This is PermitBase’s published record for Price as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Price building permits

Price, Utah — as published 2026-07-19.

Reviewed 2026-07-08 · Source

Codes adopted

GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite — Utah Code § 15A-1-204 binds 'the state and each political subdivision,' which includes Carbon County as the compliance agency serving Price City (Price has no independent building-permit authority; see localAmendments). Carbon County's own Building Permits page ('What codes are enforced?' FAQ) still displays the pre-7/1/2026 edition list; re-checked live 2026-07-16, page text is byte-identical to the 2026-07-08 fetch ('2021 International Building Code, including Appendix J 2021 International Residential Code 2021-Appendix Q of 2021 IRC 2021 IPC, 2021 IMC, 2021 IFGC, 2020 NEC'). State law governs regardless of the page's lag; each line below states current law first, then the county's as-published (stale or omitted) text.2024 International Building Code (IBC), including Appendix J — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Carbon County's Building Permits FAQ still lists '2021 International Building Code, including Appendix J' (live re-check 2026-07-16).2021 International Residential Code (IRC), including Appendix Q — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches Carbon County's FAQ, which lists '2021 International Residential Code, 2021-Appendix Q of 2021 IRC' (live re-check 2026-07-16).2024 International Plumbing Code (IPC) — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Carbon County's FAQ still lists '2021 IPC' (live re-check 2026-07-16).2024 International Mechanical Code (IMC) — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Carbon County's FAQ still lists '2021 IMC' (live re-check 2026-07-16).2024 International Fuel Gas Code (IFGC) — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Carbon County's FAQ still lists '2021 IFGC' (live re-check 2026-07-16).2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g); this edition did NOT change in the 7/1/2026 flip. Carbon County's FAQ still lists '2020 NEC' (live re-check 2026-07-16) — this is a PRE-EXISTING discrepancy that predates and is unrelated to the 2026-07-01 code-cycle flip (the 2023 NEC has been state law since before this project's original 2026-07-08 review); reported here as-published rather than corrected.2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split) — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Not mentioned anywhere on Carbon County's Building Permits FAQ, Building Department page, or Building Information/Resources page as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of county publication), not fabricated.2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Not mentioned on any Carbon County page reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Not mentioned on any Carbon County page reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned on any Carbon County page reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.No International Fire Code (IFC) entry: § 15A-2-103 does not adopt the IFC — it is separately governed under Title 15A Chapter 5, outside the scope of this section. Carbon County's FAQ does not list an IFC edition either, so there is no mis-citation to correct here.

Permit types & fees

Residential Building Permit (New Home / Cabin)

Required for new single-family home and cabin construction on property within Price City limits (as well as unincorporated Carbon County and the county's other incorporated cities/towns). Issued exclusively by Carbon County's Building & Planning Department — Price City has no independent building-permit function and instead requires proof of separate city zoning approval as a prerequisite. Reviewed under the state-mandated 2024 IBC (incl. Appendix J) and 2021 IRC (incl. Appendix Q), per Utah Code § 15A-2-103, effective 7/1/2026; plus 2024 IPC/IMC/IFGC and 2023 NEC. Carbon County's own FAQ still lists the pre-flip 2021 IBC/IPC/IMC/IFGC and 2020 NEC as of live re-check 2026-07-16 — see codesAdopted for the governing-law citations.

Reviewed 2026-07-08 · Source

Requirements

  • Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect/install/enlarge/alter/repair/remove/convert/replace any electrical, gas, mechanical or plumbing system, must first apply to the Building Department and obtain the required permit (per Carbon County Building Permits page, quoting the adopted code's permit-requirement section)
  • Proof of city zoning approval required for property within Price City limits, in addition to the county building permit — per both Price City's own Planning & Zoning page and Carbon County's Building Permits FAQ ('If you are building in East Carbon, Helper, Price City, Wellington, or Scofield Town, you must provide proof of city zoning approval')
  • Completed and signed Building Permit Application, including contractor's name(s) and license number(s), or a signed Owner/Builder Certification Form if the owner is completing any of the work
  • A complete plan set (PDF only — jpgs and other file types not accepted) including site plan, footing/foundation plan, wall framing/columns/beams, floor framing, roof framing or stamped truss sheets, electrical plan, plumbing plan, HVAC plans with heating/cooling load calculations (Manual J & D), and gas pipe sizing calculations
  • Proof of fees paid for water connection (PRWID or city water authority) and sewer hook-up (PRWID, city sewer authority, or Scofield Reservoir Special Service District) or, where unserved, spring/well approval from the Utah Division of Water Rights and/or Individual Wastewater (septic) approval from the Southeast Utah Health District
  • Engineered WET-stamped plans (no copies accepted) required for all structures in the Scofield area D0 seismic zone, and may be required elsewhere for unusual shapes/sizes, foundation/basement walls over 9 feet, walkout basements, basements with a garage, or non-rectangular log structures

