This is PermitBase’s published record for Cottonwood Heights as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Cottonwood Heights building permits
VerifiedCottonwood Heights, Utah — as published 2026-07-19.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Dwelling / Remodel)
VerifiedRequired for new single-family residential construction and residential remodels regulated by the adopted 2021 IRC/IBC suite. Cottonwood Heights uses a single valuation-based fee structure (no separate flat-fee table) administered by its contracted Building Official.
Verified 2026-07-03 · Source
Requirements
- New residential dwelling construction or residential remodel regulated by the adopted 2021 IRC/IBC
- Online application only, submitted via the city's iWorq-based Building Permit Application portal
- Building plans uploaded with the application — the city will not accept an application without accompanying plans (oversized plans emailed directly to the permits team)
- Zoning and setbacks compliance per the city's published Zoning and Setbacks standards
Required documents
- RequiredResidential Checklist – New ConstructionOfficial checklist for new residential dwelling plan submittals, linked from the Building Permit / Codes and Standards pages.
- RequiredResidential Remodel ChecklistOfficial checklist for residential remodel plan submittals.
- OptionalOwner-Builder Certification / DOPL Owner Builder FormRequired for applicants pursuing an owner-builder permit, per the city's official Owner-Builder Certification page and linked DOPL form.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | 100% of the building valuation data table from the most current IBC edition adopted in Utah | Cottonwood Heights official Fee Schedule page, 'Community and economic development > Building fees (code title 15)': 'Building permit fee — 100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah.' |
| Plan Review Fee (residential) | 65% of base building permit fee | Cottonwood Heights official Fee Schedule page: 'Plan review fee (residential) — 65% of base building permit.' |
Electrical, Mechanical & Plumbing Permit
VerifiedCovers standalone or combined electrical, mechanical, and plumbing work. Cottonwood Heights charges each trade at a flat 5% of the base building permit fee when applied for together with the building permit; if applied for separately, the fee instead follows the IBC fee schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical, Mechanical & Plumbing Permit; the city's official Fee Schedule page (live-checked 2026-07-19) publishes no separate EV-specific line item or process.
Verified 2026-07-13 · Source
Requirements
- Electrical, mechanical, or plumbing work regulated statewide by the 2024 IPC / 2024 IMC / 2024 IFGC (Utah Code § 15A-2-103(1)(d)/(e)/(f), effective 7/1/2026) and the 2023 NEC (§ 15A-2-103(1)(g), unchanged); the city's own Building Codes and Standards page still lists the 2021 IPC/IMC/IFGC and 2020 NEC as of live-check 2026-07-16, but the statute controls
- Online application via the city's iWorq Building Permit Application portal
Required documents
- RequiredBuilding Permit Application (iWorq portal)Submitted online only; the city does not accept paper or in-person-only applications.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical, Mechanical, or Plumbing Fee (applied with building permit) | 5% of base building permit fee, each trade | Cottonwood Heights official Fee Schedule page: 'Electrical, mechanical and plumbing fees — Each is 5% of base building permit fee when applying with the building permit.' |
| Electrical, Mechanical, or Plumbing Fee (applied separately) | Follows the IBC fee schedule (valuation-based) | Cottonwood Heights official Fee Schedule page: 'If you apply separately, fee follows the IBC schedule.' No further separate flat-dollar figure is published; left as described verbatim rather than converted to an estimated dollar amount. |
Solar Installation Permit
VerifiedRequired for residential and commercial solar photovoltaic installations. Cottonwood Heights publishes a dedicated Solar Installation Checklist as part of its supplemental residential plans/standards, but does not publish a separate flat solar permit fee distinct from the general valuation-based building permit fee.
Verified 2026-07-13 · Source
Requirements
- Solar installation plans meeting the city's published Solar Installation Checklist
- Online application via the city's iWorq Building Permit Application portal
Required documents
- RequiredSolar Installation ChecklistOfficial supplemental residential checklist for solar installation plan submittals, linked from the Building Permits page.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (applies — no solar-specific flat fee published) | 100% of the building valuation data table from the most current IBC edition adopted in Utah | No solar-specific line item appears on the city's official Fee Schedule page; solar installations are billed under the same general Building Permit Fee / Plan Review Fee structure as other permits, per that page's Community and Economic Development > Building fees section. |
Commercial Building Permit
VerifiedRequired for new commercial construction in Cottonwood Heights, administered by a contracted Building Official (Sunrise Engineering). The building permit fee is 100% of the IBC building valuation data table — the same method used for residential — and the non-residential plan review fee is 65% of the base building permit fee, matching the residential rate.
