Skip to main content
PermitBase

Austin building permits

Department contacts, adopted codes, permit types, fees, and gotchas for Austin, Texas.

Last verified 2026-09-06 · Source · Embed this page’s badge · Version history

Building department

Address
6310 Wilhelmina Delco Dr., Austin, TX 78752
Phone
512-978-4000
Office hours
Chat and phone staffed 8 a.m.-4 p.m., Monday through Thursday; on Fridays staff are unavailable for online chat and phone inquiries. 3-1-1 after hours.

Inspection guide

See how inspections work in Austin — sequence, scheduling & re-inspection fees.

Codes adopted

Texas adopts the International Residential Code as it existed on May 1, 2012 as the municipal residential building code, by statute rather than through a state agency. A municipality may adopt local amendments that add, modify, or remove requirements set by that code, and may review and consider later International Code Council changes but is not obliged to. The statutory edition does not advance on a cycle.

  • 2024 International Building Code (ICC), adopted at City Code 25-12-1 with the deletions listed in that section
  • 2024 International Residential Code for One- and Two-Family Dwellings (ICC), with Appendices BA, BB, BF, BI, BJ, BK, BL, BM and BO
  • 2026 National Electrical Code and Annex H (NFPA), adopted at City Code 25-12-61. Show full text

    2026 National Electrical Code and Annex H (NFPA), adopted at City Code 25-12-61. The electrical edition is set at STATE level, not by Austin: TDLR adopts the NEC as the statewide electrical code under the Texas Electrical Safety and Licensing Act, so this differing edition is a state mandate rather than a local choice. NOTE A LIVE DISCREPANCY: TDLR's own compliance guide still states the 2023 edition, effective 1 September 2023, while Austin's ordinance and Houston's permitting-centre notices both carry the 2026 edition. Recorded as a disagreement between official sources rather than resolved by picking one.

  • 2024 Uniform Mechanical Code (IAPMO) - Austin adopts the UMC, not the International Mechanical Code
  • 2024 Uniform Plumbing Code (IAPMO) - Austin adopts the UPC, not the International Plumbing Code
  • 2024 International Fire Code (ICC), with Appendices B and F
  • 2024 International Energy Conservation Code (ICC), with Appendices CG, CH, CI, CJ, RE, RF, RJ and RK
  • 2024 International Existing Building Code (ICC)
  • 2024 International Property Maintenance Code (ICC)
  • 2024 International Wildland-Urban Interface Code (ICC), with Appendices A, B, C and D
  • 2024 International Swimming Pool and Spa Code (ICC)

Permit types & fees

Property Access

Austin's permit history is searchable by address

2,373,173 permits on record for Austin, 1921–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
1,327units

266 buildings · $0 valuation

Trailing 12 months
7,332units

12 of 12 months reported · #3 in Texas coverage by units

Year to date (2026 YTD through 2026-07)
3,496units

1,429 buildings · $362.1M valuation

7 month(s) reported to Census

Full year 2025
8,893units

2,369 buildings · $1,568.3M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Texas building activity

Tips & gotchas

  • Austin's adopted codes come from THREE publishers - ICC, IAPMO and NFPA - so asking for 'the international code' will not identify the governing document for mechanical, plumbing or electrical work.
  • Application status is tracked in the Austin Build + Connect (AB+C) portal.
  • The published review times took effect 1 July 2026 and reduced timelines for several project types; a figure quoted from before that date will be too long.
  • Volume Builder review times revert to New Construction times when an additional review group, such as Tree or Fire review, is required.