Version history — Lovington, New Mexico
This is PermitBase’s own verified record for Lovington, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Lovington’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- Lovington, New Mexico — Commercial Building Permit record added
- 2026-07-23Superseded
- Lovington, New Mexico — fee schedule re-verified across 2 permit types
- 2026-07-22Superseded
- 2026-07-20Superseded
- Lovington, New Mexico — EV Charger / EVSE Permit record added
- Lovington, New Mexico — Solar PV Permit record added
- Lovington, New Mexico — EV Charger / EVSE Permit fee record added: Minimum Inspection Fee for Items Not Listed (a standalone new EV charger circuit with no service/panel change) ($27.00)
- Lovington, New Mexico — EV Charger / EVSE Permit fee record added: Residential Electrical Service — 100 Amp or below (if the EV charger install requires a new/upgraded service) ($45.00)
- Lovington, New Mexico — EV Charger / EVSE Permit fee record added: Residential Electrical Service — over 100 through 200 Amp ($72.00)
- Lovington, New Mexico — EV Charger / EVSE Permit fee record removed: State CID Electrical Permit Fee
- Lovington, New Mexico — Solar PV Permit fee record added: State Building Permit (CID) Fee — structural/racking scope ($3.00 per $1,000 of valuation up to $15,000, plus $1.00 per $1,000 of valuation over $15,000, plus a 20% plan review fee on top of the building permit fee)
- Lovington, New Mexico — Solar PV Permit fee record added: State Electrical Permit (CID) Fee — PV interconnection scope (Residential, by service size: 100A or less $45.00; over 100-200A $72.00; over 200-320A $99.00; over 320-400A $225.00; over 400A $360.00 (live CID rate, includes the 1.8x multiplier applied to the base NMAC rate); plus $40.00/hr for plan review)
- Lovington, New Mexico — Solar PV Permit fee record removed: State Building Permit (CID) Fee (electrical/structural, PV interconnection and racking)
- 2026-07-19Superseded
- Lovington, New Mexico — Water/Sewer Connection Permit fee record added: Water meter fee (new meter cost, by size) (¾ inch meter: $1,000.00; 1 inch meter: $1,000.00; 2 inch meter: $2,050.00; 3 inch meter: $3,500.00; 4 inch meter: $4,500.00; 5 inch meter: $6,000.00)
- Lovington, New Mexico — Water/Sewer Connection Permit fee record removed: Water meter fee
- 2026-07-18Initial record — coverage of Lovington began