This is PermitBase’s published record for Clinton as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Clinton building permits
VerifiedClinton, Utah — as published 2026-07-20.
Verified 2026-07-13 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction, additions, alterations, and most structural or MEP modifications to existing structures in Clinton, governed by the 2021 IRC per Clinton's Design Criteria (rev. 07/03/2023). Fees are valuation-based per the 1997 ICBO Uniform Administrative Code Table 1-A as modified by the city, with a 0.85 permit-fee multiplier applied except for shell-only buildings (0.80), commercial tenant finish (0.35), and commercial remodel (0.60).
Verified 2026-07-03 · Source
Requirements
- New single-family or multi-family residential construction
- Additions requiring structural work
- Structural, plumbing, mechanical, and/or electrical modifications to existing structures (Clinton City Code § 5-1-1)
- Conversion of non-habitable space to habitable space
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Community Development Department; plans and specifications in duplicate (or as otherwise required by the Building Official) per Clinton City Code § 5-1-2. Online submission available via the Building Permit Application Portal.
- RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details, conforming to Clinton's Design Criteria (rev. 07/03/2023)
- OptionalEngineered Truss PlansSealed truss layouts for new construction with trusses
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — $1 to $1,000 valuation | $58.80 | Clinton City Consolidated Fee Schedule, FY 2026-27 (effective 7/1/2026), Building Permit Fees table (Modified FY 2005) |
| Building Permit Fee — $1,000.01 to $2,000 valuation | $58.80 for the first $1,000 plus $2.70 for each additional $100 or fraction thereof | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Building Permit Fee — $2,001 to $25,000 valuation | $83.40 for the first $2,000 plus $16.80 for each additional $1,000 or fraction thereof | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Building Permit Fee — $25,001 to $50,000 valuation | $469.80 for the first $25,000 plus $12.11 for each additional $1,000 or fraction thereof | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Building Permit Fee — $50,001 to $100,000 valuation | $772.55 for the first $50,000 plus $8.40 for each additional $1,000 or fraction thereof | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Building Permit Fee — $100,001 to $500,000 valuation | $1,192.55 for the first $100,000 plus $6.72 for each additional $1,000 or fraction thereof | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Building Permit Fee — $500,001 to $1,000,000 valuation | $3,880.55 for the first $500,000 plus $5.70 for each additional $1,000 or fraction thereof | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Building Permit Fee — over $1,000,000 valuation | $6,730.55 for the first $1,000,001 plus $4.65 for each additional $1,000 or fraction thereof | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Permit Fee Multiplier | 0.85 (standard); 0.80 shell-only building; 0.35 commercial tenant finish; 0.60 commercial remodel | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Permit Fees table. Finished basement valuation is 1.5x the unfinished-basement figure in the current ICC valuation table. |
| Plan Review Fee — Single Family Dwelling | 30% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table |
| Plan Review Fee — Multi-Family | 65% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Plan Review Fee — Accessory Buildings and Detached Garages | 20% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Investigation Fee (work commenced without a permit) | 100% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27; charged in addition to required permit fees per Clinton City Code § 5-1-9 |
| State Fee | 1% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Technology Fee — Single Family Residential | $30 | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table |
| Technology Fee — Commercial Permits | $45 | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Building Bond — Single Family Dwellings and modifications | $1,500.00 (refundable) | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table. Bond ensures compliance with the Utah Uniform Building Standards Act Rules and protects the public right-of-way; necessity determined by the Building Official. |
| Building Bond — Single Family Dwellings in a PH Zone (trees, landscaping & automatic sprinkling system) | $8,500.00 | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Building Bond — Multi-Family Dwellings and modifications / Commercial (existing structure, new construction) | $75.00 per linear foot of curb, gutter, sidewalk | Clinton City Consolidated Fee Schedule, FY 2026-27 |
