Skip to main content
PermitBase

Do I Need a Permit to Pour Concrete in Texas?

Concrete and driveway permit requirements. When flatwork needs a permit, right-of-way bonds, and drainage rules.

Only if it connects to the street, modifies drainage, or is a structural element.

When You Don't Need a Permit

Simple concrete flatwork on your own property — a backyard patio, a walkway, or a small pad — typically does not require a building permit in most cities, as long as it doesn't alter drainage patterns or connect to the public right-of-way.

When You Do Need a Permit

A permit is required for: new driveways or driveway widenings (curb cut modification), sidewalk work in the public right-of-way, any concrete that changes drainage patterns, and structural concrete (retaining walls, foundations). Driveway permits may also require a refundable right-of-way bond ($500-$2,000).

Drainage Is Key

The biggest issue with concrete work isn't the concrete itself — it's drainage. Most cities prohibit directing water runoff onto neighboring properties. If your new concrete changes how water flows on your lot, you may need a drainage plan even for otherwise exempt work.

ADA at the Sidewalk

If your driveway crosses a public sidewalk, the approach must meet ADA slope requirements. This is enforced during the permit process and is a common reason driveway permits are revised.

Backyard patio? Probably no permit. Driveway or anything touching the street? Yes. Always check drainage impact.

Permit fees by city in Texas

Verified from each city’s published fee schedule. Where a city has no separate fee listed for this project, open the city page for the current requirements and amount.

2 rows

Permit fees by city in Texas
Permit feeSource
DallasSee city page for the current Residential New Construction Permit feeResidential New Construction Permit
Fort WorthSee city page for the current Residential Building Permit (New Construction, Addition & Remodel) feeResidential Building Permit (New Construction, Addition & Remodel)

See the national overview for this permit →