Skip to main content
PermitBase

This is PermitBase’s published record for Unincorporated Cache County as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Cache County building permits

Verified

Unincorporated Cache County, Utah — as published 2026-07-19.

Verified 2026-07-17 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2021 International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — Utah Code § 15A-2-103(1)(b)/(c); unchanged by the July 1, 2026 revision — still the current edition2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both. NOTE (county page live-checked 2026-07-16): the Cache County Building Code Information page lists 2024 IECC in its main statewide-codes list but separately carries a 'Residential Code: 2021 IRC and the 2021 IECC' line for dwellings up to a duplex — that residential IECC carve-out lags the statute, which adopts a single 2024 IECC edition with no residential/commercial split; the statewide 2024 IECC governs.2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 revision. NOTE: The Cache County Building Code Information page (last seen 2026-06-30) still lists '2020 NEC' — that page is not updated; the statewide 2023 NEC is the legally in-force edition.NOTE (verified 2026-07-16 against the live Utah Code § 15A-2-103 text, version headed 'Effective 7/1/2026 / Superseded 1/1/2027'): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC listed above took effect July 1, 2026, replacing the 2021 editions; IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. This file previously forecast this change but still led with the 2021 editions as current — corrected on this date.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, and structural alterations in unincorporated Cache County. The Cache County Building Division issues permits for unincorporated county areas and many incorporated municipalities (Amalga, Avon, Benson, Cornish, Cove, Hyrum, Millville, Paradise, Petersboro, Providence, Richmond, River Heights, Smithfield, Trenton, Wellsville). Logan City and several others issue their own permits.

Verified 2026-07-17 · Source

Requirements

  • New single-family dwelling construction
  • Additions to existing residential structures
  • Any structural modification or alteration
  • Projects with valuation over $500
  • New SFD plans must be engineered plans (per Cache County Building Division policy)

Required documents

  • RequiredBuilding Permit ApplicationCompleted editable PDF form (BP_Application_Editable2024Updated.pdf). All applications must be submitted digitally via email to cachecountyplanreview@gmail.com. All materials must be submitted at once — incomplete packets are not accepted.
  • RequiredApproved Zoning Clearance and Site PlanFrom the Cache County Zoning Office or appropriate city office, required before building permit application is processed
  • RequiredComplete Set of Building Plans (PDF)Floor plan with dimensions for all levels, garages, decks, porches, plumbing plan, electrical plan, heating/AC plan. Elevations of all four sides. Footing, foundation, truss/rafter, and all egress details. Engineered plans required for new SFD.
  • OptionalManual J&D FormHVAC duct sizing and layout from your mechanical contractor — required for new SFD with furnace and when replacing a furnace in a remodel
  • RequiredREScheck (Energy Compliance)Demonstrates compliance with adopted Utah energy code (see energycodes.gov/rescheck)
  • OptionalOwner/Builder CertificationRequired if doing work yourself (residential new construction, remodel, and addition only). Submitted to State of Utah.

Fee schedule

Fee typeAmountNotes
Residential Valuation FormulaMain Floor sq ft × $150 + Upper Floors sq ft × $120 + Basement sq ft × $80 + Garage sq ft × $55 = Project ValuationCache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024). Example from fee schedule: 1,200 main + 1,400 upper + 1,200 basement + 650 garage = $479,750 valuation → $3,000 base fee.
New SFD — valuation $0–$300,000$2,500Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024), table 'Single Family Dwelling - New Construction - Unincorporated'; re-verified live 2026-07-17
New SFD — valuation $300,000–$500,000$3,000Cache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17
New SFD — valuation $500,000–$700,000$3,800
Cache County Building Division Fee Schedule, Ord. Show full citation

Cache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17. CORRECTED 2026-07-17: this file previously listed the bracket as $500,000–$750,000; the live PDF's 'Single Family Dwelling - New Construction - Unincorporated' table breaks at $700,000, not $750,000.

New SFD — valuation $700,000–$850,000$5,200
Cache County Building Division Fee Schedule, Ord. Show full citation

Cache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17. CORRECTED 2026-07-17: this bracket was missing from this file — the old 5-tier structure ($2,500/$3,000/$3,800/$4,800/Consult at 300k/500k/750k/1M breakpoints) had been copied from the Detached ADU fee table rather than the actual SFD table.

