This is PermitBase’s published record for Herriman as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Herriman building permits

Verified

Herriman, Utah — as published 2026-07-19.

Verified 2026-07-01 · Source

Codes adopted

2021 International Residential Code (IRC), including amendments to the 2021 Residential Energy Code and Appendix AE & AQ — Herriman City Building Codes and Design Criteria (herriman.gov/building-codes-design-criteria, live-checked 2026-07-16); REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. CORRECTION (2026-07-16): a prior version of this entry read 'Appendix E & Q' — the city's page actually reads 'Appendix AE & AQ,' which correctly maps to Appendix AQ (§ 15A-2-103(1)(c)) and, subject to § 15A-2-104(1), Appendix AE (§ 15A-2-103(1)(k)); corrected to match the source verbatim.Residential provisions of the 2024 International Swimming Pool & Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n), superseding the 2021 ISPSC. Herriman's Building Codes and Design Criteria page still lists 'Residential provisions of the 2021 International Swimming Pool & Spa Code (ISPSC)' verbatim — live-checked 2026-07-16, confirming this one item lags. The statute controls.2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law). Herriman's own page (live-checked 2026-07-16) already lists '2024 Commercial IECC' for the commercial side, but for residential energy it instead cites 'Amendments to the 2021 Residential Energy Code' rather than the unified 2024 IECC — that residential-specific citation is superseded by the single 2024 IECC under current law; preserved as history in the HISTORY entry below.HISTORY (superseded 7/1/2026, but still shown on Herriman's own page as of live-check 2026-07-16): 'Amendments to the 2021 Residential Energy Code' — Herriman City Building Codes and Design Criteria; no longer has independent authority for residential energy provisions now that Utah Code § 15A-2-103(1)(h) applies a single unsplit 2024 IECC to both residential and commercial construction statewide.2023 National Electrical Code (NEC) — Herriman City Building Codes and Design Criteria (live-checked 2026-07-16, unchanged); also Utah Code § 15A-2-103(1)(g); REMAINS CURRENT, UNCHANGED by the 7/1/2026 amendment2024 International Building Code (IBC), including Appendix C & J — Herriman City Building Codes and Design Criteria, live-checked 2026-07-16: the city's own page is ALREADY CURRENT, verbatim listing '2024 International Building Code (IBC), including Appendix C & J,' matching Utah Code § 15A-2-103(1)(a) effective 7/1/2026. This file's prior codesAdopted entry (2021 IBC) was the stale one.2024 International Plumbing Code (IPC) — Herriman City Building Codes and Design Criteria, live-checked 2026-07-16: the city's own page is ALREADY CURRENT, matching Utah Code § 15A-2-103(1)(d). This file's prior codesAdopted entry (2021 IPC) was the stale one.2024 International Mechanical Code (IMC) — Herriman City Building Codes and Design Criteria, live-checked 2026-07-16: the city's own page is ALREADY CURRENT, matching Utah Code § 15A-2-103(1)(e). This file's prior codesAdopted entry (2021 IMC) was the stale one.2024 International Fuel Gas Code (IFGC) — Herriman City Building Codes and Design Criteria, live-checked 2026-07-16: the city's own page is ALREADY CURRENT, matching Utah Code § 15A-2-103(1)(f). This file's prior codesAdopted entry (2021 IFGC) was the stale one.2024 International Fire Code (IFC) — Herriman City Building Codes and Design Criteria, live-checked 2026-07-16 (the city's own page now reads '2024 International Fire Code (IFC),' up from the 2021 edition in this file's prior entry). NOTE: the IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act; the city's own edition choice is left as published, no statutory edition change applies via § 15A-2-103.Commercial provisions of the 2024 International Energy Conservation Code — Herriman City Building Codes and Design Criteria, live-checked 2026-07-16 (already updated from the 2021 edition in this file's prior entry); collapses into the single unsplit 2024 IECC entry above per Utah Code § 15A-2-103(1)(h), which no longer distinguishes residential/commercial editions.2024 International Existing Building Code (subject to HUD & IRC Appendix E) — Herriman City Building Codes and Design Criteria, live-checked 2026-07-16: the city's own page is ALREADY CURRENT, matching Utah Code § 15A-2-103(1)(i). This file's prior codesAdopted entry (2021 IEBC) was the stale one.Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed on Herriman's own Building Codes and Design Criteria page (live-checked 2026-07-16), added here per statute.ICC/ANSI A117.1-2009 and A117.1-2017 — Herriman City Building Codes and Design CriteriaApplicable Utah State Amendments — Utah Code Title 15ANOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Herriman's Building Codes and Design Criteria page (herriman.gov/building-codes-design-criteria) was live-checked 2026-07-16 via real-browser navigation. UNLIKE most sibling cities checked in this pass, Herriman's page is ALREADY CURRENT for IBC/IPC/IMC/IFGC/IEBC/commercial-IECC (all show 2024) — this file's PRIOR codesAdopted data (2021 for all of these) was the stale one, not the city. The only genuine city-side lag found: the ISPSC residential-provisions citation still reads 2021 (should be 2024), and the residential-energy citation still points to 'Amendments to the 2021 Residential Energy Code' rather than the unified 2024 IECC that now governs both residential and commercial per § 15A-2-103(1)(h). IRC and NEC editions are correct on both the statute and the city's page.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family dwellings, structural additions, and structural alterations in Herriman. Fees are valuation-based per the Herriman Master Fee Schedule effective July 1, 2026.