| Temporary Water Service (residential, collected with building permit) | $21.00 one-time fee | Clinton City Consolidated Fee Schedule, FY 2026-27, Direct Service Fees |
| Impact Fees — Parks & Trails / Police / Fire / Storm Water / Sewer / Culinary Water / Transportation (Single Family Detached, per unit) | Parks & Trails $2,552; Police $110; Fire $200; Storm Water $0.10/SF of lot; Sewer $113 (does not include North Davis Sewer District impact fee); Culinary Water $1,964 (3/4" meter); Transportation $682 | Clinton City Consolidated Fee Schedule, FY 2026-27, Impact Fees table (Revised FY 2019, rates from IFAs/IFFPs by Zion's Public Finance and JUB Engineering, dated May 2019, adopted by City Council 6/11/2019) |
| North Davis Sewer District Impact Fee — Single Family Residential within Clinton | $3,454.03 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Impact Pass Thru Fees (est. 2024); this is separate from and in addition to the Clinton City sewer impact fee above |
| Credit/Debit Card Transaction Fee | 3% of the non-utility credit/debit card transaction (VISA, Mastercard, Discover) | Clinton City Consolidated Fee Schedule, FY 2026-27 |
Electrical / Mechanical / Plumbing Permit (Utility Modifications)
VerifiedRequired for electrical, mechanical, and plumbing work in Clinton. Clinton's Design Criteria (rev. 07/03/2023) lists 2021 IPC, 2021 IMC, 2021 IFGC, and 2020 NEC, but the statewide-governing editions per Utah Code § 15A-2-103 are now 2024 IPC, 2024 IMC, and 2024 IFGC (effective 2026-07-01; Clinton's Design Criteria has not been confirmed updated) and 2023 NEC (unchanged by the 2026 revision, one edition ahead of what Clinton's Design Criteria lists). Simple utility-related modifications and appliance exchanges are charged a flat fee under the city's 'Other Inspection Fees' schedule rather than the valuation-based building fee table. EV charger/EVSE installation is electrical work and falls under this general permit; the FY 2026-27 Consolidated Fee Schedule does not publish an EV-specific line item — a charger circuit would be billed as an electrical service upgrade/new circuit under the valuation-based building fee table, not the flat $58.80 'Utility Related Modifications' rate (which is scoped to appliance exchanges).
Verified 2026-07-03 · Source
Requirements
- Electrical service upgrades, new circuits, rewiring
- Furnace, air conditioner, or conventional water heater installation, exchange, or replacement
- Plumbing fixture installation or lateral repair/replacement
- Other appliance replacements as determined by the Building Official
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Community Development Department per Clinton City Code § 5-1-2
- OptionalUtah Contractor License (DOPL)Required for electrical/mechanical/plumbing work not performed by the homeowner on their own primary residence
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Utility Related Modifications (air conditioner, heater, conventional water heater exchanges, and other appliance replacements) | $58.80 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
| Lateral Repair or Replacement | $58.80 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
| Re-inspection Fee (assessed under adopted Construction Codes) | $58.80 per inspection | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 2 |
| Inspections for which no fee is specifically indicated | $58.80 per inspection | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 3 |
| Inspections Outside of Normal Business Hours | $235.20 per call out | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 1 |
Roofing Permit
VerifiedRequired for residential and commercial re-roofing in Clinton. Clinton publishes discrete flat fees for this permit type rather than charging under the general valuation-based building fee table.
Verified 2026-07-03 · Source
Requirements
- Re-roofing (residential or commercial)
- Re-siding (charged under the same fee line as re-roofing/fireplaces/woodstoves)
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Community Development Department
- OptionalUtah Roofing Contractor License (DOPL)Required if work is not performed by the homeowner on their primary residence
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roof Residential | $80.00 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
| Re-Roof Commercial | $58.80 per inspection | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
| Re-Siding, Fireplaces & Woodstoves | $80.00 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 (shared fee line item) |
Residential Pool Permit
VerifiedRequired for installation of residential swimming pools, hot tubs, and spas in Clinton. In-ground pools carry a discrete flat fee plus a required bond; above-ground pools, hot tubs, and spas carry a lower flat fee.