New SFD — valuation $850,000–$1,000,000$7,800Cache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17. CORRECTED 2026-07-17: this bracket was missing from this file (previously covered by the erroneous $750,000–$1,000,000 / $4,800 ADU-table row).
New SFD — valuation $1,000,000–$2,000,000$8,600
Cache County Building Division Fee Schedule, Ord. Show full citation

Cache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17. CORRECTED 2026-07-17: this file previously jumped straight to 'over $1,000,000 — Consult' with no $1M–$2M tier; the PDF's unincorporated SFD table has a distinct $8,600 tier here, with 'Consult' reserved for over $2,000,000.

New SFD — valuation over $2,000,000Consult building departmentCache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17. CORRECTED 2026-07-17: threshold moved from over $1,000,000 to over $2,000,000 to match the PDF's unincorporated SFD table.
Plan Review Fee15% of base permit feeCache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18; assessed if not ready when inspector arrives
Credit/Debit Card Processing Fee2.5% service fee (AMEX not accepted); e-check $0.49 flatCache County Building Permit Applications page, cachecounty.gov/building/building-permit-applications.html

Electrical Permit

Verified

Required for electrical meter upgrades, new service, generator installations, and other electrical work in unincorporated Cache County. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). Note: the County's Building Code Information page shows '2020 NEC' but the statewide 2023 NEC is legally in force. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the county's Building Division Fee Schedule does not publish an EV-specific line item.

Verified 2026-07-17 · Source

Requirements

  • Electrical meter or service upgrade
  • Generator installation
  • Generlink transfer switch installation
  • New circuits, panel upgrades, rewiring (contact building office to confirm if utility permit applies)

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com with all required documentation at once
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL). Homeowners may pull their own permit for work on their own primary residence but must still pass inspection.

Fee schedule

Fee typeAmountNotes
Electrical Meter Upgrade (Residential)$75Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024); fee schedule PDF re-fetched and re-confirmed live 2026-07-17 (flat fee, unchanged)
Generator Permit$100Cache County Building Division Fee Schedule, Ord. 2024-18
Generlink Transfer Switch Permit$75Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Mechanical / HVAC Permit

Verified

Required for furnace/AC replacement and gas line/meter upgrades in unincorporated Cache County. The county FAQ indicates simple furnace replacements may use a utility permit — call to confirm. Governed by the 2024 International Mechanical Code (IMC) / 2024 International Fuel Gas Code (IFGC) as adopted by Utah Code § 15A-2-103, effective July 1, 2026 (2021 editions governed through June 30, 2026).

Verified 2026-07-17 · Source

Requirements

  • Furnace or AC replacement (residential)
  • Gas line or meter upgrade
  • New HVAC system installation
  • Ductwork installation or major modification

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • OptionalManual J&D FormRequired for new SFD with furnace and when replacing a furnace in a remodel — HVAC duct sizing and layout from mechanical contractor
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump

Fee schedule

Fee typeAmountNotes
Furnace/AC Replacement (Residential)$75Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024); fee schedule PDF re-fetched and re-confirmed live 2026-07-17 (flat fee, unchanged)
Gas Line/Meter Upgrade (Residential)$75Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs including water heater replacement in unincorporated Cache County. Governed by the 2024 International Plumbing Code (IPC) as adopted by Utah Code § 15A-2-103, effective July 1, 2026 (2021 edition governed through June 30, 2026). The fee schedule lists water heater replacement as its own line item at $75.

Verified 2026-07-17 · Source

Requirements

  • Water heater installation or replacement
  • New plumbing fixture installations
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • OptionalPlumbing PlanIsometric drawing showing fixture locations, pipe sizes, and drainage — required for larger projects
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Water Heater Replacement (Residential)$75Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024). Flat fee, its own line item in the RESIDENTIAL PERMITS table (fee schedule PDF re-fetched and re-confirmed live 2026-07-01; re-confirmed again live 2026-07-17, unchanged).
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Roofing Permit

Verified

Required for roof replacement and re-roofing in unincorporated Cache County. The fee schedule lists a flat 'Reroof' fee.

Verified 2026-07-17 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com with all required documentation
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Reroof Permit$130Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024); re-verified live 2026-07-17, unchanged
Plan Review Fee15% of base fee
Cache County Building Division Fee Schedule, Ord. Show full citation

Cache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17. CORRECTED 2026-07-17: the PDF states this row as a percentage formula only ('15% of Base fee') — no dollar figure appears next to Reroof in the source. This file previously appended a computed illustration, '($19.50)' = 15% of the $130 Reroof fee, as if it were quoted text; the arithmetic was correct but the figure was PermitBase's own derivation, not something stated in the PDF, so it has been removed to avoid implying the source quotes a dollar amount.

