This is PermitBase’s published record for Farmington as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Farmington building permits
VerifiedFarmington, New Mexico — as published 2026-07-20.
Verified 2026-07-02 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family residential construction in Farmington. Farmington does not accept online applications or payments — all permits must be applied for and paid in person at the Building Inspection Division office. Plans are reviewed against the 2021 New Mexico Residential Building Code (2021 IRC as amended).
Verified 2026-07-02 · Source
Requirements
- Building permit required for all new residential construction (Category 101 Single Family Residence in the City's permit reporting system)
- Must comply with the 2021 New Mexico Residential Building Code (2021 IRC as amended, 14.7.3 NMAC) and 2021 New Mexico Residential Energy Conservation Code (14.7.6 NMAC)
- Homeowner or a contractor representing the owner may take out the permit; New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a property owner to obtain a building permit for their own primary residence without a contractor license, provided the homeowner performs the major portion of the work by dollar value
- Submit two (2) sets of construction plans plus a site plan
- Zoning/setback compliance verified by the Planning and Zoning Division — call (505) 599-1317
- Applications and payment must be made in person at 805 Municipal Drive, Annex Building, 2nd Floor — no online permitting or payment
Required documents
- RequiredBuilding Permit ApplicationPaper application submitted in person at the Community Development Planning and Zoning Division & Building Inspection Division office
- RequiredConstruction Drawings (two sets) plus Site PlanPer the Residential New House Plan Submittal Requirements bulletin: legal description and address (street address, subdivision, lot and block number); building location with distances to property lines; proposed driveway and sidewalks drawn to engineer's scale (1"=10' to 1"=30'); drawn to scale no less than 1/4 inch to the foot, in blue-line or black-line print; foundation design and foundation plan; floor framing plan; roof framing plan (truss plans must be on site before framing inspection); wall and roof section details showing insulation, anchor bolts, plate, and stud spacing; indicated insulation R-value and NM Energy Conservation Code compliance; type and size of all exterior doors and windows; drawn on paper no smaller than 18"x24"; plot plan on 8.5"x11" or 8.5"x14"
Fee schedule
| Fee type | Amount | Notes |
|---|
Residential Addition / Alteration / Remodel Permit
VerifiedRequired for additions, alterations, remodels, and structural renovations to existing residential structures in Farmington, including garage additions/conversions, decks, carports, and interior/exterior renovation affecting structure or life safety.
Verified 2026-07-02 · Source
Requirements
- Permit required for residential additions, alterations, remodeling, interior and exterior renovation, garage additions and conversions, decks, carports, porch covers, and retaining/soil retention walls
- Must comply with the 2021 New Mexico Residential Building Code (14.7.3 NMAC)
- Homeowner permit exemption available for the owner's primary residence (14.5.2 NMAC)
- Applications and payment made in person only at 805 Municipal Drive, Annex Building, 2nd floor
Required documents
- RequiredBuilding Permit ApplicationPaper application submitted in person at the Building Inspection Division office
- RequiredConstruction DrawingsPlans showing scope of work, dimensions, and structural details of the addition or alteration
Fee schedule
| Fee type | Amount | Notes |
|---|
Residential Electrical Permit
VerifiedRequired for electrical work on residential properties in Farmington, including new wiring, service changes, branch circuits, and low-voltage hardwire work. Electrical work must comply with the 2020 New Mexico Electrical Code (based on the 2020 NEC, adopted via 14.10.4 NMAC, effective March 28, 2023).
Verified 2026-07-02 · Source
Requirements
- Permit required for hardwired low voltage work and all electrical installations, changes, or repairs
- Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended) — 14.10.4 NMAC, effective March 28, 2023
- New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to obtain an electrical permit for their own primary residence, limited to appurtenant structures such as garages, carports, and sheds, provided the homeowner performs the major portion of the work
- Only a New Mexico-licensed electrical contractor (or exempt homeowner) may perform and permit the work
- Applications and payment made in person only at the Building Inspection Division office
Required documents
- RequiredElectrical Permit ApplicationPaper application submitted in person at 805 Municipal Drive, Annex Building, 2nd floor
Fee schedule
| Fee type | Amount | Notes |
|---|
Residential Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs on residential properties in Farmington, governed by the 2021 New Mexico Plumbing Code (2021 UPC as amended, 14.8.2 NMAC).
Verified 2026-07-02 · Source
Requirements
- Permit required for plumbing equipment installation, sewer line work, and water line work
- Must comply with the 2021 New Mexico Plumbing Code (2021 UPC as amended) — 14.8.2 NMAC
- New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to obtain a plumbing permit for their own primary residence, provided the homeowner performs the major portion of the work
- Applications and payment made in person only at the Building Inspection Division office
Required documents
- RequiredPlumbing Permit ApplicationPaper application submitted in person at 805 Municipal Drive, Annex Building, 2nd floor
Fee schedule
| Fee type | Amount | Notes |
|---|
Residential Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, air conditioning, and mechanical equipment installations on residential properties in Farmington, governed by the 2021 New Mexico Mechanical Code (2021 UMC as amended, 14.9.2 NMAC).
