This is PermitBase’s published record for Unincorporated Cache County as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Cache County building permits

Verified

Unincorporated Cache County, Utah — as published 2026-06-30.

Verified 2026-06-30 · Source

Codes adopted

2021 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective through June 30, 20262021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); continues in force after July 1, 20262021 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective through June 30, 20262021 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective through June 30, 20262021 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective through June 30, 20262021 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective through June 30, 20262021 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective through June 30, 20262021 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n); effective through June 30, 20262023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force. NOTE: The Cache County Building Code Information page (last seen 2026-06-30) still lists '2020 NEC' — that page is not updated; the statewide 2023 NEC is the legally in-force edition.NOTE: Effective July 1, 2026 — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replace the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026)

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, and structural alterations in unincorporated Cache County. The Cache County Building Division issues permits for unincorporated county areas and many incorporated municipalities (Amalga, Avon, Benson, Cornish, Cove, Hyrum, Millville, Paradise, Petersboro, Providence, Richmond, River Heights, Smithfield, Trenton, Wellsville). Logan City and several others issue their own permits.

Verified 2026-06-30 · Source

Requirements

  • New single-family dwelling construction
  • Additions to existing residential structures
  • Any structural modification or alteration
  • Projects with valuation over $500
  • New SFD plans must be engineered plans (per Cache County Building Division policy)

Required documents

  • RequiredBuilding Permit ApplicationCompleted editable PDF form (BP_Application_Editable2024Updated.pdf). All applications must be submitted digitally via email to cachecountyplanreview@gmail.com. All materials must be submitted at once — incomplete packets are not accepted.
  • RequiredApproved Zoning Clearance and Site PlanFrom the Cache County Zoning Office or appropriate city office, required before building permit application is processed
  • RequiredComplete Set of Building Plans (PDF)Floor plan with dimensions for all levels, garages, decks, porches, plumbing plan, electrical plan, heating/AC plan. Elevations of all four sides. Footing, foundation, truss/rafter, and all egress details. Engineered plans required for new SFD.
  • OptionalManual J&D FormHVAC duct sizing and layout from your mechanical contractor — required for new SFD with furnace and when replacing a furnace in a remodel
  • RequiredREScheck (Energy Compliance)Demonstrates compliance with adopted Utah energy code (see energycodes.gov/rescheck)
  • OptionalOwner/Builder CertificationRequired if doing work yourself (residential new construction, remodel, and addition only). Submitted to State of Utah.

Fee schedule

Fee typeAmountNotes
Residential Valuation FormulaMain Floor sq ft × $150 + Upper Floors sq ft × $120 + Basement sq ft × $80 + Garage sq ft × $55 = Project ValuationCache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024). Example from fee schedule: 1,200 main + 1,400 upper + 1,200 basement + 650 garage = $479,750 valuation → $3,000 base fee.
New SFD — valuation $0–$300,000$2,500Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024)
New SFD — valuation $300,000–$500,000$3,000Cache County Building Division Fee Schedule, Ord. 2024-18
New SFD — valuation $500,000–$750,000$3,800Cache County Building Division Fee Schedule, Ord. 2024-18
New SFD — valuation $750,000–$1,000,000$4,800Cache County Building Division Fee Schedule, Ord. 2024-18
New SFD — valuation over $1,000,000Consult building departmentCache County Building Division Fee Schedule, Ord. 2024-18
Plan Review Fee15% of base permit feeCache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18; assessed if not ready when inspector arrives
Credit/Debit Card Processing Fee2.5% service fee (AMEX not accepted); e-check $0.49 flatCache County Building Permit Applications page, cachecounty.gov/building/building-permit-applications.html

Electrical Permit

Verified

Required for electrical meter upgrades, new service, generator installations, and other electrical work in unincorporated Cache County. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). Note: the County's Building Code Information page shows '2020 NEC' but the statewide 2023 NEC is legally in force.

Verified 2026-07-01 · Source

Requirements

  • Electrical meter or service upgrade
  • Generator installation
  • Generlink transfer switch installation
  • New circuits, panel upgrades, rewiring (contact building office to confirm if utility permit applies)

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com with all required documentation at once
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL). Homeowners may pull their own permit for work on their own primary residence but must still pass inspection.

