Skip to main content
PermitBase

This is PermitBase’s published record for Clearfield as of 2026-07-16. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Clearfield building permits

Verified

Clearfield, Utah — as published 2026-07-16.

Verified 2026-07-03 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Clearfield's own Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) still lists the 2021 IBC — live-checked 2026-07-16 via direct PDF fetch of clearfield.city/wp-content/uploads/2023/10/Design-Criteria-Letterhead.pdf, confirming the city's document has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city document's lag.2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches Clearfield's Design Criteria and Adopted Codes document.Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Clearfield's own Design Criteria and Adopted Codes document, added here per statute.2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IPC — live-checked 2026-07-16, confirming lag. The statute controls.2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IMC — live-checked 2026-07-16, confirming lag. The statute controls.2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IFGC — live-checked 2026-07-16, confirming lag. The statute controls.2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). Clearfield's own Design Criteria document (rev. 9/29/2023) lists the 2020 NEC — one edition behind the statewide-mandatory floor, confirmed still unchanged via live PDF fetch 2026-07-16. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of Clearfield's own document.2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law). Supersedes Clearfield's own split scheme: the Design Criteria document (rev. 9/29/2023) separately cited 2021 IECC commercial provisions plus 2015 IECC residential provisions and 2015 IRC Chapter 11, Energy Efficiency, for residential energy — preserved here as history. Live-checked 2026-07-16: Clearfield's Design Criteria document still shows this pre-2024 split scheme; the statute controls.2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i), superseding the 2021 IEBC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 IEBC — live-checked 2026-07-16, confirming lag. The statute controls.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n), superseding the 2021 ISPSC. Clearfield's Design Criteria document (rev. 9/29/2023) still lists the 2021 ISPSC — live-checked 2026-07-16, confirming lag. The statute controls.Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed in Clearfield's own Design Criteria document, added here per statute.NOTE: A prior commercial-permit checklist PDF (undated content, hosted under a 2021 upload path) lists 2018 IBC/IMC/IPC, 2017 NEC, 2018 IFCI, 2018 IECC as 'Current Codes' — this is superseded by the Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) cited above, which is the more recent and more specific authority on adopted code editionsNOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Clearfield's Design Criteria and Adopted Codes document (rev. 9/29/2023, effective 7/1/2023) was live-checked 2026-07-16 via direct PDF fetch and is confirmed still lagging — it verbatim lists 2021 IBC/IMC/IPC/IFGC/IEBC/ISPSC, 2020 NEC, and the pre-2024 split IECC scheme (2021 commercial / 2015 residential). The statewide statute controls over Clearfield's un-updated document.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and most repairs to residential buildings in Clearfield, governed by the 2021 IRC. Two complete sets of plans are required for residential submittals.

Verified 2026-07-03 · Source

Requirements

  • New single-family or multi-family residential construction
  • Room additions
  • Detached or attached garages
  • Structural modifications or replacement/repair of any structural component
  • Basement finishes and remodels involving moving walls, windows, or doors

Required documents

  • RequiredBuilding Permit ApplicationOnline application and payment available; plans may also be submitted through permits@clearfieldcity.org. Two complete sets of plans and specifications required.
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details
  • RequiredEnergy Compliance DocumentationPer the 2024 IECC (single statewide edition, Utah Code § 15A-2-103(1)(h), effective 7/1/2026); Clearfield's Design Criteria and Adopted Codes document (rev. 9/29/2023) still cites the superseded 2015 IRC Chapter 11 / 2015 IECC residential provisions (live-checked 2026-07-16), but the statute controls
  • OptionalEngineered Truss PlansSealed truss layouts for new construction with trusses

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1–$500$23.50Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Building Permit — valuation $501–$2,000$23.50 plus $3.05 for each additional $100 or fraction thereofClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Building Permit — valuation $2,001–$25,000$69.25 plus $14.00 for each additional $1,000 or fraction thereofClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Building Permit — valuation $25,001–$50,000$391.75 plus $10.10 for each additional $1,000 or fraction thereofClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Building Permit — valuation $50,001–$100,000$643.75 plus $7.00 for each additional $1,000 or fraction thereofClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Building Permit — valuation $100,001–$500,000$993.75 plus $5.60 for each additional $1,000 or fraction thereofClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Building Permit — valuation $500,001–$1,000,000$3,233.75 plus $4.75 for each additional $1,000 or fraction thereofClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Building Permit — valuation over $1,000,000$5,608.75 plus $3.65 for each additional $1,000 or fraction thereofClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Plan Check Fee — Residential (and pools)20% of the building permit feeClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Plan Check Deposit — New Residential Construction$250Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Residential 'Identical Plans' Review$100Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Re-inspection Fee$47 per hour (minimum charge 0.5 hours for inspections with no fee specifically indicated: $25 each)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Inspection Outside Normal Business Hours$47 per hour, minimum charge of two hoursClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
State Surcharge1% may be applicable to building permit feesClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025): 'A 1% state surcharge may be applicable to building permit fees.'

