This is PermitBase’s published record for Herriman as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Herriman building permits
VerifiedHerriman, Utah — as published 2026-06-30.
Verified 2026-07-01 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family dwellings, structural additions, and structural alterations in Herriman. Fees are valuation-based per the Herriman Master Fee Schedule effective July 1, 2026.
Verified 2026-06-30 · Source
Requirements
- New single-family or multi-family residential construction
- Additions involving structural work
- Structural modifications — load-bearing wall removal, foundation alterations
- Conversion of non-habitable space to habitable space
- Any work requiring plan review under Herriman Title 10
Required documents
- RequiredBuilding PlansComplete construction drawings to scale — floor plans, elevations, sections, and structural details. For new residential buildings and detached structures over 800 sq ft, structural pages must be stamped by a licensed structural engineer.
- RequiredSite PlanProperty survey showing footprint, setbacks, and relationship to property lines
- RequiredEnergy Compliance DocumentationREScheck or equivalent demonstrating compliance with the 2021 IECC
- OptionalEngineered Truss PlansSealed truss layouts for new construction with truss systems
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| SFD Building Permit — value $2,000 or less | $19 for first $500 value + $3.88 for each additional $100 to $2,000 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| SFD Building Permit — value $2,001 to $25,000 | $88 for first $2,000 value + $16.28 for each additional $1,000 to $25,000 | Herriman Master Fee Schedule, effective July 1, 2026 |
| SFD Building Permit — value $25,001 to $50,000 | $519 for first $25,000 value + $13.96 for each additional $1,000 to $50,000 | Herriman Master Fee Schedule, effective July 1, 2026 |
| SFD Building Permit — value $50,001 to $100,000 | $902 for first $50,000 value + $10.86 for each additional $1,000 to $100,000 | Herriman Master Fee Schedule, effective July 1, 2026 |
| SFD Building Permit — value $100,001 to $500,000 | $1,507 for first $100,000 value + $6.98 for each additional $1,000 to $500,000 | Herriman Master Fee Schedule, effective July 1, 2026 |
| SFD Building Permit — value $500,001 to $1,000,000 | $5,260 for first $500,000 value + $4.65 for each additional $1,000 to $1,000,000 | Herriman Master Fee Schedule, effective July 1, 2026 |
| SFD Building Permit — value over $1,000,000 | $8,276 for first $1,000,000 value + $3.88 for each additional $1,000 or fraction thereof | Herriman Master Fee Schedule, effective July 1, 2026 |
| Plan Review Fee | 65% of building permit fee | Herriman Master Fee Schedule, effective July 1, 2026 |
| State Surcharge | 1% of (Building Permit + Electrical Permit + Plumbing Permit + Mechanical Permit) combined | Herriman Master Fee Schedule, effective July 1, 2026 |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Electrical Permit
VerifiedRequired for electrical work in Herriman including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as listed on Herriman's Building Codes page.
Verified 2026-06-30 · Source
Requirements
- New electrical circuits or wiring installations
- Electrical panel upgrades or replacements
- Service entrance changes
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
- RequiredPermit ApplicationBuilding permit application listing the electrical contractor
- OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout
- OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) — required unless owner-builder on own primary residence
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit — Residential | $100 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| Electrical Permit — Non-Residential | $153 | Herriman Master Fee Schedule, effective July 1, 2026 |
| Each Additional Meter on Same Inspection | $10 | Herriman Master Fee Schedule, effective July 1, 2026 |
| Temporary Power (Each Meter Base) | $47 | Herriman Master Fee Schedule, effective July 1, 2026 |
| For Each New or Modified Circuit | $5 | Herriman Master Fee Schedule, effective July 1, 2026 |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Herriman including water heaters, fixture additions, and gas line work. Governed by the 2021 International Plumbing Code (IPC) and 2021 International Fuel Gas Code (IFGC).
