Version history — Unincorporated Davis County, Utah
This is PermitBase’s own verified record for Unincorporated Davis County, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Unincorporated Davis County’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-07-01Current record
- Unincorporated Davis County, Utah — Electrical Permit fee record updated: Approximately $202 minimum → $202.00 minimum
- Unincorporated Davis County, Utah — Plumbing Permit fee record updated: Approximately $202 minimum → $202.00 minimum
- Unincorporated Davis County, Utah — Mechanical / HVAC Permit fee record updated: Approximately $202 minimum → $202.00 minimum
- Unincorporated Davis County, Utah — Solar Panel Permit fee record updated: Valuation-based per Davis County Code § 2.48.050(A), Ord. No. 4-2017 (minimum $200) → Valuation-based per Davis County Code § 2.48.050(A), Ord. No. 4-2017 (minimum $200.00)
- Unincorporated Davis County, Utah — Accessory Dwelling Unit (ADU) fee record updated: Per the Davis County Building Permit Fee Schedule (§ 2.48.050(A), Ord. No. 4-2017): minimum $200, scaling with project valuation → Per the Davis County Building Permit Fee Schedule (§ 2.48.050(A), Ord. No. 4-2017): minimum $200.00, scaling with project valuation
- 2026-06-30Superseded
- Unincorporated Davis County, Utah — fee schedule re-verified across 11 permit types
- Unincorporated Davis County, Utah — permit-type records re-verified (22 updates)
- 2026-06-27Initial record — coverage of Unincorporated Davis County began