Version history — Gallup, New Mexico
This is PermitBase’s own verified record for Gallup, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Gallup’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-21Current record
- Gallup, New Mexico — Fire Sprinkler / Fire Alarm System Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified — no fee schedule specific to Fire Prevention office plan review or fire-system permitting was located → Not published — no fee schedule specific to Fire Prevention office plan review or fire-system permitting exists
- Gallup, New Mexico — Change of Use / Change of Occupancy Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified — no separate C/O fee line item was located → Not published — no separate C/O fee line item appears in the City's fee materials
- 2026-08-01Superseded
- Gallup, New Mexico — Commercial Building Permit (New Construction, Additions, Alterations & Tenant Improvements) record added
- 2026-07-23Superseded
- Gallup, New Mexico — Residential Building Permit (New Construction) fee record updated: GENUINELY UNPUBLISHED as of lastVerified — the City's transition notice (posted June 8, 2026) announces the new Site Development Permit but the City had not yet published a specific fee schedule/amount for this new permit type as of this review; the pre-transition Resolution R2004-40 Zoning Check Fee ($15 residential / $25 commercial) governed the zoning-review component of the old process and may inform (but does not confirm) the new fee → Valuation-based per Resolution No. R2004-40: $15.00 minimum for $1-$500 valuation, scaling to $3,539.50 for the first $1,000,000 plus $2.00 per additional $1,000; plus a Plan Check Fee (75% new commercial / 55% commercial additions-remodels under $50,000 / 45% residential) and a Zoning Check Fee ($25 commercial / $15 residential)
- Gallup, New Mexico — Residential Addition / Alteration / Remodel Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified — see residential-building-permit fee notes for avenues exhausted → Valuation-based per Resolution No. R2004-40 (same schedule as residential-building-permit entry: $15.00 minimum for $1-$500 valuation up to $3,539.50 for the first $1,000,000 plus $2.00 per additional $1,000, plus Plan Check Fee 45% residential/55-75% commercial and Zoning Check Fee $15 residential/$25 commercial)
- Gallup, New Mexico — Residential Solar Photovoltaic (PV) Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified → Valuation-based per Resolution No. R2004-40 (see residential-building-permit entry for the full fee table)
- Gallup, New Mexico — Fence Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified — Resolution No. R2004-40 (the City's pre-transition fee schedule) sets a general valuation-based building-permit fee table ($15.00 minimum for $1-$500 valuation) that historically applied to fence permits as a City-issued 'building permit' category, but the City's current published Fee Schedule page (gallupnm.gov/338/Fee-Schedule) does not show building/fence permit fees (it displays unrelated Fitness Center rates), and no updated fee notice specific to fence permits under the post-July-2026 structure was located → Valuation-based per Resolution No. R2004-40: $15.00 minimum for $1-$500 valuation, scaling per the same schedule cited on the residential-building-permit entry
- Gallup, New Mexico — Sign Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified — no current fee schedule for sign permits was located on the City's Fee Schedule page (338, which shows unrelated Fitness Center rates), Building Permits pages, or the FAQ page → Valuation-based, set by City Resolution (No. R2004-40) per the sign permit's own application instructions; no separate flat fee schedule specific to signs was located
- Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- 2026-07-22Superseded
- 2026-07-20Superseded
- Gallup, New Mexico — Residential Solar Photovoltaic (PV) Permit record added
- Gallup, New Mexico — EV Charger / EVSE Permit record added
- 2026-07-03Initial record — coverage of Gallup began