Verified 2026-06-30 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions involving structural work
  • Structural modifications — load-bearing wall removal, foundation alterations
  • Conversion of non-habitable space to habitable space
  • Any work requiring plan review under Herriman Title 10

Required documents

  • RequiredBuilding PlansComplete construction drawings to scale — floor plans, elevations, sections, and structural details. For new residential buildings and detached structures over 800 sq ft, structural pages must be stamped by a licensed structural engineer.
  • RequiredSite PlanProperty survey showing footprint, setbacks, and relationship to property lines
  • RequiredEnergy Compliance DocumentationREScheck or equivalent demonstrating compliance with the 2021 IECC
  • OptionalEngineered Truss PlansSealed truss layouts for new construction with truss systems

Fee schedule

Fee typeAmountNotes
SFD Building Permit — value $2,000 or less$19 for first $500 value + $3.88 for each additional $100 to $2,000Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
SFD Building Permit — value $2,001 to $25,000$88 for first $2,000 value + $16.28 for each additional $1,000 to $25,000Herriman Master Fee Schedule, effective July 1, 2026
SFD Building Permit — value $25,001 to $50,000$519 for first $25,000 value + $13.96 for each additional $1,000 to $50,000Herriman Master Fee Schedule, effective July 1, 2026
SFD Building Permit — value $50,001 to $100,000$902 for first $50,000 value + $10.86 for each additional $1,000 to $100,000Herriman Master Fee Schedule, effective July 1, 2026
SFD Building Permit — value $100,001 to $500,000$1,507 for first $100,000 value + $6.98 for each additional $1,000 to $500,000Herriman Master Fee Schedule, effective July 1, 2026
SFD Building Permit — value $500,001 to $1,000,000$5,260 for first $500,000 value + $4.65 for each additional $1,000 to $1,000,000Herriman Master Fee Schedule, effective July 1, 2026
SFD Building Permit — value over $1,000,000$8,276 for first $1,000,000 value + $3.88 for each additional $1,000 or fraction thereofHerriman Master Fee Schedule, effective July 1, 2026
Plan Review Fee65% of building permit feeHerriman Master Fee Schedule, effective July 1, 2026
State Surcharge1% of (Building Permit + Electrical Permit + Plumbing Permit + Mechanical Permit) combinedHerriman Master Fee Schedule, effective July 1, 2026
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Electrical Permit

Verified

Required for electrical work in Herriman including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as listed on Herriman's Building Codes page. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Herriman Master Fee Schedule does not publish a separate EV-specific fee line item.