State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in unincorporated Cache County. The county FAQ confirms rooftop solar needs a building permit but does not need a zoning clearance. Ground pedestal solar also does not need a zoning clearance but requires a building permit.

Verified 2026-07-17 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • No zoning clearance required for solar in unincorporated county areas (per Development Services Director determination)

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com — no Manual J&D required for solar
  • RequiredSolar Site Plan / Roof PlanDiagrams/plans showing where panels will go on the roof, dimensions
  • RequiredEquipment SpecificationsManufacturer specifications showing materials, weight, etc.
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power) required before energizing

Fee schedule

Fee typeAmountNotes
Solar Permit (Residential)$400Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024); fee schedule PDF re-fetched and re-confirmed live 2026-07-17 (unchanged)
Solar Batteries$200Cache County Building Division Fee Schedule, Ord. 2024-18
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Deck Permit

Verified

Required for new deck, patio, or covered porch construction in unincorporated Cache County. The fee schedule lists a flat 'Deck/Patio/Covered Porch' fee.

Verified 2026-07-17 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Covered porches and patios

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredApproved Zoning Clearance and Site PlanFrom Cache County Zoning Office, required before building permit
  • RequiredConstruction DrawingsFraming plan with beam/joist sizes, post locations, footing details, and ledger attachment method

Fee schedule

Fee typeAmountNotes
Deck/Patio/Covered Porch Permit$300Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024); fee schedule PDF re-fetched and re-confirmed live 2026-07-17 (unchanged)
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Fence Permit

Verified

Required for fences over 7 feet tall in unincorporated Cache County. The county FAQ explicitly states: 'Fences not exceeding 7 ft tall — Permit not required.'

Verified 2026-07-17 · Source

Requirements

  • Fences over 7 feet in height require a permit
  • Fences 7 feet or under in height — no permit required per Cache County FAQ

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • OptionalSite PlanShowing fence location relative to property lines

Fee schedule

Fee typeAmountNotes
Fence Permit (over 7 ft)$200
Cache County Building Division Fee Schedule, Ord. Show full citation

Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024); fee schedule PDF re-fetched and re-confirmed live 2026-07-17 (unchanged). Fences 7 ft or under do not require a permit per Cache County FAQ (FAQ quote re-verified live 2026-07-17: 'Fences not exceeding 7 ft tall. Permit not required.').

Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Accessory Dwelling Unit (ADU)

Verified

Required for construction of an internal or detached ADU in unincorporated Cache County. The fee schedule lists separate fee items for Internal ADU and Detached ADU (which uses the same fee tiers as new SFD construction). Contact Planning & Zoning for zoning eligibility.

Verified 2026-07-17 · Source

Requirements

  • Property must be zoned to allow ADU use — contact Cache County Planning & Zoning at (435) 755-1640
  • Internal ADUs (basement apartments, garage conversions) require a separate building permit
  • Detached ADUs are valued and permitted under the standard new-construction fee schedule
  • Separate entrance required from primary dwelling

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredApproved Zoning Clearance and Site PlanFrom Cache County Planning & Zoning — required before building permit is processed
  • RequiredFull Construction Plans (PDF)Complete floor plan, elevations, structural details. Engineered plans required if new detached structure.

Fee schedule

Fee typeAmountNotes
Internal ADU Permit$300Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024) — flat fee, re-confirmed live 2026-07-01; re-confirmed again live 2026-07-17, unchanged
Internal ADU Plan Review$50Cache County Building Division Fee Schedule, Ord. 2024-18
Detached ADU — valuation $0–$300,000$2,500Cache County Building Division Fee Schedule, Ord. 2024-18 — Detached ADU has its own valuation-tier table (distinct from the actual SFD table); re-verified live 2026-07-17 against the PDF's 'Detached Accessory Dwelling Unit (ADU)' table, confirmed matching
Detached ADU — valuation $300,000–$500,000$3,000Cache County Building Division Fee Schedule, Ord. 2024-18
Detached ADU — valuation $500,000–$750,000$3,800Cache County Building Division Fee Schedule, Ord. 2024-18
Detached ADU — valuation $750,000–$1,000,000$4,800Cache County Building Division Fee Schedule, Ord. 2024-18
Detached ADU — valuation over $1,000,000Consult building departmentCache County Building Division Fee Schedule, Ord. 2024-18
Plan Review Fee (Detached ADU)15% of base permit feeCache County Building Division Fee Schedule, Ord. 2024-18
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in unincorporated Cache County. The fee schedule lists a flat 'Basement Finish' fee. Note: basement finish inspections are physically inspected only if there is an outside entrance and the owner/contractor is present.