Verified 2026-07-03 · Source
Requirements
- In-ground or above-ground pool installation
- Hot tub or spa installation
- Pool barrier/fencing per code
- Electrical bonding and grounding for pool equipment
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Community Development Department
- RequiredSite PlanPool location, setbacks, barrier/fence layout
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Pools (in ground) | $250.00 + Bond | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6. Bond amount not separately specified for pools in the fee schedule beyond the general Building Bond table; confirm bond amount for pools directly with the Building Division. |
| Pools (above ground), Hot Tubs, & Spas | $58.80 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
Solar Energy System Permit
VerifiedRequired for solar hot water and solar electric (PV) system installation in Clinton. Fees vary by system type (hot water vs. electric), mounting configuration (roof vs. ground mount), and whether the submission is a revision to a previously permitted system.
Verified 2026-07-03 · Source
Requirements
- Solar hot water system installation (residential)
- Solar electric (PV) system installation (residential or commercial)
- Ground-mount solar electric system installation (residential)
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Community Development Department
- RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels (roof-mount systems)
- RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Hot Water System (Residential) | $176.40 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 (est. 2019) |
| Solar Electric System (Residential) | $335.40 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 (est. 2021) |
| Solar Electric System (Ground Mount – Residential) | $176.40 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
| Revised Solar Electric System (Residential) | $117.60 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
| Solar Electric System (Commercial) | $58.80 per inspection | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
Demolition Permit
VerifiedRequired to demolish all or part of a structure in Clinton. Clinton City Code Title 5, Chapter 6 imposes detailed utility-disconnection requirements. Residential demolition carries a discrete flat fee plus a bond; commercial and relocation are charged per inspection plus a bond.
Verified 2026-07-03 · Source
Requirements
- Complete or partial demolition of any structure — requires a building permit from the Community Development Department (Clinton City Code § 5-6-1)
- Utility disconnects (sewer, culinary water, secondary water, land drains, power, telephone/cable) completed per Clinton City Code § 5-6-3 specifications
- Site restoration and grading after demolition (Clinton City Code § 5-6-4)
Required documents
- RequiredDemolition Application (Building Permit)Submitted to the Community Development Department per Clinton City Code § 5-6-1
- RequiredUtility Disconnect ConfirmationSewer, culinary water, secondary water, land drain, power, and telephone/cable laterals disconnected per the specific cut-back and plugging methods in Clinton City Code § 5-6-3
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition — Residential | $117.60 + Bond | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 7 |
| Demolition — Commercial | Per Inspection + Bond | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 7 |
| Relocation Residential or Commercial | Per Inspection + Bond | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 7 |
Sign Permit
VerifiedRequired for permanent and temporary signage in Clinton. Fees are flat, published under 'Other Inspection Fees' in the Consolidated Fee Schedule.
Verified 2026-07-03 · Source
Requirements
- Permanent sign installation
- Temporary sign installation
Required documents
- RequiredSign Permit ApplicationSubmitted to the Community Development Department, (801) 614-0740
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Signs | $125.00 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
| Temporary Sign Fee | $35.00 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 (est. 2013) |
Residential Remodel Permit (Patio Covers, Awnings & Decks)
VerifiedRequired for residential remodels, patio covers, awnings, and decks in Clinton. Both are charged discrete flat fees under 'Other Inspection Fees' rather than the general valuation-based building-fee table.
Verified 2026-07-03 · Source
Requirements
- Residential remodel work
- Patio covers, awnings, and decks
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Community Development Department
- RequiredConstruction DrawingsFraming plan with beam/joist sizes, post locations, footing details for decks/patio covers
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Remodel | $176.40 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
| Patio Covers, Awnings & Decks | $125.00 | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 6 |
Commercial Building Permit
VerifiedRequired for new commercial building construction (including shell-only buildings) in Clinton, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 2026-07-01; Clinton's own Design Criteria document, rev. 07/03/2023, has not been confirmed updated to reflect this transition). Fees use the same valuation-based Building Permit Fee table as residential, with the standard 0.85 permit-fee multiplier applying to new commercial construction — except shell-only buildings, which get a lower 0.80 multiplier. Commercial plan review (65% of the building fee) and a $45 commercial technology fee apply on top.