Electrical Permit

Verified

Required for electrical work in Clearfield including new circuits, panel upgrades, service changes, and new wiring. Governed by the 2023 National Electrical Code, statewide-mandatory per Utah Code § 15A-2-103(1)(g); Clearfield's own Design Criteria and Adopted Codes document (rev. 9/29/2023) still lists the 2020 NEC (live-checked 2026-07-16), but the statewide-mandatory 2023 edition controls. Clearfield does not publish a separate electrical fee table — electrical work is charged under the same building valuation table as other building permits.

Verified 2026-07-03 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Solar panel electrical connections

Required documents

  • RequiredBuilding Permit ApplicationOnline application and payment available, or submit through permits@clearfieldcity.org
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout
  • OptionalUtah Electrical Contractor License (DOPL)Required for work not performed by the homeowner on their own primary residence

Fee schedule

Fee typeAmountNotes
Electrical PermitValuation-based per building permit fee table (see residential building permit fees)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — no separate electrical fee table is published; electrical work is assessed under the same building valuation table (verified by full-text review of the fee schedule PDF).
Additional Electrical Outlet (specific line item found in fee schedule, context unclear — appears under a special-event/booth fee section, not the general building-permit section)$130.00
Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — listed under 'July 4th Booth Fees'; Show full citation

Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — listed under 'July 4th Booth Fees'; this appears to be an event-vendor charge, not a standard residential/commercial electrical permit fee. Included for completeness but flagged as likely inapplicable to typical electrical permits.

Re-inspection Fee$47 per hour (minimum 0.5 hour / $25 for unspecified inspections)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Clearfield including water heaters, fixture additions, and gas line work. Governed by the 2024 IPC, current statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); Clearfield's Design Criteria and Adopted Codes document (rev. 9/29/2023) still lists the 2021 IPC (live-checked 2026-07-16), but the statute controls. Charged under the same building valuation fee table as other building permits.

Verified 2026-07-03 · Source

Requirements

  • New plumbing fixture installations or new installations/replacing lines
  • Water heater installation or replacement
  • Gas line installation or modification
  • Water line or sewer line replacement or extension

Required documents

  • RequiredBuilding Permit ApplicationOnline application and payment available, or submit through permits@clearfieldcity.org
  • OptionalUtah Plumbing Contractor License (DOPL)Required for work not performed by the homeowner on their primary residence

Fee schedule

Fee typeAmountNotes
Plumbing PermitValuation-based per building permit fee table (see residential building permit fees)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — no separate plumbing fee table is published; plumbing work is assessed under the same building valuation table.
Re-inspection Fee$47 per hour (minimum 0.5 hour / $25 for unspecified inspections)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and gas fireplace/log installations in Clearfield. Governed by the 2024 IMC and 2024 IFGC, current statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e)/(f); Clearfield's Design Criteria and Adopted Codes document (rev. 9/29/2023) still lists the 2021 editions (live-checked 2026-07-16), but the statute controls. Charged under the same building valuation fee table.

Verified 2026-07-03 · Source

Requirements

  • Heating and air conditioning installations or replacements
  • Boiler installation or replacement
  • Gas log or gas line installation
  • Fireplace installation (wood, pellet, or gas)

Required documents

  • RequiredBuilding Permit ApplicationOnline application and payment available, or submit through permits@clearfieldcity.org
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, boiler, or fireplace

Fee schedule

Fee typeAmountNotes
Mechanical PermitValuation-based per building permit fee table (see residential building permit fees)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — no separate mechanical fee table is published; mechanical work is assessed under the same building valuation table.
Re-inspection Fee$47 per hour (minimum 0.5 hour / $25 for unspecified inspections)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)

Roofing Permit

Verified

Required for reroofing (complete replacement) in Clearfield; minor roof repairs do not require a permit. Fees are valuation-based per the building permit fee table.

Verified 2026-07-03 · Source

Requirements

  • Reroofing (complete roof replacement)
  • Structural roof repairs

Required documents

  • RequiredBuilding Permit ApplicationOnline application and payment available, or submit through permits@clearfieldcity.org
  • OptionalUtah Roofing Contractor License (DOPL)Required if work is not performed by the homeowner on their primary residence

Fee schedule

Fee typeAmountNotes
Roofing PermitValuation-based per building permit fee table (see residential building permit fees)Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — no separate roofing fee table is published; reroofing is assessed under the same building valuation table.

Deck Permit

Verified

Required for decks over 30 inches above grade in Clearfield, with or without covers; decks 30 inches or less above grade with no roof do not require a permit. Fees are valuation-based.