Required documents

  • RequiredBuilding Permit ApplicationCompleted and signed, including contractor name(s) and license number(s). Apply online at carbon.utah.gov or in person at the County Building & Planning Office.
  • OptionalOwner/Builder Certification FormRequired if the owner is completing any of the work themselves (do-it-yourselfer), in lieu of a licensed contractor.
  • RequiredSite Plan (PDF)Drawn to scale, showing lot shape/dimensions, street, front of lot, and setbacks to property lines of all existing and proposed structures, per the county's Residential Site Plan Requirements.
  • RequiredFull Construction Plan Set (PDF, not less than 1/4" = 1')Footing/foundation plan; wall framing/columns/beams with sizes; floor framing/girder/joist/blocking sizes and spans; roof framing/rafter size and span or stamped truss sheet details; electrical plan; plumbing plan; HVAC plans with heat loss/gain calculations (Manual J & D); gas pipe sizing calculations.
  • RequiredProof of City Zoning ApprovalRequired specifically for property within Price City limits (and East Carbon, Helper, Wellington, Scofield Town) before or alongside the county building permit application, per both Price City's and Carbon County's official guidance.
  • RequiredProof of Water/Sewer Fees PaidWater connection from PRWID or city water authority; sewer hook-up from PRWID, city sewer authority, or Scofield Reservoir Special Service District; or septic approval from Southeast Utah Health District where unserved by sewer.

Fee schedule

Fee typeAmountNotes

Commercial Building Permit

Required for new commercial and industrial construction on property within Price City limits. Issued exclusively by Carbon County's Building & Planning Department — Price City has no independent building-permit function and requires proof of separate city zoning approval as a prerequisite (and, if the site is in an Industrial Zone, a Conditional Use Permit that can take up to 2 months). Carbon County publishes a dedicated 'Commercial and Industrial Structures' checklist distinct from its residential New Home/Cabin packet.

Reviewed 2026-07-19 · Source

Requirements

  • Approval from Price City's Zoning Administrator (or the relevant zoning authority) — proof of city zoning approval is required before/alongside the county building permit
  • If the property is in an Industrial Zone: all uses require a Conditional Use Permit, and the building permit cannot be approved until that process is complete; approval may take up to 2 months
  • Completed and signed Building Permit Application with contractor name(s) and Utah license number(s), applied online at carbon.utah.gov/department/building/
  • Site plan drawn to scale showing lot shape/dimensions, street, front of lot, setbacks to property lines, utilities, and septic system if applicable
  • 2 sets of engineered WET-stamped plans (PDF, not less than 1/4" = 1'), sealed and signed by registered Utah Architects and/or Professional Engineers trained in the specific discipline (electrical, plumbing, mechanical, or structural) being sealed
  • Fire sprinkler system plans, if required
  • Proof of fees paid for water connection (PRWID or city water authority) and sewer hook-up (PRWID, city sewer authority, or Scofield Reservoir Special Service District), or spring/well and septic approval where unserved

Required documents

  • RequiredCommercial and Industrial Structures Building Permit Information (checklist)Official Carbon County checklist, verified by direct PDF text extraction 2026-07-19: approval from Zoning Administrator or city jurisdiction; Conditional Use Permit if in an Industrial Zone (up to 2 months); completed/signed permit application; scaled site plan; 2 sets of engineered WET-stamped plans covering footing/foundation, wall framing, floor framing, roof framing/trusses, electrical, plumbing, HVAC with heat-loss calcs, gas pipe sizing, and fire sprinkler system if required; proof of water/sewer fees paid.
  • RequiredCommercial Site Plan (example/requirements)County-published example of a commercial site plan showing elevations at property corners and utility/easement locations, distinct from the residential site plan format.
  • RequiredProof of City Zoning ApprovalRequired specifically for property within Price City limits before or alongside the county building permit application, per both Price City's and Carbon County's official guidance.
  • OptionalConditional Use Permit (Industrial Zone only)Required for all uses in an Industrial Zone; the building permit cannot be approved until this separate process is complete. County guidance states this may take up to 2 months.

Fee schedule

Fee typeAmountNotes

Commercial Tenant Improvement / Tenant Finish Permit

Required for interior tenant-improvement and tenant-finish work within existing commercial space on property within Price City limits. Carbon County does not publish a fee category or checklist distinct from new commercial construction — the same Commercial and Industrial Structures checklist and unconditional engineered-plan requirement apply, scoped to the actual work performed. Price City zoning approval is still required for the underlying property/use unless the TI is a pure interior scope not implicating zoning.