Verified 2026-07-17 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (requires plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
  • OptionalElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations

Fee schedule

Fee typeAmountNotes
Basement Finish Permit$300Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024) — flat fee, its own line item, re-confirmed live 2026-07-01; re-confirmed again live 2026-07-17, unchanged
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17, unchanged
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Demolition Permit

Verified

Required for demolition or removal of any structure in unincorporated Cache County. The state of Utah requires all structures to be demolished or moved to have a Demolition Permit.

Verified 2026-07-17 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Moving a structure off the property

Required documents

  • RequiredDemolition Permit ApplicationFill out and call the office for further instructions: (435) 755-1650 press 1
  • OptionalAsbestos SurveyFederal NESHAP regulations require an asbestos inspection for structures that may contain asbestos-containing materials (typically pre-1980 construction)
  • RequiredUtility Disconnect ConfirmationUtilities must be disconnected before demolition

Fee schedule

Fee typeAmountNotes
Demolition Permit$50Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024); fee schedule PDF re-fetched and re-confirmed live 2026-07-17 (unchanged; no plan review fee listed for this permit type in the PDF, consistent with this file)
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18

Swimming Pool Permit

Verified

Required for in-ground and above-ground swimming pool installation in unincorporated Cache County. The fee schedule lists a flat swimming pool fee.

Verified 2026-07-17 · Source

Requirements

  • In-ground swimming pool construction
  • Above-ground pools with depth over 24 inches (IRC R326 threshold)
  • Pool barrier/fence required for all pools
  • Contact Planning & Zoning for zoning clearance before applying

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredApproved Zoning Clearance and Site PlanFrom Cache County Zoning Office
  • RequiredPool PlansPool dimensions, depth, equipment location, and structural details
  • RequiredBarrier PlanPool fence/barrier details meeting IRC Chapter 31 requirements
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details

Fee schedule

Fee typeAmountNotes
Swimming Pool Permit$750Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024) — flat fee, its own line item, re-confirmed live 2026-07-01; re-confirmed again live 2026-07-17, unchanged
Plan Review Fee$50Cache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17, unchanged
State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Retaining Wall Permit

Verified

Required for retaining walls over 4 feet in height (measured from bottom of footing to top of wall) in unincorporated Cache County. The county FAQ explicitly states retaining walls over 4 feet are required to have engineered plans and stamped.

Verified 2026-07-17 · Source

Requirements

  • Retaining walls over 4 feet in total height (bottom of footing to top of wall)
  • Engineered plans stamped by a licensed Utah PE required
  • Any retaining wall supporting a surcharge

Required documents

  • RequiredBuilding Permit ApplicationCompleted application emailed to cachecountyplanreview@gmail.com
  • RequiredEngineered Wall PlansStamped structural drawings from a licensed Utah PE — required per Cache County FAQ for walls over 4 ft
  • RequiredSite PlanWall location relative to property lines, structures, and utilities

Fee schedule

Fee typeAmountNotes
Retaining Wall Permit (4 ft+)$250Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024); re-verified live 2026-07-17, unchanged
Plan Review Fee15% of Base fee
Cache County Building Division Fee Schedule, Ord. Show full citation

Cache County Building Division Fee Schedule, Ord. 2024-18; re-verified live 2026-07-17. CORRECTED 2026-07-17: this file previously listed a flat $50 plan review fee here, matching the flat-fee pattern used by deck/fence/basement-finish/solar/pool permits. The live PDF's 'Retaining Wall (4 ft +)' row instead lists Plan Review Fee as '15% of Base fee' (15% of the $250 base fee = $37.50) — the same percentage-formula mechanism used for Reroof, Detached ADU, and Single Family Dwelling permits, not the $50 flat mechanism.

State Surcharge1% of permit feeCache County Building Division Fee Schedule, Ord. 2024-18
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18

Commercial Building Permit

Verified

Required for new commercial construction, additions, and remodels in unincorporated Cache County. The Cache County Building Division Fee Schedule (Ord. 2024-18) contains a dedicated COMMERCIAL PERMITS section with its own 'New Construction, Addition & Remodel (Commercial)' valuation table, separate from the residential/unincorporated SFD table used for houses. Plan review on commercial permits is 65% of the base fee (versus 15% on most residential permit types), and the state adds its standard 1% surcharge.

