Kaysville building permits

Verified

Kaysville, Utah — as published 2026-07-16.

Verified 2026-07-23 · Source

Codes adopted

2021 International Residential Code (IRC) — one- & two-family dwellings and townhomes; REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria (kaysville.gov/750/Design-Criteria)Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized in Kaysville's own Design Criteria page, added here per statute2024 International Building Code (IBC), including Appendices C and J — commercial construction; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-162024 International Mechanical Code (IMC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-162024 International Plumbing Code (IPC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-162024 International Fuel Gas Code (IFGC) — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-162024 International Energy Conservation Code (IECC), single unsplit statewide edition — commercial; CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition Kaysville's Design Criteria page had shown as of 2026-07-162021 International Fire Code (IFC) — commercial; Kaysville Design Criteria. NOTE: the IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (which governs Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act; left as published by the City, no statutory edition change applies via § 15A-2-1032023 National Electrical Code (NEC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment; Kaysville Design Criteria already correctly reflects 20232024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Kaysville's own Design Criteria page or elsewhere on kaysville.gov, added here per statute since the City's own materials omit itResidential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); CURRENT as of 7/1/2026, supersedes the 2021 edition referenced in this file's Residential Pool Permit entry, which had not been updated as of 2026-07-16NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Kaysville's Design Criteria page (kaysville.gov/750/Design-Criteria) was live-checked 2026-07-16 and is ALREADY CORRECT — it states verbatim 'The 2021 IRC as adopted by the State of Utah Title 15A' for residential, and 'The 2024 IBC, IMC, IFC, IPC, IFGC, IECC, Etc, and the 2023 NEC as adopted by the State of Utah' for commercial (Kaysville does not separately itemize IEBC or ISPSC on this page). This file's earlier codesAdopted entries (rev. pre-2026-07-16) were stale relative to Kaysville's own already-updated page; both are now aligned to 2024/2021/2023 per statute. The Utah Code § 15A-2-103 citation in the sources array below has been updated to the current in-force version link

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, and structural alterations in Kaysville, governed by the 2021 IRC. Applications are submitted through the Cityinspect online portal.

Verified 2026-07-23 · Source

Requirements

  • New single-family, duplex, or townhome construction
  • Additions requiring structural work
  • Structural modifications — load-bearing wall removal, foundation alterations
  • Conversion of non-habitable space to habitable space

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3; create an account on first use
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details
  • OptionalEngineered Truss PlansSealed truss layouts for new construction with trusses

Fee schedule

Fee typeAmountNotes
Application Fee — Residential$25 (non-refundable deposit, processed upfront toward total building fees due upon issuance)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees), applies to applications received after Jan 17, 2023
Building Permit FeeValuation-based per ICC Current Valuation DataKaysville City Building Permit Fees page: 'Building Permit fee is based on Valuation - valuation based on ICC Current Valuation Data (averaging $2,500) plus a 1% State education fee and a 25% plan check fee.'
State Education Fee1% of permit feeKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Plan Check Fee25% of permit feeKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Construction Bond — New Single Family Dwelling$1,500 (refundable upon final occupancy inspection approval)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Parks/Recreation Impact Fee$4,480Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees) — new single-family dwellings
Water Impact Fee$769 (3/4-inch meter) or $1,282 (1-inch meter)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Water Meter/Connection Fee$345 (3/4-inch) or $400 (1-inch)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Sewer Impact Fee$2,400 (Central Davis Sewer District) or $3,454.03 (North Davis Sewer District), depending on service areaKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Roadway Facilities Impact Fee$1,330Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Public Safety Facilities Impact Fee$356Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Fire Facilities Impact Fee$296Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Power Impact Fee$954–$1,908 (varies by amperage)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees) — Kaysville operates its own municipal power utility
Credit Card Convenience Fee3% (American Express not accepted regardless of amount)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees), effective August 2022; checks and e-checks bypass this fee

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Kaysville. Kaysville charges a single flat fee regardless of square footage, intentionally kept low to encourage permitting.

