Skip to main content
PermitBase

This is PermitBase’s published record for Price as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Price building permits

Price, Utah — as published 2026-07-07.

Reviewed 2026-07-08 · Source

Codes adopted

2021 International Building Code (IBC), including Appendix J — per Carbon County Building Permits page 'What codes are enforced?' FAQ2021 International Residential Code (IRC), including Appendix Q — per the same FAQ2021 International Plumbing Code (IPC)2021 International Mechanical Code (IMC)2021 International Fuel Gas Code (IFGC)2020 National Electrical Code (NEC) — note this is one cycle behind the 2023 NEC used by many other 2026-era Utah jurisdictions in this corpus; confirmed directly against Carbon County's own published FAQ rather than assumed uniform statewide.

Permit types & fees

Residential Building Permit (New Home / Cabin)

Required for new single-family home and cabin construction on property within Price City limits (as well as unincorporated Carbon County and the county's other incorporated cities/towns). Issued exclusively by Carbon County's Building & Planning Department — Price City has no independent building-permit function and instead requires proof of separate city zoning approval as a prerequisite. Reviewed under the 2021 IBC/IRC (including Appendix J and Appendix Q respectively), 2021 IPC/IMC/IFGC, and 2020 NEC.

Reviewed 2026-07-08 · Source

Requirements

  • Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect/install/enlarge/alter/repair/remove/convert/replace any electrical, gas, mechanical or plumbing system, must first apply to the Building Department and obtain the required permit (per Carbon County Building Permits page, quoting the adopted code's permit-requirement section)
  • Proof of city zoning approval required for property within Price City limits, in addition to the county building permit — per both Price City's own Planning & Zoning page and Carbon County's Building Permits FAQ ('If you are building in East Carbon, Helper, Price City, Wellington, or Scofield Town, you must provide proof of city zoning approval')
  • Completed and signed Building Permit Application, including contractor's name(s) and license number(s), or a signed Owner/Builder Certification Form if the owner is completing any of the work
  • A complete plan set (PDF only — jpgs and other file types not accepted) including site plan, footing/foundation plan, wall framing/columns/beams, floor framing, roof framing or stamped truss sheets, electrical plan, plumbing plan, HVAC plans with heating/cooling load calculations (Manual J & D), and gas pipe sizing calculations
  • Proof of fees paid for water connection (PRWID or city water authority) and sewer hook-up (PRWID, city sewer authority, or Scofield Reservoir Special Service District) or, where unserved, spring/well approval from the Utah Division of Water Rights and/or Individual Wastewater (septic) approval from the Southeast Utah Health District
  • Engineered WET-stamped plans (no copies accepted) required for all structures in the Scofield area D0 seismic zone, and may be required elsewhere for unusual shapes/sizes, foundation/basement walls over 9 feet, walkout basements, basements with a garage, or non-rectangular log structures

Required documents

  • RequiredBuilding Permit ApplicationCompleted and signed, including contractor name(s) and license number(s). Apply online at carbon.utah.gov or in person at the County Building & Planning Office.
  • OptionalOwner/Builder Certification FormRequired if the owner is completing any of the work themselves (do-it-yourselfer), in lieu of a licensed contractor.
  • RequiredSite Plan (PDF)Drawn to scale, showing lot shape/dimensions, street, front of lot, and setbacks to property lines of all existing and proposed structures, per the county's Residential Site Plan Requirements.
  • RequiredFull Construction Plan Set (PDF, not less than 1/4" = 1')Footing/foundation plan; wall framing/columns/beams with sizes; floor framing/girder/joist/blocking sizes and spans; roof framing/rafter size and span or stamped truss sheet details; electrical plan; plumbing plan; HVAC plans with heat loss/gain calculations (Manual J & D); gas pipe sizing calculations.
  • RequiredProof of City Zoning ApprovalRequired specifically for property within Price City limits (and East Carbon, Helper, Wellington, Scofield Town) before or alongside the county building permit application, per both Price City's and Carbon County's official guidance.
  • RequiredProof of Water/Sewer Fees PaidWater connection from PRWID or city water authority; sewer hook-up from PRWID, city sewer authority, or Scofield Reservoir Special Service District; or septic approval from Southeast Utah Health District where unserved by sewer.

Fee schedule

Fee typeAmountNotes

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Price building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/carbon-county-ut/price/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: b4a28d8

Reproducible from PermitBase’s version-controlled dataset, commit b4a28d8.