Fort Worth building permits

Fort Worth, Texas — as published 2026-09-06.

Reviewed 2026-09-06 · Source

Codes adopted

2021 International Building Code (ICC) - effective April 1, 2022, Ordinance No. 25382-03-20222021 International Residential Code (ICC) - effective April 1, 2022, Ordinance No. 25383-03-20222021 International Mechanical Code (ICC) - effective April 1, 2022, Ordinance No. 25384-03-20222021 International Plumbing Code and 2021 International Fuel Gas Code (ICC) - effective April 1, 2022, Ordinance No. 25385-03-20222021 International Existing Building Code (ICC) - effective April 1, 2022, Ordinance No. 25386-03-20222021 International Fire Code (ICC) - effective April 1, 2022, Ordinance No. 25388-03-2022Fort Worth Administrative Building Code (2021 edition) - Ordinance No. 25387-03-20222015 International Energy Conservation Code (ICC) - retained; NOT updated to the 2021 edition2018 International Swimming Pool and Spa Code (ICC) - effective September 1, 20202023 National Electrical Code (NFPA 70) - effective March 1, 2023 (a 2026 NEC is proposed, targeted effective September 1, 2026, per the city's Building & Energy Codes page)

Permit types & fees

Residential Building Permit (New Construction, Addition & Remodel)

Covers one- and two-family detached homes, duplexes and townhouses on individually platted lots, and their accessory structures. Required for new construction and for work that changes, moves, or repairs walls, floors, ceilings, windows, doors, electrical, mechanical or plumbing. Not required for cosmetic remodels (floor/wall covering, cabinets, countertops, shelving) or plumbing fixture replacement. Applicant must be a registered building contractor or qualify for a homestead permit (own and occupy the property as primary residence, per a homestead exemption from the appraisal district).

Reviewed 2026-09-06 · Source

Requirements

  • Applicant must be a registered building contractor, or qualify for a homestead permit (owner-occupied primary residence with homestead exemption)
  • Complete set of construction plans
  • All permits may be applied for online via Accela Citizen Access / CFW Permit Assist

Required documents

  • RequiredBuilding permit application (online, Accela Citizen Access)
  • RequiredComplete set of plans
  • RequiredNuts & Bolts of Residential Building Permits guide (PDF, English and Spanish)

Fee schedule

Fee typeAmountNotes

Commercial Building Permit (New Construction, Addition & Remodel)

Required for new commercial construction, commercial accessory buildings, remodels and additions to commercial or industrial buildings (multifamily projects are treated as commercial). The building permit must be obtained and issued before a trade permit (electrical/mechanical/plumbing) can be applied for. Permits are not required for cosmetic remodels or plumbing fixture replacement.

Reviewed 2026-09-06 · Source

Requirements

  • Projects with construction costs of $50,000 or more must register with the Texas Department of Licensing and Regulation for Architectural Barriers (TABS) and provide the registration number at time of application
  • Building permit must be issued before trade permits (electrical, mechanical, plumbing) can be applied for
  • Additional requirements may apply depending on property location, zoning, or area design guidelines

Required documents

  • RequiredApplication
  • RequiredChecklist/Requirements
  • RequiredUse Verification Form (new construction, remodel, change of use)
  • RequiredRemodel/Change of Use Questionnaire (remodel, change of use)
  • RequiredComplete Set of Plans
  • RequiredCertified copy of Plat (new construction, additions, accessory structures)
  • RequiredSite Plan (new construction, accessory structures, change of use)
  • RequiredEnergy Code Compliance documentation (if adding conditioned/heated space or lighting)

Fee schedule

Fee typeAmountNotes

Electrical Permit

Required for changing, moving, or repairing electrical equipment, including electrical services, at residential or commercial properties. For new commercial construction, additions and remodels, the electrical permit is a trade permit that can only be applied for after the building permit has been issued.

Reviewed 2026-09-06 · Source

Requirements

  • Building permit must be issued first for new commercial construction/additions/remodels before an electrical trade permit can be applied for
  • Work must comply with the 2023 National Electrical Code (NFPA 70) with local amendments

Required documents

    Fee schedule

    Fee typeAmountNotes

    Plumbing Permit

    Required for changing, installing, moving or repairing plumbing, including water heaters and shower pans. New sprinkler/irrigation system installations and valve replacement also require a plumbing permit. For new commercial construction, additions and remodels, the plumbing permit is a trade permit that can only be applied for after the building permit has been issued.