Verified 2026-06-30 · Source
Requirements
- New plumbing fixture installations (sinks, toilets, showers)
- Water heater installation or replacement
- Water line or sewer line replacement or extension
- Gas line installation or modification
- Backflow prevention device installation
Required documents
- RequiredPermit ApplicationBuilding permit application listing the plumbing contractor
- OptionalPlumbing PlanRequired for larger projects — isometric or plan showing fixture locations, pipe sizes, and drainage
- OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) — required unless owner-builder on own primary residence
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit — Residential | $100 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| Plumbing Permit — Non-Residential | $153 | Herriman Master Fee Schedule, effective July 1, 2026 |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Herriman. Governed by the 2021 International Mechanical Code (IMC) and 2021 International Fuel Gas Code (IFGC).
Verified 2026-06-30 · Source
Requirements
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Gas fireplace or appliance installation
Required documents
- RequiredPermit ApplicationBuilding permit application listing the mechanical contractor
- OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler
- OptionalContractor LicenseValid Utah HVAC contractor license (Utah DOPL) — required unless owner-builder
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit — Residential | $100 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| Mechanical Permit — Non-Residential | $153 | Herriman Master Fee Schedule, effective July 1, 2026 |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Roofing Permit
VerifiedRequired for re-roofing in Herriman when triggering conditions are met per Herriman's Building FAQs, and for all roof conversions. The re-roof permit fee is a flat $118.
Verified 2026-06-30 · Source
Requirements
- Re-roofing where existing roof is water-soaked or deteriorated
- Re-roofing where existing roof is wood shake, slate, clay, cement, or asbestos-cement tile
- Re-roofing where existing roof already has two or more layers of covering
- All roof conversions (changing pitch) always require a permit
- All commercial re-roofs require a permit
Required documents
- RequiredPermit ApplicationScope of work, square footage, and material specifications
- OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not owner-builder
- OptionalTruss Diagram and House LayoutRequired for roof conversions only — showing truss detail, bearing walls
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roof Permit | $118 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Solar Panel Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems and battery storage in Herriman. The permit fee is a flat residential solar fee per the Master Fee Schedule.
Verified 2026-06-30 · Source
Requirements
- Rooftop solar panel installation
- Ground-mounted solar array installation
- Battery storage system installation (e.g., Powerwall)
- Electrical service upgrade for solar interconnection
Required documents
- RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways on the roof
- RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
- RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels
- RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
- OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Solar Permit | $118 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Deck Permit
VerifiedRequired for new deck construction or structural modification of existing decks in Herriman. The fee schedule lists separate flat fees for open decks ($139) and covered decks ($222).
Verified 2026-06-30 · Source
Requirements
- New deck construction attached to or detached from the house
- Decks more than 30 inches above grade
- Structural modifications to existing decks
- Adding or replacing a deck ledger
Required documents
- RequiredDeck PlansFraming plan with beam/joist sizes, post locations, and footing details
- RequiredSite PlanShowing deck location with setbacks from property lines
- OptionalLedger DetailConnection detail for attached decks per IRC R507.2
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Deck Permit (open/uncovered) | $139 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| Covered Deck Permit | $222 | Herriman Master Fee Schedule, effective July 1, 2026 |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Basement Finish Permit
VerifiedRequired for finishing or remodeling an unfinished basement in Herriman, including framing, electrical, plumbing, and mechanical work. The building permit fee uses the 'All Other' valuation-based Category B table in the Master Fee Schedule (Basement listed explicitly).