Verified 2026-06-30 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

  • RequiredPermit ApplicationBuilding permit application listing the electrical contractor
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) — required unless owner-builder on own primary residence

Fee schedule

Fee typeAmountNotes
Electrical Permit — Residential$100Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
Electrical Permit — Non-Residential$153Herriman Master Fee Schedule, effective July 1, 2026
Each Additional Meter on Same Inspection$10Herriman Master Fee Schedule, effective July 1, 2026
Temporary Power (Each Meter Base)$47Herriman Master Fee Schedule, effective July 1, 2026
For Each New or Modified Circuit$5Herriman Master Fee Schedule, effective July 1, 2026
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Herriman including water heaters, fixture additions, and gas line work. Governed by the 2024 International Plumbing Code (IPC) and 2024 International Fuel Gas Code (IFGC) per Utah Code § 15A-2-103(1)(d) and (1)(f), which superseded the 2021 editions statewide on July 1, 2026.

Verified 2026-06-30 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredPermit ApplicationBuilding permit application listing the plumbing contractor
  • OptionalPlumbing PlanRequired for larger projects — isometric or plan showing fixture locations, pipe sizes, and drainage
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) — required unless owner-builder on own primary residence

Fee schedule

Fee typeAmountNotes
Plumbing Permit — Residential$100Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
Plumbing Permit — Non-Residential$153Herriman Master Fee Schedule, effective July 1, 2026
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Herriman. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) per Utah Code § 15A-2-103(1)(e) and (1)(f), which superseded the 2021 editions statewide on July 1, 2026.

Verified 2026-06-30 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Gas fireplace or appliance installation

Required documents

  • RequiredPermit ApplicationBuilding permit application listing the mechanical contractor
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler
  • OptionalContractor LicenseValid Utah HVAC contractor license (Utah DOPL) — required unless owner-builder

Fee schedule

Fee typeAmountNotes
Mechanical Permit — Residential$100Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
Mechanical Permit — Non-Residential$153Herriman Master Fee Schedule, effective July 1, 2026
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Roofing Permit

Verified

Required for re-roofing in Herriman when triggering conditions are met per Herriman's Building FAQs, and for all roof conversions. The re-roof permit fee is a flat $118.

Verified 2026-06-30 · Source

Requirements

  • Re-roofing where existing roof is water-soaked or deteriorated
  • Re-roofing where existing roof is wood shake, slate, clay, cement, or asbestos-cement tile
  • Re-roofing where existing roof already has two or more layers of covering
  • All roof conversions (changing pitch) always require a permit
  • All commercial re-roofs require a permit

Required documents

  • RequiredPermit ApplicationScope of work, square footage, and material specifications
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not owner-builder
  • OptionalTruss Diagram and House LayoutRequired for roof conversions only — showing truss detail, bearing walls

Fee schedule

Fee typeAmountNotes
Re-Roof Permit$118Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems and battery storage in Herriman. The permit fee is a flat residential solar fee per the Master Fee Schedule.

Verified 2026-06-30 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation (e.g., Powerwall)
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways on the roof
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
  • OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power)

Fee schedule

Fee typeAmountNotes
Residential Solar Permit$118Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Deck Permit

Verified

Required for new deck construction or structural modification of existing decks in Herriman. The fee schedule lists separate flat fees for open decks ($139) and covered decks ($222).

Verified 2026-06-30 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks more than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredDeck PlansFraming plan with beam/joist sizes, post locations, and footing details
  • RequiredSite PlanShowing deck location with setbacks from property lines
  • OptionalLedger DetailConnection detail for attached decks per IRC R507.2

Fee schedule

Fee typeAmountNotes
Deck Permit (open/uncovered)$139Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
Covered Deck Permit$222Herriman Master Fee Schedule, effective July 1, 2026
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Herriman, including framing, electrical, plumbing, and mechanical work. The building permit fee uses the 'All Other' valuation-based Category B table in the Master Fee Schedule (Basement listed explicitly).

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (requires plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
  • RequiredElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations
  • OptionalMechanical PlanHVAC supply/return for new rooms, combustion air for furnace room
  • OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink

Fee schedule

Fee typeAmountNotes
Building Permit — 'All Other' Category B (Basement explicitly listed) — value $2,001 to $25,000$107 for first $2,000 value + $21.62 for each additional $1,000 to $25,000
Re-verified 2026-07-01 directly against the live Herriman Master Fee Schedule PDF (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf, effective July 1, 2026), page 1: the 'Building Permit - All… Show full citation

Re-verified 2026-07-01 directly against the live Herriman Master Fee Schedule PDF (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf, effective July 1, 2026), page 1: the 'Building Permit - All Other (B) (Addition, Basement, Non-Buildings, Remodel, Tenant Improvement, I-ADUs, etc.)' table explicitly names Basement and shows '$107 for 1st $2,000 value + $21.62 for each additional $1,000 to $25,000' for the $2,001–$25,000 tier — figures confirmed verbatim. Valuation-based fee grounded in a cited official source = verified per program rule.