Verified 2026-07-23 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window per IRC R310)
  • Adding a bathroom (requires plumbing work)
  • Electrical wiring for new rooms

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • RequiredRemodel ChecklistExisting layout of the home and proposed floor plan; per Kaysville's published Remodel Checklist (kaysville.gov/DocumentCenter/View/4911/Remodel-Checklist)

Fee schedule

Fee typeAmountNotes
Basement Finish/Remodel Permit$245.70 flat fee, regardless of square footageKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees): 'This fee has intentionally remained the same for years to encourage residents to apply for a permit and covers the plan review, the 4-way, insulation and final inspection.'

Mechanical / HVAC / Water Heater Permit

Verified

Required for furnace, air conditioning, and water heater installation or replacement in Kaysville. Governed by the 2024 IMC (commercial) and the IRC mechanical provisions (residential). Kaysville publishes a single flat fee covering furnace, A/C, and water heater work.

Verified 2026-07-23 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Water heater installation or replacement (including like-for-like swaps)
  • Ductwork installation or major modification

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • OptionalUtah HVAC/Plumbing Contractor License (DOPL)Required for work not performed by the homeowner on their own primary residence

Fee schedule

Fee typeAmountNotes
Furnace / A/C / Water Heater Permit$65.65 flat feeKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees), re-verified live 2026-07-23, exact figure unchanged. The page adds: 'tankless water heater require review fee' — a tankless water heater may incur an additional review fee beyond the flat $65.65; amount not stated, confirm with the Building Department.

Electrical Permit / Service Upgrade

Verified

Required for electrical work in Kaysville including service upgrades, panel changes, new circuits, and rewiring. Governed by the 2023 NEC (Utah Code § 15A-2-103(1)(g)). Kaysville operates its own municipal electric utility (Kaysville City Power). EV charger/EVSE installation is electrical work and falls under this general Electrical Permit / Service Upgrade; the Kaysville Building Permit Fees page does not publish a distinct EV-specific fee line item.

Verified 2026-07-20 · Source

Requirements

  • Electrical service upgrade (e.g., 200-amp panel upgrade)
  • New electrical circuits, rewiring, or adding outlets/switches/fixtures
  • Generator connections
  • Solar panel electrical connections (see Solar Panel Permit)

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • OptionalElectrical Plan / Single-Line DiagramRequired for service changes — panel schedule and circuit layout
  • OptionalUtah Electrical Contractor License (DOPL)Required for work not performed by the homeowner on their own primary residence

Fee schedule

Fee typeAmountNotes
Electrical Service Upgrade Permit$195 plus any impact fee difference (e.g., amperage increase)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Power Extension Fee (400-amp upgrade example)$535.60Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees) — Kaysville City Power extension fee cited for a 400-amp upgrade scenario
Power Impact Fee$954–$1,908 (varies by amperage)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)

EV Charger / EVSE Permit

Verified

Kaysville does not publish a distinct EV charger/EVSE fee line item. EV charger/EVSE installation is electrical work and is billed and processed as an Electrical Service Upgrade under Kaysville's general Electrical Permit — the city's own Building Permit Fees page has no separate EV-specific fee or checklist.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel/service capacity upgrade to serve the charger
  • Coordination with Kaysville City Power (the city's own municipal electric utility) on panel/service capacity

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • OptionalElectrical Plan / Single-Line DiagramRequired for service changes — panel schedule and circuit layout

Fee schedule

Fee typeAmountNotes
Electrical Service Upgrade Permit (covers EV charger installation)$195 plus any impact fee difference (e.g., amperage increase)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees). No distinct EV charger/EVSE line exists; a home EV charger install is processed as an Electrical Service Upgrade under this same fee.
Power Extension Fee (400-amp upgrade example)$535.60Kaysville City Building Permit Fees page — Kaysville City Power extension fee cited for a 400-amp upgrade scenario, applicable if the EV charger requires a service upgrade.
Power Impact Fee$954–$1,908 (varies by amperage)Kaysville City Building Permit Fees page.

Roofing Permit

Verified

Required for roof tear-off and re-roofing in Kaysville since January 1, 2020. Ice barrier and inspection requirements are specifically published by the city.

