Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-09-06.

Dallas building permits

Dallas, Texas — as published 2026-09-06.

Reviewed 2026-09-06 · Source

Codes adopted

2021 International Building Code (ICC), with Dallas Amendments - Dallas City Code Chapter 53, effective May 12, 20232021 International Residential Code (ICC), with Dallas Amendments - Dallas City Code Chapter 57, effective May 12, 20232021 International Existing Building Code (ICC), with Dallas Amendments - Dallas City Code Chapter 58, effective June 13, 20222021 International Plumbing Code (ICC), with Dallas Amendments - Dallas City Code Chapter 54, effective May 12, 20232021 International Mechanical Code (ICC), with Dallas Amendments - Dallas City Code Chapter 55, effective May 12, 20232023 National Electrical Code (NFPA 70), with Dallas Amendments - Dallas City Code Chapter 56 (the city's Electrical Inspections page states this same 2023 NEC edition is adopted 'effective June 13, 2022,' which predates the 2023 code's publication - see contradiction note)2021 International Fire Code (ICC), with Dallas Amendments - Dallas City Code Chapter 16, effective February 10, 20232021 International Energy Conservation Code (ICC), with Dallas Amendments - Dallas City Code Chapter 59, effective May 12, 20232021 International Fuel Gas Code (ICC), with Dallas Amendments - Dallas City Code Chapter 60, effective May 12, 20232015 International Green Construction Code (ICC), with Dallas Amendments - Dallas City Code Chapter 612021 International Swimming Pool and Spa Code (ICC), with Dallas Amendments - Dallas City Code Chapter 62, effective June 13, 2022

Permit types & fees

Residential New Construction Permit

A Residential Permit is an official approval from the City of Dallas that allows you to start construction, renovation, or major repairs on your home. It ensures that your project meets safety codes and building standards designed to protect you, your family, and your community. Applications for new single-family and duplex construction are submitted through the DallasNow online portal.

Reviewed 2026-09-06 · Source

Requirements

  • Application and plan submittal through the DallasNow online portal
  • Termite Protection Form
  • Residential Buildings Energy Compliance Certificate or Compliance Path documentation

Required documents

  • RequiredResidential New Construction Checklist
  • RequiredResidential Infill Waiver (where applicable)
  • RequiredSidewalk Waiver (where applicable)
  • RequiredTermite Protection Form
  • RequiredResidential Buildings Energy Compliance Certificate
  • RequiredResidential Buildings Energy Compliance Path
  • RequiredWater and Wastewater Service Installation Application

Fee schedule

Fee typeAmountNotes
New Single-Family and Duplex Construction Permit Fee, 0-700 sq ftsquare footage x 1.07 = permit fee
New Single-Family and Duplex Construction Permit Fee, 701-2,350 sq ftsquare footage x 0.34569 + $300
New Single-Family and Duplex Construction Permit Fee, 2,351-10,500 sq ftsquare footage x 0.077 + $800
New Single-Family and Duplex Construction Permit Fee, 10,501+ sq ftsquare footage x 0.0272 + $1,000
Minimum Inspection Fee (1 trade)$125
Minimum Inspection Fee (9 or more trades)$1,125

Residential Remodel / Addition Permit

Covers remodeling, additions, and repair work to existing one- and two-family dwellings, including work that requires energy-code compliance for trade work on existing residences. Applications and checklists are submitted through DallasNow.

Reviewed 2026-09-06 · Source

Requirements

  • Remodel Checklist completion
  • General Repair Scope of Work Form for repair-only projects
  • Energy Code Remodels/Renovations form when trade work triggers energy-code compliance
  • Homeowner's Exemption from Contractor Registration form, if the homeowner is acting as their own contractor

Required documents

  • RequiredResidential Addition Checklist
  • RequiredRemodel Checklist (Single-Family Dwelling Remodel)
  • RequiredEnergy Code Remodels/Renovations (form)
  • RequiredGeneral Repair Scope of Work Form
  • RequiredHomeowner's Exemption from Contractor Registration

Fee schedule

Fee typeAmountNotes
Alterations or Repairs of Single-Family and Duplex Structures - base permit fee$181 per dwelling unit
Alterations or Repairs of Single-Family and Duplex Structures - additional trades+ $100 per additional trade

Commercial New Construction Permit

A commercial building permit is an official authorization required before constructing, altering, or renovating a commercial property. It ensures that all work complies with local building codes, zoning regulations, and safety standards. Applications are submitted through DallasNow.