Building Permit — Category B — value $2,000 or less$36 for first $500 value + $4.71 for each additional $5,000 valueHerriman Master Fee Schedule, effective July 1, 2026
Building Permit — Category B — value $25,001 to $50,000$605 for first $25,000 value + $15.60 for each additional $1,000 valueHerriman Master Fee Schedule, effective July 1, 2026
Plan Review Fee (Tenant Finish / Addition / Remodel)$183 minimum, up to 65% of building permit feeHerriman Master Fee Schedule, effective July 1, 2026
Electrical Permit (if applicable)$100 residentialHerriman Master Fee Schedule, effective July 1, 2026
Plumbing Permit (if applicable)$100 residentialHerriman Master Fee Schedule, effective July 1, 2026
Mechanical Permit (if applicable)$100 residentialHerriman Master Fee Schedule, effective July 1, 2026
State Surcharge1% of (Building Permit + Electrical + Plumbing + Mechanical) combinedHerriman Master Fee Schedule, effective July 1, 2026
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Fence Permit

Verified

Required for fence installation in Herriman. The permit fee is a flat $77 per the Herriman Master Fee Schedule, plus a $48 plan review fee.

Verified 2026-06-30 · Source

Requirements

  • New fence construction
  • Replacement of existing fence in a different location or at a different height

Required documents

  • RequiredSite PlanShowing fence location relative to property lines and any easements
  • OptionalFence DetailsHeight, material, and style specifications

Fee schedule

Fee typeAmountNotes
Fence Permit$77Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
Plan Review Fee — Fences$48Herriman Master Fee Schedule, effective July 1, 2026
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Demolition Permit

Verified

Required for partial or complete demolition of structures in Herriman, including utility disconnection coordination and any required asbestos surveys. The flat fee is $77 per the Master Fee Schedule.

Verified 2026-06-30 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls

Required documents

  • RequiredDemolition ApplicationScope of demolition, structure details, and disposal plan
  • OptionalAsbestos SurveyFederal NESHAP asbestos inspection required for structures that may contain asbestos-containing materials (typically pre-1980 construction)
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition

Fee schedule

Fee typeAmountNotes
Demolition Permit$77Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Swimming Pool Permit

Verified

Required for in-ground and above-ground swimming pool installation, hot tubs, and associated barriers in Herriman. Governed by the residential provisions of the 2021 International Swimming Pool & Spa Code (ISPSC). Flat fee is $298.

Verified 2026-06-30 · Source

Requirements

  • In-ground swimming pool construction
  • Above-ground pools with depth over 24 inches
  • Hot tubs and spas
  • Pool barrier/fence installation (required for all pools)

Required documents

  • RequiredPool PlansPool dimensions, depth, equipment location, and structural details
  • RequiredSite PlanPool location with setbacks, equipment pad, and barrier/fence layout
  • RequiredBarrier PlanPool fence/barrier details meeting IRC Chapter 31 and ISPSC requirements
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details

Fee schedule

Fee typeAmountNotes
Residential Pool Permit$298Herriman Master Fee Schedule, effective July 1, 2026 (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf)
Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Water Heater Permit

Verified

Required for water heater installation or replacement in Herriman. Pulled as a plumbing permit; Herriman's fee schedule does not list a separate water heater line item — the applicable fee is the residential plumbing permit flat fee of $100.

Verified 2026-07-01 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredPermit ApplicationWater heater type, size, fuel source, and location
  • OptionalEquipment SpecificationsManufacturer data sheet for the water heater
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not owner-builder on own primary residence

Fee schedule

Fee typeAmountNotes
Plumbing Permit (Residential) — covers water heater replacement$100
Re-verified 2026-07-01 directly against the live Herriman Master Fee Schedule PDF (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf, effective July 1, 2026), page 1: full line-by-line review of… Show full citation

Re-verified 2026-07-01 directly against the live Herriman Master Fee Schedule PDF (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf, effective July 1, 2026), page 1: full line-by-line review of the Building Fees section confirms no separate water-heater line item exists anywhere in the schedule; only 'Plumbing Permit: (Residential/Non-Residential) $100/$153' is listed, which is the fee that applies to water heater installs/replacements per Herriman's permitting practice (pulled as a plumbing permit). Grounded flat fee = verified per program rule.