Verified 2026-07-19 · Source
Requirements
- New commercial construction, per the city's New Commercial Checklist
- Design-professional (architect) stamp required for spaces 3,000 sq ft or larger, or for structural changes, per state law
- Geotechnical report and structural footing/foundation plan
- Signed site-plan mylar with Engineering/Water/Storm Water sign-off
- Fire Marshal-approved sprinkler plans where applicable
Required documents
- RequiredCode Analysis TablePer the city's New Commercial Checklist.
- RequiredElectrical, Mechanical, and Plumbing Plan DetailsPer the New Commercial Checklist.
- RequiredADA-Dimensioned PlansPer the New Commercial Checklist.
- RequiredWall Sections and Fire-Rated Assembly DetailsPer the New Commercial Checklist.
- RequiredGeotechnical ReportPer the New Commercial Checklist.
- RequiredStructural Footing/Foundation PlanPer the New Commercial Checklist.
- RequiredSigned Site-Plan Mylar (Engineering/Water/Storm Water)Per the New Commercial Checklist.
- OptionalDesign Professional Stamp (Architect)Required for projects 3,000 sq ft or larger per state law.
- OptionalStucco ICC ReportRequired only where stucco is part of the exterior assembly.
- OptionalFire Marshal-Approved Sprinkler PlansRequired where a fire sprinkler system is part of the scope.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | 100% of the building valuation data table from the most current IBC edition adopted in Utah | Cottonwood Heights official Fee Schedule page, 'Community and economic development > Building fees (code title 15)': 'Building permit fee — 100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah.' |
| Plan Review Fee (Non-Residential) | 65% of base building permit fee | Cottonwood Heights official Fee Schedule page: 'Plan review fee (non-residential) — 65% of base building permit.' Same rate as the residential plan review fee. |
| Electrical, Mechanical, and Plumbing Fees | 5% each of the base building permit fee when applied with the building permit | Cottonwood Heights official Fee Schedule page: 'Electrical, mechanical and plumbing fees — Each is 5% of base building permit fee when applying with the building permit. If you apply separately, fee follows the IBC schedule.' |
| Zoning Review — Commercial Building Permit | $150 | Cottonwood Heights Fee Schedule, Zoning review section: 'Commercial building permit review — $150' (vs. $75 for residential building permit review). |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for commercial remodel and tenant-improvement work in Cottonwood Heights per the city's Commercial TI Checklist, which is lighter-weight than new commercial construction (no geotechnical, foundation, or site-plan mylar requirement). The building permit fee is 100% of the IBC building valuation data table; the non-residential plan review fee is 65% of the base building permit fee, the same rate as new construction.
Verified 2026-07-19 · Source
Requirements
- Commercial remodel or tenant-improvement scope
- Plans must indicate shell construction vs. tenant finish, per the Commercial TI Checklist
- Design-professional (architect) stamp required for spaces 3,000 sq ft or larger, per state law
- Fees based on the valuation of the project; plan review fee due at time of submittal
Required documents
- RequiredCode Analysis TablePer the city's Commercial TI Checklist.
- RequiredElectrical, Mechanical, and Plumbing Plan DetailsPer the Commercial TI Checklist.
- RequiredADA-Dimensioned PlansPer the Commercial TI Checklist.
- RequiredWall Sections and Fire-Rated Assembly DetailsPer the Commercial TI Checklist.
- RequiredShell vs. Tenant Finish DesignationPlans must indicate shell construction vs. tenant finish, per the Commercial TI Checklist.
- OptionalDesign Professional Stamp (Architect)Required for projects 3,000 sq ft or larger per state law.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | 100% of the building valuation data table from the most current IBC edition adopted in Utah | Cottonwood Heights official Fee Schedule page, 'Community and economic development > Building fees (code title 15)': 'Building permit fee — 100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah.' |
| Plan Review Fee (Non-Residential) | 65% of base building permit fee | Cottonwood Heights official Fee Schedule page: 'Plan review fee (non-residential) — 65% of base building permit.' Same rate as the residential plan review fee. |
| Electrical, Mechanical, and Plumbing Fees | 5% each of the base building permit fee when applied with the building permit | Cottonwood Heights official Fee Schedule page: 'Electrical, mechanical and plumbing fees — Each is 5% of base building permit fee when applying with the building permit. If you apply separately, fee follows the IBC schedule.' |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cottonwood Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.