Reviewed 2026-07-19 · Source

Requirements

  • Interior tenant-improvement or tenant-finish work inside existing commercial space within Price City limits
  • Completed and signed Building Permit Application with contractor name(s) and license number(s)
  • Engineered WET-stamped plans for any structural, electrical, plumbing, or mechanical work involved in the tenant finish, sealed by a Utah-registered Architect or Professional Engineer in the relevant discipline
  • Fire sprinkler system plans, if the tenant improvement affects or requires fire suppression coverage

Required documents

  • RequiredCommercial and Industrial Structures Building Permit Information (checklist)Same official county checklist used for new commercial construction — Carbon County does not publish a distinct, scaled-down tenant-improvement checklist. Applicants should submit only the items relevant to their actual scope (e.g., floor plan and MEP plans for an interior TI rather than a full site/foundation plan).
  • OptionalProof of City Zoning ApprovalRequired if the tenant improvement changes the use/occupancy of the space in a way that implicates Price City zoning; confirm with Price City's Planning & Zoning office whether a pure interior TI still requires sign-off.

Fee schedule

Fee typeAmountNotes

Solar PV Permit

Required for residential rooftop or ground-mounted solar photovoltaic (PV) system installations on property within Price City limits. Issued exclusively by Carbon County's Building & Planning Department — Price City has no independent building-permit function. Carbon County publishes a dedicated 'PV System Building Permit' packet with its own Residential PV System Checklist, distinct from the county's general New Home/Cabin Checklist, confirming solar is treated as its own permit category rather than folded into the general building permit with no distinct process.

Reviewed 2026-07-19 · Source

Requirements

  • Completed and signed Building Permit Application, including contractor's name and license number, applied for online at carboncounty.cityinspect.com/login
  • A signed and notarized Owner/Builder Certification Form, if the owner is completing any of the work
  • All 8 items on Carbon County's Residential PV System Checklist — the county states 'NO APPLICATIONS WILL BE ACCEPTED WITHOUT ALL OF THE ITEMS THAT ARE LISTED'
  • Proof of city zoning approval for property within Price City limits, per Carbon County's Building Permits FAQ (same city-zoning-approval step required for all building permits, including solar)

Required documents

  • RequiredSite PlanDetailed site plan showing the location of the home, electrical meter panel, any back-fed sub-panelboards, and all PV system components on the property.
  • RequiredMounting System DetailsModule mounting system and weight of all roof components; support manufacturer specs must specify required support spacing based on local wind and snow loads. Note whether roof rafters are engineered trusses (or type/size if not), and the roof covering type and number of layers.
  • RequiredOne-Line Electrical DiagramMust show PV system type (single inverter, micro-inverter, or AC module system), exact module count/layout and series/parallel wiring, all wire types and sizes, conduit types and sizes, grounding wiring and connections, locations of all circuits and components, and ratings of all fuses/breakers.
  • RequiredBack-Fed Panel DocumentationNote which home electrical panel the PV system will back-feed, its location and rating, plus photos of the service panel (including its interior label) and photos of labels on any sub-panel that will be back-fed.
  • RequiredModule Spec SheetsPV module (solar panel) spec sheets showing STC rated watts (Pmp), Vmp, Imp, Voc, and Isc. Modules must be UL 1703 listed.
  • RequiredInverter Spec SheetsInverter manufacturer spec sheets showing rated watts/volts and max AC output amps/voltage. Utility-tied inverters must be listed 'utility interactive' meeting UL 1741, with ground fault protection.
  • OptionalTotal Array Power CalculationTotal watts, amps, volts, Voc (at coldest possible outside temperature per NEC 690.7), and short-circuit current the array can produce. Not required for micro-inverter systems.

Fee schedule

Fee typeAmountNotes
New Construction / Solar Deposit$250.00 non-refundable deposit
Carbon County Building Permits page: 'New Construction and Solar building permit applications require a non-refundable $250.00 deposit,' effective January 1, 2025, applied as a credit toward the final permit fee. Show full citation

Carbon County Building Permits page: 'New Construction and Solar building permit applications require a non-refundable $250.00 deposit,' effective January 1, 2025, applied as a credit toward the final permit fee. No further dollar-amount valuation-based fee table for solar permits could be located on Carbon County's official website after an exhaustive search (same gap documented on this jurisdiction's residential-building-permit entry) — contact the Building Department directly for a full fee quote.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Price building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-16)Later version (2026-07-20) →View current record →All versions →