This is PermitBase’s published record for Cottonwood Heights as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Cottonwood Heights building permits

Verified

Cottonwood Heights, Utah — as published 2026-07-19.

Verified 2026-07-03 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Cottonwood Heights' own Building Codes and Standards page, live-checked 2026-07-16, still lists '2021 International Building Code' verbatim — the city's page has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city page's lag.2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches the city's Building Codes and Standards page (live-checked 2026-07-16: '2021 International Residential Code').Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized on the city's own Building Codes and Standards page, added here per statute.2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. The city's Building Codes and Standards page still lists '2021 International Mechanical Code' — live-checked 2026-07-16, confirming lag. The statute controls.2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. The city's Building Codes and Standards page still lists '2021 International Fuel Gas Code' — live-checked 2026-07-16, confirming lag. The statute controls.2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. The city's Building Codes and Standards page still lists '2021 International Plumbing Code' — live-checked 2026-07-16, confirming lag. The statute controls.2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). The city's Building Codes and Standards page lists '2020 National Electric Code' — one edition behind the statewide-mandatory floor, confirmed still unchanged via live-check 2026-07-16. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of the city's own page.2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law), superseding the 2018 IECC. The city's Building Codes and Standards page still lists '2018 international energy conservation code' — live-checked 2026-07-16, confirming lag (this was already one edition behind the pre-7/1/2026 2021 IECC baseline other Salt Lake County cities used, and is now two editions behind current). The statute controls.2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not listed on the city's own Building Codes and Standards page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not listed on the city's own Building Codes and Standards page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed on the city's own Building Codes and Standards page, added here per statute.2018 International Fire Code (IFC), with Utah state amendments — per the city's official Building Codes and Standards page (live-checked 2026-07-16, unchanged). NOTE: the IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act; left as published by the city, no statutory edition change applies via § 15A-2-103.2017 ANSI ICC A117.1 Accessible and Usable Buildings and Facilities (referenced on the codes page as '2017 ANSI ADA CODE') — per the city's official Building Codes and Standards page, live-checked 2026-07-16, unchanged.2009 ANSI A117.1 Standard for Accessible and Usable Buildings and Facilities — also separately listed on the same official codes page (both 2017 and 2009 editions appear on the city's current list; reproduced verbatim rather than reconciled, since only the city's own text is authoritative here). Live-checked 2026-07-16, unchanged.2015 Uniform Code for the Abatement of Dangerous Buildings — per the city's official Building Codes and Standards page, live-checked 2026-07-16, unchanged.Cottonwood Heights Code of Ordinances (local amendments to the above, referenced but not separately itemized on the Codes and Standards page) — see localAmendments below.NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. The city's Building Codes and Standards page (cottonwoodheights.utah.gov/city-services/building/codes-and-standards) was live-checked 2026-07-16 via real-browser navigation and confirmed still lagging — it verbatim lists 2021 IBC/IMC/IFGC/IPC/IRC, 2020 National Electric Code, and 2018 IECC, and omits IEBC and ISPSC entirely. The statewide statute controls over the city's un-updated page; the prior version of this array presented the city's stale figures as simply 'the city's own page controls' without flagging that the statute itself had moved past them — this entry corrects that.

Permit types & fees

Residential Building Permit (New Dwelling / Remodel)

Verified

Required for new single-family residential construction and residential remodels regulated by the adopted 2021 IRC/IBC suite. Cottonwood Heights uses a single valuation-based fee structure (no separate flat-fee table) administered by its contracted Building Official.

Verified 2026-07-03 · Source

Requirements

  • New residential dwelling construction or residential remodel regulated by the adopted 2021 IRC/IBC
  • Online application only, submitted via the city's iWorq-based Building Permit Application portal
  • Building plans uploaded with the application — the city will not accept an application without accompanying plans (oversized plans emailed directly to the permits team)
  • Zoning and setbacks compliance per the city's published Zoning and Setbacks standards

Required documents

  • RequiredResidential Checklist – New ConstructionOfficial checklist for new residential dwelling plan submittals, linked from the Building Permit / Codes and Standards pages.
  • RequiredResidential Remodel ChecklistOfficial checklist for residential remodel plan submittals.
  • OptionalOwner-Builder Certification / DOPL Owner Builder FormRequired for applicants pursuing an owner-builder permit, per the city's official Owner-Builder Certification page and linked DOPL form.