Verified 2026-07-19 · Source
Requirements
- New commercial building construction (ground-up or shell)
- Plans and specifications in duplicate (or as otherwise required by the Building Official) per Clinton City Code § 5-1-2
- Commercial Site Plan Review approval for commercial and/or non-residential subdivision projects, tiered by gross site acreage
- SWPPP (Storm Water Pollution Prevention Plan) review for commercial development
- Building Bond (commercial): $75.00 per linear foot of curb, gutter, sidewalk for new construction
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Community Development Department; plans and specifications in duplicate per Clinton City Code § 5-1-2. Online submission available via the Building Permit Application Portal.
- RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details, conforming to Clinton's Design Criteria (rev. 07/03/2023) and the 2024 IBC.
- RequiredSite Plan Review Submittal (Commercial and/or Non-Residential Subdivision)Required for commercial/non-residential development; fee tiered by gross site acreage per the Consolidated Fee Schedule.
- OptionalSWPPP Plan Review SubmittalRequired for commercial development exceeding applicable thresholds; reviewed under the Clinton City SWPPP Review and Inspection Fees schedule.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — $1 to $1,000 valuation | $58.80 | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Permit Fees table (Modified FY 2005); PDF verified directly 2026-07-19. Same valuation table used for residential and commercial. |
| Building Permit Fee — over $1,000,000 valuation | $6,730.55 for the first $1,000,001 plus $4.65 for each additional $1,000 or fraction thereof | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Permit Fees table; PDF verified directly 2026-07-19. |
| Permit Fee Multiplier — New Commercial Construction (default) / Shell Only Building | 0.85 (standard, applies to new commercial construction not otherwise categorized); 0.80 for Shell Only Building | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Building Permit Fees' page (Modified FY 2005): 'Permit Fee Multiplier 0.85 EXCEPT THE FOLLOWING: Shell Only Building 0.80, Commercial Tenant… Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, 'Building Permit Fees' page (Modified FY 2005): 'Permit Fee Multiplier 0.85 EXCEPT THE FOLLOWING: Shell Only Building 0.80, Commercial Tenant Finish 0.35, Commercial Remodel 0.60.' PDF verified directly 2026-07-19 — the schedule does not list a separately lower multiplier specific to 'new commercial construction' beyond the shell-only exception, so ground-up commercial construction uses the standard 0.85 multiplier unless it qualifies as shell-only. |
| Plan Review Fee — Commercial (Primary Building Structures / Accessory Building) | 65% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table: 'Commercial / Primary Building Structures est. Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table: 'Commercial / Primary Building Structures est. 2001 — 65% of the Bldg. Fee' and 'Accessory Building est. 2001 — 65% of the Bldg. Fee.' PDF verified directly 2026-07-19 — more than double the 30% single-family residential plan review rate. |
| Technology Fee — Commercial Permits | $45 | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table, 'Technology Fee est. 2019' — Commercial Permits line; PDF verified directly 2026-07-19 (versus $30 for single family residential). |
| Investigation Fee (work commenced without a permit) | 100% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table. |
| State Fee | 1% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table. |
| Building Bond — Commercial New Construction | $75.00 per linear foot of curb, gutter, sidewalk | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Bond table (est. Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, Building Bond table (est. 2009): 'Commercial / New Construction — $75.00/l.f. of curb, gutter, sidewalk.' PDF verified directly 2026-07-19. Necessity of bond determined by the Building Official; only one bond required per permit. |
| Site Plan Review — Commercial and/or Non-Residential Subdivision (by gross site acreage) | 0–5 acres: $655.00 + $210.00/acre. 5.1–10 acres: $1,705.00 + $175.00/acre over 5. 10.1–15 acres: $2,580.00 + $150.00/acre over 10. 15.1–20 acres: $3,330.00 + $125.00/acre over 15. 20+ acres: $3,955.00 + $110.00/acre over 20. | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Site Plan Review, Commercial and/or Non-Residential Subdivision' table (est. Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, 'Site Plan Review, Commercial and/or Non-Residential Subdivision' table (est. 2019); PDF verified directly 2026-07-19. Separate from the Building Department's permit/plan-review fees; includes a $5 technology fee per the Planning & Zoning Fees note. |
| SWPPP Plan Review Fee — Commercial Development | $50.00 per acre or portion thereof, up to 5 acres | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Clinton City SWPPP Review and Inspection Fees' table (est. 2011); PDF verified directly 2026-07-19. Yearly inspection fee is an additional $300.00/year for commercial development. |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for interior tenant-finish work within an existing (typically shell) commercial building, and for commercial remodel work, in Clinton. Clinton's fee schedule publishes two distinct, favorable permit-fee multipliers for this category — 0.35 for 'Commercial Tenant Finish' and 0.60 for 'Commercial Remodel' — both well below the standard 0.85 multiplier used for new commercial construction, applied against the same valuation-based Building Permit Fee table.