Verified 2026-07-23 · Source

Requirements

  • Any roof replacement requiring tear-off of old roofing (permit required since Jan 1, 2020)
  • Ice barrier required on all roofs per Kaysville Roofing Requirements

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • OptionalUtah Roofing Contractor License (DOPL)Required if work is not performed by the homeowner on their primary residence

Fee schedule

Fee typeAmountNotes
Roofing PermitNot separately published as a flat fee on the Building Permit Fees page — call (801) 544-1363 to confirm current feeKaysville's published fee page (kaysville.gov/749/Building-Permit-Fees) lists furnace/A-C/water-heater ($65.65), basement finish ($245.70), pools, and solar as flat/itemized fees but does not list a discrete roofing-permit fee line. Roofing Requirements page (kaysville.gov/753/Roofing-Requirements) confirms the permit requirement (effective Jan 1, 2020) and inspection process but does not publish a flat permit-fee figure. Re-verified live 2026-07-23: the Roofing Requirements page does state 'There is no plan review fee' for roofing permits — so while a base permit fee still applies (amount unpublished), no separate plan-review surcharge is charged, unlike plan-review permits such as new residential construction (25% plan check).

Solar Panel Permit

Verified

Required for installation of rooftop solar PV systems in Kaysville. Kaysville operates its own municipal electric utility (Kaysville City Power); a separate electrical fee applies alongside the base solar permit fee and plan review.

Verified 2026-07-23 · Source

Requirements

  • Rooftop solar PV installation
  • Electrical connection to Kaysville City Power (net metering agreement required for grid-tied systems)

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and Kaysville City Power meter

Fee schedule

Fee typeAmountNotes
Residential Solar Permit — Base Fee$260Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Residential Solar Permit — Electrical Component$375 additionalKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees): 'Residential Solar: $260 + $375 electrical + plan review'
Plan ReviewAdditional fee, amount not separately itemizedKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees) lists 'plan review' as an added component of the solar fee without a specific dollar figure or percentage — call (801) 544-1363 to confirm exact plan-review cost for solar.

Residential Pool Permit

Verified

Required for installation of residential swimming pools in Kaysville. Governed by the residential provisions of the 2024 ISPSC (Utah Code § 15A-2-103(1)(n), effective 7/1/2026, superseding the 2021 edition) incorporated under the state-adopted code suite; not separately itemized on Kaysville's own Design Criteria page.

Verified 2026-07-23 · Source

Requirements

  • In-ground or above-ground pool installation exceeding code thresholds
  • Pool barrier/fencing per code
  • Electrical bonding and grounding for pool equipment

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • RequiredSite PlanPool location, setbacks, barrier/fence layout

Fee schedule

Fee typeAmountNotes
Residential Pool Permit$260Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)
Construction Bond — Pools$500 (refundable upon final inspection approval)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)

Internal Accessory Dwelling Unit (IADU)

Verified

Kaysville City Code 17-31-3 allows Internal Accessory Dwelling Units (IADUs) only — located within the primary dwelling — in response to Utah HB 82 (2021). Detached ADUs (garage apartments, 'granny flats') are explicitly NOT permitted as dwellings in Kaysville.

Verified 2026-07-23 · Source

Requirements

  • IADU must be located within the primary dwelling (internal only — no detached structures)
  • Property owner must occupy either the IADU or the primary dwelling as their primary residence
  • One dedicated paved parking space for the IADU, in addition to a standard 2-car garage and 2-car driveway
  • A permit is required if the IADU is occupied by someone other than a related family member

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3. No structural alterations are required to add an IADU, but any home modifications (additions, remodels) require a separate building permit.
  • RequiredFloor PlanShowing IADU layout within the primary dwelling, separate entrance, and parking arrangement

