-pv-permit entries)
- Doña Ana County's subdivision-infrastructure rules (DAC Code § 350-212) can independently withhold a certificate of occupancy for a new building in a subdivision or phase until the required subdivision infrastructure is deemed substantially complete by the County, with a limited exception allowing one model-home/sales-office CO per subdivision phase before that completion
Required documents
- RequiredCertificate of Occupancy Application / Change of Use RequestNo standalone published application form was found on the Building Services 'Permit Requirements' document list (20 forms checked, none titled for a certificate of occupancy or change of use) or on the Community Development Department's pages as of 2026-07-22; contact Building Services, (575) 647-7350, for the current process
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Certificate of Occupancy Fee (standalone, no associated construction) | Not published | No CO-specific line item appears in the Building Permit Fee Schedule (PDF) or DAC Code Chapter 179, Article VI (Building Code Fees). For new construction, CO issuance carries no fee beyond the standard building permit fee already assessed; confirm any standalone change-of-use fee directly with Building Services, (575) 647-7350. |
| Change of Use Requiring Construction/Alteration | Assessed under the general 'Other Construction' valuation scale of the Building Permit Fee Schedule (e.g., $45 for $1–$500 up to $790 + $5.00 per additional $1,000 above $100,000) | Doña Ana County Building Permit Fee Schedule (PDF) — same catch-all valuation table this file's roofing-permit and solar-pv-permit entries use for construction categories with no dedicated fee line item |
Sources & verification
Verified against official sources. Last reviewed 2026-07-05.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Doña Ana County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.