Verified 2026-07-19 · Source
Requirements
- Interior tenant-finish work within an existing commercial (often shell) building, OR commercial remodel work to an existing structure
- Plans and specifications in duplicate (or as otherwise required by the Building Official) per Clinton City Code § 5-1-2
- Building Bond (commercial, existing structure): $75.00 per linear foot of curb, gutter, sidewalk, where applicable
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Community Development Department; plans and specifications in duplicate per Clinton City Code § 5-1-2.
- RequiredConstruction PlansInterior floor plan, MEP layout, and structural details as applicable to the tenant-finish or remodel scope, conforming to the 2024 IBC.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (same chart as new commercial construction) | $58.80 for $1–$1,000 valuation, scaling to $6,730.55 for the first $1,000,001 plus $4.65 per additional $1,000 | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Permit Fees table (Modified FY 2005); Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, Building Permit Fees table (Modified FY 2005); PDF verified directly 2026-07-19. Same valuation table as new commercial construction — the discount for tenant-finish/remodel work is applied via the Permit Fee Multiplier line, not a separate valuation chart. |
| Permit Fee Multiplier — Commercial Tenant Finish | 0.35 | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Building Permit Fees' page (Modified FY 2005): 'Permit Fee Multiplier 0.85 EXCEPT THE FOLLOWING: ... Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, 'Building Permit Fees' page (Modified FY 2005): 'Permit Fee Multiplier 0.85 EXCEPT THE FOLLOWING: ... Commercial Tenant Finish 0.35.' PDF verified directly 2026-07-19 — the lowest multiplier in Clinton's published schedule, well below the 0.85 standard rate and the 0.60 Commercial Remodel rate. |
| Permit Fee Multiplier — Commercial Remodel | 0.60 | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Building Permit Fees' page: 'Permit Fee Multiplier 0.85 EXCEPT THE FOLLOWING: ... Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, 'Building Permit Fees' page: 'Permit Fee Multiplier 0.85 EXCEPT THE FOLLOWING: ... Commercial Remodel 0.60.' PDF verified directly 2026-07-19. Clinton's schedule distinguishes 'Commercial Tenant Finish' (0.35, interior finish of a shell/existing space) from 'Commercial Remodel' (0.60, broader remodel work) as two separate line items — confirm with the Building Division which multiplier applies to a given scope. |
| Plan Review Fee — Commercial | 65% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table: 'Commercial / Primary Building Structures — 65% of the Bldg. Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table: 'Commercial / Primary Building Structures — 65% of the Bldg. Fee' / 'Accessory Building — 65% of the Bldg. Fee.' The fee schedule does not publish a separately discounted plan-review percentage for tenant-improvement work — the same 65% commercial rate applies to the (already-discounted) building fee. |
| Technology Fee — Commercial Permits | $45 | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table, 'Technology Fee est. 2019' — Commercial Permits line; PDF verified directly 2026-07-19. |
| State Fee | 1% of the Building Fee | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Fees table. |
| Building Bond — Commercial Existing Structure | $75.00 per linear foot of curb, gutter, sidewalk | Clinton City Consolidated Fee Schedule, FY 2026-27, Building Bond table (est. Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, Building Bond table (est. 2009): 'Commercial / Existing Structure — $75.00/l.f. of curb, gutter, sidewalk.' PDF verified directly 2026-07-19. Necessity of bond determined by the Building Official — interior-only tenant finish with no frontage/right-of-way work may not trigger this fee; confirm applicability with the Building Division. |
Automatic Fire Extinguishing (Sprinkler) and Alarm System Permit
VerifiedRequired in Clinton City for installation of automatic fire sprinkler (extinguishing) systems and fire alarm systems. Per the Clinton City Consolidated Fee Schedule (FY 2026-27, effective 7/1/2026), all Automatic Extinguishing and Alarm Systems are third-party reviewed and must be reviewed by a Utah-licensed Fire Protection Engineer or a State-recognized equivalent; occupancies classified Educational 'E' or Institutional 'I' must instead be reviewed by the Utah State Fire Marshal's Office. Fees are tiered by square footage and by whether the submittal is a new installation, an existing-system remodel, or a re-review of corrected/rejected plans, with separate (lower) tiers for single-family, two-family, and manufactured homes.
