This is PermitBase’s own verified record for Cedar City, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Cedar City’s actual law was at that time.

Permanent link to today’s record

/utah/iron-county/cedar-city/as-of/2026-08-25/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-25Current record
  • 2026-07-30Superseded
    • Cedar City, Utah — fee schedule re-verified across 2 permit types
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Cedar City, Utah — Sign Permit record added
    • Cedar City, Utah — EV Charger / EVSE Permit record added
  • 2026-07-19Superseded
    • Cedar City, Utah — Commercial Building Permit fee record updated: $636.00 per 1,000 sq ft → $2,516.00 per 1,000 sq ft
    • Cedar City, Utah — Commercial Building Permit fee record updated: 1-inch meter $1,935.00; up to larger meter sizes priced proportionally per the schedule's meter-size table → 1-inch meter $3,892.00; up to larger meter sizes priced proportionally per the schedule's meter-size table
  • 2026-07-16Superseded
  • 2026-07-04Initial record — coverage of Cedar City began