    Reviewed 2026-09-06 · Source

    Requirements

    • Building permit must be issued first for new commercial construction/additions/remodels before a plumbing trade permit can be applied for
    • Work must comply with the 2021 International Plumbing Code with local amendments

    Required documents

      Fee schedule

      Fee typeAmountNotes

      Mechanical Permit

      Required for changing, moving, or repairing mechanical equipment such as central heating and air-conditioning systems, duct work, and exhaust fans. For new commercial construction, additions and remodels, the mechanical permit is a trade permit that can only be applied for after the building permit has been issued.

      Reviewed 2026-09-06 · Source

      Requirements

      • Building permit must be issued first for new commercial construction/additions/remodels before a mechanical trade permit can be applied for
      • Work must comply with the 2021 International Mechanical Code with local amendments

      Required documents

        Fee schedule

        Fee typeAmountNotes

        Residential Re-Roof Permit

        Required to re-roof and replace decking on a residential lot. Replacement of decking material, lathing boards, sheathing boards, rafters or ridge boards requires a building permit. Shingle-only replacement does not require a permit, but there is a limit on the number of shingle layers allowed.

        Reviewed 2026-09-06 · Source

        Requirements

        • Only triggered when decking, lathing, sheathing, rafters, or ridge boards are being replaced — shingle-only replacement is exempt
        • A limit applies to the number of shingle layers allowed even when no permit is required

        Required documents

        • RequiredRoofing FAQs (PDF)

        Fee schedule

        Fee typeAmountNotes

        Fence and Retaining Wall Permit

        Fences in the front yard and projected front yard can be no more than 4 feet tall and must be open design picket-style; chain link is prohibited in the front yard and projected front yard. A building permit is required for solid fences with a height above 7 feet and for open fences with a height above 8 feet. Retaining walls greater than 4 feet tall (measured from the bottom of the footing to the top of the wall) also require a permit. Fences may require additional approval if the property is in a historic district.

        Reviewed 2026-09-06 · Source

        Requirements

        • Permit only required above height thresholds: solid fences over 7 ft, open picket-style fences over 8 ft, or retaining walls over 4 ft
        • Front-yard/projected-front-yard fences limited to 4 ft, open picket-style; chain link prohibited there regardless of height
        • Additional historic-district approval may apply

        Required documents

          Fee schedule

          Fee typeAmountNotes

          Swimming Pool Permit

          Swimming pools are treated as accessory structures and require a building permit. This applies to residential pools on the same lot as the house (Residential Accessory New Permit) and to commercial swimming pools on commercial/industrial sites (Commercial New Accessory Structure permit). Additional zoning requirements apply based on location, maximum height, and square footage relative to lot size. Pools must also comply with the adopted 2018 International Swimming Pool and Spa Code.

          Reviewed 2026-09-06 · Source

          Requirements

          • Zoning requirements apply for location, maximum height, and square footage based on lot size
          • Must comply with the 2018 International Swimming Pool and Spa Code with local amendments

          Required documents

            Fee schedule

            Fee typeAmountNotes

            Demolition / Razing / Wrecking Permit

            Demolition of interior walls or removal of a building from a property requires a permit. The Residential Razing Permit is used to completely demolish a single-family home, duplex, or townhouse on its own lot; the Commercial Razing Permit is used to completely demolish freestanding structures on a commercial or industrial site. Demolishing only a portion of a building falls under the applicable remodel building permit instead.

            Reviewed 2026-09-06 · Source

            Requirements

            • Complete demolition of a whole structure uses the Razing/Wrecking permit; partial demolition uses the applicable remodel building permit

            Required documents

            • RequiredWrecking/Razing Permit application and checklist (PDF)

            Fee schedule

            Fee typeAmountNotes

            Solar Panel Permit (Accessory Structure)

            The city does not publish a standalone 'solar permit' page. Solar panels are named explicitly, alongside gazebos, wind turbines and radio towers, as an example of an accessory structure requiring a building permit under the Residential Permitting page's 'Pools and Other Small Structures' section. Electrical work to interconnect a solar system (e.g., new electrical service or equipment) separately requires an electrical permit.

            Reviewed 2026-09-06 · Source

            Requirements

            • Filed as an accessory-structure building permit (per the Residential/Commercial Accessory Structure permit categories), not a separate 'solar' permit type
            • Electrical interconnection work requires a separate electrical permit

            Required documents

              Fee schedule

              Fee typeAmountNotes

              Sources & verification

              Key facts verified against official sources. Last reviewed 2026-09-06.

              Applications & forms

              Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fort Worth building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

              View current record →All versions →