Fee schedule

Fee typeAmountNotes
IADU Permit (non-family occupant)Not published on kaysville.gov/818/Internal-Accessory-Dwelling-Units or the Building Permit Fees page as a discrete line itemRe-verified live 2026-07-23: kaysville.gov/818/Internal-Accessory-Dwelling-Units states only 'In the event the IADU is occupied by someone other than a related family member, Kaysville City requires that a permit be obtained for this purpose' with a link to the application — no dollar figure appears on the page. Also checked kaysville.gov/749/Building-Permit-Fees (live, full text) — no IADU line item exists there either. Additionally chased the actual application form linked from the IADU page (Civic Review portal, https://app.civicreview.com/application/61816c57a3e0ec001c2f01b1) — it is a multi-step JS application with a 'Fees' step gated behind entering property-owner/property information, so no fee figure is viewable without submitting an in-progress application; not attempted, as doing so would require entering fabricated personal data into a live government form. No specific number is grounded anywhere checked. If the IADU involves construction/remodeling, that work would be charged under standard building-permit valuation fees (kaysville.gov/749/Building-Permit-Fees). Contact the Building Department (commdev@kaysville.gov / (801) 546-1241, per the Civic Review application's own contact block) to confirm the exact IADU occupancy-permit fee.

Accessory Building / Addition / Carport Permit

Verified

Required for detached garages, sheds, carports, and covered patios over 200 sq ft, or any accessory structure with electrical/plumbing regardless of size, in Kaysville.

Verified 2026-07-23 · Source

Requirements

  • Accessory structures 200 sq ft or larger
  • Any accessory structure (regardless of size) with added electrical and/or plumbing
  • Cannot be placed in front yards or required side yards
  • Structures 200+ sq ft must be at least 1 foot from property lines
  • Total accessory building area capped at the lesser of 10% of lot area or 3,000 sq ft (absent conditional use approval)

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • RequiredAccessory Building/Addition/Carport ChecklistKaysville's published checklist (kaysville.gov/DocumentCenter/View/5227/Accessory-BuildingAdditionCarport-Checklist)
  • RequiredSite PlanShowing structure location, setbacks, and lot coverage calculation

Fee schedule

Fee typeAmountNotes
Building Permit FeeValuation-based per ICC Current Valuation Data, plus 1% state education fee and 25% plan check feeKaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees) — accessory buildings are charged under the same valuation-based building-permit fee structure as additions
Construction Bond — Additions/Detached Garages/Accessory Buildings$500 (refundable upon final inspection approval)Kaysville City Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees)

Demolition Permit

Required to demolish all or part of a structure in Kaysville. Includes a Historic Preservation Commission review window, mandatory utility disconnects, and an asbestos removal report requirement. Kaysville publishes a dedicated Demolition Checklist.

Reviewed 2026-07-23 · Source

Requirements

  • Complete or partial demolition of any structure
  • Utility disconnects (natural gas, secondary water, power, water) completed PRIOR to demolition
  • Asbestos Removal Report from a State-approved asbestos removal company
  • Demolition notification permit from the Utah Division of Air Quality (DAQ)
  • Historic Preservation Society approval/documentation window for applicable structures

Required documents

  • RequiredDemolition Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • RequiredDemolition Site PlanPer Kaysville's Demolition Checklist (kaysville.gov/DocumentCenter/View/5224/Demo-Checklist) — notes whether foundation/basement is removed, pedestrian protection/traffic control, fire safety compliance with IFC Chapter 33
  • RequiredAsbestos Removal ReportFrom a State-approved asbestos removal company, stating whether asbestos is present and how it will be removed
  • RequiredUtah DAQ Demolition Notification PermitRequired from the Utah Division of Air Quality (801-536-4000) before demolition; https://deq.utah.gov/air-quality/air-quality-permitting
  • RequiredPhotos of Structure Being DemolishedFor Historic Preservation Society review