Fee schedule

Fee typeAmountNotes
Electrical Meter Upgrade (Residential)$75Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024)
Generator Permit$100Cache County Building Division Fee Schedule, Ord. 2024-18
Generlink Transfer Switch Permit$75Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Mechanical / HVAC Permit

Verified

Required for furnace/AC replacement and gas line/meter upgrades in unincorporated Cache County. The county FAQ indicates simple furnace replacements may use a utility permit — call to confirm. Governed by the 2021 International Mechanical Code (IMC) / 2021 International Fuel Gas Code (IFGC) as adopted by Utah Code § 15A-2-103 (2024 IMC/IFGC effective July 1, 2026).

Verified 2026-06-30 · Source

Requirements

  • Furnace or AC replacement (residential)
  • Gas line or meter upgrade
  • New HVAC system installation
  • Ductwork installation or major modification

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • OptionalManual J&D FormRequired for new SFD with furnace and when replacing a furnace in a remodel — HVAC duct sizing and layout from mechanical contractor
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump

Fee schedule

Fee typeAmountNotes
Furnace/AC Replacement (Residential)$75Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024)
Gas Line/Meter Upgrade (Residential)$75Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs including water heater replacement in unincorporated Cache County. Governed by the 2021 International Plumbing Code (IPC) as adopted by Utah Code § 15A-2-103 (2024 IPC effective July 1, 2026). The fee schedule lists water heater replacement as its own line item at $75.

Verified 2026-07-01 · Source

Requirements

  • Water heater installation or replacement
  • New plumbing fixture installations
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • OptionalPlumbing PlanIsometric drawing showing fixture locations, pipe sizes, and drainage — required for larger projects
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Water Heater Replacement (Residential)$75Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024). Flat fee, its own line item in the RESIDENTIAL PERMITS table (fee schedule PDF re-fetched and re-confirmed live 2026-07-01).
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Roofing Permit

Verified

Required for roof replacement and re-roofing in unincorporated Cache County. The fee schedule lists a flat 'Reroof' fee.

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com with all required documentation
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Reroof Permit$130Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024)
Plan Review Fee15% of base fee ($19.50)Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in unincorporated Cache County. The county FAQ confirms rooftop solar needs a building permit but does not need a zoning clearance. Ground pedestal solar also does not need a zoning clearance but requires a building permit.

Verified 2026-06-30 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • No zoning clearance required for solar in unincorporated county areas (per Development Services Director determination)

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com — no Manual J&D required for solar
  • RequiredSolar Site Plan / Roof PlanDiagrams/plans showing where panels will go on the roof, dimensions
  • RequiredEquipment SpecificationsManufacturer specifications showing materials, weight, etc.
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power) required before energizing

Fee schedule

Fee typeAmountNotes
Solar Permit (Residential)$400Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024)
Solar Batteries$200Cache County Building Division Fee Schedule, Ord. 2024-18
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Deck Permit

Verified

Required for new deck, patio, or covered porch construction in unincorporated Cache County. The fee schedule lists a flat 'Deck/Patio/Covered Porch' fee.

Verified 2026-06-30 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Covered porches and patios

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredApproved Zoning Clearance and Site PlanFrom Cache County Zoning Office, required before building permit
  • RequiredConstruction DrawingsFraming plan with beam/joist sizes, post locations, footing details, and ledger attachment method

Fee schedule

Fee typeAmountNotes
Deck/Patio/Covered Porch Permit$300Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024)
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Fence Permit

Verified

Required for fences over 7 feet tall in unincorporated Cache County. The county FAQ explicitly states: 'Fences not exceeding 7 ft tall — Permit not required.'

Verified 2026-06-30 · Source

Requirements

  • Fences over 7 feet in height require a permit
  • Fences 7 feet or under in height — no permit required per Cache County FAQ

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • OptionalSite PlanShowing fence location relative to property lines

Fee schedule

Fee typeAmountNotes
Fence Permit (over 7 ft)$200Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024). Fences 7 ft or under do not require a permit per Cache County FAQ.
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Accessory Dwelling Unit (ADU)

Verified

Required for construction of an internal or detached ADU in unincorporated Cache County. The fee schedule lists separate fee items for Internal ADU and Detached ADU (which uses the same fee tiers as new SFD construction). Contact Planning & Zoning for zoning eligibility.

