Skip to main content
PermitBase

Version history — Woods Cross, Utah

This is PermitBase’s own verified record for Woods Cross, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Woods Cross’s actual law was at that time.

Permanent link to today’s record

/utah/davis-county/woods-cross/as-of/2026-08-25/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-25Current record
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Woods Cross, Utah — Sign Permit record added
    • Woods Cross, Utah — Fire Sprinkler System Permit record added
    • Woods Cross, Utah — Fire Alarm System Permit record added
    • Woods Cross, Utah — Sign Permit fee record added: Building Permit Fee — valuation-based (Table 3-A, Woods Cross Consolidated Fee Schedule) ($1.00–$500.00: $24.70 flat. $501.00–$2,000.00: $24.70 for the first $500 + $3.20 per additional $100 (or fraction). $2,001.00–$25,000.00: $72.70 for the first $2,000 + $14.70 per additional $1,000 (or fraction). $25,001.00–$50,000.00: $410.80 for the first $25,000 + $10.60 per additional $1,000. $50,001.00–$100,000.00: $675.80 for the first $50,000 + $7.40 per additional $1,000. $100,001.00–$500,000.00: $1,045.80 for the first $100,000 + $5.90 per additional $1,000. $500,001.00–$1,000,000.00: $3,405.80 for the first $500,000 + $5.00 per additional $1,000. $1,000,001.00 and up: $5,905.80 for the first $1,000,000 + $3.80 per additional $1,000.)
    • Woods Cross, Utah — Fire Sprinkler System Permit fee record added: Sprinkler Plan Review ($100 per hour, minimum 1 hour ($100 minimum))
    • Woods Cross, Utah — Fire Sprinkler System Permit fee record added: Fire Sprinkler System Permit ($300)
    • Woods Cross, Utah — Sign Permit fee record removed: Sign Permit Fee
    • Woods Cross, Utah — Fire Sprinkler System Permit fee record removed: Suppression Review (plan review + 2 inspections)
    • Woods Cross, Utah — EV Charger / EVSE Permit record added
  • 2026-07-19Superseded
  • 2026-07-16Superseded
  • 2026-07-07Initial record — coverage of Woods Cross began