Fee schedule

Fee typeAmountNotes
Performance Deposit — Demolition$200 (UNCONFIRMED as of 2026-07-23 — see note)PARTIAL/DOWNGRADED 2026-07-23: re-fetched kaysville.gov/182/Building-Permits (live) and the Demo Checklist (kaysville.gov/DocumentCenter/View/5224/Demo-Checklist, live PDF) in full and neither currently contains the quoted 'Two Hundred Dollars ($200.00) for each demolition of a structure or manufactured home set in a manufactured home park' text — this quote is no longer groundable on the cited page. Also checked the live Consolidated Fee Schedule (kaysville.municipalcodeonline.com/book?type=fees, current edition eff. 7/1/2026) and the FY2021 Consolidated Fee Schedule PDF (kaysville.gov/DocumentCenter/View/3057/Consolidated-Fee-FY-21-PDF); both contain only a 'Manufactured Homes Guaranty Bonds — $200.00 (refundable upon final occupancy permit)' line, which is a bond for placing a NEW manufactured home (refunded at occupancy), not a demolition deposit — it does not support the demolition-specific $200 claim either, in this or any prior edition checked. The Demo Checklist does confirm a 'performance deposit' and 'Bond Release' inspection step exist for demolition, so SOME deposit is real, but its dollar amount cannot currently be re-grounded to any live or archived Kaysville source. Confidence downgraded to partial for this field; call the Building Department at (801) 544-1363 to confirm the current demolition deposit amount before relying on the $200 figure.
Demolition Permit FeeNot separately published as a flat fee on kaysville.gov/749/Building-Permit-Fees or the Demo ChecklistKaysville's published fee page does not list a discrete demolition permit fee line item distinct from the $200 performance deposit; call (801) 544-1363 to confirm any additional permit fee.

Fence Permit

CORRECTED 2026-07-23: Kaysville's Building Permits page (kaysville.gov/182/Building-Permits) lists 'Fences over 7 feet in height' among the items requiring a building permit — meaning fences up to 7 feet do not require a building permit, not 6 feet as this entry previously (and incorrectly) stated citing kaysville.gov/205/Planning-Zoning, a page which does not in fact discuss fence height at all. Corner lot visibility restrictions apply regardless of height.

Reviewed 2026-07-23 · Source

Requirements

  • Most residential fences up to 7 feet tall do not require a building permit, per kaysville.gov/182/Building-Permits ('Fences over 7 feet in height' is listed as requiring a permit)
  • Corner lots: no fencing/landscaping/obstruction higher than 2 feet within 30 feet of the intersecting property line (kaysville.gov/205/Planning-Zoning, 'Clear View Information')
  • Zoning (Title 17) may separately cap fence height in certain yards/zones even where no building permit is triggered — confirm with Planning & Zoning before building a fence over 6 feet, since this file could not independently verify a zoning-specific height cap as of 2026-07-23

Required documents

  • OptionalNone required for standard fencesNo permit application is published as required for standard backyard fences up to 7 ft; contact Planning & Zoning at (801) 546-1241 to confirm if your specific fence design, height, or zone requires review

Fee schedule

Fee typeAmountNotes

Commercial Building Permit

Verified

Required for new commercial building construction in Kaysville, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026; Kaysville's own Design Criteria page was already updated to reflect this as of live re-check 2026-07-16). The Building Permit Fee uses the same valuation-based table as residential, but commercial plan check is 55% of the permit fee (versus 25% residential, 35% multi-family), and the plan review deposit is $1,000 (versus $25 residential).

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction on a permitted, properly zoned lot
  • Complete architectural and structural drawings
  • Commercial Plan Review Deposit ($1,000) paid at submittal
  • Roadway, Fire, and Public Safety non-residential impact fees calculated per 1,000 sq ft

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details, sealed by a licensed design professional per the 2024 IBC.
  • RequiredCommercial Plan Review Deposit ($1,000)Applied to the total plan review charge, per Kaysville City Consolidated Fee Schedule (Community Development, Building Permit Fees section).