Verified 2026-07-20 · Source
Requirements
- All Automatic Extinguishing (sprinkler) and Alarm Systems must be reviewed by a Utah-licensed Fire Protection Engineer or a State-recognized equivalent, per the Clinton City Consolidated Fee Schedule, FY 2026-27
- Educational (E) or Institutional (I) occupancies must be reviewed by the Utah State Fire Marshal's Office instead of a third-party reviewer
- Compliance with Clinton City Code of Ordinances Title 10, Chapter 8 (Fire Code) and the adopted International Fire Code
- Fees for this Title are set by the Clinton City Council by resolution and published in the Consolidated Fee Schedule, per Clinton City Code § 10-5-4
Required documents
- RequiredFire Sprinkler/Alarm System PlansPlans for the automatic extinguishing or alarm system submitted for third-party plan review (or Utah State Fire Marshal's Office review for E/I occupancies), sized to determine the applicable square-footage fee tier.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Installation — All buildings except single-family, two-family, and manufactured homes (0-3,000 sq ft) | $300.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27 (effective 7/1/2026), 'Automatic Fire Extinguishing System Fee and Plan Review Fee' (est. 2017), 'Original/initial submittal for new installations': '0 – 3,000 square feet — $300.00 per plan.' |
| New Installation — All buildings except single-family, two-family, and manufactured homes (3,001-10,000 sq ft) | $400.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27: '3,001 – 10,000 square feet — $400.00 per plan.' |
| New Installation — All buildings except single-family, two-family, and manufactured homes (10,001+ sq ft) | $400.00 + $0.07 per square foot over 10,000 | Clinton City Consolidated Fee Schedule, FY 2026-27: '10,001 square feet and greater — $400.00 + $0.07 per square foot over 10,000.' |
| New Installation — Single-family, two-family, and manufactured homes (0-3,000 sq ft) | $200.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Single family, two family and manufactured homes' new-installation tier: '0 – 3,000 square feet — $200.00 per plan.' |
| New Installation — Single-family, two-family, and manufactured homes (3,001-7,000 sq ft) | $250.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27: '3,001 – 7,000 square feet — $250.00 per plan.' |
| New Installation — Single-family, two-family, and manufactured homes (7,001+ sq ft) | $250.00 + $0.07 per square foot over 7,000 | Clinton City Consolidated Fee Schedule, FY 2026-27: '7,001 square feet and greater — $250.00 + $0.07 per square foot over 7,000.' |
| Existing System Remodel — All buildings except single-family, two-family, and manufactured homes (0-3,000 sq ft) | $150.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Original/initial submittal for existing system remodels': '0 – 3,000 square feet — $150.00 per plan' (scaling to $200.00 per plan for 3,001–10,000 sq ft, and $200.00 + $0.07/sq ft over 10,000 sq ft beyond that). |
| Existing System Remodel — Single-family, two-family, and manufactured homes (0-3,000 sq ft) | $125.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27: '0 – 3,000 square feet — $125.00 per plan' (scaling to $175.00 per plan for 3,001–7,000 sq ft, and $175.00 + $0.07/sq ft over 7,000 sq ft beyond that). |
| Re-review of Corrected or Rejected Plans — All buildings except single-family, two-family, and manufactured homes (0-3,000 sq ft) | $150.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Re-review of corrected or rejected plans' (est. 2010): '0 – 3,000 square feet — $150.00 per plan' (scaling to $200.00 per plan for 3,001–10,000 sq ft, and $200.00 + $0.07/sq ft over 10,000 sq ft beyond that). |