Fee schedule

Fee typeAmountNotes
Building Permit Fee100% of the building valuation data table from the most current IBC edition adopted in UtahCottonwood Heights official Fee Schedule page, 'Community and economic development > Building fees (code title 15)': 'Building permit fee — 100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah.'
Plan Review Fee (residential)65% of base building permit feeCottonwood Heights official Fee Schedule page: 'Plan review fee (residential) — 65% of base building permit.'

Electrical, Mechanical & Plumbing Permit

Verified

Covers standalone or combined electrical, mechanical, and plumbing work. Cottonwood Heights charges each trade at a flat 5% of the base building permit fee when applied for together with the building permit; if applied for separately, the fee instead follows the IBC fee schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical, Mechanical & Plumbing Permit; the city's official Fee Schedule page (live-checked 2026-07-19) publishes no separate EV-specific line item or process.

Verified 2026-07-13 · Source

Requirements

  • Electrical, mechanical, or plumbing work regulated statewide by the 2024 IPC / 2024 IMC / 2024 IFGC (Utah Code § 15A-2-103(1)(d)/(e)/(f), effective 7/1/2026) and the 2023 NEC (§ 15A-2-103(1)(g), unchanged); the city's own Building Codes and Standards page still lists the 2021 IPC/IMC/IFGC and 2020 NEC as of live-check 2026-07-16, but the statute controls
  • Online application via the city's iWorq Building Permit Application portal

Required documents

  • RequiredBuilding Permit Application (iWorq portal)Submitted online only; the city does not accept paper or in-person-only applications.

Fee schedule

Fee typeAmountNotes
Electrical, Mechanical, or Plumbing Fee (applied with building permit)5% of base building permit fee, each tradeCottonwood Heights official Fee Schedule page: 'Electrical, mechanical and plumbing fees — Each is 5% of base building permit fee when applying with the building permit.'
Electrical, Mechanical, or Plumbing Fee (applied separately)Follows the IBC fee schedule (valuation-based)Cottonwood Heights official Fee Schedule page: 'If you apply separately, fee follows the IBC schedule.' No further separate flat-dollar figure is published; left as described verbatim rather than converted to an estimated dollar amount.

Solar Installation Permit

Verified

Required for residential and commercial solar photovoltaic installations. Cottonwood Heights publishes a dedicated Solar Installation Checklist as part of its supplemental residential plans/standards, but does not publish a separate flat solar permit fee distinct from the general valuation-based building permit fee.

Verified 2026-07-13 · Source

Requirements

  • Solar installation plans meeting the city's published Solar Installation Checklist
  • Online application via the city's iWorq Building Permit Application portal

Required documents

  • RequiredSolar Installation ChecklistOfficial supplemental residential checklist for solar installation plan submittals, linked from the Building Permits page.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (applies — no solar-specific flat fee published)100% of the building valuation data table from the most current IBC edition adopted in UtahNo solar-specific line item appears on the city's official Fee Schedule page; solar installations are billed under the same general Building Permit Fee / Plan Review Fee structure as other permits, per that page's Community and Economic Development > Building fees section.

Commercial Building Permit

Verified

Required for new commercial construction in Cottonwood Heights, administered by a contracted Building Official (Sunrise Engineering). The building permit fee is 100% of the IBC building valuation data table — the same method used for residential — and the non-residential plan review fee is 65% of the base building permit fee, matching the residential rate.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction, per the city's New Commercial Checklist
  • Design-professional (architect) stamp required for spaces 3,000 sq ft or larger, or for structural changes, per state law
  • Geotechnical report and structural footing/foundation plan
  • Signed site-plan mylar with Engineering/Water/Storm Water sign-off
  • Fire Marshal-approved sprinkler plans where applicable