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (UBC 1997 table, same as residential)$1.00–$500: $23.50. $500.01–$2,000: $23.50 + $3.05/$100. $2,000.01–$25,000: $69.25 + $14.00/$1,000. $25,000.01–$50,000: $391.25 + $10.10/$1,000. $50,000.01–$100,000: $643.75 + $7.00/$1,000. $100,000.01–$500,000: $993.75 + $5.60/$1,000. $500,000.01–$1,000,000: $3,233.75 + $4.75/$1,000. Over $1,000,000: $5,608.75 + $3.65/$1,000.Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees (kaysville.municipalcodeonline.com/book?type=fees), effective 7/1/2026, most recently amended by Res. 26-06-06 (6/18/2026); live browser render verified directly 2026-07-19. Valuation based on ICC Current Building Valuation Data. Same table used for both residential and commercial.
Plan Check Fee — Commercial55% of permit feeKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees: 'Plan Check Fee — Residential - 25% of permit fee / Multi-family - 35% of permit fee / Commercial - 55% of permit fee / 10% of permit fee (review of duplicate plans).' Live browser render verified directly 2026-07-19.
Commercial Plan Review Deposit$1,000.00 (applied to total plan review charge)Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees: 'Commercial Plan Review Deposit (applied to total plan review charge) — $1,000.00.' Live browser render verified directly 2026-07-19 — 40x the $25.00 residential plan review deposit.
State Fee1% of permit feeKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees.
Construction Guaranty Bond — New (Commercial)$1,500.00 (refundable upon final occupancy permit)Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'BONDS' section: 'Construction Guaranty Bond - New — $1,500.00'; and the Building Permit Fees page (kaysville.gov/749/Building-Permit-Fees), 'Construction Bonds' section: 'Commercial and single family dwellings are $1,500.'
Roadway Facilities Impact Fee — Non-Residential (per 1,000 sq ft)General Commercial $3,696.00; Office $1,783.00; Institutional/Church $1,152.00; Light Industrial $1,104.00Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'ROADWAY FACILITIES' table; live browser render verified directly 2026-07-19.
Fire Facilities Impact Fee — Non-Residential$529.00 per 1,000 sq ftKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'FIRE FACILITIES' table (versus $296.00 flat for residential).
Public Safety Facilities Impact Fee — Non-Residential$205.00 per 1,000 sq ftKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'PUBLIC SAFETY FACILITIES' table (versus $356.00 flat for residential).
Power Impact Fee — Commercial (examples; Single Phase and 3 Phase tables)Commercial Single Phase 200A: $3,817.00; Commercial 3 Phase (120/240V) 200A: $5,725.00; Commercial 3 Phase (277/480V) 200A: $13,359.00 (full table has 6+ tiers per phase configuration up to 2,000A)Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, 'POWER IMPACT FEES' table; Kaysville operates its own municipal power utility. Live browser render verified directly 2026-07-19.
Site Plan Review (Commercial)$400.00 base fee, plus add-on factors (e.g., 50% surcharge if streams/creeks/ditches on-site, traffic study fee if generating >300 daily trips or corner-lot commercial, consultant/coordination hourly add-ons)Kaysville City Consolidated Fee Schedule, Community Development > Site Development Review, 'BASE FEES' and 'ADDITIONAL AMOUNTS FROM FACTORS' tables; live browser render verified directly 2026-07-19.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for interior tenant-finish and remodel work within an existing commercial building in Kaysville. Kaysville's Consolidated Fee Schedule publishes a distinct, lower-cost remodel line item for residential structures ('Existing Residential Structure (Remodels)' at $50 + $10/$1,000 valuation) but does NOT publish an equivalent discounted line for commercial remodels/tenant finish — commercial tenant-improvement work is billed under the same valuation-based Building Permit Fee table and 55% commercial Plan Check Fee as new commercial construction.

Verified 2026-07-19 · Source

Requirements

  • Interior tenant-finish or remodel work within an existing commercial building
  • Complete plans showing interior layout, MEP, and structural scope as applicable
  • Commercial Plan Review Deposit ($1,000) paid at submittal