Verified 2026-07-01 · Source
Requirements
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window)
- Adding a bathroom (requires plumbing permit)
- Electrical wiring for new rooms
- Any structural modifications
Required documents
- RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
- RequiredElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations
- OptionalMechanical PlanHVAC supply/return for new rooms, combustion air for furnace room
- OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — 'All Other' Category B (Basement explicitly listed) — value $2,001 to $25,000 | $107 for first $2,000 value + $21.62 for each additional $1,000 to $25,000 | Re-verified 2026-07-01 directly against the live Herriman Master Fee Schedule PDF (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf, effective July 1, 2026), page 1: the 'Building Permit - All Other (B) (Addition, Basement, Non-Buildings, Remodel, Tenant Improvement, I-ADUs, etc.)' table explicitly names Basement and shows '$107 for 1st $2,000 value + $21.62 for each additional $1,000 to $25,000' for the $2,001–$25,000 tier — figures confirmed verbatim. Valuation-based fee grounded in a cited official source = verified per program rule. |
| Building Permit — Category B — value $2,000 or less | $36 for first $500 value + $4.71 for each additional $5,000 value | Herriman Master Fee Schedule, effective July 1, 2026 |
| Building Permit — Category B — value $25,001 to $50,000 | $605 for first $25,000 value + $15.60 for each additional $1,000 value | Herriman Master Fee Schedule, effective July 1, 2026 |
| Plan Review Fee (Tenant Finish / Addition / Remodel) | $183 minimum, up to 65% of building permit fee | Herriman Master Fee Schedule, effective July 1, 2026 |
| Electrical Permit (if applicable) | $100 residential | Herriman Master Fee Schedule, effective July 1, 2026 |
| Plumbing Permit (if applicable) | $100 residential | Herriman Master Fee Schedule, effective July 1, 2026 |
| Mechanical Permit (if applicable) | $100 residential | Herriman Master Fee Schedule, effective July 1, 2026 |
| State Surcharge | 1% of (Building Permit + Electrical + Plumbing + Mechanical) combined | Herriman Master Fee Schedule, effective July 1, 2026 |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Fence Permit
VerifiedRequired for fence installation in Herriman. The permit fee is a flat $77 per the Herriman Master Fee Schedule, plus a $48 plan review fee.
Verified 2026-06-30 · Source
Requirements
- New fence construction
- Replacement of existing fence in a different location or at a different height
Required documents
- RequiredSite PlanShowing fence location relative to property lines and any easements
- OptionalFence DetailsHeight, material, and style specifications
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence Permit | $77 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| Plan Review Fee — Fences | $48 | Herriman Master Fee Schedule, effective July 1, 2026 |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Demolition Permit
VerifiedRequired for partial or complete demolition of structures in Herriman, including utility disconnection coordination and any required asbestos surveys. The flat fee is $77 per the Master Fee Schedule.
Verified 2026-06-30 · Source
Requirements
- Complete demolition of any structure
- Partial demolition involving structural elements
- Removal of load-bearing walls
Required documents
- RequiredDemolition ApplicationScope of demolition, structure details, and disposal plan
- OptionalAsbestos SurveyFederal NESHAP asbestos inspection required for structures that may contain asbestos-containing materials (typically pre-1980 construction)
- RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | $77 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Swimming Pool Permit
VerifiedRequired for in-ground and above-ground swimming pool installation, hot tubs, and associated barriers in Herriman. Governed by the residential provisions of the 2021 International Swimming Pool & Spa Code (ISPSC). Flat fee is $298.
Verified 2026-06-30 · Source
Requirements
- In-ground swimming pool construction
- Above-ground pools with depth over 24 inches
- Hot tubs and spas
- Pool barrier/fence installation (required for all pools)
Required documents
- RequiredPool PlansPool dimensions, depth, equipment location, and structural details
- RequiredSite PlanPool location with setbacks, equipment pad, and barrier/fence layout
- RequiredBarrier PlanPool fence/barrier details meeting IRC Chapter 31 and ISPSC requirements
- RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Pool Permit | $298 | Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf) |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Water Heater Permit
VerifiedRequired for water heater installation or replacement in Herriman. Pulled as a plumbing permit; Herriman's fee schedule does not list a separate water heater line item — the applicable fee is the residential plumbing permit flat fee of $100.
Verified 2026-07-01 · Source
Requirements
- Water heater replacement (including like-for-like swaps)
- New water heater installation
- Conversion from tank to tankless water heater
- Gas line modification for water heater
Required documents
- RequiredPermit ApplicationWater heater type, size, fuel source, and location
- OptionalEquipment SpecificationsManufacturer data sheet for the water heater
- OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not owner-builder on own primary residence
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit (Residential) — covers water heater replacement | $100 | Re-verified 2026-07-01 directly against the live Herriman Master Fee Schedule PDF (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf, effective July 1, 2026), page 1: full line-by-line review of the Building Fees section confirms no separate water-heater line item exists anywhere in the schedule; only 'Plumbing Permit: (Residential/Non-Residential) $100/$153' is listed, which is the fee that applies to water heater installs/replacements per Herriman's permitting practice (pulled as a plumbing permit). Grounded flat fee = verified per program rule. |
| Re-Inspection Fee | $265 | Herriman Master Fee Schedule, effective July 1, 2026 |
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Herriman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.