Reviewed 2026-09-06 · Source

Requirements

  • Building Permit and/or Certificate of Occupancy application submitted via DallasNow
  • Zoning verification via the city's Zoning Maps
  • Predevelopment meeting recommended for complex projects

Required documents

  • RequiredCurrent Permit Fee Estimate Worksheet
  • RequiredCertificate of Occupancy Checklist
  • RequiredDWU Water/Wastewater Service Installation Application
  • RequiredBond Agreement (Dallas Water Utilities)

Fee schedule

Fee typeAmountNotes
New Commercial Construction Permit Fee, $0-2,000 valuationvalue x 0 + $75
New Commercial Construction Permit Fee, $2,000-25,000 valuationvalue x 0.0095 + $100
New Commercial Construction Permit Fee, $25,001-60,000 valuationvalue x 0.0075 + $100
New Commercial Construction Permit Fee, $60,001-200,000 valuationvalue x 0.027665 + $350
New Commercial Construction Permit Fee, $200,001-900,000 valuationvalue x 0.006325 + $400
New Commercial Construction Permit Fee, $900,001-1,500,000 valuationvalue x 0.003895 + $500
New Commercial Construction Permit Fee, $1,500,001-2,500,000 valuationvalue x 0.003862 + $700
New Commercial Construction Permit Fee, $2,500,001-5,000,000 valuationvalue x 0.003630 + $850
New Commercial Construction Permit Fee, $5,000,000-10,000,000 valuationvalue x 0.005095 + $1,100
New Commercial Construction Permit Fee, $10,000,000 or more valuationvalue x 0.002527 + $1,300
New Multi-Family Construction Permit Fee$652 per dwelling unit
Minimum Inspection Fee (1 trade)$125
Minimum Inspection Fee (9 or more trades)$1,125

Commercial Alteration / Addition Permit

Covers alterations, additions, and repairs to existing commercial buildings, priced on a valuation-based sliding scale distinct from the new-construction fee table.

Reviewed 2026-09-06 · Source

Requirements

  • Building Permit application submitted via DallasNow

Required documents

  • RequiredCurrent Permit Fee Estimate Worksheet

Fee schedule

Fee typeAmountNotes
Alterations or Repairs Permit Fee, $0-2,000 valuationvalue x 0 + $132
Alterations or Repairs Permit Fee, $2,000-25,000 valuationvalue x 0.0057394 + $143
Alterations or Repairs Permit Fee, $25,001-60,000 valuationvalue x 0.004312869 + $259
Alterations or Repairs Permit Fee, $60,001-100,000 valuationvalue x 0.003997634 + $400
Alterations or Repairs Permit Fee, $100,001-300,000 valuationvalue x 0.002464894 + $739
Alterations or Repairs Permit Fee, $300,001-500,000 valuationvalue x 0.002764076 + $1,382
Alterations or Repairs Permit Fee, $500,001-700,000 valuationvalue x 0.002456814 + $2,336
Alterations or Repairs Permit Fee, $700,001-900,000 valuationvalue x 0.002596076 + $1,720
Alterations or Repairs Permit Fee, $900,001-1,100,000 valuationvalue x 0.002793145 + $3,072
Alterations or Repairs Permit Fee, $1,100,001-2,500,000 valuationvalue x 0.00151757 + $3,794
Alterations or Repairs Permit Fee, $2,500,001-5,000,000 valuationvalue x 0.001209584 + $6,048
Alterations or Repairs Permit Fee, $5,000,001-10,000,000 valuationvalue x 0.001073154 + $10,732
Alterations or Repairs Permit Fee, $10,000,001 or more valuationvalue x 0.002153246 + $21,532
Minimum Inspection Fee (based on # of trades or valuation, whichever is greater; 1 trade)$125

Demolition Permit

Required before demolishing a structure. Complete removal of structures and foundations requires a demolition permit (per the city's guidance for storm-damaged single-family dwellings, which applies the same general demolition-permit requirement used citywide).