Required documents

  • RequiredBuilding Permit Application (Cityinspect)Apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3
  • RequiredConstruction PlansInterior floor plan, MEP layout, and structural details as applicable to the tenant-finish or remodel scope, conforming to the 2024 IBC.
  • RequiredCommercial Plan Review Deposit ($1,000)Applied to the total plan review charge, per Kaysville City Consolidated Fee Schedule.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (same table as new commercial construction)Same tiered table as new commercial construction — e.g., $5,608.75 plus $3.65 per additional $1,000 over $1,000,000Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees, live browser render verified directly 2026-07-19. The schedule publishes a discrete, lower 'Existing Residential Structure (Remodels)' line ($50.00 flat, plus $10.00 per $1,000 of valuation) for residential remodels, but NO equivalent discounted line for commercial remodel/tenant-improvement work — commercial tenant finish falls back to the general valuation table.
Plan Check Fee — Commercial55% of permit feeKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees: 'Plan Check Fee — Commercial - 55% of permit fee.' Same rate applies to both new commercial construction and tenant-improvement/remodel work — no separate, lower tenant-finish percentage is published (unlike, e.g., Clinton City's separate 0.35 Commercial Tenant Finish multiplier).
Commercial Plan Review Deposit$1,000.00 (applied to total plan review charge)Kaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees. Live browser render verified directly 2026-07-19 — same deposit amount applies to tenant-improvement submittals as to new commercial construction.
State Fee1% of permit feeKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees.
Duplicate Plan Review (if applicable)10% of permit feeKaysville City Consolidated Fee Schedule, Community Development > Building Permit Fees: 'Plan Check Fee ... 10% of permit fee (review of duplicate plans).' Applies if the tenant-finish layout matches a previously reviewed identical plan.

Sign Permit

Verified

Required for permanent sign installation in Kaysville, with a separate lower-cost permit for banner (temporary) signs. Flat fees are published in the city's Consolidated Fee Schedule under Building Permit Fees.

Verified 2026-07-19 · Source

Requirements

  • Permanent sign installation (building/wall or freestanding signs)
  • Banner or other temporary sign display uses the separate, lower-cost Banner Sign Permit

Required documents

  • RequiredSign Permit ApplicationSubmitted to the Kaysville City Community Development/Building Department

Fee schedule

Fee typeAmountNotes
Sign Permit$65.00Kaysville City Consolidated Fee Schedule (municipal code online, Community Development > Building Permit Fees), live-fetched 2026-07-19: "Sign Permit $65.00"
Banner Sign Permit$32.50Kaysville City Consolidated Fee Schedule, same table, live-fetched 2026-07-19: "Banner Sign Permit $32.50"

Commercial Fire Sprinkler and Fire Alarm Permit

Verified

Kaysville is unusual among nearby Davis County cities in that fire sprinkler and fire alarm permitting is handled directly by the Kaysville Building Department, NOT a separate fire district or the Fire Department, per the city's official Building Permits page: 'When installing new or modifying existing fire sprinkler and fire alarm systems in Kaysville City, it's the Building Department NOT the Fire Department that handles the submittals and the approvals of plans and inspections.' The city treats fire sprinkler and fire alarm work as a single combined 'Commercial Fire Alarm and Sprinkler' permit category with its own distinct application deposit fee, separate from the deposit fees for new commercial buildings, tenant improvements, mechanical, or signs.

Verified 2026-07-20 · Source

Requirements

  • Apply for the 'Commercial Fire Alarm/Sprinkler' permit through the Building Department and attach plans for review
  • Reference the business address or the building's issued permit number, to link the fire/sprinkler plans to the existing building or tenant improvement permit for deferred submittal
  • Applications submitted through the online Building Permit portal (utah.cityinspect.com)

Required documents

  • RequiredCommercial Fire Alarm/Sprinkler Permit ApplicationSubmitted through Kaysville's online Cityinspect building permit portal, referencing the associated business address or building permit number.
  • RequiredFire Sprinkler and/or Fire Alarm PlansPlan set for the fire protection system(s) being installed or modified, attached to the permit application for Building Department review.

Fee schedule

Fee typeAmountNotes
Commercial Fire Alarm and Sprinkler — Application Deposit$100.00Kaysville City official Building Permits page (kaysville.gov/182/Building-Permits), 'Notice of Adoption of Application Fee & Impact Fee Increase' section: building application deposit fees table lists 'Commercial Fire Alarm and Sprinkler — $100' (compare: all residential types $25, Commercial new buildings $1,000, Commercial Tenant Improvement/Remodel $100, Commercial Mechanical $25, Commercial Signs $25). This deposit fee applies to applications received after January 17, 2023, and is credited toward the total fees due upon permit issuance — it is not necessarily the full final permit cost.