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction, addition, or remodel on a properly zoned parcel
  • Approved Zoning Clearance and Site Plan from Cache County Planning & Zoning ((435) 755-1640) before the building permit application is processed
  • Complete set of construction plans/drawings covering the full scope of work
  • Application Commercial Plan Review Deposit due at submittal — $1,000 for projects valued under $5,000,000, $2,500 for projects valued $5,000,000 and over
  • Owner/Builder Certification does not apply — Cache County's Building Permit Applications page limits that form to 'Residential new construction, remodel, and addition only, no commercial'

Required documents

  • RequiredBuilding Permit ApplicationCompleted application submitted digitally via email to cachecountyplanreview@gmail.com with all materials in one email — incomplete packets are not accepted, per the same submittal policy published for residential permits
  • RequiredApproved Zoning Clearance and Site PlanFrom the Cache County Planning & Zoning office, required before a commercial building permit application is processed
  • RequiredComplete Set of Construction Plans (PDF)Site plan, floor plans, elevations, and structural, electrical, mechanical, and plumbing plans for the full scope of work
  • RequiredCommercial Plan Review Deposit PaymentDeposit due at time of application per the fee schedule's 'Application Commercial Plan Review Deposit' line item — $1,000 (valuation below $5,000,000) or $2,500 (valuation $5,000,000+)

Fee schedule

Fee typeAmountNotes
New Construction, Addition & Remodel (Commercial) — valuation below $100,000$2,192Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024), COMMERCIAL PERMITS table 'New Construction, Addition & Remodel (Commercial)', row 'Total Valuation Below $100,000'; PDF fetched and confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $100,000–$250,000$3,254Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $100,000-$250,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $250,000–$500,000$5,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $250,000-$500,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $500,000–$1,000,000$7,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $500,000-$1,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $1,000,000–$2,500,000$9,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $1,000,000-$2,500,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $2,500,000–$5,000,000$15,900Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $2,500,000-$5,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $5,000,000–$7,000,000$24,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $5,000,000-$7,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $7,000,000–$10,000,000$35,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $7,000,000-$10,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $10,000,000–$15,000,000$54,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $10,000,000-$15,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $15,000,000–$20,000,000$68,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $15,000,000-$20,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $20,000,000–$30,000,000$108,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $20,000,000-$30,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $30,000,000–$40,000,000$140,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $30,000,000-$40,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $40,000,000–$50,000,000$165,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $40,000,000-$50,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation $50,000,000–$60,000,000$200,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $50,000,000-$60,000,000'; confirmed live 2026-07-19.
New Construction, Addition & Remodel (Commercial) — valuation over $60,000,000Consult building departmentCache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation Over $60,000,000'; confirmed live 2026-07-19.
Plan Review Fee65% of base feeCache County Building Division Fee Schedule, Ord. 2024-18 — every row of the 'New Construction, Addition & Remodel (Commercial)' table lists '65% of Base Fee' in its Plan Review Fees column, versus 15% used on most residential permit types; confirmed live 2026-07-19.
State Surcharge1% of base feeCache County Building Division Fee Schedule, Ord. 2024-18, row 'State Regulated 1% toward all building permit fees - Commercial'; confirmed live 2026-07-19.
Application Commercial Plan Review Deposit — valuation below $5,000,000$1,000Cache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Application Commercial Plan Review Deposit — Total Valuation Below $5,000,000'; confirmed live 2026-07-19.
Application Commercial Plan Review Deposit — valuation $5,000,000 and over$2,500Cache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Application Commercial Plan Review Deposit — Total Valuation Over $5,000,000'; confirmed live 2026-07-19.
Building Permit Renewal$75Cache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Building Permit Renewal'; confirmed live 2026-07-19.
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Re-inspection Fee'; confirmed live 2026-07-19.
Other Inspections, No Specific Fee Noted$75 per hourCache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Other Inspections, No Specific Fee Noted'; confirmed live 2026-07-19.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement (tenant finish) work in existing commercial buildings in unincorporated Cache County — interior build-outs, remodels, and finish work for a new or changing tenant space. Listed as its own 'Tenant Improvement/Finish' line item in the COMMERCIAL PERMITS section of the county's fee schedule (Ord. 2024-18), distinct from and generally cheaper than the 'New Construction, Addition & Remodel (Commercial)' table. The three lowest valuation tiers are billed as a flat fee with no added plan-review percentage; the schedule switches to a base fee plus 65% plan-review percentage at $500,000+ valuation.