Reviewed 2026-09-06 · Source

Requirements

  • Permit application via DallasNow

Required documents

    Fee schedule

    Fee typeAmountNotes
    Demolition Fee$205 + $0.21 per square foot of floor area
    Signs - Removal/Demolition$78

    Electrical Permit

    Trade permit for electrical work, reviewed under the 2023 National Electrical Code with Dallas Amendments (Dallas City Code Chapter 56). Registered electrical contractors may apply for standalone electrical trade permits online.

    Reviewed 2026-09-06 · Source

    Requirements

    • Electrical Contractor Registration with the City of Dallas
    • State Electrical License through the Texas Department of Licensing & Regulation (TDLR)

    Required documents

    • RequiredElectrical Contractor Registration form
    • RequiredRequest for Temporary Utilities form
    • RequiredElectrical No Work Checklist - Clean and Show

    Fee schedule

    Fee typeAmountNotes
    Standalone single-trade permit, minimum inspection fee$125 (per the Minimum Inspection Fee Schedule; full permit fee is valuation-based per the Alterations or Repairs Permit Fee table when tied to a larger project)

    Plumbing Permit

    Trade permit for plumbing work, reviewed under the 2021 International Plumbing Code with Dallas Amendments (Dallas City Code Chapter 54). Effective June 1, 2026, plumbing rough and final inspections must be scheduled together with the corresponding mechanical inspections on the same day.

    Reviewed 2026-09-06 · Source

    Requirements

    • Plumbing Contractor registration with the City of Dallas

    Required documents

    • RequiredPlumbing Contractor and Medical Gas Registration form
    • RequiredBackflow Assembly Tester Registration Form

    Fee schedule

    Fee typeAmountNotes
    Backflow Prevention Device Filing Fee$81
    Standalone single-trade permit, minimum inspection fee$125 (per the Minimum Inspection Fee Schedule; full permit fee is valuation-based when tied to a larger project)

    Mechanical Permit

    Trade permit for HVAC/mechanical work, reviewed under the 2021 International Mechanical Code with Dallas Amendments (Dallas City Code Chapter 55). Effective June 1, 2026, mechanical rough and final inspections must be scheduled together with the corresponding plumbing inspections on the same day.

    Reviewed 2026-09-06 · Source

    Requirements

    • Mechanical Contractor registration with the City of Dallas

    Required documents

    • RequiredMechanical Contractor Registration form

    Fee schedule

    Fee typeAmountNotes
    Standalone single-trade permit, minimum inspection fee$125 (per the Minimum Inspection Fee Schedule; full permit fee is valuation-based when tied to a larger project)

    Roofing Permit

    Minor repairs to roofing or roof vents do not require a permit, but replacing large areas of a roof or an entire roof requires a re-roof (roofing) permit. Roofing permits may be obtained over the counter at district offices, the Oak Cliff Municipal Center, or online.

    Reviewed 2026-09-06 · Source

    Requirements

      Required documents

        Fee schedule

        Fee typeAmountNotes

        Fence and Swimming Pool Barrier Permit

        Permit covering fence construction and required swimming pool safety barriers, per the city's Fence and Swimming Pool Barrier Permit Checklist. Pool construction itself is also reviewed under the 2021 International Swimming Pool and Spa Code with Dallas Amendments (Dallas City Code Chapter 62).

        Reviewed 2026-09-06 · Source

        Requirements

          Required documents

          • RequiredFence and Swimming Pool Barrier Permit Checklist

          Fee schedule

          Fee typeAmountNotes

          Sources & verification

          Key facts verified against official sources. Last reviewed 2026-09-06.

          Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dallas building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

          View current record →All versions →

          Permalink: /texas/dallas-county/dallas/as-of/2026-09-06/

          Snapshot date: 2026-09-06

          Commit: 77ec26a

          Reproducible from PermitBase’s version-controlled dataset, commit 77ec26a.