| Re-review of Corrected or Rejected Plans — Single-family, two-family, and manufactured homes (0-3,000 sq ft) | $125.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27: '0 – 3,000 square feet — $125.00 per plan' (scaling to $175.00 per plan for 3,001–7,000 sq ft, and $175.00 + $0.07/sq ft over 7,000 sq ft beyond that). |
| Automatic Fire Sprinklers/Alarm System/Fire/Smoke/Heat/CO Detection System Plan Review — Original/Initial Review | $350.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Uniform Cost Recovery / Standby Services' section (est. Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27, 'Uniform Cost Recovery / Standby Services' section (est. 2008): 'Automatic Fire Sprinklers/Alarm System/Fire/Smoke/Heat/CO Detection System Plan Review: Original/initial review fee — $350.00 per plan.' This is a second, separately dated (2008) fee line item published alongside the 2017 'Automatic Fire Extinguishing System Fee and Plan Review Fee' schedule above; both appear in the same current fee schedule and are reported here exactly as published rather than reconciled. |
| Automatic Fire Sprinklers/Alarm System/Fire/Smoke/Heat/CO Detection System Plan Review — Re-review | $225.00 per plan | Clinton City Consolidated Fee Schedule, FY 2026-27, 'Uniform Cost Recovery / Standby Services' section: 'Re-review of corrected/rejected plans — $225.00 per plan.' |
EV Charger / EVSE Permit
Clinton City does not publish a distinct "EV Charger" or "EVSE" fee line item. Its Consolidated Fee Schedule (FY 2026-27) bills additions or modifications to existing electrical systems under a single valuation-based Building Permit Fee category ('Additions or Modifications to Existing Structures; Structural, Plumbing, Mechanical, and/or Electrical Systems'), assessed per Section 304 of the 1997 Uniform Administrative Code, Section 109 of the IBC, and Section R108 of the IRC — the same clause covering all trade work, not a specific EV category. A full-text search of the current fee schedule found no mention of "EV," "EVSE," "electric vehicle," or "charging station."
Reviewed 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Clinton City
- Dedicated 240V circuit and/or panel capacity installed by a licensed electrician
- Building permit filed with Clinton City for the electrical modification, valued per Section 304 UAC / Section 109 IBC / Section R108 IRC
Required documents
- RequiredBuilding Permit Application (Electrical/Mechanical/Plumbing)Filed with Clinton City for the electrical work associated with the charger installation.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Additions or Modifications to Existing Structures (Structural, Plumbing, Mechanical, and/or Electrical Systems); no distinct EV charger line item | Assessed per Section 304 of the 1997 Uniform Administrative Code (UAC), Section 109 of the IBC, and Section R108 of the IRC (valuation-based) | Clinton City Consolidated Fee Schedule, FY 2026-27 (Building Permit Fees est. Show full citationHideClinton City Consolidated Fee Schedule, FY 2026-27 (Building Permit Fees est. 2001): 'Additions or Modifications to Existing Structures; Structural, Plumbing, Mechanical, and/or Electrical Systems. Fees shall be assessed in accordance with the provisions of Section 304 of the 1997 Uniform Administrative Code (UAC), Section 109 of the IBC and Section R108 of the IRC.' |
| Re-inspection Fee (if a re-inspection of the EV charger circuit is needed) | $58.80 per inspection | Clinton City Consolidated Fee Schedule, FY 2026-27, Other Inspection Fees, item 2. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clinton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.