Verified 2026-07-01 · Source

Requirements

  • Property must be zoned to allow ADU use — contact Cache County Planning & Zoning at (435) 755-1640
  • Internal ADUs (basement apartments, garage conversions) require a separate building permit
  • Detached ADUs are valued and permitted under the standard new-construction fee schedule
  • Separate entrance required from primary dwelling

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredApproved Zoning Clearance and Site PlanFrom Cache County Planning & Zoning — required before building permit is processed
  • RequiredFull Construction Plans (PDF)Complete floor plan, elevations, structural details. Engineered plans required if new detached structure.

Fee schedule

Fee typeAmountNotes
Internal ADU Permit$300Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024) — flat fee, re-confirmed live 2026-07-01
Internal ADU Plan Review$50Cache County Building Division Fee Schedule, Ord. 2024-18
Detached ADU — valuation $0–$300,000$2,500Cache County Building Division Fee Schedule, Ord. 2024-18 — detached ADU uses the new SFD fee tiers
Detached ADU — valuation $300,000–$500,000$3,000Cache County Building Division Fee Schedule, Ord. 2024-18
Detached ADU — valuation $500,000–$750,000$3,800Cache County Building Division Fee Schedule, Ord. 2024-18
Detached ADU — valuation $750,000–$1,000,000$4,800Cache County Building Division Fee Schedule, Ord. 2024-18
Detached ADU — valuation over $1,000,000Consult building departmentCache County Building Division Fee Schedule, Ord. 2024-18
Plan Review Fee (Detached ADU)15% of base permit feeCache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in unincorporated Cache County. The fee schedule lists a flat 'Basement Finish' fee. Note: basement finish inspections are physically inspected only if there is an outside entrance and the owner/contractor is present.

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (requires plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
  • OptionalElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations

Fee schedule

Fee typeAmountNotes
Basement Finish Permit$300Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024) — flat fee, its own line item, re-confirmed live 2026-07-01
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Demolition Permit

Verified

Required for demolition or removal of any structure in unincorporated Cache County. The state of Utah requires all structures to be demolished or moved to have a Demolition Permit.

Verified 2026-06-30 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Moving a structure off the property

Required documents

  • RequiredDemolition Permit ApplicationFill out and call the office for further instructions: (435) 755-1650 press 1
  • OptionalAsbestos SurveyFederal NESHAP regulations require an asbestos inspection for structures that may contain asbestos-containing materials (typically pre-1980 construction)
  • RequiredUtility Disconnect ConfirmationUtilities must be disconnected before demolition

Fee schedule

Fee typeAmountNotes
Demolition Permit$50Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024)
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18

Swimming Pool Permit

Verified

Required for in-ground and above-ground swimming pool installation in unincorporated Cache County. The fee schedule lists a flat swimming pool fee.

Verified 2026-07-01 · Source

Requirements

  • In-ground swimming pool construction
  • Above-ground pools with depth over 24 inches (IRC R326 threshold)
  • Pool barrier/fence required for all pools
  • Contact Planning & Zoning for zoning clearance before applying

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredApproved Zoning Clearance and Site PlanFrom Cache County Zoning Office
  • RequiredPool PlansPool dimensions, depth, equipment location, and structural details
  • RequiredBarrier PlanPool fence/barrier details meeting IRC Chapter 31 requirements
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details

Fee schedule

Fee typeAmountNotes
Swimming Pool Permit$750Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024) — flat fee, its own line item, re-confirmed live 2026-07-01
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Retaining Wall Permit

Verified

Required for retaining walls over 4 feet in height (measured from bottom of footing to top of wall) in unincorporated Cache County. The county FAQ explicitly states retaining walls over 4 feet are required to have engineered plans and stamped.

Verified 2026-06-30 · Source

Requirements

  • Retaining walls over 4 feet in total height (bottom of footing to top of wall)
  • Engineered plans stamped by a licensed Utah PE required
  • Any retaining wall supporting a surcharge

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredEngineered Wall PlansStamped structural drawings from a licensed Utah PE — required per Cache County FAQ for walls over 4 ft
  • RequiredSite PlanWall location relative to property lines, structures, and utilities

Fee schedule

Fee typeAmountNotes
Retaining Wall Permit (4 ft+)$250Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024)
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Cache County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-27)Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/cache-county/unincorporated-cache/as-of/2026-06-30/

Snapshot date: 2026-06-30

Commit: a45de4c

Reproducible from PermitBase’s version-controlled dataset, commit a45de4c.