Verified 2026-07-03 · Source

Requirements

  • Decks over 30 inches above grade (with or without covers)
  • Porch/patio covers and awnings

Required documents

  • RequiredBuilding Permit ApplicationOnline application and payment available, or submit through permits@clearfieldcity.org
  • RequiredConstruction DrawingsFraming plan with beam/joist sizes, post locations, footing details, and ledger attachment method
  • RequiredSite PlanDeck location showing setbacks from property lines

Fee schedule

Fee typeAmountNotes
Deck PermitValuation-based per building permit fee table (see residential building permit fees); plan check 20% of permit feeClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — no separate deck fee table is published; deck construction is assessed under the same building valuation table.

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Clearfield, including framing, electrical, plumbing, and mechanical work. Governed by the 2021 IRC.

Verified 2026-07-03 · Source

Requirements

  • Basement finishes
  • Remodels involving moving walls, windows, or doors
  • Room finishes involving structural or MEP work

Required documents

  • RequiredBuilding Permit ApplicationOnline application and payment available, or submit through permits@clearfieldcity.org
  • RequiredFloor PlanLayout showing room sizes, egress windows, door locations, and smoke/CO detector placement

Fee schedule

Fee typeAmountNotes
Basement Finish PermitValuation-based per building permit fee table; plan check 20% of permit feeClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025) — no separate basement-finish fee table is published; charged under the same building valuation table.

Fence Permit

Verified

A fence permit (not a building permit) is required for most new fences in Clearfield; masonry or concrete fences require a full building permit. Ordinary fences (except masonry/concrete) need only the fence permit.

Verified 2026-07-03 · Source

Requirements

  • New fence construction (fence permit required; masonry/concrete fences require a building permit)
  • Masonry or concrete fences (building permit required)

Required documents

  • RequiredFence Permit / Building Permit ApplicationOnline application and payment available, or submit through permits@clearfieldcity.org

Fee schedule

Fee typeAmountNotes
Fence PermitNot published as a discrete line item in the Consolidated Fee Schedule (Ordinance 2025-16, adopted 6-24-2025) — the schedule was searched in full text for 'fence' with no dedicated fee found
The 'When Do I Need a Building Permit?' handout confirms fences (except masonry/concrete) require a fence permit, distinct from a building permit — but no dollar amount for this fence permit is… Show full citation

The 'When Do I Need a Building Permit?' handout confirms fences (except masonry/concrete) require a fence permit, distinct from a building permit — but no dollar amount for this fence permit is published anywhere in the current Consolidated Fee Schedule. Masonry/concrete fences are charged under the standard building valuation table. Contact (801) 525-2701 for the current fence permit fee.

Demolition Permit

Verified

Required for demolition of structures in Clearfield. Clearfield publishes a specific flat demolition permit fee, unlike some neighboring Davis County cities that only use valuation-based fees.

Verified 2026-07-03 · Source

Requirements

  • Complete or partial demolition of any structure

Required documents

  • RequiredDemolition ApplicationSubmit through permits@clearfieldcity.org or the online portal; include scope of demolition and disposal plan
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition

Fee schedule

Fee typeAmountNotes
Demolition Permit (including inspections)$150Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025): 'Demolition permit (including inspections) — $150'

Sign Permit

Verified

Required for permanent and temporary signage in Clearfield. Fees are flat and published in the Consolidated Fee Schedule under Planning & Zoning fees.

Verified 2026-07-03 · Source

Requirements

  • Permanent sign installation
  • Temporary sign installation

Required documents

  • RequiredSign Permit ApplicationSubmit through the Community Development Department, (801) 525-2701

Fee schedule

Fee typeAmountNotes
Sign Permit — Permanent$500Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025), Planning & Zoning section: 'Sign Permit: Permanent — $500'
Sign Permit — Temporary$100Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025), Planning & Zoning section: 'Temporary — $100'

Street Cut / Excavation Permit

Verified

Required for any excavation, boring, or street-cut work in Clearfield rights-of-way. Fees vary by excavation type, road age, and season (winter excavations cost double).

Verified 2026-07-03 · Source

Requirements

  • Street cuts and lateral/longitudinal excavations in the public right-of-way
  • Boring, curb/gutter removal, open trench, or sidewalk/misc. concrete work in the right-of-way

Required documents

  • RequiredStreet Cut Permit (Excavation Permit) ApplicationSubmit through the Community Development Department, (801) 525-2701

Fee schedule

Fee typeAmountNotes
Street Cut Permit — Application Fee (includes two inspections)$60 per inspectionClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Street Cut Permit — Inspection Fee$1.26 per square footClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Lateral excavation (roads older than 1 year)$60 per lane cutClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Lateral excavation (roads newer than 1 year)$120 per lane cutClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Winter Excavations (Oct. 15 – April 15)2x the standard permit feesClearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)
Bond per lateral excavation$1,000Clearfield City Consolidated Fee Schedule, Chapter 5 (Ordinance 2025-16, adopted 6-24-2025)

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clearfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-04)Later version (2026-07-19) →View current record →All versions →

Permalink: /utah/davis-county/clearfield/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.