Verified 2026-07-02 · Source
Requirements
- Permit required for mechanical equipment installation
- Must comply with the 2021 New Mexico Mechanical Code (2021 UMC as amended) — 14.9.2 NMAC
- New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to obtain a mechanical permit for their own primary residence, provided the homeowner performs the major portion of the work
- Applications and payment made in person only at the Building Inspection Division office
Required documents
- RequiredMechanical Permit ApplicationPaper application submitted in person at 805 Municipal Drive, Annex Building, 2nd floor
Fee schedule
| Fee type | Amount | Notes |
|---|
Residential Roofing Permit
VerifiedRequired for roof overlays, re-roofs, and structural roof renovations on residential properties in Farmington. Design must account for the City's local minimum roof live load of 20 PSF.
Verified 2026-07-02 · Source
Requirements
- Permit required for roof overlay, re-roof, and structural roof renovations — explicitly listed on the City's 'Do I need a Construction Permit?' page
- Must comply with the 2021 New Mexico Residential Building Code (14.7.3 NMAC) and the City's local minimum roof live load of 20 PSF
- New Mexico's homeowner permit exemption applies to the owner's own primary residence
- Applications and payment made in person only at the Building Inspection Division office
Required documents
- RequiredBuilding Permit ApplicationPaper application submitted in person at 805 Municipal Drive, Annex Building, 2nd floor
Fee schedule
| Fee type | Amount | Notes |
|---|
Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of solar panels on residential properties in Farmington. Solar installations must comply with the 2012 New Mexico Solar Energy Code (2012 USEC as amended, 14.9.6 NMAC), which the City has explicitly adopted.
Verified 2026-07-02 · Source
Requirements
- Solar panel installation is explicitly listed among work requiring a permit on the City's 'Do I need a Construction Permit?' page
- Must comply with the 2012 New Mexico Solar Energy Code (2012 Uniform Solar Energy Code as amended) — 14.9.6 NMAC, which applies to all solar energy system construction work in New Mexico subject to CID jurisdiction, in effect since May 1, 2015
- Electrical permit and inspection also required for the PV system's electrical connections, per the 2020 New Mexico Electrical Code
- Applications and payment made in person only at the Building Inspection Division office
Required documents
- RequiredBuilding/Electrical Permit ApplicationPaper application submitted in person at 805 Municipal Drive, Annex Building, 2nd floor; solar PV plan review includes application and permit provisions under Section 103.3 of the adopted Solar Energy Code
Fee schedule
| Fee type | Amount | Notes |
|---|
EV Charger / Electric Vehicle Charging Station Permit
VerifiedFarmington has no dedicated EV charger permit, application, or fee schedule. Installation of an electric vehicle charging station (Level 1/2 EVSE) is electrical work and is processed under the City's standard Residential Electrical Permit, governed by the 2020 New Mexico Electrical Code (based on the 2020 NEC, which includes Article 625, Electric Vehicle Power Transfer System) — the same mechanism documented in the electrical-permit entry. No EV-specific provision or fee line was found published on the City's 'Do I need a Construction Permit?' page, the State of NM Adopted Construction Codes page, or the Manual of Fees. Re-chased 2026-07-20: located and directly checked the City's 'Manual of Fees' page -- its only linked document is a Water/Wastewater Division 'Set Price List' (utility tap/meter fees, unrelated to building/electrical permits); the page's own text states 'Permitting fees are based upon type of construction, square footage, type of materials and construction codes... contact one of our Building Inspectors at (505)599-1304' rather than publishing a table. Confirms the same gap already documented on this file's general electrical-permit entry (also confidence: verified, also fees: []), which this EV-charger entry mirrors exactly since it uses the identical Residential Electrical Permit.
Verified 2026-07-20 · Source
Requirements
- Permit required for the electrical work associated with EV charger/EVSE installation (new wiring, branch circuit, or panel/service work), same as any other electrical installation
- Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended, including Article 625) — 14.10.4 NMAC, effective March 28, 2023
- New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to obtain the electrical permit for their own primary residence, limited to appurtenant structures such as garages and carports, provided the homeowner performs the major portion of the work
- Only a New Mexico-licensed electrical contractor (or exempt homeowner) may perform and permit the work
- Applications and payment made in person only at the Building Inspection Division office
Required documents
- RequiredElectrical Permit ApplicationSame paper application used for all electrical work, submitted in person at 805 Municipal Drive, Annex Building, 2nd floor
Fee schedule
| Fee type | Amount | Notes |
|---|
Sources & verification
Verified against official sources. Last reviewed 2026-07-02.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Farmington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.