Re-Inspection Fee$265Herriman Master Fee Schedule, effective July 1, 2026

Commercial Building Permit

Verified

Required for new non-residential (commercial) building construction in Herriman. Herriman's Master Fee Schedule publishes a dedicated "Building Permit - Non-Residential Buildings (A)" valuation table, separate from the single-family and multi-family residential tables. Plan review is 65% of the building permit fee, and a 1% state surcharge applies to the combined building, electrical, plumbing, and mechanical permit fees, same as residential.

Verified 2026-07-19 · Source

Requirements

  • New non-residential (commercial) building construction
  • Complete architectural and structural drawings
  • Site Plan Review approval from Planning (Commercial/Industrial Conditional Use) prior to or concurrent with the building permit
  • Energy code compliance documentation for the adopted commercial IECC

Required documents

  • RequiredBuilding Permit ApplicationSubmit to the Herriman City Building Department, 5355 W Herriman Main St
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, and structural details
  • RequiredCommercial/Industrial Site Plan ReviewPlanning Department site plan approval is required for new commercial and industrial development ahead of or alongside the building permit
  • OptionalEnergy Code Compliance DocumentationCOMcheck or equivalent documentation demonstrating compliance with the adopted commercial IECC

Fee schedule

Fee typeAmountNotes
Building Permit — Non-Residential, Building Value $100,000–$500,000$1,993 for the 1st $100,000 value + $12.40 for each additional $1,000 valueHerriman Master Fee Schedule, effective July 1, 2026 — "Building Permit - Non-Residential Buildings (A)" table (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf, page 1)
Building Permit — Non-Residential, Building Value $500,000–$1,000,000$6,954 for the 1st $500,000 value + $7.97 for each additional $1,000 valueHerriman Master Fee Schedule, effective July 1, 2026 — Building Permit - Non-Residential Buildings (A) table
Building Permit — Non-Residential, Building Value over $1,000,000$10,941 for the 1st $1,000,000 value + $6.20 for each additional $1,000 valueHerriman Master Fee Schedule, effective July 1, 2026 — Building Permit - Non-Residential Buildings (A) table. The published Non-Residential table begins at $100,000; no separate non-residential tier below $100,000 is printed.
Plan Review Fee — 1st Time Review65% of building permitHerriman Master Fee Schedule, effective July 1, 2026, Plan Review Fee section — "Residential/Commercial - 1st Time Review"
Electrical Permit (Non-Residential)$153.00Herriman Master Fee Schedule, effective July 1, 2026 — "Electrical Permit: (Residential/Non-Residential) $100/$153"; non-residential rate is higher than the $100 residential rate
Mechanical Permit (Non-Residential)$153.00Herriman Master Fee Schedule, effective July 1, 2026 — "Mechanical Permit: (Residential/Non-Residential) $100/$153"
Plumbing Permit (Non-Residential)$153.00Herriman Master Fee Schedule, effective July 1, 2026 — "Plumbing Permit: (Residential/Non-Residential) $100/$153"
Zoning Review Fee$109.00Herriman Master Fee Schedule, effective July 1, 2026, per occurrence
State Surcharge1% × (Building Permit + Electrical Permit + Plumbing Permit + Mechanical Permit)Herriman Master Fee Schedule, effective July 1, 2026
Reinspection Fee$265.00Herriman Master Fee Schedule, effective July 1, 2026, per occurrence
Fire Impact Fee — Non-Residential$0.43 per square footHerriman Master Fee Schedule, Impact Fees section, effective July 1, 2026
Police Impact Fee — Non-Residential$0.35 per square footHerriman Master Fee Schedule, Impact Fees section, effective July 1, 2026
Transportation Impact Fee — General Office Building (per 1,000 sq ft gross floor area)$2,332.18
Herriman Master Fee Schedule, Transportation Impact Fees, effective June 23, 2026 — representative commercial-use rate; Show full citation