Verified 2026-07-19 · Source

Requirements

  • Interior build-out, remodel, or finish work in an existing commercial tenant space
  • Approved Zoning Clearance and Site Plan from Cache County Planning & Zoning ((435) 755-1640) before the building permit application is processed
  • Construction plans covering the scope of work (floor plan, MEP as applicable)
  • Application Commercial Plan Review Deposit due at submittal — $1,000 for projects valued under $5,000,000, $2,500 for projects valued $5,000,000 and over

Required documents

  • RequiredBuilding Permit ApplicationCompleted application submitted digitally via email to cachecountyplanreview@gmail.com with all materials in one email — incomplete packets are not accepted
  • RequiredApproved Zoning Clearance and Site PlanFrom the Cache County Planning & Zoning office, required before a tenant improvement permit application is processed
  • RequiredConstruction PlansFloor plan showing existing and proposed layout and scope of work; mechanical, electrical, and plumbing plans as applicable to the scope
  • RequiredCommercial Plan Review Deposit PaymentDeposit due at time of application per the fee schedule's 'Application Commercial Plan Review Deposit' line item — $1,000 (valuation below $5,000,000) or $2,500 (valuation $5,000,000+)

Fee schedule

Fee typeAmountNotes
Tenant Improvement/Finish — valuation below $100,000$1,500
Cache County Building Division Fee Schedule, Ord. Show full citation

Cache County Building Division Fee Schedule, Ord. 2024-18 (adopted 11/6/2024), COMMERCIAL PERMITS table 'Tenant Improvement/Finish', row 'Total Valuation Below $100,000'; Plan Review Fees column reads 'Flat fee' for this row (no added percentage). PDF fetched and confirmed live 2026-07-19.

Tenant Improvement/Finish — valuation $100,000–$250,000$2,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $100,000-$250,000'; Plan Review Fees column reads 'Flat fee'; confirmed live 2026-07-19.
Tenant Improvement/Finish — valuation $250,000–$500,000$2,500Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $250,000-$500,000'; Plan Review Fees column reads 'Flat fee'; confirmed live 2026-07-19.
Tenant Improvement/Finish — valuation $500,000–$1,000,000$3,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $500,000-$1,000,000'; Plan Review Fees column switches to '65% of Base Fee' at this tier; confirmed live 2026-07-19.
Tenant Improvement/Finish — valuation $1,000,000–$2,500,000$6,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $1,000,000-$2,500,000'; Plan Review Fees column reads '65% of Base Fee'; confirmed live 2026-07-19.
Tenant Improvement/Finish — valuation $2,500,000–$5,000,000$9,000Cache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation $2,500,000-$5,000,000'; Plan Review Fees column reads '65% of Base Fee'; confirmed live 2026-07-19.
Tenant Improvement/Finish — valuation over $5,000,000Consult building departmentCache County Building Division Fee Schedule, Ord. 2024-18, same table, row 'Total Valuation Over $5,000,000'; Plan Review Fees column reads '65% of Base Fee'; confirmed live 2026-07-19.
State Surcharge1% of base feeCache County Building Division Fee Schedule, Ord. 2024-18, row 'State Regulated 1% toward all building permit fees - Commercial'; confirmed live 2026-07-19.
Application Commercial Plan Review Deposit — valuation below $5,000,000$1,000Cache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Application Commercial Plan Review Deposit — Total Valuation Below $5,000,000'; confirmed live 2026-07-19.
Application Commercial Plan Review Deposit — valuation $5,000,000 and over$2,500Cache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Application Commercial Plan Review Deposit — Total Valuation Over $5,000,000'; confirmed live 2026-07-19.
Re-Inspection Fee$75Cache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Re-inspection Fee'; confirmed live 2026-07-19.
Other Inspections, No Specific Fee Noted$75 per hourCache County Building Division Fee Schedule, Ord. 2024-18, 'Additional Fees/Deposits' section, row 'Other Inspections, No Specific Fee Noted'; confirmed live 2026-07-19.

Sources & verification

Verified against official sources. Last reviewed 2026-07-17.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Cache County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-17)Later version (2026-07-20) →View current record →All versions →

Permalink: /utah/cache-county/unincorporated-cache/as-of/2026-07-19/

Snapshot date: 2026-07-19

Commit: dd70553

Reproducible from PermitBase’s version-controlled dataset, commit dd70553.