Change of Use / Change of Occupancy

Verified

Kaysville does not publish a distinct 'Change of Use' or 'Change of Occupancy' permit or fee line item. Confirmed by direct review of the Business Licensing page, Business License Fees page, Building Permits page, and the FY2027 Consolidated Fee Schedule (Resolution 26-06-06, adopted 6/18/2026, effective 7/1/2026) — no standalone application or fee exists. Where a change of use involves no construction, a new occupant simply obtains a standard Commercial business license (Zoning Administrator site approval, Fire Department business inspection, Business Licensing Office). Where construction accompanies the change of use, occupancy classification is determined as part of Kaysville's existing Commercial Building Permit or Commercial Tenant Improvement / Tenant Finish Permit process, governed by the 2024 IBC and IEBC (statewide-mandatory per Utah Code § 15A-2-103(1)(a) and (1)(i), effective 7/1/2026).

Verified 2026-07-21 · Source

Requirements

  • No standalone change-of-use or change-of-occupancy application exists in Kaysville — the applicable process depends on whether construction accompanies the use change
  • If no construction is involved: the new occupant/business obtains a standard Commercial business license through Kaysville Business Licensing, subject to Zoning Administrator site approval and a Fire Department business inspection before the license can be issued
  • If construction is involved: file under Kaysville's existing Commercial Building Permit or Commercial Tenant Improvement / Tenant Finish Permit process, which determines the Occupancy Group under the 2024 IBC/IEBC
  • Governed by the 2024 International Existing Building Code (IEBC), statewide-mandatory per Utah Code § 15A-2-103(1)(i) as of 7/1/2026, which addresses change-of-occupancy classification

Required documents

  • OptionalCommercial License Application (if no construction accompanies the use change)Apply through Kaysville Business Licensing (801-546-1241); requires Zoning Administrator approval that the site is properly zoned/used and a Fire Department business inspection before the license can be issued.
  • OptionalBuilding Permit Application (Cityinspect) — Commercial Building or Tenant Improvement (if construction accompanies the use change)Same application used for this file's Commercial Building Permit / Commercial Tenant Improvement Permit entries; apply online at https://utah.cityinspect.com/register?registration_id=b6YPk5XkR3

Fee schedule

Fee typeAmountNotes
Business License — Commercial (applies when a new business/use occupies a space, no construction)$120.00, plus a one-time $15.00 Set Up Fee for the initial business license applicationKaysville City Consolidated Fee Schedule, Resolution 26-06-06 (FY2027, adopted 6/18/2026, effective 7/1/2026), 'BUSINESS LICENSE FEES' section, direct PDF fetch and read 2026-07-21: 'Commercial $120.00' (increased from $80.00) and 'Set Up Fee (charged once for initial business license application) $15.00'. No separate 'change of use' fee line item exists; a new occupant/use is billed the same Commercial license fee as any other new business.
Fire Department Business Inspection$100.00Kaysville City Consolidated Fee Schedule, Resolution 26-06-06 (FY2027), Section 5, 'INSPECTION FEES' (newly adopted table): 'Business Inspection $100.00', direct PDF fetch and read 2026-07-21. Kaysville's own 'What Do I Need To Do To Get A Business License' guide (kaysville.gov/DocumentCenter/View/197/Business-License-Information-PDF) states a fire inspection is required on all commercial businesses 'before a business license can be sent' — this FY2027 fee formalizes that inspection's cost.
Transfer/Modify Fee (existing license changes, not a genuinely new occupant/use)$10.00Kaysville City Consolidated Fee Schedule, Resolution 26-06-06 (FY2027), 'BUSINESS LICENSE FEES' section: 'Transfer/Modify Fee $10.00', direct PDF fetch and read 2026-07-21. Applies to modifying or transferring details on an existing license rather than licensing a genuinely new occupant/use, which is billed the full Commercial license fee instead.
Building Permit / Plan Check (if construction accompanies the change of use)Valuation-based, per this file's Commercial Building Permit or Commercial Tenant Improvement / Tenant Finish Permit fee tablesNo separate change-of-occupancy fee is published; where the change of use also triggers tenant-finish or remodel work, it is billed exactly as those two entries in this file.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kaysville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-04)View current record →All versions →

Permalink: /utah/davis-county/kaysville/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.