Herriman Master Fee Schedule, Transportation Impact Fees, effective June 23, 2026 — representative commercial-use rate; the full table has distinct per-use rates (e.g. Shopping Center >300k sq ft: $8,779.45/1,000 sq ft gross leasable area, High-Turnover Restaurant: $17,614.21/1,000 sq ft)

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement (tenant finish) work in existing commercial buildings in Herriman. Herriman's Master Fee Schedule explicitly groups "Tenant Improvement" under its "Building Permit - All Other (B) (Addition, Basement, Non-Buildings, Remodel, Tenant Improvement, I-ADUs, etc.)" valuation table, which is separate from and generally lower than both the new-construction Non-Residential table and the Category (A) tables. Plan review for tenant finish carries its own minimum: $183 or up to 65% of the building permit fee, whichever governs.

Verified 2026-07-19 · Source

Requirements

  • Interior build-out, remodel, or finish work in an existing commercial tenant space
  • Floor plan showing existing and proposed layout, occupancy classification, and egress
  • Mechanical, electrical, and plumbing plans for the scope of work

Required documents

  • RequiredBuilding Permit ApplicationSubmit to the Herriman City Building Department, 5355 W Herriman Main St
  • RequiredConstruction PlansFloor plan showing scope of work, occupancy classification, and egress; structural details if load-bearing elements are affected

Fee schedule

Fee typeAmountNotes
Building Permit — Category (B) [Addition, Basement, Non-Buildings, Remodel, Tenant Improvement, I-ADUs], Value $2,001–$25,000$107 for the 1st $2,000 value + $21.62 for each additional $1,000 valueHerriman Master Fee Schedule, effective July 1, 2026 — "Building Permit - All Other (B)" table, which explicitly lists "Tenant Improvement" as a covered category (herriman.gov/uploads/files/6491/2026-Fee-Schedule.pdf, page 1)
Building Permit — Category (B), Value $25,001–$50,000$605 for the 1st $25,000 value + $15.60 for each additional $1,000 valueHerriman Master Fee Schedule, effective July 1, 2026 — Building Permit - All Other (B) table
Building Permit — Category (B), Value $50,001–$100,000$994 for the 1st $50,000 value + $10.81 for each additional $1,000 valueHerriman Master Fee Schedule, effective July 1, 2026 — Building Permit - All Other (B) table
Building Permit — Category (B), Value $100,001–$500,000$1,535 for the 1st $100,000 value + $8.65 for each additional $1,000 valueHerriman Master Fee Schedule, effective July 1, 2026 — Building Permit - All Other (B) table
Building Permit — Category (B), Value $500,001–$1,000,000$4,995 for the 1st $500,000 value + $7.34 for each additional $1,000 value or fraction thereofHerriman Master Fee Schedule, effective July 1, 2026 — Building Permit - All Other (B) table
Building Permit — Category (B), Value over $1,000,000$8,663 for the 1st $1,000,000 value + $5.64 for each additional $1,000 value or fraction thereofHerriman Master Fee Schedule, effective July 1, 2026 — Building Permit - All Other (B) table
Plan Review Fee — Tenant Finish, Addition/Remodel, etc.$183.00 minimum, up to 65% of building permitHerriman Master Fee Schedule, effective July 1, 2026, Plan Review Fee section — "Tenant Finish, Addition/Remodel, etc."
Commercial Rock/Masonry Finish Plan Review$185.00Herriman Master Fee Schedule, effective July 1, 2026, Plan Review Fee section — applies where the tenant finish scope includes commercial rock/masonry finish work
State Surcharge1% × (Building Permit + Electrical Permit + Plumbing Permit + Mechanical Permit)Herriman Master Fee Schedule, effective July 1, 2026
Reinspection Fee$265.00Herriman Master Fee Schedule, effective July 1, 2026, per occurrence

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Herriman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-16)Later version (2026-07-20) →View current record →All versions →

Permalink: /utah/salt-lake-county/herriman/as-of/2026-07-19/

Snapshot date: 2026-07-19

Commit: d0dcc20

Reproducible from PermitBase’s version-controlled dataset, commit d0dcc20.