Required documents

  • RequiredCode Analysis TablePer the city's New Commercial Checklist.
  • RequiredElectrical, Mechanical, and Plumbing Plan DetailsPer the New Commercial Checklist.
  • RequiredADA-Dimensioned PlansPer the New Commercial Checklist.
  • RequiredWall Sections and Fire-Rated Assembly DetailsPer the New Commercial Checklist.
  • RequiredGeotechnical ReportPer the New Commercial Checklist.
  • RequiredStructural Footing/Foundation PlanPer the New Commercial Checklist.
  • RequiredSigned Site-Plan Mylar (Engineering/Water/Storm Water)Per the New Commercial Checklist.
  • OptionalDesign Professional Stamp (Architect)Required for projects 3,000 sq ft or larger per state law.
  • OptionalStucco ICC ReportRequired only where stucco is part of the exterior assembly.
  • OptionalFire Marshal-Approved Sprinkler PlansRequired where a fire sprinkler system is part of the scope.

Fee schedule

Fee typeAmountNotes
Building Permit Fee100% of the building valuation data table from the most current IBC edition adopted in UtahCottonwood Heights official Fee Schedule page, 'Community and economic development > Building fees (code title 15)': 'Building permit fee — 100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah.'
Plan Review Fee (Non-Residential)65% of base building permit feeCottonwood Heights official Fee Schedule page: 'Plan review fee (non-residential) — 65% of base building permit.' Same rate as the residential plan review fee.
Electrical, Mechanical, and Plumbing Fees5% each of the base building permit fee when applied with the building permitCottonwood Heights official Fee Schedule page: 'Electrical, mechanical and plumbing fees — Each is 5% of base building permit fee when applying with the building permit. If you apply separately, fee follows the IBC schedule.'
Zoning Review — Commercial Building Permit$150Cottonwood Heights Fee Schedule, Zoning review section: 'Commercial building permit review — $150' (vs. $75 for residential building permit review).

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for commercial remodel and tenant-improvement work in Cottonwood Heights per the city's Commercial TI Checklist, which is lighter-weight than new commercial construction (no geotechnical, foundation, or site-plan mylar requirement). The building permit fee is 100% of the IBC building valuation data table; the non-residential plan review fee is 65% of the base building permit fee, the same rate as new construction.

Verified 2026-07-19 · Source

Requirements

  • Commercial remodel or tenant-improvement scope
  • Plans must indicate shell construction vs. tenant finish, per the Commercial TI Checklist
  • Design-professional (architect) stamp required for spaces 3,000 sq ft or larger, per state law
  • Fees based on the valuation of the project; plan review fee due at time of submittal

Required documents

  • RequiredCode Analysis TablePer the city's Commercial TI Checklist.
  • RequiredElectrical, Mechanical, and Plumbing Plan DetailsPer the Commercial TI Checklist.
  • RequiredADA-Dimensioned PlansPer the Commercial TI Checklist.
  • RequiredWall Sections and Fire-Rated Assembly DetailsPer the Commercial TI Checklist.
  • RequiredShell vs. Tenant Finish DesignationPlans must indicate shell construction vs. tenant finish, per the Commercial TI Checklist.
  • OptionalDesign Professional Stamp (Architect)Required for projects 3,000 sq ft or larger per state law.

Fee schedule

Fee typeAmountNotes
Building Permit Fee100% of the building valuation data table from the most current IBC edition adopted in UtahCottonwood Heights official Fee Schedule page, 'Community and economic development > Building fees (code title 15)': 'Building permit fee — 100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah.'
Plan Review Fee (Non-Residential)65% of base building permit feeCottonwood Heights official Fee Schedule page: 'Plan review fee (non-residential) — 65% of base building permit.' Same rate as the residential plan review fee.
Electrical, Mechanical, and Plumbing Fees5% each of the base building permit fee when applied with the building permitCottonwood Heights official Fee Schedule page: 'Electrical, mechanical and plumbing fees — Each is 5% of base building permit fee when applying with the building permit. If you apply separately, fee follows the IBC schedule.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cottonwood Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-16)Later version (2026-07-20) →View current record →All versions →

Permalink: /utah/salt-lake-county/cottonwood-heights/as-of/2026-07-19/

Snapshot date: 2026-07-19

Commit: 6084d45

Reproducible from PermitBase’s version-controlled dataset, commit 6084d45.